EROSION CONTROL NARRATIVE

Similar documents
EROSION CONTROL NARRATIVE

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

Stage Discharge Tabulation for Only Orifice Flow

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

Continuing Education Course #101 Drainage Design with WinTR-55

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

WATER MANAGEMENT REPORT FOR PAGE ESTATES

Section 4: Model Development and Application

APPENDIX B WORKSHEETS & EXHIBITS

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti

Introduction and Organization of Instructions The following is a brief outline for use the skimmer, how to size and shape the basin, how to construct

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Stone Outlet Sediment Trap

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

TPDES: Soil, Erosion and Sedimentation Methods

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Stormwater Capacity Analysis for Westover Branch Watershed

APPENDIX B DRAINAGE REPORT

Hydrology Study Report

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

STORMWATER MANAGEMENT REPORT

Chapter 10 - Sacramento Method Examples

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Culvert and Pipe Phasing

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

Drainage Study for Civic Center Way

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

Basic Hydraulics June 2007

Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 5

Wellsgate Terrace SPECIFICATIONS.

Rock & Aggregate Drop Inlet Protection

Suitable Applications Sediment traps should be considered for use:

STORMWATER DESIGN CALCULATIONS

The Effect of Stormwater Controls on Sediment Transport in Urban Streams

D. B. G R A Y E N G I N E E R I N G I N C.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

Guide to the use of the Erosion and Sediment Control Evaluation Tool

OPEN CHANNEL FLOW. One-dimensional - neglect vertical and lateral variations in velocity. In other words, Q v = (1) A. Figure 1. One-dimensional Flow

Drainage Analysis. Appendix F

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

Rock Sizing for Small Dam Spillways

Module 5: Channel and Slope Protection Example Assignments

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

WATERVIEW EAST PRELIMINARY DRAINAGE REPORT EL PASO COUNTY, COLORADO

9. Flood Routing. chapter Two

Materials. Use materials meeting the following.

Objectives: After completing this assignment, you should be able to:

HYDROLOGY REPORT Tentative Tract No. 5978

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

APPENDIX B HYDROLOGY

CCR Rule Annual Inspection Report (cont.) 2

Open Channel Flow Part 2. Ch 10 Young, notes, handouts

Bushkill Creek 3 rd Street Dam Removal Analysis

Appendix E Guidance for Shallow Flooding Analyses and Mapping

DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE

Monitoring Considerations and Costs

Rock Sizing for Multi-Pipe & Culvert Outlets

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

Determination of Urban Runoff Using ILLUDAS and GIS

Rock Sizing for Batter Chutes

Rucker Pond. Background

Appendix B Equations and Examples

Chapter 7 Mudflow Analysis

DAVID NOEL KELLY CIVIL. David Noel Kelly :24:14-04'00'

GIS Enabled Automated Culvert Design

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Sediment Control Log (SCL)

Rock Sizing for Waterway & Gully Chutes

Caledon Villas Corporation

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design

Instream Sediment Control Systems

Section 3.0 Existing Systems Hydrology and Hydraulics

Chapter Introduction EROSION AND SEDIMENT CONTROL. Erosion

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load

Transcription:

EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment movement. This Erosion Control plan has been divided into four (4) phases; Initial, Interim, Final A and Final B. The initial phase will take place before construction activities begin on the site. The purpose of this phase will be to set up perimeter control construction best management practices (CBMP). This phase will consist of CBMPs such as silt fence, vehicle tracking control, concrete washout areas, stabilized staging areas, drainage swales/diversion ditches, and temporary sediment basins. These CBMPs will ensure proper sediment and erosion control as construction activities commence within the site. This phase will stay as is in the release plans dated June 12, 2017. After the Initial Phase erosion control CBMPs have been established, the Interim Erosion Control phase will begin. During this phase, construction activities such as clearing, grading, utility and infrastructure placement will begin. Rough cut street control will be in place during this phase once overlot grading is completed. In addition, as part of this phase, a temporary detention pond will be put in place, additional to the two sediment basins. All the Erosion Control design calculations for the temporary detention pond 0, sediment basin 1 and 2, as well as the temporary Diversion Ditch and swale have been included with this submittal. A basin map showing the tributary areas going into each of the sediment basins has been included in the report (see map SBTM). The percentage of imperviousness used to design the temporary detention pond 0 is 40% per the Residential % Imperviousness calculations, attached in this report. Diversion Ditch section EC A-A (see construction plans) has been sized for 28.30 cfs which is the proposed flow from design points 22, 25, 30, and 27 (see Drainage Map). Drainage Swale section EC C-C (see construction plans) has been sized for 30.20 cfs which is the sum of flows from proposed basins A- 23, A-24, A-25, A-26, A-27, and A-28 (see Drainage Map). Temporary Detention Pond 0 has been sized to required volume of 173,673.72 c.f. of storage (3.987 acre-feet), and the spillway weir has been designed for 167 cfs inflow, per the StormCAD results. Temporary Sediment Basin 1 and Sediment Basin 2, have been sized per UDFCD s sediment basin specifications of 3,600 cf/ac. Temporary Detention Pond 0 was designed with a temporary outlet structure as part of the roads draining to this pond will be paved before the Floodplain permit is granted. Sediment Basins 1 was designed to release the design volume through a 5 Floating Skimmer in no less than 48 hours per UDFCD s Sediment Basin Chapter 7, Volume 3. Sediment Basin 2 was designed as a standard sediment basin, using the SB-1 table in the above mention UDFCD chapter for a basin of 15 acres. This sediment basin will release through a riser pipe per the SB-1 table. The outlet structure, floating skimmer and riser pipe were designed in conformance with City of Thornton Standards and Specifications, UDFCD and State requirements. These CBMPs will ensure proper sediment and erosion control as construction activities commence within the site. The Final A phase will take place after the overlot grading has been completed. The Final A Phase will consists of the final stabilization of part of the site (see construction plans, paving area), including CBMPs such as surface roughening, mulching, permanent seeding, and inlet protection. While keeping previous CBMPs such as silt fence, and drainage swales/ditches. The Temporary Detention Pond 0 and the two Sediment Basins will remain during this phase. Final B phase will take place once the Floodplain permit has been issued and permanent stormwater facilities have been constructed, the temporary detention pond and sediment basins can be removed. As inlets/outlets are constructed, inlet/outlet protection will be placed. Final B phase will consists of the

final stabilization for the whole site, including CBMPs such as surface roughening, mulching, permanent seeding, and inlet protection. Applicable CBMPs will be kept in place until construction has been completed and final stabilization is complete. This phase will stay as is in the release plans dated June 12, 2017, called Final Erosion Control plans.

DETENTION BASIN STAGE-STORAGE TABLE BUILDER Project: Willow Bend 1 UD-Detention, Version 3.07 (February 2017) Basin ID: Temporary Detention Pond 0 Depth Increment = ft Optional Optional Example Zone Configuration (Retention Pond) Stage - Storage Stage Override Length Width Area Override Area Volume Volume Description (ft) Stage (ft) (ft) (ft) (ft^2) Area (ft^2) (acre) (ft^3) (ac-ft) Required Volume Calculation Top of Micropool -- 0.00 -- -- -- 254 0.006 Selected BMP Type = EDB -- 1.00 -- -- -- 15,152 0.348 7,552 0.173 Watershed Area = 47.89 acres -- 2.00 -- -- -- 34,044 0.782 31,961 0.734 Watershed Length = 3,218 ft -- 3.00 -- -- -- 37,100 0.852 67,873 1.558 Watershed Slope = 0.018 ft/ft -- 4.00 -- -- -- 40,264 0.924 106,555 2.446 Watershed Imperviousness = 40.00% percent -- 5.00 -- -- -- 43,528 0.999 148,451 3.408 Percentage Hydrologic Soil Group A = 0.0% percent -- 6.00 -- -- -- 46,893 1.077 193,661 4.446 Percentage Hydrologic Soil Group B = 0.0% percent -- 7.00 -- -- -- 50,043 1.149 242,129 5.559 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 8.00 -- -- -- 53,276 1.223 293,789 6.744 Desired WQCV Drain Time = 40.0 hours -- 9.00 -- -- -- 56,592 1.299 348,723 8.006 Location for 1-hr Rainfall Depths = Thornton - Civic Center Water Quality Capture Volume (WQCV) = 0.718 acre-feet Optional User Override Excess Urban Runoff Volume (EURV) = 1.780 acre-feet 1-hr Precipitation 2-yr Runoff Volume (P1 = 0.97 in.) = 1.350 acre-feet 0.97 inches 5-yr Runoff Volume (P1 = 1.38 in.) = 2.366 acre-feet 1.38 inches 10-yr Runoff Volume (P1 = 1.37 in.) = 2.703 acre-feet inches 25-yr Runoff Volume (P1 = 1.77 in.) = 4.442 acre-feet inches 50-yr Runoff Volume (P1 = 2.1 in.) = 5.753 acre-feet inches 100-yr Runoff Volume (P1 = 2.69 in.) = 8.116 acre-feet 2.69 inches 500-yr Runoff Volume (P1 = 3.4 in.) = 11.300 acre-feet inches Approximate 2-yr Detention Volume = 1.265 acre-feet Approximate 5-yr Detention Volume = 2.232 acre-feet Approximate 10-yr Detention Volume = 2.173 acre-feet Approximate 25-yr Detention Volume = 2.700 acre-feet Approximate 50-yr Detention Volume = 2.964 acre-feet Approximate 100-yr Detention Volume = 3.987 acre-feet Stage-Storage Calculation Zone 1 Volume (WQCV) = 0.718 acre-feet Zone 2 Volume (EURV- Zone 1) = 1.062 acre-feet Zone 3 Volume (100-year - Zones 1 & 2) = 2.207 acre-feet Total Detention Basin Volume = 3.987 acre-feet Initial Surcharge Volume (ISV) = user ft^3 Initial Surcharge Depth (ISD) = user ft Total Available Detention Depth (H total) = user ft Depth of Trickle Channel (H TC) = user ft Slope of Trickle Channel (S TC) = user ft/ft Slopes of Main Basin Sides (S main) = user H:V Basin Length-to-Width Ratio (R L/W) = user Initial Surcharge Area (A ISV) = user ft^2 Surcharge Volume Length (L ISV) = user ft Surcharge Volume Width (W ISV) = user ft Depth of Basin Floor (H FLOOR) = user ft Length of Basin Floor (L FLOOR) = user ft Width of Basin Floor (W FLOOR) = user ft Area of Basin Floor (A FLOOR) = user ft^2 Volume of Basin Floor (V FLOOR) = user ft^3 Depth of Main Basin (H MAIN) = user ft Length of Main Basin (L MAIN) = user ft Width of Main Basin (W MAIN) = user ft Area of Main Basin (A MAIN) = user ft^2 Volume of Main Basin (V MAIN) = user ft^3 Calculated Total Basin Volume (V total) = user acre-feet UD-Detention_v3.07-Sediment Pond 0.xlsm, Basin 5/23/2018, 12:33 PM

DETENTION BASIN STAGE-STORAGE TABLE BUILDER UD-Detention, Version 3.07 (February 2017) 20 400 1 User Defined Stage-Area Boolean for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA 0 Calc_S_TC 15 300 H_FLOOR L_FLOOR_OTHER Length, Width (ft.) 10 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.97 Zone 1 (WQCV) 1.97 Zone 1 (WQCV) 3.26 Zone 2 (EURV) 3.26 Zone 2 (EURV) 200 Area (sq.ft.) 5.57 Zone 3 (100-year 5.57 Zone 3 (100-year) 5 100 0 0 0.00 2.50 5.00 7.50 10.00 Stage (ft) Length (ft) Width (ft) Area (sq.ft.) 1.300 8.020 0.975 6.015 Area (acres) 0.650 4.010 Volume (ac-ft) 0.325 2.005 0.000 0.000 0.00 2.50 5.00 7.50 10.00 Stage (ft.) Area (acres) Volume (ac-ft) UD-Detention_v3.07-Sediment Pond 0.xlsm, Basin 5/23/2018, 12:33 PM

Detention Basin Outlet Structure Design Project: Willow Bend 1 Basin ID: Temporary Detention Pond 0 UD-Detention, Version 3.07 (February 2017) Stage (ft) Zone Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.97 0.718 Orifice Plate Zone 2 (EURV) 3.26 1.062 Orifice Plate Zone 3 (100-year) 5.57 2.207 Weir&Pipe (Restrict) Example Zone Configuration (Retention Pond) 3.987 Total User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft 2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate Invert of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 1.806E-02 ft 2 Depth at top of Zone using Orifice Plate = 3.26 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = N/A inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 2.60 sq. inches (diameter = 1-13/16 inches) Elliptical Slot Area = N/A ft 2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.10 0.43 0.76 1.09 1.42 1.75 2.08 2.41 Orifice Area (sq. inches) 2.60 2.60 2.60 2.60 2.60 2.60 2.60 2.60 Row 9 (optional) Stage of Orifice Centroid (ft) 2.74 Orifice Area (sq. inches) 2.60 Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) User Input: Vertical Orifice (Circular or Rectangular) Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft 2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped) Calculated Parameters for Overflow Weir Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 4.50 N/A ft (relative to basin bottom at Stage = 0 ft) Height of Grate Upper Edge, H t = 4.50 N/A feet Overflow Weir Front Edge Length = 5.67 N/A feet Over Flow Weir Slope Length = 2.92 N/A feet Overflow Weir Slope = 0.00 N/A H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area = 3.23 N/A should be > 4 Horiz. Length of Weir Sides = 2.92 N/A feet Overflow Grate Open Area w/o Debris = 13.25 N/A ft 2 Overflow Grate Open Area % = 80% N/A %, grate open area/total area Overflow Grate Open Area w/ Debris = 6.62 N/A ft 2 Debris Clogging % = 50% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft) Outlet Orifice Area = 4.11 N/A ft 2 Outlet Pipe Diameter = 36.00 N/A inches Outlet Orifice Centroid = 0.97 N/A feet Restrictor Plate Height Above Pipe Invert = 20.30 inches Half-Central Angle of Restrictor Plate on Pipe = 1.70 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal) Calculated Parameters for Spillway Spillway Invert Stage= 6.00 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.60 feet Spillway Crest Length = 66.00 feet Stage at Top of Freeboard = 7.60 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 1.19 acres Freeboard above Max Water Surface = 1.00 feet Routed Hydrograph Results Design Storm Return Period = WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) = 0.53 1.07 0.97 1.38 1.37 1.77 2.10 2.69 3.40 Calculated Runoff Volume (acre-ft) = 0.718 1.780 1.350 2.366 2.703 4.442 5.753 8.116 11.300 OPTIONAL Override Runoff Volume (acre-ft) = Inflow Hydrograph Volume (acre-ft) = 0.717 1.780 1.350 2.366 2.703 4.443 5.753 8.111 11.293 Predevelopment Unit Peak Flow, q (cfs/acre) = 0.00 0.00 0.01 0.08 0.18 0.49 0.68 1.03 1.53 Predevelopment Peak Q (cfs) = 0.0 0.0 0.4 3.6 8.6 23.5 32.7 49.5 73.1 Peak Inflow Q (cfs) = 8.8 21.7 16.5 28.7 32.7 53.3 68.7 95.9 132.2 Peak Outflow Q (cfs) = 0.5 1.0 0.8 1.2 1.2 15.9 30.1 44.3 96.4 Ratio Peak Outflow to Predevelopment Q = N/A N/A N/A 0.3 0.1 0.7 0.9 0.9 1.3 Structure Controlling Flow = Plate Plate Plate Plate Plate Overflow Grate 1 Overflow Grate 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) = N/A N/A N/A N/A N/A 1.1 2.2 3.2 3.3 Max Velocity through Grate 2 (fps) = N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) = 38 49 45 53 55 55 53 49 45 Time to Drain 99% of Inflow Volume (hours) = 43 57 53 61 64 65 63 60 57 Maximum Ponding Depth (ft) = 1.86 3.06 2.59 3.69 4.03 4.99 5.30 5.99 6.40 Area at Maximum Ponding Depth (acres) = 0.72 0.86 0.82 0.90 0.93 1.00 1.02 1.08 1.10 Maximum Volume Stored (acre-ft) = 0.636 1.609 1.215 2.154 2.474 3.388 3.701 4.435 4.871

FLOW [cfs] 160 140 120 100 80 60 40 20 Detention Basin Outlet Structure Design UD-Detention, Version 3.07 (February 2017) COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1 Vert Orifice 2 500YR Count_Underdrain IN = 0 0.11 eter = 3/8 inch) 2 1 1 500YR OUT Count_WQPlate = 1 0.14 eter = 7/16 inch) 100YR IN 100YR Count_VertOrifice1 OUT = 0 0.18 eter = 1/2 inch) Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean 50YR Count_VertOrifice2 IN = 0 0.24 eter = 9/16 inch) 4 1 5yr, <72hr 0 50YR OUT Count_Weir1 = 1 0.29 eter = 5/8 inch) >5yr, <120hr 0 25YR IN Count_Weir2 = 0 0.36 er = 11/16 inch) Max Depth Row 25YR OUT 10YR Count_OutletPipe1 IN = 1 0.42 eter = 3/4 inch) WQCV 186 Watershed Constraint Check 10YR Count_OutletPipe2 OUT = 0 0.50 er = 13/16 inch) 2 Year 260 Slope 0.018 COUNTA_2 5YR (Standard IN FSD Setup)= 1 0.58 eter = 7/8 inch) EURV 307 Shape 4.96 MaxPondDepth_Error? 5YR OUT FALSE 0.67 er = 15/16 inch) 5 Year 370 2YR IN Hidden Parameters & Calculations 0.76 meter = 1 inch) 10 Year 404 Spillway Depth 2YR OUT 0.86 = 1-1/16 inches) 25 Year 500 0.60 EURV IN WQ Plate Flow at 100yr depth = 1.67 0.97 = 1-1/8 inches) 50 Year 531 EURV OUT CLOG #1= 40% 1.08 = 1-3/16 inches) 100 Year 600 1 Z1_Boolean WQCV IN C dw #1 = 1.15 1.20 = 1-1/4 inches) 500 Year 641 1 Z2_Boolean WQCV OUT C do #1 = 1.07 1.32 = 1-5/16 inches) Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.000 1.45 = 1-3/8 inches) 1 Opening Message CLOG #2= #VALUE! 1.59 = 1-7/16 inches) Draintime Running C dw #2 = #VALUE! 1.73 = 1-1/2 inches) Outlet Boolean Outlet Rank Total (1 to 4) C do #2 = #VALUE! 1.88 = 1-9/16 inches) Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = #VALUE! 2.03 = 1-5/8 inches) Vertical Orifice 2 0 0 Boolean 0 Underdrain Q at 100yr depth = 0.00 2.20 1-11/16 inches) Overflow Weir 1 1 1 0 Max Depth 0.1 1 10 VertOrifice1 Q at 100yr depth = 0.00 2.36 = 1-3/4 inches) Overflow Weir 2 TIME [hr] 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54 1-13/16 inches) Outlet Pipe 1 1 1 0 Freeboard PONDING DEPTH [ft] 7 EURV_draintime_user = 2.72 = 1-7/8 inches) Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 500YR 0 2.90 1-15/16 inches) 0 Spillway Length CountA_3 100YR(EURV & 100yr) = 1 3.09 eter = 2 inches) Button Visibility Boolean FALSE Time Interval 6 5 4 3 CountA_4 50YR (100yr Only) = 1 3.29 gular openings) 1 Button_Trigger 25YR 10YR 5YR 2YR EURV WQCV 0 Underdrain 1 WQCV Plate 0 EURV-WQCV Plate 0 EURV-WQCV VertOrifice 1 Outlet 90% Qpeak 0 Outlet Undetained 2 1 0 0.1 1 10 100 DRAIN TIME [hr] AREA [ft^2], VOLUME [ft^3] 400,000 350,000 300,000 250,000 200,000 150,000 100,000 User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] 1,400.00 1,200.00 1,000.00 800.00 600.00 400.00 OUTFLOW [cfs] 50,000 200.00 0 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 PONDING DEPTH [ft] S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound

Storm Inflow Hydrographs Detention Basin Outlet Structure Design Outflow Hydrograph Workbook Filename: UD-Detention, Version 3.07 (February 2017) The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program. SOURCE WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK Time Interval TIME WQCV [cfs] EURV [cfs] 2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs] 6.74 min 0:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:06:44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydrograph 0:13:29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Constant 0:20:13 0.39 0.93 0.72 1.23 1.39 2.20 2.76 3.66 4.74 0.742 0:26:58 1.05 2.55 1.95 3.36 3.82 6.13 7.78 10.59 14.14 0:33:42 2.70 6.55 5.00 8.62 9.81 15.74 19.98 27.21 36.33 0:40:26 7.42 17.98 13.74 23.67 26.93 43.15 54.73 74.43 99.23 0:47:11 8.82 21.67 16.49 28.68 32.72 53.33 68.66 95.93 132.20 0:53:55 8.42 20.74 15.77 27.48 31.37 51.36 66.45 93.67 130.54 1:00:40 7.67 18.88 14.36 25.01 28.55 46.80 60.68 85.82 120.07 1:07:24 6.85 16.94 12.87 22.48 25.67 42.16 54.70 77.42 108.38 1:14:08 5.92 14.72 11.16 19.57 22.38 36.90 47.96 68.06 95.53 1:20:53 5.16 12.78 9.70 17.03 19.49 32.23 41.93 59.57 83.69 1:27:37 4.67 11.59 8.80 15.42 17.64 29.08 37.76 53.48 74.88 1:34:22 3.86 9.66 7.31 12.87 14.73 24.39 31.77 45.23 63.70 1:41:06 3.16 7.96 6.01 10.63 12.17 20.22 26.37 37.60 53.02 1:47:50 2.43 6.23 4.68 8.35 9.59 16.03 21.00 30.11 42.68 1:54:35 1.82 4.74 3.54 6.39 7.35 12.40 16.29 23.46 33.37 2:01:19 1.31 3.48 2.58 4.72 5.44 9.27 12.24 17.72 25.32 2:08:04 1.02 2.64 1.97 3.57 4.11 6.94 9.13 13.14 18.67 2:14:48 0.84 2.15 1.61 2.90 3.33 5.58 7.30 10.45 14.78 2:21:32 0.71 1.82 1.37 2.44 2.81 4.69 6.14 8.77 12.37 2:28:17 0.62 1.59 1.20 2.13 2.45 4.08 5.33 7.59 10.69 2:35:01 0.56 1.43 1.07 1.91 2.19 3.65 4.76 6.77 9.51 2:41:46 0.52 1.31 0.99 1.75 2.01 3.34 4.35 6.18 8.67 2:48:30 0.38 0.97 0.73 1.30 1.49 2.49 3.27 4.71 6.70 2:55:14 0.28 0.70 0.53 0.94 1.08 1.81 2.37 3.40 4.83 3:01:59 0.20 0.52 0.39 0.70 0.80 1.34 1.75 2.52 3.58 3:08:43 0.15 0.38 0.29 0.52 0.59 0.99 1.30 1.87 2.66 3:15:28 0.11 0.28 0.21 0.37 0.43 0.73 0.96 1.38 1.97 3:22:12 0.08 0.20 0.15 0.27 0.31 0.52 0.69 1.00 1.43 3:28:56 0.05 0.14 0.11 0.19 0.22 0.38 0.50 0.72 1.03 3:35:41 0.04 0.10 0.07 0.13 0.15 0.27 0.35 0.51 0.74 3:42:25 0.02 0.06 0.04 0.08 0.10 0.17 0.23 0.34 0.49 3:49:10 0.01 0.03 0.02 0.05 0.05 0.10 0.13 0.20 0.29 3:55:54 0.00 0.01 0.01 0.02 0.02 0.05 0.06 0.10 0.15 4:02:38 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.03 0.05 4:09:23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:16:07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:22:52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:29:36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:36:20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:43:05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:49:49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:56:34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:03:18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:10:02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:16:47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:23:31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:30:16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:37:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:43:44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:50:29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:57:13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:03:58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:10:42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:17:26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:24:11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:30:55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:37:40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:44:24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:51:08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:57:53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:04:37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:11:22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:18:06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:24:50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:31:35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:38:19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:45:04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:51:48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7:58:32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8:05:17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UD-Detention, Version 3.07 (February 2017) Summary Stage-Area-Volume-Discharge Relationships The user can create a summary S-A-V-D by entering the desired stage increments and the remainder of the table will populate automatically. The user should graphically compare the summary S-A-V-D table to the full S-A-V-D table in the chart to confirm it captures all key transition points. Stage - Storage Description Detention Basin Outlet Structure Design Stage Area Area Volume Volume Total Outflow [ft] [ft^2] [acres] [ft^3] [ac-ft] [cfs] For best results, include the stages of all grade slope changes (e.g. ISV and Floor) from the S-A-V table on Sheet 'Basin'. Also include the inverts of all outlets (e.g. vertical orifice, overflow grate, and spillway, where applicable).

PROJECT : Willow Bend 1 DATE : 3/30/2018 PROJECT NO. : 13023 BY : IC Grate Capacity Calculations - TEMPORARY DETENTION POND 0 A. Verify grate can pass the 100-year flow: Q 100 = 36.30 cfs Determine the area necessary to pass the required flow through grate: A = Q / (C*(2GH) 1/2 ) Q: 36.30 cfs C: 0.65 G: 32.2 ft/s 2 H: 2.30 ft A open = 4.59 ft 2 (Required) Try: CDOT Close Mesh Grate Grate size: (L*W) 5.67 X 2.92 ft Area of grate = 16.56 Ft 2 Bars Across Length Bar size: 4.0 in deep X 0.38 in wide spaced at 2.38 inches OC No. of bars = [(W ft * 12 in/ft) / Sp(in)] + 1 = 16 Bars Area of bars = L Bar * W Bar * Number of bars = 2.84 ft 2 Bars Across Width Bar size: 0.375 in deep X 0.38 in wide spaced at 8 inches OC No. of bars = [(W ft * 12 in/ft) / Sp(in)] + 1 = 5 Bars Area of bars = L Bar * W Bar * Number of bars = 0.46 ft 2 Area of grate open to flow = A Grate - A Bars = 13.27 ft 2 % Open = 80.1% Area** 6.63 Ft 2 > 4.59 Ft 2 Grate can pass the required flow ** 50% reduction of the open area of the inlet has been applied for a clogging factor

Chapter 12 Storage TEMPORARY DETENTION POND #0 RIPRAP RUNDOWN Figure 12-21. Embankment protection details and rock sizing chart (adapted from Arapahoe County) September 2017 Urban Drainage and Flood Control District 12-33 Urban Storm Drainage Criteria Manual Volume 2

Chapter 12 Storage TEMPORARY DETENTION POND #0 SPILLWAY RIPRAP Figure 12-21. Embankment protection details and rock sizing chart (adapted from Arapahoe County) September 2017 Urban Drainage and Flood Control District 12-33 Urban Storm Drainage Criteria Manual Volume 2

Determination of Culvert Headwater and Outlet Protection Project: Basin ID: Willow Bend 1 Sediment Pond 0 - Outfall Soil Type: Choose One: Sandy Non-Sandy Design Information (Input): Design Discharge Q = 36.3 cfs Circular Culvert: Barrel Diameter in Inches D = 36 inches Inlet Edge Type (Choose from pull-down list) Box Culvert: OR Barrel Height (Rise) in Feet Height (Rise) = ft Barrel Width (Span) in Feet Width (Span) = ft Inlet Edge Type (Choose from pull-down list) Number of Barrels No = 1 Inlet Elevation Elev IN = 5233 ft Outlet Elevation OR Slope Elev OUT = 5232.31 ft Culvert Length L = 138.8 ft Manning's Roughness n = 0.013 Bend Loss Coefficient k b = 0 Exit Loss Coefficient k x = 1 Tailwater Surface Elevation Elev Y t = ft Max Allowable Channel Velocity V = 5 ft/s Required Protection (Output): Tailwater Surface Height Y t = 1.20 ft Flow Area at Max Channel Velocity A t = 7.26 ft 2 Culvert Cross Sectional Area Available A = 7.07 ft 2 Entrance Loss Coefficient k e = 0.20 Friction Loss Coefficient k f = 1.00 Sum of All Losses Coefficients k s = 2.20 ft Culvert Normal Depth Y n = 1.97 ft Culvert Critical Depth Y c = 1.96 ft Tailwater Depth for Design d = 2.48 ft Adjusted Diameter OR Adjusted Rise D a = - ft Expansion Factor 1/(2*tan(Θ)) = 5.32 Flow/Diameter 2.5 OR Flow/(Span * Rise 1.5 ) Q/D^2.5 = 2.33 ft 0.5 /s Froude Number Fr = 0.98 Tailwater/Adjusted Diameter OR Tailwater/Adjusted Rise Yt/D = 0.40 Inlet Control Headwater HW I = 2.89 ft Outlet Control Headwater HW O = 2.69 Design Headwater Elevation HW = 5,235.89 ft Headwater/Diameter OR Headwater/Rise Ratio HW/D = 0.96 Minimum Theoretical Riprap Size d 50 = 6 in Nominal Riprap Size d 50 = 6 in UDFCD Riprap Type Type = VL Length of Protection L p = 17 ft Width of Protection T = 7 ft

Channel Report Hydraflow Express Extension for Autodesk AutoCAD Civil 3D by Autodesk, Inc. Wednesday, May 23 2018 TEMPORARY DETENTION POND 0 - OUTFALL PIPE ANALYSIS Circular Diameter (ft) = 3.00 Invert Elev (ft) = 5232.31 Slope (%) = 0.50 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 36.30 Highlighted Depth (ft) = 1.98 Q (cfs) = 36.30 Area (sqft) = 4.96 Velocity (ft/s) = 7.31 Wetted Perim (ft) = 5.70 Crit Depth, Yc (ft) = 1.96 Top Width (ft) = 2.84 EGL (ft) = 2.81 Elev (ft) Depth (ft) Section 5236.00 3.69 5235.00 2.69 5234.00 1.69 5233.00 0.69 5232.00-0.31 5231.00-1.31 0 1 2 3 4 5 Reach (ft)

PROJECT : Willow Bend DATE : 5/22/2018 PROJECT NO. : 13023 BY : IC Sediment Basin Calculations - TEMP.SED. BASIN #1 Required Sediment Basin Volume Tributary Area (ac) 18.12 Provided Volume Contour Elevation Actual Elevation 0.00 5233.00 1.00 5234.00 2.00 5235.00 3.00 5236.00 4.00 5237.00 5.00 5238.00 6.00 5239.00 Total Required Volume = 1.50 ac-ft ( Volume = 3600 CF/AC ) = 65,232 ft3 = 32,616 ft3 (50% Volume) Ft 2 1/3 (A1 + A2 + (A1A2) 1/2 ) D Total Volume (ft 3 ) Total Volume (ac-ft) 12,788 0 0.00 14,782 13,773 13,773 0.32 16,887 15,823 29,596 0.68 19,164 18,014 47,609 1.09 21,548 20,344 67,954 1.56 23,963 22,745 90,698 2.08 26,479 Elevation Depth Pond Overflow Crest Elev= 5237.00 4.00 50% Sediment Basin Water Elev= 5235.17 2.17 Sediment Basin Water elevation= 5236.88 3.88 JANSEN STRAWN CONSULTING ENGINEERS 1165 S. Pennsylvania St. - Denver, CO 80210 p: 303.561.3333 f: 303.561.3339

PROJECT : Willow Bend DATE : 5/22/2018 PROJECT NO. : 13023 BY : IC Overflow Weirs - TEMP.SED. BASIN #1 Pond Weir Tributary Area (ac) Depth (100-yr) Basin Slope (%) Basin Length (ft) 18.12 2.69 2.08% 1683.00 Soil Type %: A= 0.00% B= 0.00% C= 100.00% Max Allowable Release Rate Q 100 = 19.34 cfs (q= 1.19 cfs/ac) aq (Equation 12-5) Weir Equation=>Q=CLH 3/2 Try Weir Release: Q 100 = 19.34 cfs C= 3.00 L= 28 ft Flow Depth= 0.38 ft USE: 28' JANSEN STRAWN CONSULTING ENGINEERS 990 S. Broadway - Denver, CO 80209 p: 303.561.3333 f: 303.561.3339

5 Faircloth Skimmer Cut Sheet J. W. Faircloth & Son, Inc. www.fairclothskimmer.com 6 4 Coupling Sch 40 INCLUDED coupling But connection not attached 1 5 pvc float 2 Vent with Silver tip Inlet 5 Aluminum straps suspending inlet 4 Sch 40 SOLID pvc barrel or arm SUPPLIED BY USER 3 40 2 40 2 4 hose, ss clamps 4 threaded male nipple on outlet end 1 5 inlet extension 4 4 HEAD on center of inlet and orifice Skimmer shown in floating position 1. Hose attached to outlet using the threaded 4 nipple. Typical methods used: on a metal structure a steel stubout welded on the side at the bottom to the side with a 4 threaded coupling or reducers; on a concrete structure with a hole or orifice at the bottom, use a steel plate with a hole cut in it and coupling welded to it that will fit over the hole in the concrete and bolted to the structure with sealant. 2. Dimensions are approximate, not intended as plans for construction. 3. Barrel (solid, not foam core pipe) should be 1.4 times the depth of water with a minimum length of 8 so the inlet can be pulled to the side for maintenance. If more than 10 long weight may have to be added to inlet to counter the increased buoyancy. 4. Inlet tapers down from 5 maximum inlet to a 4 barrel and hose. Barrel is smaller to reduce buoyancy and tendency to lift inlet but is sufficient for flow through inlet because of slope. The inlet orifice can be reduced using the plug and cutter provided to control the outflow rate. 5. Inlet is 8 pipe between the straps with slots cut in the inlet and aluminum screen door (smaller than shown in illustration) for access to the 5 inlet and orifice inside. 6. Capacity 32,832 cubic feet per day maximum with 5 inlet and 4 head. Inlet can be reduced by installing a smaller orifice using the plug and cutter provided to adjust flow rate for the particular basin volume and drawdown time required. 7. Shipped assembled. User glues inlet extension and barrel, installs vent, cuts orifice in plug and attaches to outlet pipe or structure. Includes flexible hose, rope, orifice cutter, etc. 5inchCut TM 11-07 November 14, 2007

Chapter 12 Storage TEMPORARY SEDIMENT POND #1 RIPRAP RUNDOWN Figure 12-21. Embankment protection details and rock sizing chart (adapted from Arapahoe County) September 2017 Urban Drainage and Flood Control District 12-33 Urban Storm Drainage Criteria Manual Volume 2

Chapter 12 Storage TEMPORARY SEDIMENT POND #1 SPILLWAY RIPRAP Figure 12-21. Embankment protection details and rock sizing chart (adapted from Arapahoe County) September 2017 Urban Drainage and Flood Control District 12-33 Urban Storm Drainage Criteria Manual Volume 2

Channel Report Hydraflow Express Extension for Autodesk AutoCAD Civil 3D by Autodesk, Inc. Friday, Apr 13 2018 TEMPORARY DIVERSION DITCH EC-A-A TO SEDIMENT BASIN #1 Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 10.00 Slope (%) = 2.06 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 28.30 Highlighted Depth (ft) = 0.85 Q (cfs) = 28.30 Area (sqft) = 7.01 Velocity (ft/s) = 4.04 Wetted Perim (ft) = 12.67 Crit Depth, Yc (ft) = 0.83 Top Width (ft) = 12.50 EGL (ft) = 1.10 Elev (ft) Depth (ft) Section 13.00 3.00 12.50 2.50 12.00 2.00 11.50 1.50 11.00 1.00 10.50 0.50 10.00 0.00 9.50-0.50 0 5 10 15 20 25 30 35 Reach (ft)

PROJECT : Willow Bend DATE : 5/22/2018 PROJECT NO. : 13023 BY : IC Sediment Basin Calculations - TEMP.SED. BASIN #2 Required Sediment Basin Volume Tributary Area (ac) 15.53 Provided Volume Contour Elevation Actual Elevation 0.00 5229.00 1.00 5230.00 2.00 5231.00 3.00 5232.00 4.00 5233.00 5.00 5234.00 6.00 5235.00 Total Required Volume = 1.28 ac-ft ( Volume = 3600 CF/AC ) = 55,908 ft3 = 27,954 (50% Volume) Ft 2 1/3 (A1 + A2 + (A1A2) 1/2 ) D Total Volume (ft 3 ) Total Volume (ac-ft) 10,730 0 0.00 12,531 11,619 11,619 0.27 14,433 13,471 25,090 0.58 16,436 15,424 40,513 0.93 18,539 17,477 57,990 1.33 20,742 19,630 77,620 1.78 23,047 21,884 99,505 2.28 Elevation Depth Pond Overflow Crest Elev= 5233.00 4.00 50% Sediment Basin Water Elev= 5231.19 2.19 Sediment Basin Water elevation= 5232.88 3.88 JANSEN STRAWN CONSULTING ENGINEERS 1165 S. Pennsylvania St. - Denver, CO 80210 p: 303.561.3333 f: 303.561.3339

PROJECT : Willow Bend DATE : 5/22/2018 PROJECT NO. : 13023 BY : IC Overflow Weirs Pond Weir Tributary Area (ac) Depth (100-yr) Basin Slope (%) Basin Length (ft) 15.53 2.69 1.88% 1592.00 Soil Type %: A= 0.00% B= 0.00% C= 100.00% Max Allowable Release Rate Q 100 = 16.06 cfs (q= 1.15 cfs/ac) aq (Equation 12-5) Weir Equation=>Q=CLH 3/2 Try Weir Release: Q 100 = 16.06 cfs C= 3.00 L= 22 ft Flow Depth= 0.39 ft USE: 22' JANSEN STRAWN CONSULTING ENGINEERS 990 S. Broadway - Denver, CO 80209 p: 303.561.3333 f: 303.561.3339

Channel Report Hydraflow Express Extension for Autodesk AutoCAD Civil 3D by Autodesk, Inc. Tuesday, May 22 2018 TEMPORARY SWALE EC-C-C TO SEDIMENT BASIN #2 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 1.20 Invert Elev (ft) = 10.00 Slope (%) = 1.52 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 30.20 Highlighted Depth (ft) = 1.08 Q (cfs) = 30.20 Area (sqft) = 7.99 Velocity (ft/s) = 3.78 Wetted Perim (ft) = 13.01 Crit Depth, Yc (ft) = 1.00 Top Width (ft) = 12.80 EGL (ft) = 1.30 Elev (ft) Depth (ft) Section 12.00 2.00 11.50 1.50 11.00 1.00 10.50 0.50 10.00 0.00 9.50-0.50 0 2 4 6 8 10 12 14 16 18 Reach (ft)

Sediment Basin (SB) SC-7 August 2013 Urban Drainage and Flood Control District SB-5 Urban Storm Drainage Criteria Manual Volume 3

SC-7 Sediment Basin (SB) SB-6 Urban Drainage and Flood Control District August 2013 Urban Storm Drainage Criteria Manual Volume 3

Sediment Basin (SB) SC-7 August 2013 Urban Drainage and Flood Control District SB-7 Urban Storm Drainage Criteria Manual Volume 3