East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project

Similar documents
Tom Blackman Project Lead. Mékell Mikell Communications Representative

WELCOME Lake Wabukayne OPEN HOUSE

Illinois River Sediment Quality and Beneficial Use Options

Materials. Use materials meeting the following.

Culvert and Pipe Phasing

Learning Objectives: I can identify and interpret river flows and directions.

Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

Stickney Avenue Depositional Zone (SADZ) Investigation

GM POWERTRAIN BEDFORD FACILITY BEDFORD, INDIANA

Grand Canyon Sediment Augmentation Study. Tim Randle, P.E. Manager, Sedimentation and River Hydraulics Group, Denver, Colorado

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ.

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

A PRIMER ON DAM REMOVALS IN MICHIGAN. Joe Rathbun Michigan Dept. Environmental Quality

Solutions to Flooding on Pescadero Creek Road

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Considerations for Mechanical Dredging, Hydraulic Dredging and Mechanical Dewatering of Sediments

Steven Noble MDEQ - WRD Enbridge Response Unit

EAGLES NEST AND PIASA ISLANDS

Ms. A. Mormando's Class *

Science EOG Review: Landforms

Volatile Losses from Aged Field Sediments

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

APPENDIX H SAN DIEGUITO LAGOON W-19 INLET AND OCEAN ENTRANCE MAINTENANCE STUDY

Ground Water Control of Tree Island Origin, Genesis and Destruction. By John F. Meeder and Peter W. Harlem SERC,FIU

How does erosion happen?

Woodford County Erosion Prevention Plan and Permit. Application #

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

Water Pollution Studies for the Lower Grand River, Michigan

April 9, Phosphate Mining and Reclamation Overview

Estimating Remedial Volumes for a GLLA Project on the Milwaukee River

ATTACHMENT A WEAVER BOTTOMS SEDIMENT BASIN MAINTENANCE PROJECT PROJECT REPORT SUMMARY (APRIL 7, 2014)

Passive, Adsorbent-Based Sediment Pore Water Sampling

Stabilization Study. Prepared For: The Town of Bethlehem. Henry Hudson Park Shoreline Stabilization Study. June 2011

Photographic Log. Photo No. 1. Date: 10/27/15. Direction Photo Taken: Southwest. Photo Taken By: JBH1

Feasibility Study for Potential Removal of McLane & Goldman Dams Souhegan River, Milford, NH. Public Kick-off Meeting

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Controlling Processes That Change Land

Kootenai River Habitat Restoration Program Update

404 Nationwide Permit: File No. SPL PKK FWS-LA-14B F0556 Streambed Alteration Agreement Notification No.

Long-Distance Pumping and Opportunities for Engineering with Nature

Mapping Water Resources and Reservoirs for Climate Resilience in Zambezi River Basin

Snead Pond Restoration

SOLUT TO AUGUST 25 T SPREAD 7 AUGUST 20 TH

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017

Four Mile Run Levee Corridor Stream Restoration

Regional Sediment Management

Surface Water Short Study Guide

Livingston American School 4 th Quarter Curriculum Map

Crows Landing Naval Base Easement

Identifying, Understanding and Addressing Flood-Related Hazards

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States

Geotube Technology for Residuals and Biosolids Management

Natural Shoreline Landscapes on Michigan Inland Lakes

Island Design. UMRS EMP Regional Workshop. Presentation for the

MISSISSIPPI COASTAL IMPROVEMENTS

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016

Changes in Texas Ecoregions

Chapter 2: Physical Geography

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal

DREDGING A land manager s guide to the rules

Overview of fluvial and geotechnical processes for TMDL assessment

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

Information Paper. Kansas City District. Missouri River Fish and Wildlife Mitigation Project Jim and Olivia Hare Wildlife Area, MO

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #

Opportunities to Improve Ecological Functions of Floodplains and Reduce Flood Risk along Major Rivers in the Puget Sound Basin

Land and Water Study Guide

SILT FENCE EFFECTIVENESS

Columbia Estuary Province

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018

Remedial Program. GE Hudson Falls Plant Site. GE Hudson Falls Plant Site. TDCS Status

ISSUED FOR CONSTRUCTION

Why Geomorphology for Fish Passage

NODE. Reconnaissance Inventory of Wetland and Sedimentation Basin Sites New and Alamo Rivers Volume lof2

THIN-LAYER PLACEMENT OF DREDGE MATERIAL FOR MARSH NOURISHMENT, RESOTRATION, AND RESPONSE TO SEA LEVEL RISE

3.11 Floodplains Existing Conditions

Seagrass Transplantation & Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst.

Use of Bioengineering Techniques for Revegetation of Riparian Areas: Colomac Mine Remediation Project, NWT

VEGETATION EVA BOEHRINGER

GIS-Based Sediment Quality Database for the St. Louis River Area of Concern (AOC): Overview Presentations and Demonstration

Ecological Patterns and Processes in Ghost Tree Islands of the Everglades

Sediment Stability in the Lower Passaic River Integration of Multiple Lines of Evidence

Illinois State Water Survey Division

CE415L Applied Fluid Mechanics Laboratory

Removal of riverbank protection along the River Rhine (the Netherlands)

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Appendix E: Cowardin Classification Coding System

Former Guterl Specialty Steel Site

!"#$%&&'()*+#$%(,-./0*)%(!

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

CCR Rule Annual Inspection Report (cont.) 2

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Adjacent Sewage Treatment Plant

A Thesis. The Department of Oceanography and Coastal Sciences. by Lauren Land B.S., University of Maryland College Park, 2008 December 2010

27. Running Water I (p ; )

Developed in Consultation with Florida Educators

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

Transcription:

East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project Jointly funded by the U.S. EPA Great Lakes Legacy Act, Indiana Department of Environmental Management (IDEM), and Indiana Department of Natural Resources (IDNR). This cleanup is the result of a partnership between the U.S. EPA, IDEM, IDNR, U.S. Fish and Wildlife Service, Du Pont, Save the Dunes, Shirley Heinze Land Trust, and the Nature Conservancy Grand Calumet Overview 5 Reach 2c 3 4 Reach 4 & 5 2 1 Reach 4a & 4b Started May 2013 Completed Reach 3 Oct. 2010 Completed Sept. 2009 Reach 1 & 2 Completed June 2013 Reach 2a & 2b 4a 4b West Branch East Branch

The Great Lakes Legacy Act Goal: Accelerate the pace of sediment remediation in U.S. Areas of Concern (AOCs) Mechanism: Use partnerships as an innovative approach to conducting sediment remediation Grand Calumet River

Future Activities Dredging Hydraulic Dredging Dewatering Sediment Dewatering Sediment in Geotextile Tubes Capping Excavation Placing Sand Cap Placing Sand Cap Detail Excavating Marsh Sediment Loading Marsh Sediment Restoration Roxana Marsh West Branch of Grand Calumet River Restored area with upland seed mix one year after dredging. An island planted with wetland plants is visible on the background. Upland area of Roxana Marsh planted with upland seed mix, shrubs and trees. Subcontractors (Pizzo) replanting wetland vegetation during second growing season along the bank.

Air Monitoring Real-time monitoring Performed around active work areas Provides instantaneous readings of dust and organic vapor levels Construction activities adjusted or changed if readings exceed acceptable levels Fixed location monitoring Collect air samples over daily work shift Reported air concentrations for individual chemicals Results provide a more complete picture of longer-term air impacts from construction Odor control system Implemented as needed based on odor levels at the site and surrounding community. Legend!0!0 Fixed Air Sample Location Moving Air Sample Location Sheet Pile Construction Access Road Dredge Limits Sedimentation Basin River River Support Access Area Sediment Dewatering Area Marsh Sediment Dewatering Area River Sediment Dewatering/ Cap Stock Pile Area/ Water Treatment Plant 0 1,000 2,000 Feet Background location at Roxana Marsh (approximately 1 mile west of Kennedy Ave) Location 11 not shown A second offsite location (12) will be added (approximately 1 mile east of Kline Ave at Ivanhoe Nature Preserve) The air sampling locations shown on the map above have been selected to measure air concentrations at the project permimeter, in areas where contaminated sediment is handled and processed, and at background locations distant from the site. Odor control misting Results from cleanups completed up to 2012 Over 2000 samples collected Samples analyzed for VOCs, PAHs, metals, mercury, PCBs, and pesticides No difference in concentrations measured near work areas vs. background location away from site

Current Activities Sediment Dewatering Pad Construction Mobilization of Hydraulic Dredge Removal of Abandoned Railroad Bridge and Natural Gas Pipeline Installation of Temporary Sheetpile Wall to Protect Downstream Area

Where Does the Sediment Go? Dredging Excavation Contaminated sediment is removed from the Grand Calumet River by either dredging or excavation. When the sediment is removed from the river or surrounding wetlands, it is too wet to send to a landfill. The wet material needs to be dried out and the excess water removed. Sediment dredged by hydraulic means is pumped to large geotextile tubes. The solid sediment stays inside the tube while the water flows through the fabric. The water is collected, treated and then eventually returned to the river. Sediment that is excavated is transported to a dewatering pad. Drying agents are then mixed into the sediment to absorb excess moisture. Once the sediment is suitable for the landfill, it is loaded into trucks. A plastic liner is placed inside the truck to retain any liquid that might be come out of the sediment during transport. After a few weeks the formerly wet sediment is a dry soil-like material. At the landfill, the sediment is placed with other waste.