PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO

Similar documents
CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA

CITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

ATTACHMENT A. Item #1 Minimum Bid: $3, Parcel No Assessed Value: $10,000 Acreage: 0

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

CHAPTER 5 DOWNTOWN DEVELOPMENT AUTHORITY

VILLAGE OF ORLAND PARK

TOWN OF SEVERANCE, COLORADO. NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning

Proclaiming Certain Lands as Reservation for the Confederated Tribes of the

VILLAGE OF ORLAND PARK

73-2 have been satisfied; and

C-62 RELATED ACTS. Priv. Acts 1955, Ch. 275, "An Act to redefine the boundaries of the City of Belle Meade... C-63

1 i12 4( H nnd Fl) (2 F Fxhtht I} Pa:e of

NOTICE OF PUBLIC HEARING GREEN MEADOWS ANNEXATION (Formally Known as Rude Annexation) (File No. A-17-04)

APPLICATION FOR SIMPLE CHANGE IN SURFACE POINT OF DIVERSION PURSUANT TO (3.5), C.R.S.

ATTACHMENT 10 WRITTEN DIRECT NOTICE TO ELECTRIC UTILITIES WITHIN FIVE MILES

The Dance Hall Goes in What School District?

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to

Sacramento County Recorder Craig A, Kramer, Clerk/Recorder BOOK PAGE 0708

GIS Monroe Geographic Information System March 14, 2018

Transcontinental Gas Pipe Line Corporation Compliance Filing in Docket No. RP05-369

Summary of Legal Descriptions

For Sale on Bids. Open House By Appointment

Township 34 North, Range 9 West, NMPM (NUL) Section 3: E/2

TOWNSHIP OF SCHUYUULL COUNTY OF SCRUYLMLL RESOLUTIONS ADOPTED 7.9 RESOLUTION

Advanced Geologic Exploration, Inc.

Name of Applicant Mailing Address address Telephone Number

CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO

WHEREAS, a zoning district map and legaldescription for the subject property are provided in Ordinance Exhibits A and B, respectively; and

Visitation: Recreation and Tourism Model

REQUEST FOR PROPOSALS CLOSING DATE:

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS

Request Applicant Owner Zoning Location Attachments Site and Surrounding Area Direction Surrounding Zoning Surrounding Land Use Access

THE CORPORATION OF THE CITY OF GRAND FORKS BYLAW NO. 2049

APPLICATION FOR CHANGE OF WATER RIGHT

A. My name is Watsun Randolph and my business address is 45 Horner Street Warrenton

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

Legislation Passed June 9, 2015

APPLICATION FOR CONDITIONAL ABSOLUTE WATER STORAGE RIGHT

Public Land Survey System Knowledge Remains an Important Skill

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF LANE COUNTY, OREGON

PLANNING COMMISSION AGENDA

D C P\J C, D CD P\J R

WHITEHEAD 30 (10) (570) (30) (10) & TRACY MILLER.

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005

South Alamito Creek Ranch

TABLE OF CONTENTS LIST OF FIGURES PROJECT LOCATION MAP LIST OF APPENDICES WATER DISTRICT MAP & DESCRIPTION OPINION OF PROBABLE COSTS

PUP R-4 R-3 R-4 R-3 R-4 B-1 B-3 B-1 B-1 B-1 R-3 C-1 R-3 R-3 A-1 M-2C SUBJECT PROPERTY B-3 R-5 B-3C B-3C B-3C B-3C B-2.

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

10/25/2017. Overview of the issue What is meandering What is an island Research and Analysis Conclusion

132 Imperial Road North Bay, Ontario P1A 4M5. Subject: Tower Site Proposed for Trout Lake, 1427 Owl s Nest Road, Township of Hoskin

Bedrock Associated with the Ranch House at the Tallgrass Prairie National Preserve, Chase County, Kansas

National Oilwell Varco Survey Report

2. That the designated areas consists of approximately acres, the population in the subject area is zero, and the land use type is industrial.

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

/O/U / 013 om NO

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO

Sustainable Groundwater Management Act: Initial Notification of a Proposed Basin Boundary Modification

Analysis of Change in Land Use around Future Core Transit Corridors: Austin, TX, Eric Porter May 3, 2012

NCEES FS Practice Exam

BEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA CAUSE CD NO. APPLICANT: CONTINENTAL RESOURCES, INC.

FOR SALE +/- 419 ACRES ¼ Mile South of Alliance Airport

Interceptor Surveying and Mapping (ISM) Pre-proposal Meeting

Flood Scenario Worksheet

El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al.

Butte County Board of Supervisors Agenda Transmittal

NORTHWEST MENARD COUNTY, TEXAS Prepared for the City of Menard

FINAL AESTHETICS RESOURCES STUDY PLAN. Takatz Lake Hydroelectric Project, FERC No Prepared by: City and Borough of Sitka Electric Department

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015

June 26, Federal. Commissioners: Re: CP Pursuant to. the. Pursuant to. ordering

Technical Memorandum #2 Future Conditions


BEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA OPERATING LLC LOCATION EXCEPTION. Report of the Administrative Law Judge

AGENDA CLAYTON BOARD OF ADJUSTMENT

[LLAZC X.L EA0000; AZ SRP ] Notice of Temporary Closures: Selected Public Lands in La Paz County, AZ

El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al., CP79-224, and CP15-516

SHIPPING SAFETY CONTROL ZONES ORDER [FEDERAL]

STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT

REQUEST FOR PROPOSALS

BOARD OF COUNTY COMMISSIONERS SARPY COUNTY, NEBRASKA

MONTGOMERY COUNTY PLANNING DEPARTMENT

Jo Daviess County Geographic Information System

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015

A regular meeting of the Village of Victor Planning Board was held on Wednesday, July 26, 2017, at the Village Hall, 60 East Main Street.

MAPS AND THEIR CLASSIFICATION

Boardman to Hemingway Transmission Line Project

Texas Land Survey Maps For Wise County By Gregory A. Boyd READ ONLINE

Texas Statewide Mesonet Network (TexMesonet) Dr. Kantave Greene 11/15/17

Elk River Resources, LLC Andrews County, TX Sec 24, Blk 12, University Land Survey Wapiti H Wellbore #1 Survey: MWD Surveys (QES) QES Survey Re

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2011/2012 April 26, 2011

AN ARCHAEOLOGICAL SURVEY FOR THE DCP MIDSTREAM THREE RIVERS PLANT TO CGP 51 PROJECT IN LIVE OAK COUNTY, TEXAS

CITY OF STURGIS 1984 REVISED ORDINANCES TITLE 35-1

Ellis County-Midlothian to Waxahachie Trail Corridor Research

RESOLUTION NO. R To Acquire Real Property Interests Required for the Lynnwood Link Extension

EEC Modification Project. Initial Draft Resource Report 10 Alternatives. 569 Brookwood Village Suite 749 Birmingham, Alabama 35209

County's Auditor's Report of Outstanding Indebtedness of the Governmental Units in Washington County, Minnesota. For the Year Ended December 31, 2017

III. FORECASTED GROWTH

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

Transcription:

Application of CenterPoint Energy Houston Electric, LLC for a Certificate of Convenience and Necessity for a Proposed 138 kv Transmission Line within Harris County, Texas PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO. 44242 This notice is provided to notify you of the intent of CenterPoint Energy Houston Electric, LLC (CenterPoint Energy) to construct a 138 kilovolt (kv) double-circuit transmission line from the existing CenterPoint Energy Zenith Substation located northwest of the intersection of FM 529 (Freeman Road) and Grand Parkway (SH 99) to an existing 138 kv transmission line located north of Morton Ranch Road. The proposed transmission line will be approximately six to eight miles long depending upon the route certificated by the Public Utility Commission of Texas (PUC). The estimated cost of this project ranges from approximately $12,646,000 to $21,860,000. If you have any questions about the proposed transmission line project, you can visit our Zenith-Franz Project website at www.centerpointenergy.com/zenithfranz or contact Mr. Steven Fox at (713) 207-4985, e-mail: zenithfranz@centerpointenergy.com. A detailed routing map may be viewed at any of the following locations: Cypress Service Center Katy/Spring Branch Service Center CenterPoint Energy Tower 18018 Huffmeister Road 3401 Brittmoore Road 1111 Louisiana Street Cypress, TX 77429 Houston, TX 77043 Houston, TX 77002 Contact: Christopher Oliver Contact: Walter Hunter Contact: Linda Johnston (281) 955-3013 (713) 945-4537 (713) 207-5218 All routes and route segments included in this notice are available for selection and approval by the Public Utility Commission of Texas. If you wish to participate in this proceeding by becoming an intervenor, the deadline for intervention in the proceeding is March 30, 2015, and the PUC should receive a letter from you requesting intervention by that date. Mail the request for intervention and 10 copies of the request to: Public Utility Commission of Texas Central Records Attn: Filing Clerk 1701 N. Congress Ave. P.O. Box 13326 Austin, Texas. 78711-3326 Persons who wish to intervene in the docket must also mail a copy of their request for intervention to all parties in the docket and all persons that have pending motions to intervene, at or before the time the request for intervention is mailed to the PUC. In addition to the intervention deadline, other important deadlines may already exist that affect your participation in this docket. You should review the orders and other filings already made in the docket. The only way to fully participate in the PUC s decision on where to locate the transmission line is to intervene in the docket. It is important for an affected person to intervene, because the utility is not obligated to keep affected persons informed of the PUC s proceedings and cannot predict which route may or may not be approved by the PUC The deadline for intervention in this docket is March 30, 2015, and the PUC should receive a letter from anyone requesting intervention by that date.

The PUC has a brochure Landowner and Transmission Line Cases at the PUC. Copies of the brochure are available from Mr. Steven Fox at 713-207-4985, e-mail: zenithfranz@centerpointenergy.com, or may be downloaded from the PUC s website at http://www.puc.texas.gov/industry/electric/forms/ccn/brochure8x11.pdf. To obtain additional information about this docket, you may contact the PUC s Customer Assistance Hotline at (512) 936-7120 or (888) 782-8477. Hearing-and speech-impaired individuals with text telephones (TTY) may contact the PUC s Customer Assistance Hotline at (512) 936-7136 or toll free at (800) 735-2989.

Alternative Route No. Description of Proposed Transmission Line Alternative Routes for the 138 kv Zenith - Franz Project in Harris County PUC DOCKET NO. 44242 Alternative Routes Not Listed in Any Order of Preference or Priority Segment Combination Total Length (miles) Total Project Cost 3 A-D-J-P-W-AJ-AM 7.3 $19,657,000 6 B-H-L-M-P-W-AJ-AM 7.3 $21,860,000 8 B-H-N-V-AA-AF-AI-AM 6.2 $12,646,000 10 B-H-N-V-AA-AF-AH-AL 6.8 $16,313,000 11 B-H-K-U-Z-AD-AK 7.0 $18,275,000 12 B-H-N-Q-U-Z-AD-AK 7.2 $18,140,000 15 B-H-K-U-Z-AD-AG-AL 8.0 $21,182,000 Route Segment Descriptions Segment A Segment A begins at CenterPoint Energy s existing Zenith Substation, located southwest of Cypress, Texas, approximately 14,130 feet northwest of the intersection of FM 529 (Freeman Road) and Grand Parkway (SH 99), in Harris County, Texas. From the existing substation, Segment A proceeds in a northerly direction for approximately 887 feet to an angle point. From this a n g l e point, Segment A proceeds in an easterly direction parallel to and north o f an existing 138 kv transmission line for 4,111 feet to the intersection of Segments A and D. Segment B Segment B begins at CenterPoint Energy s existing Zenith Substation, located southwest of Cypress, Texas, approximately 13,916 feet northwest of the intersection of FM 529 (Freeman Road) and Grand Parkway (SH 99), in Harris County, Texas. From the existing substation, Segment B proceeds in a southeasterly direction for approximately 192 feet to an angle point. From this angle point, Segment B proceeds in a southerly direction for 606 feet to an angle point. From this angle point, Segment B proceeds in a westerly direction for 793 feet to an angle point. From this angle point, Segment B proceeds in a southerly direction parallel to and east of an existing 345 kv transmission line for approximately 1,267 feet to the intersection of Segments B and H.

Segment D From the intersection of Segments A and D, Segment D proceeds in an easterly direction parallel to and north o f an existing 138 kv transmission line for approximately 520 feet to an angle point. This portion of Segment D crosses Grand Parkway (SH 99). From this angle point, Segment D proceeds in a southeasterly direction parallel to and east of Grand Parkway (SH 99) for 604 feet to an angle point. This portion of Segment D crosses an existing 138 kv transmission line. From this angle point, Segment D proceeds in a southeasterly direction parallel to and east of Grand Parkway (SH 99) for approximately 969 feet to an angle point. From this angle point, Segment D proceeds in a southeasterly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment D proceeds in a southeasterly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment D proceeds in a southeasterly direction parallel to and east of Grand Parkway (SH 99) for approximately 587 feet to the intersection of Segments D and J. Segment H From the intersection of Segments B and H, Segment H proceeds in a southerly direction for approximately 142 feet to an angle point. From this angle point, Segment H proceeds in a southwesterly direction for 351 feet to an angle point. This portion of Segment H crosses an existing 345 kv transmission line. From this angle point, Segment H proceeds in a southeasterly direction parallel to and west of an existing 345 kv transmission line for approximately 4,916 feet to the intersection of Segments H, K, L, and N. Segment J From the intersection of Segments D and J, Segment J proceeds in a southeasterly direction parallel to and east of Grand Parkway (SH 99) for approximately 611 feet to an angle point. From this angle point, Segment J proceeds in a southerly direction parallel to and east of Grand Parkway (SH 99) for approximately 4,668 feet to the intersection of Segments J, M, and P. Segment K From the intersection of Segments H, K, L, and N, Segment K proceeds in a westerly direction parallel to and south of Longenbaugh Road for approximately 4,826 feet to an angle point. This portion of Segment K crosses Porter Road. From this angle point, Segment K proceeds in a southerly direction parallel to and west of Porter Road for approximately 5,218 feet to the intersection of Segments K, Q, and U.

Segment L From the intersection of Segments H, K, L, and N, Segment L proceeds in an easterly direction parallel to and south of Longenbaugh Road for approximately 5,320 feet to the intersection of Segments L and M. Segment M From the intersection of Segments L and M, Segment M proceeds in an easterly direction parallel to and south of Longenbaugh Road for approximately 487 feet to the intersection of Segments J, M and P. This portion of Segment M crosses Grand Parkway (SH 99). Segment N From the intersection of Segments H, K, L, and N, Segment N proceeds in a southeasterly direction parallel to and west of an existing 345 kv transmission line for approximately 5,341 feet to the intersection of Segments N, Q, and V. This portion of Segment N crosses Bear Creek. Segment P From this intersection of Segments J, M, and P, Segment P proceeds in a southeasterly direction parallel to and east of Grand Parkway (SH 99) for approximately 636 feet to an angle point. From this angle point, Segment P proceeds in a southeasterly direction parallel to and east of Grand Parkway (SH 99) for approximately 1,443 feet to an angle point. From this angle point, Segment P proceeds in a southerly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment P proceeds in a southerly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment P proceeds in a southerly direction parallel to and east of Grand Parkway (SH 99) for approximately 1,978 feet to the intersection of Segments P and W. Segment Q From the intersection of Segments N, Q, and V, Segment Q proceeds in a westerly direction parallel to and north of FM 529 (Freeman Road) for approximately 5,943 feet to the intersection of Segments Q, K, and U. This portion of Segment Q crosses Porter Road. Segment U From the intersection of Segments K, Q, and U, Segment U proceeds in a southerly direction for approximately 5,326 feet to the intersection of Segments U and Z. This portion of Segment U crosses FM 529 (Freeman Road).

Segment V From the intersection of Segments N, Q, and V, Segment V proceeds in a southeasterly direction parallel to and west of an existing 345 kv transmission line for approximately 5,422 feet to the intersection of Segments V and AA. This portion of Segment V crosses FM 529 (Freeman Road). Segment W From the intersection of Segments P and W, Segment W proceeds in a southerly direction parallel to and east of Grand Parkway (SH 99) for approximately 12,007 feet to an angle point. This portion of Segment W crosses FM 529 (Freeman Road) and Bear Creek. From this angle point, Segment W proceeds in a southwesterly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment W proceeds in a southwesterly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment W proceeds in a southwesterly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment W proceeds in a southwesterly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment W proceeds in a southwesterly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. From this angle point, Segment W proceeds in a southwesterly direction parallel to and east of Grand Parkway (SH 99) for approximately 599 feet to an angle point. This portion of Segment W crosses South Mayde Creek. From this angle point, Segment W proceeds in a southwesterly direction parallel to and east of Grand Parkway (SH 99) for approximately 565 feet to the intersection of Segments W and AJ. Segment Z From the intersection of Segments U and Z, Segment Z proceeds in a southerly direction for approximately 5,309 feet to the intersection of Segments Z and AD. This portion of Segment Z crosses South Mayde Creek and Stockdick School Road. Segment AA From the intersection of Segments V and AA, Segment AA proceeds in a southeasterly direction parallel to and west of an existing 345 kv transmission line for approximately 5,446 feet to the intersection of Segments AA and AF. This portion of Segment AA crosses Beckendorff Road and Stockdick School Road.

Segment AD From the intersection of Segments Z and AD, Segment AD proceeds in a southerly direction parallel to and west of Porter Road for approximately 5,238 feet to the intersection of Segments AD, AG, and AK. Segment AF From the intersection of Segments AA and AF, Segment AF proceeds in a southeasterly direction parallel to and west of an existing 345 kv transmission line for approximately 4,889 feet to the intersection of Segments AF, AH, and AI. This portion of Segment AF crosses South Mayde Creek. Segment AG From the intersection of Segments AD, AG, and AK, Segment AG proceeds in an easterly direction parallel to and north of Clay Road for approximately 2,817 feet to an angle point. This portion of Segment AG crosses Porter Road. From this angle point, Segment AG proceeds in an easterly direction for 824 feet to an angle point. This portion of Segment AG crosses Clay Road. From this angle point, Segment AG proceeds in an easterly direction parallel to and south of Clay Road for approximately 1,720 feet to the intersection of Segments AG, AH and AL. Segment AH From the intersection of Segments AF, AH, and AI, Segment AH proceeds in a southwesterly direction for approximately 630 feet to an angle point. This portion of Segment AH crosses Clay Road. From this angle point, Segment AH proceeds in a westerly direction parallel to and south of Clay Road for approximately 3,423 feet to the intersection of Segments AH, AG, and AL. Segment AI From the intersection of Segments AF, AH, and AI, Segment AI proceeds in a southeasterly direction parallel to and west of an existing 345 kv transmission line for approximately 1,024 feet to the intersection of Segments AI, AJ, and AM. This portion of Segment AI crosses Clay Road and Grand Parkway (SH 99). Segment AJ From the intersection of Segments W and AJ, Segment AJ proceeds in a southwesterly direction parallel to and east of Grand Parkway (SH 99) for approximately 661 feet to the intersection of Segments AJ, AI and AM. This portion of Segment AJ crosses Clay Road and an existing 345 kv transmission line.

Segment AK From the intersection of Segments AD, AG, and AK, Segment AK proceeds in a southerly direction parallel to and west of Porter Road for approximately 2,643 feet to a proposed tie point to CenterPoint Energy s 138 kv transmission system. This portion of Segment AK crosses Clay Road. Segment AL From the intersection of Segments AH, AG, and AL, Segment AL proceeds in a southerly direction for approximately 809 feet to an angle point. From this angle point, Segment AL proceeds in a southerly direction for approximately 600 feet to an angle point. From this angle point, Segment AL proceeds in a southerly direction for approximately 1,160 feet to a proposed tie point to CenterPoint Energy s 138 kv transmission system. Segment AM From the intersection of AJ, AI, and AM, Segment AM proceeds in a southeasterly direction parallel to and west of an existing 345 kv transmission line for approximately 2,143 feet to a proposed tie point to CenterPoint Energy s 138 kv transmission system.

345 KV CKTS 98D & 99D 345 KV CKTS 99F & 71D GRAND PKWY DR KATY HOCKLEY CUT OFF RD KATY HOCKLEY RD 99 JOHN PAUL'S LANDING LANGHAM CREEK 345 KV CKTS 71C & 98I A 138 KV CKTS 09J & 76A D JOHN PAUL'S LANDING B ZENITH SUBSTATION JOHN PAUL'S LANDING PAUL D. RUSHING PARK H J K LONGENBAUGH RD L M HAROLD FREEMAN FARM PORTER RD N P Q FM 529 (FREEMAN RD) SETTLERS VILLAGE DR BEAR CR EE K U V BECKENDORFF RD BECKENDORFF RD SO UTH M AYDE CR EE K PEEK RD Z W STOCKDICK SCHOOL RD AA STOCKDICK SCHOOL RD FREEMAN PROPERTY AIRPORT FOUR SEASONS PARK AD AF AG CLAY RD AH AI AJ 138 KV CKTS 66A & 09H MORTON RD PORTER RD AK MORTON RANCH RD MORTON CREEK RANCH AL GRAND PKWY FRANZ CORNER 99 MORTON RANCH RD AM ELROD RD N MASON RD STARBRIDGE POINTE LN LAKES OF BRIDGEWATER MORTON RANCH RD VILLAGE DR RAINTREE KATY PARK WILLIAMSCHASE DR MORTON VIEW DR 138 KV ZENITH-FRANZ PROJECT PROPOSED ALTERNATIVE ROUTES 0 0.5 1 MILES A TIE POINT PROPOSED ALTERNATIVE ROUTE SEGMENT STUDY AREA BOUNDARY EXISTING 138 KV TRANSMISSION LINE EXISTING 345 KV TRANSMISSION LINE RUNWAY ROAD STREAM / DRAINAGE WATER BODY PARK / RECREATIONAL AREA EXISTING SUBSTATION CENTERPOINT OWNED PARCEL / EASEMENT ALT. ROUTES 3 6 8 10 11 12 15 SEGMENT COMBINATION A-D-J-P-W-AJ-AM B-H-L-M-P-W-AJ-AM B-H-N-V-AA-AF-AI-AM B-H-N-V-AA-AF-AH-AL B-H-K-U-Z-AD-AK B-H-N-Q-U-Z-AD-AK B-H-K-U-Z-AD-AG-AL