UNIVERSITY OF VIRGINIA

Similar documents
Facilities Operations Procedure for the Management of Snow and Ice

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

John A. Carlson Snow and Ice Removal

SNOW CONTROL OPERATIONS

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

COUNCIL POLICY MANUAL

City of Hailey Public Works - Street Division

SNOW CREW CALL IN SHEET

TOWN OF GRAND FALLS WINDSOR

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

CITY OF LANSING SNOW AND ICE REMOVAL OPERATION PLAN, VERSION 2008

Dunn County Snow Removal Policy

AUTHORITY: Town Council POLICY NUMBER:

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

City of Camrose Winter Road Maintenance Policy

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

FACILITIES PLANNING AND MANAGEMENT (FP&M) SNOW REMOVAL PLAN (Revision)

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

Policy Title: Snow Removal & Ice Control Policy #: PW

SNOW AND ICE REMOVAL PROCEDURES

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions.

REQUEST FOR PROPOSALS

Town of Oconomowoc Snow & Ice Control Policy

Town of Windsor. Department of Public Works

Approved by: A. Cherrie Epps, Ph.D., President and Chief Executive Officer

City of Rhinelander Snow and Ice Policy

City of Brainerd, Minnesota Snowplowing Policy

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

COUNCIL POLICY BACKGROUND

APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT

EXCEPTIONAL CLOSURES - CHECKLIST FOR GOOSTREY COMMUNITY PRIMARY SCHOOL

Snow, Ice and Leaves Clearance Policy

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES

City of Pittsfield. Snow and Ice Control Plan

City of Lee s Summit Public Works Operations

THE PARKE AT OCEAN PINES HOME OWNERS ASSOCIATION, INC. Policy Resolution Snow Removal Policy

Snow and Ice Removal

SOUTH HOLDERNESS TECHNOLOGY COLLEGE Snow and Ice Policy and Procedures

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

Home Owners. Age Male/Female. Snow removal for his/her driveway or private property

MUNICIPALITY OF TRENT HILLS WINTER CONTROL QUALITY STANDARDS

WINTER MAINTENANCE OPERATIONS POLICY. City of River Falls, Wisconsin

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

City of Laramie, Wyoming SNOW AND ICE POLICY

Tahlequah Public Schools Inclement Weather Transportation Plan

CITY OF MINOT SNOW REMOVAL PLAN November 2017

SNOW AND ICE REMOVAL. Policy i

WINTER WEATHER PROCEDURES & EMERGENCY PREPAREDNESS CHECKLIST

WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas)

WINTER STORM Annex II

Annex B Natural No-Notice Event

Actions SLT Staff Students, Parents/Carers Ensure all. with caution in all. gritted.

Town of Grand Falls Windsor Snow Clearing Policy Department of Engineering and Works

BFA, Facilities Management Page 1 of 2 POLICY

MONTGOMERY COUNTY SNOW PLAN

Facilities Management

Winter Weather Snow and Ice Hazard Mitigation Guidelines. November 30, 2018

Public Works Operations Procedure Report FY 2016 Snow Plan

Snow Response in an Urban Setting

CITY OF MINOT SNOW REMOVAL PLAN October 2018

DEPARTMENT OF PUBLIC WORKS

CLOSURE PROCEDURE AND SNOW PLAN

SNOW AND ICE CONTROL POLICY

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

POLICY MEDICAL UNIVERSITY OF SOUTH CAROLINA OFFICE OF PARKING MANAGEMENT POLICY AND PROCEDURES MANUAL. SUBJECT: Emergency Weather Conditions PAGE 1

Snow & Ice Management Policy/Guide. Town of Medway Massachusetts

Operational Snow and Ice Control Plan

WINTER WEATHER MAINTENANCE PLAN

Chancellor s Memorandum CM-64 Tornado Policy

ROLLING RIVER SCHOOL DIVISION POLICY

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION:

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

SNOW AND ICE CONTROL GUIDELINES

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

CITY OF OSHKOSH SNOW & ICE REMOVAL POLICY. Revised

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

Emergency Closing Response Plan

RESOLUTION NO INTRODUCTION

Winter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works

Edmonton International Airport

Policy for Snow Removal and Ice Control Wahpeton, North Dakota

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.

ADMINISTRATIVE PROCEDURES

CUSTER COUNTY SNOW REMOVAL PROCEDURES

TOWN OF WINDSOR SNOW CONTROL PLAN

State of Georgia Snow and Ice Plan

Winter Weather Snow and Ice Hazard Mitigation Guidelines DRAFT NOVEMBER 12, 2014

WINTER W E AT H E R MA I NT E NAN C E PLAN

CITY OF EAGLE LAKE SNOW PLOWING POLICY

CLEA# Approved Date: Feb Revision Date: Aug 02, May06, Mar08, Jan 09 New ( ) Amends ( ) Rescinds ( ) Pages:

SNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)

Transcription:

FACILITIES MANAGEMENT UNIVERSITY OF VIRGINIA SNOW AND ICE CONTROL PLAN 2017-2018

Table of Contents Introduction... 2 Snow and Ice Control Objectives... 2 Organization... 2 Director of Operations:... 2 Director of Health System Physical Plant:... 2 Landscaping Superintendent:... 2 HSPP Zone Managers:... 2 Landscaping Supervisors:... 3 Academic Zone Managers:... 3 Incident Commander (IC):... 3 Assistant Incident Commander:... 3 Building Services:... 3 Facilities Management Designated Personnel:... 3 Athletic and Intermural Departments:... 3 Director of Operations, John Paul Jones Arena... 4 Fontana Food Center... 4 Contracted Snow Removal:... 4 Preseason Planning... 4 Review of Plan... 4 Materials and Equipment... 4 Annual Snow Review of Snow and Ice Removal Assignments and Communications Test... 5 Event Management... 5 Snow and Ice Removal Levels... 5 Weather Monitoring... 6 Mobilization... 6 Command & Control... 7 Areas of Responsibility... 9 Snow Removal Maps... Error! Bookmark not defined. Stand Down From Snow Removal Operations... 9 Post Event Activities... 10 Restocking of Inventory... 10 Cleaning, Evaluation and Repair of Equipment... 10 After-Action Review... 10 Appendices... 11 Appendix A: Plow Trucks AssignedEquipment... 11 Appendix B: Contract Snow Plowing Areas... 12 1

Introduction Facilities Management has primary responsibility for snow and ice control operations for the University and Health System. This plan establishes basic priorities for conducting these operations; describes the organization, control, and communications procedures; and assigns specific responsibilities. During a snow event, only bona fide emergencies have a higher priority than snow and ice control operations for landscaping and operations personnel. Snow and Ice Control Objectives In accordance with Policy HRM-032 Disruption of Normal University Operation Resulting from Weather or Emergency Events, snow and ice control operations will be undertaken to ensure that: 1. The University of Virginia Health System, to include outlying clinics and hospitals, operates without disruption 2. Safe access to University Grounds is maintained throughout a snow event for emergency vehicles 3. Access to the UVA Police Department is maintained 4. University bus routes are cleared and available for use by students, faculty, and staff 5. The schools and departments of the University will be able to operate during regularly scheduled hours while the University is in session 6. Housing Facilities will remain accessible for the duration of the storm a. Walkways and stairs at Gooch-Dillard, located on the third floor terrace (see map for exact location) are the only egress routes for this building and will be kept passable at all times during all snow and ice conditions. This is a code requirement and shall be included in future versions of the University Snow plan. Any changes to this requirement must be approved by the State Fire Marshal s office Organization Director of Operations: Overall responsibility for snow and ice control for all roadways, parking lots, and pedestrian access for the University Academic Division. Reports snow removal progress directly to the Associate Vice President and Chief Facilities Officer and the Office of Safety and Emergency Preparedness. Director of Health System Physical Plant: Overall responsibility for snow and ice control for all walkways and entrances in the Health System area. Landscaping Superintendent: Serves as the Snow Control Officer, reporting to the Director of Operations, for both the Health System and Academic areas. They are responsible for ensuring the continuity of the Snow Control Officer responsibilities during their absence. HSPP Zone Managers: They are responsible for the supervision and prioritization of efforts to clear sidewalks, steps and entrances to Medical facilities. These efforts shall ensure that all emergency egress paths and 2

entrances to all buildings remain clear at all times. Upon completion of the storm, all entrances will be cleared to their full widths. He or she shall establish a snow response procedure for his or her area. The manager of each area shall designate personnel and have a written procedure, communicated to each employee, addressing employee notification during snow events. Landscaping Supervisors: Responsible for the supervision and prioritization efforts to clear all roadways, parking lots, and parking garages in their assigned zone. Academic Zone Managers: They are responsible for the supervision and prioritization of efforts to clear sidewalks, steps and entrances to Academic buildings and Housing facilities. These efforts shall ensure that all emergency egress paths and at least one accessible entrance to all buildings remain clear at all times. Upon completion of the storm, all entrances will be cleared to their full widths. He or she shall establish a snow response procedure for his or her area. The manager of each area shall designate personnel and have a written procedure, communicated to each employee, addressing employee notification during snow events. Incident Commander (IC): Director of Operations functions as the Facilities Management Incident Commander. He or she sets objectives and priorities, devises strategies, and has overall responsibility for managing an incident. The Incident Commander will normally be activated during those times when a snow event has increased in scope such as a prolonged snow event, loss of utilities, or other facilities related events. Assistant Incident Commander: The Systems Control Center Manager functions as the Assistant Incident Commander, assisting the Incident Commander. The Assistant Incident Commander shall perform all duties and responsibilities of the Incident Commander during those times he or she is not available. Building Services: This division s primary responsibility during snow events is to ensure the interior entranceways and lobbies are free of melted snow and deicing materials that could be a slip hazard. When precipitation has ended, crews will support the clearing of building entrances to their full width. At all times, fire exits will be cleared to permit full door opening and all associated steps and/or landings will be kept clear. Facilities Management Designated Personnel: Members of Facilities Management who are expected to report to work during all events whether the University and Health System are operating on a normal schedule or not. In general, employees are responsible for responding to all snow events or contacting their manager or supervisor to determine if they need to respond. Athletic and Intermural Departments: These departments are responsible for clearing walks and entrances of their respective athletic facilities. 3

Director of Operations, John Paul Jones Arena Responsible for clearing all walks, steps and building entrances to the arena. Fontana Food Center Department is responsible for the steps, walks and loading dock associated with this area. Contracted Snow Removal: A severe snowstorm might be more than the Facilities Management staff and equipment can handle. There are standing contracts to use for snow removal from University maintained surface parking lots and streets. These contracts are not normally for snowfalls of short duration or less than 2 accumulation. Every effort should be taken to handle snow removal with in-house resources. The decision to activate the contractors is determined by the Snow Control Officer. Preseason Planning Review of Plan The Snow and Ice Control Plan shall be reviewed and updated by October 1 annually for the upcoming snow season by the Landscaping Superintendent. Materials and Equipment By October 15 th of each year The Landscaping Superintendent shall ensure that: The below deicing materials are on-site and ready for issue Materials Bulk Sand Bulk sand & salt mix Bulk salt Magnesium chloride (or equivalent) Quantities 35 Tons 100 Tons 60 Tons 15 Tons ***Quantities are the minimum that shall be on-site at the start of the snow season*** All snow removal trucks and associated equipment (i.e. plows, spreader, etc.) have been serviced and are ready for use Zone Managers shall ensure that: An inventory of all small equipment is completed and provided to the Landscaping Superintendent All small equipment that is used for the particular snow removal needs of their assigned areas is prepared, tested, and ready for use schedule needed repairs with the Landscaping Superintendent. An inventory of consumable equipment (i.e. shovels, PPE, etc.) is completed and needed items are ordered and available by November 1 st of each year 4

Ensure all staff understands his or her emergency status designated vs. non-designated All Other Teams such as Project Services, Utilities, Fire Protection, Chiller Plant, and Heat Plant, Automation Services, Metering, and Recycling shall: Provide inventory of all snow removal equipment (i.e. vehicles w/ snow plows, gators w/ snow plows, snow blowers, etc.) to the Landscaping Superintendent Complete an inventory of consumable equipment (i.e. shovels, PPE, etc.) and ensure needed items are ordered and available by November 1 st of each year Ensure all staff understands his or her emergency status designated vs. non-designated Annual Snow Review of Snow and Ice Removal Assignments and Communications Test By the start of the snow season or November 1, whichever is earlier, the Systems Control Center Manager and Landscaping Superintendent shall schedule a meeting of Facilities Management Managers and Supervisors to review the current year snow plan. This shall include review of priority areas, equipment deployment, and command & control operations during a snow event. The FM Snow Alert Group shall be reviewed for needed changes and a test alert shall be sent to all members. Event Management Snow and Ice Removal Levels There are three levels within the Snow and Ice Control Plan as defined below: Level I - Minor, Localized Impact Level I of a winter weather related emergency is typically defined as a light snow or flurries during normal working hours with no measurable accumulation or snow accumulations of 1 inch or less during the evening hours, weekend, or during holidays. It is possible that there will be ice forming on walks, steps, or roads. These events are easily managed by Landscaping personnel. Level II Significant, But Limited Impact Level II of a winter weather related emergency is typically defined as a snow that is 1"- 6", snow/ice fall during off hours not allowing enough time to be cleared by 7:00 a.m., snow falling heavily, with accumulation possible, dangerous ice forming on walks, steps, and roads. This level normally requires additional support from Maintenance Zones and possibly other departments. Level III Significant, Widespread Impact Level III of a winter weather related emergency is typically a snow that is 6 inches or more, heavy snow or ice, continued snow or ice over long periods, accumulating snow or ice during class hours. This level requires the mobilization and assignment of snow removal duties of available personnel from all operational areas in Facilities Management, to include the Health System Physical Plant. Facilities Management staff may be asked to report to work early or to work after their normally scheduled hours to assist with snow or ice removal. ****It is possible that additional support will be requested at any of the above levels**** 5

Weather Monitoring Monitoring of the weather shall be the responsibility of both the Landscaping Superintendent and the Systems Control Center Manager. Prior to weekends or holidays when weather forecasts indicate a reasonable probability of snow or ice conditions, plows and salt spreaders will be mounted on selected equipment as determined by the Landscaping Superintendent and those vehicles shall be fully fueled Whenever weather forecasts or conditions indicate a high probability of imminent snow or ice conditions, snow and ice control personnel will report as conditions warrant. Personnel may be held after normal working hours to prepare equipment and commence initial sanding, salting, or plowing. The Landscaping Superintendent shall convene a storm event planning meeting whenever a large scale snow event is expected (i.e. Level II or Level III event) to discuss: o Preparation measures: Relocation of Facility Management vehicles Equipment / deicing material staging Hotel arrangements (if required) o Assignment of equipment o Staffing needs Meeting shall be scheduled at least 48 hours in advance of expected snow or ice event o Attendees shall include: Director of Operations Director of Project Services Landscaping Superintendent and Supervisors Associate Director of Maintenance Associate Director or Manager of Utility Distribution Systems Associate Director of Power & Light Associate Director of Building Services Associate Director for Housing Associate Director of Automation Services Deputy Director for Operations for Health Systems Physical Plant Director of Programs and Informatics FM Safety Director Snow Zone Managers Landscaping Superintendent or the Systems Control Center Manager shall be responsible for briefing the Facilities Management leadership of the planning measures. Mobilization During normal working hours, supervisors are responsible for communicating snow and ice control measures duties to their staff. After normal working hours, weekends, or holidays, personnel assigned to snow and ice control duties should call the Facilities Management Snow 6

Line (434-243-0647). Supervisors and Managers will receive an alert from the Landscaping Superintendent regarding the weather event. Command & Control Director of Operations Snow Control Officer Academic Zone Manager Landscaping Supervisor HSPP Zone Manager FM Service Desk (Systems Control Center After hours) Figure 1 Organizational Structure - Snow Event Only Incident Commander Assistant Incident Commander Snow Control Officer On-Scene Leader (i.e. Power & Light Associate Director or Supervisor) Academic Zone Manager Landscaping Supervisor HSPP Zone Manager FM Service Desk (Systems Control Center - After-hours) Maintenance Team Figure 2 Organizational Structure Snow & Utility/Facilities Event 7

During a snow event, communications must be maintained between the Snow Control Officer, Landscaping Supervisors, Maintenance Zone Managers, and FM Service Desk or Systems Control Center after-hours to ensure priority areas are cleared as quickly as possible in order to maintain access to critical areas of the Health System and University. In most snow events, the Snow Control Officer, with assistance from the Systems Control Center Manager as needed, will coordinate all snow removal activities and report directly to the Director of Operations on snow removal progress. However, as the weather event increases in scope such as a prolonged snow event, loss of utilities, or other facilities related events, the Incident Command Structure shall be activated and the Incident Commander will assume control of the incident. The Incident Commander shall work directly with Systems Control to create and send Significant Event update messages to key University and Medical Center personnel. Other command and control measures include: For Level I, II, & III events, FM Service Desk or Systems Control Center will receive all requests for snow or ice removal. Requests will be sent to the Snow Control Officer, who will determine the priority for all requests received and assign to Landscaping Supervisor for a Level I event or Snow Zone Manager during a Level II or III as appropriate. Level II or III events may require the addition of an Incident Commander. In these situations, the Facilities Management Upper Level Conference Room may be used as the Control Center. The Snow Control Officer: o Is responsible for carrying out the snow and ice control plan, for closely monitoring available sources of weather information, and for maintaining liaison with the Virginia Department of Highways and Transportation, the University Police Department and the Office of Emergency Preparedness concerning weather and road conditions o Is responsible for scheduled updates to the Facilities Management Leadership on the conditions of roads and sidewalks Level I: As needed Level II: Every two hours Level III: Hourly NOTE 1: Snow Zone Supervisors and Managers shall provide the Snow Control Officer with updates on the condition of their zone s sidewalks and roads following the above schedule. o Works closely with Parking & Transportation to determine contractor needs during a storm event; contractors to begin plowing only when directed by the Snow Control Supervisor Landscaping Supervisors and Zone Managers shall check-in/out at the beginning and end of their shift to ensure that the Snow Control Officer has the most current status of their zone s sidewalks and roads Facilities Management designated personnel, who are NOT part of zone maintenance shall check-in with their assigned snow zone for their snow removal assignments Designated employees are assigned responsibility for clearing steps and walks, and shall be held over or called back for such duties as required to assure that essential access, such 8

as egress routes and handicap access is available to all buildings. The Landscaping Supervisors and Zone Managers shall initiate Callback on the direction of the Snow Control Supervisor. Areas of Responsibility Health Systems Physical Plant: Zone 1: University Hospital, Battle Building at UVA Children s Hospital, Lee and 11 th Street Garages, Primary Care Center, University Hospital Helicopter Pad, 1222 Jefferson Park Avenue, Clinical Lab, Emily Couric Cancer Center, Patton Mansion Zone 2: Elson Student Health Center, Medical Research Lab (MR4), Biomedical Engineering and Medical Science Building (MR5), Carter-Harrison Research Building (MR6), McLeod Hall, South Parking Garage, Outpatient Surgery Center, Jordan Hall, Claude Moore Nursing School, 999 Grove Child Care, Claude Moore Medical Education Building, Stacey Hall, 1107 W. Main, and 1003 W. Main Zone 3: Wertland Street Lab, 120 Chancellor, Cobb Hall, Davis Wing, McIntire Wing, Private Clinics Wing, Barringer Wing, Old Medical School, Corner Bldg, Multistory Building, McKim Hall up to Hospital Drive, and Hospitality House Zone 4: KCRC Children s Rehab Center, Northridge, Transitional Care Hospital, Moser Center, Medical Office Building 1, Medical Office Building 2, Aurbach Medical Research Building, and Sheridan G. Snyder Translational Research Building Landscaping Department: The Facilities Management Landscape Department has primary responsibility for snow removal from academic areas with support from Maintenance Zones and other FM Departments. See link below for snow zone information. http://gis.virginia.edu/documents/gis_snowremovalareas.pdf NOTE 2: Snow and ice control operations can require an extended period of work. Facilities Management supervisors shall manage work assignments so that employees are assigned to shifts, normally not exceeding 12 hours, with rested workers available to continue operations. Any shift that exceeds 12 hours must be approved by a Director. NOTE 3: If extended operations are required, adequate sleeping quarters shall be provided for rest between shifts. Work Management will coordinate needed hotel rooms within 48 hours of snow event. Stand Down from Snow Removal Operations The Snow Control Officer, in discussion with the Director of Operations, Zone Managers, and Landscaping Supervisors, shall determine when Facilities Management snow removal operations end. Upon the decision to end snow removal operations, the Snow Control Officer shall 9

determine if any follow up service or monitoring is needed. If residual clean up remains, this will be completed by Landscaping, Building Services, and Zone Maintenance personnel Post Event Activities Restocking of Inventory As soon as practical following an event, all Departments and Maintenance Zones shall complete an inventory of consumable equipment such shovels, PPE, and deicing materials. Replenish those needed items as soon as possible in preparation for the next snow event. Cleaning, Evaluation and Repair of Equipment Equipment operators shall clean and inspect equipment and report any damage, wear, defect, or concern about equipment to Landscaping Superintendent. Plow trucks shall be cleaned and inspected for damage or needed repairs. Those trucks needing repair shall be reported to the Landscaping Superintendent After-Action Review An after-action review shall be scheduled by the Systems Control Center Manager within 48 hours of the ending of the event to discuss any needed changes to equipment or personnel deployment and any additional concerns or suggestions. Attendees shall include: Director of Operations Director of Project Services Landscaping Superintendent and Supervisors Zone Maintenance Managers Associate Director of Maintenance Associate Director or Manager of Utility Distribution Systems Associate Director of Power & Light Associate Director of Building Services Associate Director for Housing Associate Director of Automation Services Deputy Director for Operations for Health Systems Physical Plant Director of Programs and Informatics FM Safety Director 10

Appendices Appendix A: Plow Trucks Assigned Truck Org. Assigned Snow Equipment Utilization Number Assign 346 20235 Plow & Spreader Parking decks 719 20235 Plow & Spreader Streets, parking lots 720 20235 Plow & Spreader Streets, parking lots 721 20235 Plow & Spreader Streets, parking lots 723 20235 Plow & Spreader Streets, parking lots 726 20235 Plow & Spreader Streets, parking lots 380 20235 Plow & Spreader Streets, parking lots 448 20235 Plow Streets, parking lots 517 20235 Plow Streets, parking lots 581 20235 Plow Streets, parking lots 597 20235 Plow Streets, parking lots 637 20235 Plow Streets, parking lots 639 20235 Plow Streets, parking lots 645 20235 Plow Streets, parking lots 656 20235 Plow Streets, parking lots 687 20235 Plow Streets, parking lots 731 20235 Plow Streets, parking lots 11

Appendix B: Contract Snow Plowing Areas Location Lots Funding Criteria Responsibility Contractor Scott Stadium Red,S6, E3, T4 P&T As Ruffner Hall R1, R2, R6 P&T As Clark Hall C1 P&T As Bice House K2 P&T As Facilities E1 P&T As Management North Grounds D1, D2, D3, D5, D22, P&T As Judge Advocate General Carruthers Hall Blue, Y1, Visitor lot X1, X2 JAG As Necessary P&T As Michie Y2 P&T As John Paul Jones Arena University Hall JPJ P&T As Blue, Commuter/Stora ge (Cage & S. Massie) Health System U3, U5, M1, M3, M4, M6, M9, M10, M11, M16, S3, B1, Loading Dock P&T HSPP As As Health System Hauling HSPP As Health System Streets HSPP As 12