J. E. COULTER ASSOCIATES LIMITED -ii- APPENDIX B: GUIDELINES

Similar documents
Roadway Traffic Noise Assessment. 407 Nelson Street Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO

Transportation Noise Assessment. 121 Parkdale Avenue. Ottawa, Ontario

Transportation Noise & Vibration Feasibility Assessment. 383 Albert Street & 340 Queen Street Ottawa, Ontario

Noise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario

Environmental Noise and Vibration Assessments Place D Orleans Drive. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

Appendix C STAMSON Noise Model Output File for Tunnel Alternative (Alternative 3)

Environmental Noise & Vibration Assessment

Transportation Noise Assessment. 590 Rideau Street. Ottawa, Ontario

Feasibility Noise Assessment. Westgate Shopping Centre Redevelopment. Ottawa, Ontario

Transportation Noise Assessment. 809 Richmond Road. Ottawa, Ontario

Transportation Noise Assessment. Salvation Army Multi-Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario

Transportation Noise Assessment. 560 Rideau Street. Ottawa, Ontario

3443 INNES ROAD NOISE IMPACT ASSESSMENT REPORT

Traffic Noise Impact Study. 383 Slater Street / 400 Albert Street. Ottawa, Ontario

Transportation Noise Assessment Prince of Wales Residential Development Ottawa, Ontario

Transportation Noise Feasibility Assessment & 3930 Riverside Drive Ottawa, Ontario

Transportation Noise Assessment. Salvation Army Multi Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario

Environmental Noise Assessment. St-Charles Market. Ottawa, Ontario

Transportation Noise Assessment. 370 Queen Elizabeth Drive. Ottawa, Ontario

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1088 Maritime Way - Ottawa Prepared For

REP Taggart 1140 Wellington Noise Control Study Page 1 of 18

115 ECHO DRIVE CITY OF OTTAWA DETAILED NOISE STUDY

Transportation Noise Assessment. Salvation Army Multi Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario

HABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1136 Martime Way - Ottawa Prepared For

Dubai Municipality LRT Noise and Vibration Impact Stage 2

Noise from Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control. Rob Stevens, HGC Engineering

Noise Maps, Report & Statistics, Dublin City Council Noise Mapping Project Roads and Traffic Department

Appendix E FTA NOISE MODELING WORKSHEETS AND DETAILED METHODOLOGY

GIS-BASED VISUALISATION OF TRAFFIC NOISE

Holistic approach for rolling noise mitigation

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

Insertion Loss Analysis of the Acoustic Panels with Composite Construction

Compliance Noise Survey & Assessment

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX J Wind and Temperature Gradients

MINISTRY OF TRANSPORTATION HIGHWAY 404 EXTENSION FINAL NOISE STUDY. Assignment Number: 2013-E-0017 #3

Assessment & Specifications for Noise Controls

1 INTRODUCTION 4 2 NOISE DESCRIPTORS 5 3 NOISE SENSITIVE POINTS OF RECEPTION 5 4 PROPOSED LAND USE 7 5 GUIDELINES AND CRITERIA 8

Turbines and turbine sets Measurement of emitted airborne noise Engineering/survey method

STATISTICAL ANALYSIS OF THE ACOUSTICAL PROPERTIES OF ROAD SURFACES

Chapter 11. Noise Impacts of Transportation Systems. Transportation Decision-making Principles of Project Evaluation and Programming

APPENDIX B. Noise Primer

Directive on the Assessment and Management of Environmental Noise

APPENDIX Q BLASTING IMPACT ASSESSMENT REPORT

ACOUSTICAL IMPACT OF TRAFFIC FLOWING EQUIPMENTS IN URBAN AREA

Rio Tinto- Compagnie minière IOC

Paine Field Airport Existing and Future Environmental Assessment, Initiation of Commercial Service Noise Analysis

Fundamentals of Sound

MAY 5, Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc.

MAPPING OF NOISE BY USING GIS IN ŞANLIURFA. 1. Introduction

Experimental validation of a numerical model for the ground vibration from trains in tunnels

PART I : SECTION (1) GENERAL Government Notifications

Special edition paper

Appendix G Noise Modeling Files

APPENDIX 11A: BASELINE NOISE MONITORING RESULTS

A new trial to estimate the noise propagation characteristics of a traffic noise system

Fast Determination of the Acoustic Area of Influence of Roads, Railways, Airports and Industries

EXPERIMENTAL STUDY OF THE NOISE DIRECTIVITY OF A HYBRID ELECTRIC VEHICLE

FIRST, MORE ABOUT SOUND

Predicting highly-resolved traffic noise

ISO 6395 INTERNATIONAL STANDARD. Earth-moving machinery Determination of sound power level Dynamic test conditions


COULD THE GUNSHOT BE HEARD?

AERCOUSTICS ENGINEERING LIMITED

Coordinated Transit and Land Use Planning in the Region of Waterloo

LIST OF PUBLISHED STANDARDS

604. Noise in european railway under modernization and its reduction

Monitoring Survey in the Vicinity of St. Marys Cement: Interim Report

Contents. Page 1 of 12

Chapter 6. Wave Motion. Longitudinal and Transverse Waves

Statistic analysis of acoustic noise in the industrial and living areas

ACCURACY AND PRECISION IN TRAFFIC NOISE PREDICTION

1 Wind Turbine Acoustics. Wind turbines generate sound by both mechanical and aerodynamic

Comparing railway noise prediction results for passenger trains using various models

DETAILED NOISE CONTROL STUDY PROPOSED TOWNHOUSE AND APARTMENT BUILDINGS BRONTE ROAD DEVELOPMENT TOWN OF OAKVILLE

Muswellbrook Coal Company

3D ANALYSIS AND INVESTIGATION OF TRAFFIC NOISE FROM ROADS OF THE ADELAIDE CBD AND THEIR IMPACT ON BUILDINGS

Chapter 2: The Project site & its Environment

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

Traffic noise and perceived soundscapes: a case study

26. Research on influence of damages of car vehicle combustion engine on noise level

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.

WEST VALLEY BOULEVARD MIXED USE PROJECT NOISE IMPACT ANALYSIS. January 9, 2015

Noise impact of innovative barriers dedicated to freight trains in urban areas

ON NOISE MAPPING AND ACTION PLANS IN PORTUGAL

Numerical and Experimental Study on Vibration and Noise of Embedded Rail System

ENVIRONMENTAL NOISE ASSESSMENT CERRO DE HULA WIND PROJECT ENERGÍA EÓLICA DE HONDURAS, S.A. (EEHSA)

A simple model for estimating excess attenuation of road traffic noise

Develop and implement harmonised noise assessment methods

A Thesis Proposal. Agrawal, Ravi. Submitted to the Office of Graduate Studies of Texas A&M University

Number Title Year Organization Page

Road Noise Management Tool: Mapping Action Areas classified by acoustical and non-acoustical priority criteria

Attachment 3. Updating UBC s Regional Context Statement. University of British Columbia CONSIDERATION MEMORANDUM OF CONSULTATION INPUT

Tampere - City planning, geology and climate change

Appendix C Benchmarking Cost Estimates

An Introduction to the Fundamentals of Acoustics

Transcription:

J. E. COULTER ASSOCIATES LIMITED -ii- APPENDIX B: GUIDELINES

NPC-115 NPC-115 Construction Equipment 1. Scope This Publication sets sound emission standards for various items of new construction equipment accord ing to the da te of manufac ture of the equipm ent. 2. Technical Definitions The technical terms used in this Publication are defined in Publication NPC101 Technical Definitions. 3. Sound Emission Standards Tables 115-1 to 115-4 inclusive list Residential Area sound emission standards and Quiet Zone sound em ission standards for sp ecific item s of n ew construction eq uipm ent m easured in accordance with the procedures indicated. TABLE 115-1 Quiet Zone and Residential Area Sound Emission Standards for Excavation Equipment, Dozers, Loaders, Backhoes or Other Equipment Capable of Being Used for Similar Application Maximum Sound Level (dba) as determined using Publication NPC - 103 - Procedures, section 6 dba Date of Manufacture Power Rating Less than 75 kw Power Rating 75 kw and Larger January 1, 1979 to December 31, 1980 85 88 January 1, 1981 and after 83 85

NPC-115 TABLE 115-2 Sound Emission Stan dards for Pneum atic Pavem ent Breakers Standard Date of Manufacture Maximum Sound Level (dba) as measured using Publication NPC - 103 Quiet Zone Sound Emission January 1, 1979 and after 85 Residential Area Sound Emission Standard January 1, 1979 to December 31, 1980 January 1, 1981 and after 90 85 TABLE 115-3 Sound Emission Stan dards for Portable Air Compressors Standard Date of Manufacture Maximum Sound Level (dba) as measured using Publication NPC - 103 Quiet Zone Sound Emission Standard January 1, 1979 to December 31, 1980 January 1, 1981 and after 76 70 Residential Area Sound Emission January 1, 1979 and after 76

NPC-115 TABLE 115-4 Soun d Em ission S tanda rd for T racked Drills Standard Date of Manufacture Maximum Sound Level (dba) as measured using Publication NPC - 103 Procedures, section 6 Quiet Zone and Residential Area Sound Emission Standard January 1, 1981 and after 100

J. E. COULTER ASSOCIATES LIMITED -iii- APPENDIX C: REFERENCES 1. Ministry of the Environment, "Model Municipal Noise Control By-Law, Final Report", August, 1978. 2. Ministry of the Environment, Noise Assessment Criteria in Land Use Planning, Publication LU-131, October 1997 and its Annex, October 1997. 3. Ministry of the Environment's STAMSON Computer Programme (Version 5.03). 4. Ministry of Transportation of Ontario, Provincial and Environmental Planning Office "Environmental Guide for Noise", October 2006. 5. Model Municipal Noise Control By-Law, Final Report, Publication NPC-101 Technical Definitions, Ministry of the Environment, August 1978 6. Model Municipal Noise Control By-Law, Final Report, Publication NPC-102 Instrumentation, Ministry of the Environment, August 1978 7. Model Municipal Noise Control By-Law, Final Report, Publication NPC-103 Procedures, Ministry of the Environment, August 1978 8. Model Municipal Noise Control By-Law, Final Report, Publication NPC-104 Sound Level Adjustments, August 1978 9. Ministry of the Environment, Sound Level Limits for Stationary Sources in Class 1 and 2 Areas (Urban), Publication NPC-205, October 1995 10. Ministry of the Environment, Sound Levels Due to Road Traffic, Publication NPC-206, October 1995 11. The Corporation of the City of Waterloo, By-law Number 2010-073, passed May 17, 2010 12. The City of Kitchener, Municipal Code Chapter 450, Noise, February 2011 13. Corporation of the City of Cambridge, By-law Number 32-04, passed February 9, 2004 14. Model Municipal Noise Control By-Law, Final Report, Publication NPC-115, Construction Equipment, August 1978 15. Transit Noise and Vibration Impact Assessment, Federal Transit Administration, May 2006

J. E. COULTER ASSOCIATES LIMITED -iv- 1 db CHANGE (Noise) APPENDIX D: DEFINITIONS For sounds experienced by a listener, one immediately following the other, a 1 db change is the smallest increment which can be reliably detected by most people. If the time delay between experiencing the sounds is more than a few seconds, the change is not reliably detected (i.e., the listener is not sensitive to a 1 db change occurring over 1 year's time). In environmental noise, a 1 db change occurs with an increase in traffic of 25%. 3 db CHANGE (Noise) An increase in the L eq of 3 db is reliably detected by most listeners, and is the smallest change considered significant by most planning authorities. It is the smallest change in the overall L eq (all sounds combined) which can be reliably detected by standard noise monitoring techniques. A doubling of traffic in a community will cause a 3 db change, if traffic is the only major noise source. 5 db CHANGE (Noise) An increase in the overall L eq of 5 db represents a relatively significant impact in terms of overall Leq, particularly if an area is already at or above daytime L of 55. 10 db CHANGE (Noise) A 10 db increase in overall L eq represents a doubling in the loudness of the sound, and represents a major impact on an urban community, especially if the levels are already above 50 L. Leq L eq is the sound pressure level averaged over the measurement period. It can be considered as the continuous steady sound pressure level that would have the same total acoustic energy as the real fluctuating noise over the same time period. This index is the most representative measure of community response to sound levels. Ground-borne Vibration Ground-borne vibration is vibration transmitted through the soil that is felt, rather than heard. Typically, vibration levels are most felt at frequencies below 50Hz. Vibration-induced Noise Vibration-induced noise is a result of ground-borne vibration being transmitted into the structure of a building and radiating as a rumbly sound that is more audible than feelable to the touch. Generally, vibration-induced noise is a concern at frequencies greater than 50Hz. Vibration Velocity Vibration velocity is the speed at which the building or ground moves up and down or sideways eq eq

J. E. COULTER ASSOCIATES LIMITED -vas it oscillates. It is does not relate to how fast the vibration wave is moving along in the soil. Double Crossover A type of special trackwork structure that allows a rail vehicle to switch directions, without the need for a loop. Double-ended Pocket Track A type of special trackwork structure that allows a vehicle to be stored in between two tracks in case of emergencies/vehicle breakdown.

J. E. COULTER ASSOCIATES LIMITED -vi- APPENDIX E: SOUND LEVEL MEASUREMENT DETAILS

J. E. COULTER ASSOCIATES LIMITED -vii- APPENDIX F: SAMPLE CALCULATIONS

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:18:56 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: lrt.te Time Period: Day/Night 16/8 hours Description: POR3 LRT Sound Level Calculations VOLUMES INCREASED x5 Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 0/0 veh/timeperiod Medium truck volume : 2440/320 veh/timeperiod Heavy truck volume : 0/0 veh/timeperiod Posted speed limit : 60 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 18.00 / 18.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 0.50 m ROAD (0.00 + 66.70 + 0.00) = 66.70 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 67.49 0.00-0.79 0.00 0.00 0.00 0.00 66.70 Segment Leq : 66.70 dba Total Leq All Segments: 66.70 dba Results segment # 1: (night) ----------------------------- Source height = 0.50 m ROAD (0.00 + 60.89 + 0.00) = 60.89 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 61.68 0.00-0.79 0.00 0.00 0.00 0.00 60.89 Segment Leq : 60.89 dba Total Leq All Segments: 60.89 dba TOTAL Leq FROM ALL SOURCES (DAY): 66.70 (NIGHT): 60.89

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:28:22 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: lrt.te Description: POR6 LRT Only Time Period: Day/Night 16/8 hours DISTANCED DOUBLED, LRT VOLUME INCREASED x10 Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 0/0 veh/timeperiod Medium truck volume : 2440/320 veh/timeperiod Heavy truck volume : 0/0 veh/timeperiod Posted speed limit : 40 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 16.00 / 16.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 0.50 m ROAD (0.00 + 63.00 + 0.00) = 63.00 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 63.28 0.00-0.28 0.00 0.00 0.00 0.00 63.00 Segment Leq : 63.00 dba Total Leq All Segments: 63.00 dba Results segment # 1: (night) ----------------------------- Source height = 0.50 m ROAD (0.00 + 57.19 + 0.00) = 57.19 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 57.47 0.00-0.28 0.00 0.00 0.00 0.00 57.19 Segment Leq : 57.19 dba Total Leq All Segments: 57.19 dba TOTAL Leq FROM ALL SOURCES (DAY): 63.00 (NIGHT): 57.19

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:29:35 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: wp.te Time Period: Day/Night 16/8 hours Description: POR6 With Project Traffic Only DISTANCES DOUBLED Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 11473/2350 veh/timeperiod Medium truck volume : 483/99 veh/timeperiod Heavy truck volume : 121/25 veh/timeperiod Posted speed limit : 50 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 28.00 / 28.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 1.00 m ROAD (0.00 + 61.52 + 0.00) = 61.52 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 64.23 0.00-2.71 0.00 0.00 0.00 0.00 61.52 Segment Leq : 61.52 dba Total Leq All Segments: 61.52 dba Results segment # 1: (night) ----------------------------- Source height = 1.00 m ROAD (0.00 + 57.66 + 0.00) = 57.66 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 60.37 0.00-2.71 0.00 0.00 0.00 0.00 57.66 Segment Leq : 57.66 dba Total Leq All Segments: 57.66 dba TOTAL Leq FROM ALL SOURCES (DAY): 61.52 (NIGHT): 57.66

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:29:09 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: np.te Time Period: Day/Night 16/8 hours Description: POR6 No Project Traffic Only DISTANCES DOUBLED Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 14690/3009 veh/timeperiod Medium truck volume : 619/127 veh/timeperiod Heavy truck volume : 155/32 veh/timeperiod Posted speed limit : 50 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 28.00 / 28.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 1.00 m ROAD (0.00 + 62.60 + 0.00) = 62.60 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 65.31 0.00-2.71 0.00 0.00 0.00 0.00 62.60 Segment Leq : 62.60 dba Total Leq All Segments: 62.60 dba Results segment # 1: (night) ----------------------------- Source height = 1.00 m ROAD (0.00 + 58.73 + 0.00) = 58.73 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 61.44 0.00-2.71 0.00 0.00 0.00 0.00 58.73 Segment Leq : 58.73 dba Total Leq All Segments: 58.73 dba TOTAL Leq FROM ALL SOURCES (DAY): 62.60 (NIGHT): 58.73

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:40:34 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: lrt.te Description: POR12 LRT Only Time Period: Day/Night 16/8 hours DISTANCED DOUBLED, LRT VOLUME INCREASED x5 Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 0/0 veh/timeperiod Medium truck volume : 2440/320 veh/timeperiod Heavy truck volume : 0/0 veh/timeperiod Posted speed limit : 40 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 24.00 / 24.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 0.50 m ROAD (0.00 + 61.24 + 0.00) = 61.24 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 63.28 0.00-2.04 0.00 0.00 0.00 0.00 61.24 Segment Leq : 61.24 dba Total Leq All Segments: 61.24 dba Results segment # 1: (night) ----------------------------- Source height = 0.50 m ROAD (0.00 + 55.43 + 0.00) = 55.43 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 57.47 0.00-2.04 0.00 0.00 0.00 0.00 55.43 Segment Leq : 55.43 dba Total Leq All Segments: 55.43 dba TOTAL Leq FROM ALL SOURCES (DAY): 61.24 (NIGHT): 55.43

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:41:01 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: np.te Time Period: Day/Night 16/8 hours Description: POR12 No Project Traffic Only DISTANCES DOUBLED Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 19713/4038 veh/timeperiod Medium truck volume : 830/170 veh/timeperiod Heavy truck volume : 208/43 veh/timeperiod Posted speed limit : 50 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 24.00 / 24.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 1.00 m ROAD (0.00 + 64.54 + 0.00) = 64.54 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 66.58 0.00-2.04 0.00 0.00 0.00 0.00 64.54 Segment Leq : 64.54 dba Total Leq All Segments: 64.54 dba Results segment # 1: (night) ----------------------------- Source height = 1.00 m ROAD (0.00 + 60.68 + 0.00) = 60.68 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 62.72 0.00-2.04 0.00 0.00 0.00 0.00 60.68 Segment Leq : 60.68 dba Total Leq All Segments: 60.68 dba TOTAL Leq FROM ALL SOURCES (DAY): 64.54 (NIGHT): 60.68

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:41:21 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: wp.te Time Period: Day/Night 16/8 hours Description: POR12 With Project Traffic Only DISTANCES DOUBLED Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 14666/3004 veh/timeperiod Medium truck volume : 618/126 veh/timeperiod Heavy truck volume : 154/32 veh/timeperiod Posted speed limit : 50 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 22.00 / 22.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 1.00 m ROAD (0.00 + 63.63 + 0.00) = 63.63 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 65.29 0.00-1.66 0.00 0.00 0.00 0.00 63.63 Segment Leq : 63.63 dba Total Leq All Segments: 63.63 dba Results segment # 1: (night) ----------------------------- Source height = 1.00 m ROAD (0.00 + 59.77 + 0.00) = 59.77 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 61.43 0.00-1.66 0.00 0.00 0.00 0.00 59.77 Segment Leq : 59.77 dba Total Leq All Segments: 59.77 dba TOTAL Leq FROM ALL SOURCES (DAY): 63.63 (NIGHT): 59.77

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:46:13 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: np.te Time Period: Day/Night 16/8 hours Description: POR20 No Project Traffic Only DISTANCES DOUBLED Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 11749/2406 veh/timeperiod Medium truck volume : 495/101 veh/timeperiod Heavy truck volume : 124/25 veh/timeperiod Posted speed limit : 50 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 20.00 / 20.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 1.00 m ROAD (0.00 + 63.09 + 0.00) = 63.09 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 64.34 0.00-1.25 0.00 0.00 0.00 0.00 63.09 Segment Leq : 63.09 dba Total Leq All Segments: 63.09 dba Results segment # 1: (night) ----------------------------- Source height = 1.00 m ROAD (0.00 + 59.19 + 0.00) = 59.19 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 60.44 0.00-1.25 0.00 0.00 0.00 0.00 59.19 Segment Leq : 59.19 dba Total Leq All Segments: 59.19 dba TOTAL Leq FROM ALL SOURCES (DAY): 63.09 (NIGHT): 59.19

STAMSON 5.0 NORMAL REPORT Date: 07-07-2011 14:45:46 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: wp.te Time Period: Day/Night 16/8 hours Description: POR20 With Project Traffic Only DISTANCES DOUBLED Road data, segment # 1: (day/night) ------------------------------------ Car traffic volume : 8781/1816 veh/timeperiod Medium truck volume : 699/125 veh/timeperiod Heavy truck volume : 124/25 veh/timeperiod Posted speed limit : 50 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: (day/night) ---------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 2 (Reflective ground surface) Receiver source distance : 20.00 / 20.00 m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: (day) --------------------------- Source height = 1.07 m ROAD (0.00 + 63.09 + 0.00) = 63.09 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 64.34 0.00-1.25 0.00 0.00 0.00 0.00 63.09 Segment Leq : 63.09 dba Total Leq All Segments: 63.09 dba Results segment # 1: (night) ----------------------------- Source height = 1.06 m ROAD (0.00 + 58.99 + 0.00) = 58.99 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.00 60.24 0.00-1.25 0.00 0.00 0.00 0.00 58.99 Segment Leq : 58.99 dba Total Leq All Segments: 58.99 dba TOTAL Leq FROM ALL SOURCES (DAY): 63.09 (NIGHT): 58.99