APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW)

Similar documents
Guideline Petroleum Drilling Regulations (CNR 1150/96)

Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS

Introduction to Oil&Gas Well Drilling

Drillworks. DecisionSpace Geomechanics DATA SHEET

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

The Evolution of Drilling Techniques at the Camden Gas Project. Chris Holmes and Jon Black AGL 27 th June 2007

J.V. Herwanger* (Ikon Science), A. Bottrill (Ikon Science) & P. Popov (Ikon Science)

Colorado s Underground Injection Control Program: Prevention and Mitigation of Induced Seismicity

PETROLEUM 101. Mark Shrimpton Jacques Whitford

Introduction to Formation Evaluation Abiodun Matthew Amao

Exploration, Drilling & Production

Larus Energy Limited ANNUAL GENERAL MEETING, 30 TH SEPTEMBER, 2014 COMPANY UPDATE ASH MANGANO, CHIEF EXECUTIVE OFFICER

Well Logging Importance in Oil and Gas Exploration and Production

Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania. Authors: John Lavelle, Amin Yaghoobi

Phoenix South-3 drilling update 09 August 2018

Pressure Regimes in Deep Water Areas: Cost and Exploration Significance Richard Swarbrick and Colleagues Ikon GeoPressure, Durham, England

Drilling Challenges Related to Geopressure Compartmentalization Selim S. Shaker, Geopressure Analysis Services (G.A.S.)

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

September 21,

Introduction to Oil and Gas Production

Well Construction and Cementing Practices in Shale and Salt Water Disposal Wells

Seismic Guided Drilling: Near Real Time 3D Updating of Subsurface Images and Pore Pressure Model

Licence P1368: Relinquishment Report (end of 2 nd term) Hurricane Exploration PLC

GUIDELINES FOR DRILLING

COGCC Underground Injection Program & Induced Seismicity

GEOSTEERING Scope of work, project management and geosteering scenarios

Multi-target wells: a new concept to improve well economics

Shale Development and Hydraulic Fracturing or Frac ing (Fracking) What is it?

MULTIPLE CHOICE QUESTIONS OIL, GAS, AND PETROCHEMICALS. The Energy and Resources Institute

Optimizing Drilling Performance by Wellbore Stability and Pore-Pressure Evaluation in Deepwater Exploration T. Klimentos, Schlumberger

Estimation of Pore Pressure from Well logs: A theoretical analysis and Case Study from an Offshore Basin, North Sea

ractical Geomechanics for Oil & Gas Industry

6. THE BOREHOLE ENVIRONMENT. 6.1 Introduction. 6.2 Overburden Pressures

September 17, OGC

Provincial Standards for Early Exploration

Implementing and Monitoring a Geomechanical Model for Wellbore Stability in an Area of High Geological Complexity

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

NUCLEAR POWER PLANT SITE SELECTION

New Well. Iplication. General Well Information. RKB Elevation 105 Drive Depth ft 3765 Subsea BOP Yes. SWF om ft

Derogation Criteria for the Requirements for Generators Network Code

Festningen Part 1 Page 1 of 12

NPD Factpages. Wellbore / Exploration. General information. Wellbore name 6507/7-3 EXPLORATION. Factmaps in new window. link

Regulatory Report (Grid North)

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for the Form of Reports and Illustrations

MULTI-DISCIPLINARY TEAMWORK DELIVERS OUTSTANDING KRECHBA HORIZONTAL WELL PERFORMANCE

Tesorillo Project Presentation Spain. June 2013

West Coast Research. WESTCARB Technical Director California Energy Commission

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

EGYPT: SILDRIL Gives Top Performance in Nile Delta Well

SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION

Kansas Underground Injection Control Program & Induced Seismicity. By: Benjamin Busboom Stinson Leonard Street

Defining Metrics for Reliability of Hydraulic Fracturing Operations in Shale Gas

PORE PRESSURE AND FRACTURE PRESSURE MODELLING WITH- OFFSET WELL DATA AND ITS APPLICATION TO-SURFACE CASING DESIGN OF A DEVELOPMET WELL

Oil and Gas Production and Exploration, Part I

OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL

OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL

Reprinted From. Volume 03 Issue 03-JulY 2010

Rotary Drilling Rotary Drilling Bits

Early Exploration Plan Activity Information

Oil Company Company et al Foothills W6

X,800. X,850 ft. X,900 ft. X,950 ft. X,000 ft. GeoSphere. Reservoir Mapping-While-Drilling Service

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)

QUARTERLY ACTIVITIES REPORT

LITTLE ABOUT BASIC PETROPHYSICS

PART I Hot Dry Rock Geothermal Energy: History and Potential of the Newest and Largest Renewable Energy Resource

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017

APPLICATION FOR CHANGE OF WATER RIGHT

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

Petrophysical Data Acquisition Basics. Coring Operations Basics

OTC OTC PP. Abstract

Instructional Objectives

Petroleum Exploration

Heterogeneity Type Porosity. Connected Conductive Spot. Fracture Connected. Conductive Spot. Isolated Conductive Spot. Matrix.

Predicting the path ahead

NPD Factpages. Wellbore / Exploration. General information. Wellbore name 17/12-2 EXPLORATION. Factmaps in new window link.

Precise well placement in the Cygnus gas field. Ian Dredge ENGIE E&P UK Limited

N121: Modern Petrophysical Well Log Interpretation

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

REID S DOME GAS DRILLING PROGRAM TO COMMENCE

Geohazards have a direct impact on the drilling and

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

For personal use only

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Electronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315)

SEPTEMBER 1991 MONTHLY REPORT. Scientific Observation Hole (SOH) Geothermal Resource Permit: GRP TMK: :01; :02; and :32

1.0 PURPOSE AND FORMAT OF THE FINAL EIR

OVERVIEW OF ER DRILLING IN EARTH EMBANKMENT DAMS AND

PETROLEUM GEOSCIENCES GEOLOGY OR GEOPHYSICS MAJOR

Guidance for implementing the Potential Fossil Yield Classification (PFYC) System

CADE/CAODC DRILLING CONFERENCE October 20 & 22, 2003 Calgary, Alberta, Canada

ractical Geomechanics for Unconventional Resources

Hot Creek Valley Oil Field

Zomo Oil Discovery Fifth oil discovery made in Niger

The following procedures describe how application managers will review chemical additives during the permit application review phase.

2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS

Practical Application of Directional Drilling at Takigami Geothermal Field

Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

Transcription:

APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW) Operator: Pursuant to section 8 and 9 of the Petroleum and Natural Gas Act (R.S.N.L. 1990, c. P-10) and in compliance with section 29 of the Petroleum Drilling Regulations, (CNR 1150/96), the Operator hereby applies for Authority to Drill a Well (ADW) The undersigned Operator s Representative hereby declares that, to the best of his or her knowledge, the information contained or incorporated herein is true, accurate and complete. Operator s Representative: Signed: (Printed Name) Title: Date:

Instructions: 1) Instructions to assist the Operator in completing this application are provided throughout the document in Blue font. The text in Blue font should be deleted prior to submission to the Department of Natural Resources (DNR) Petroleum Development Section. 2) Once the application is completed, it should be signed and dated in blue ink by the Operator s representative responsible for the drilling program. A hard copy of the application, together with a CD containing both the MS Word document and a pdf of the signed version of the application, as well as electronic copies of any files and attachments associated with the application, including an MS Excel spreadsheet of any proposed well trajectory, should be submitted to DNR. Electronic submission can be submitted to the Petroleum Development email account at: petroleum_development@gov.nl.ca 3) Provided that the application is complete and the proposed program is consistent with the Petroleum Drilling Regulations (CNR 1150/96) and associated guidelines, approval will normally be issued within 21 days. 4) When completing this application, Operators should note that all of the requirements related to Drilling Program Approval (DPA) including benefits plans, financial responsibility, safety plans, contingency plans, environmental protection plans and field data acquisition programs also apply to this approval. 5) All diagrams, schematics, tables or other documents embedded within this application, or attached as an Appendix to this application, must be of high resolution for easy readability. 6) Any deviations from an approved ADW during the execution of the program should be brought to the attention of the DNR as soon as reasonably practicable. In all circumstances, DNR is to be notified prior to the implementation of any proposed change. Dept. of Natural Resources Page 2 of 21 August 21, 2012

1.0 Introduction Describe the purpose, timing and objectives of the well (1-2 paragraphs). 2.0 General Information Well Name: Permit/License/Lease Basin/Field/Pool: Drilling Rig: Rig Type: Drilling Contractor: Geographic Coordinates: Long Lat Estimated Elevation (meters): RT GL Estimated Total Depth (MD): Anticipated Spud Date: Anticipated time to Drill Well: Estimated Cost: Dept. of Natural Resources Page 3 of 21 August 21, 2012

3.0 Legal Survey Plan A legal survey shall be used to confirm the location of all wells as soon as practical. The Operator must submit a tentative survey plan with the application and embed within this section. 4.0 Site Meteorological and Environmental Consideration(s) Operator to describe how the program has been designed to overcome the meteorological and environmental conditions referred to in the application for Drilling Program Approval (DPA). This shall include providing the prevailing environmental conditions in the area of the drill site, the expected discharge at the drill site and details of the equipment, procedures and resources to be employed to protect the natural environment in the vicinity of the proposed well. 5.0 Geological Prognosis 5.1 Description Provide a technical description of the prospect. This description should emphasize structural and depositional interpretations, identify the target formation(s), play type (structural, stratigraphic and/or both) and include a discussion of the rationale for selecting the well location. Dept. of Natural Resources Page 4 of 21 August 21, 2012

5.2 Stratigraphic Chart(s) Insert a diagrammatic presentation of the anticipated stratigraphic section and the interval velocities used to produce the section. 5.3 Anticipated Lithology Provide a discussion of the anticipated Lithology. This is to include the depth, thickness and Lithology of anticipated formations. Also, please provide interval velocities or other sources of information used to produce this section. 5.4 Geologic Tops Complete the following table. Please ensure that the depth uncertainty associated with each top is included. Formation/Zone mrt (MD) mrt (TVD) +/- m (TVD) Dept. of Natural Resources Page 5 of 21 August 21, 2012

5.5 Prospective Horizons Complete the following table. Target Target Name UTM Easting (meters) UTM Northing (meters) 1 2 3 Please provide a technical description of each of the target formations. Structure maps are to be provided in Section 5.6. 5.6 Well Section Where offset well data is available, embed in this section of the application, or attach as an Appendix: 1. A stratigraphic cross-section showing regional geologic markers and interpretations superimposed on a relevant suite of logs 2. A seismic-geological schematic showing structural and stratigraphic interpretations. In both cases, the targeted formation(s) should be highlighted, and the figure should be at an adequate resolution to clearly depict the logs and geological markers. Dept. of Natural Resources Page 6 of 21 August 21, 2012

5.7 Geophysical Maps Please provide a series of time structure or depth structure contour maps illustrating the areal configuration of the major horizons. Depth structure contour maps to be produced from drill logs if no seismic is available. 5.8 Seismic Data If seismic data has been acquired, at least 2 fully processed seismic sections, crossing the proposed well site or projected across the proposed well site which preferably should be orthogonal. This would include interpreted and un-interpreted copies of both lines. Dept. of Natural Resources Page 7 of 21 August 21, 2012

6.0 Well Evaluation Program 6.1 Mud Logging Program Please outline details of the mud logging program that will be conducted during operations. The Operator is to ensure that this program will be conducted in compliance with Petroleum Drilling Regulations. 6.2 Drill Cuttings Purpose Sample Type/Preparation Frequency Destination /Comments Hole Section Lithological Analyses Geochemical Analysis 1 set washed and dried cuttings 1 vial container (25ml) 1 set unwashed cuttings 500g in a moisture-proof container DNR Requires minimum of 1 sample every 5 meters DNR Requires minimum of 1 sample every 10 meters DNR DNR Fluid Analysis 1 Fluid Sample o Drilling As Obtained. o Formation Flow Testing one sample minimum per formation tested DNR on request of Director 6.3 Conventional Coring and Wireline Logging Program Please complete the attached Table 1 respecting conventional coring and logging components of the well evaluation program. Conventional Coring: The operator shall ensure that conventional cores are taken in accordance with the specified program contained in Table 1. Specific details on how conventional core shall be taken and the subsequent analysis are outlined in Section 100 (3) and 101, respectively, of the Petroleum Drilling Regulations. Wireline Logging: The operator shall ensure that wireline logs that are necessary for the proper evaluation of a well are taken over all uncased intervals in the well below the Dept. of Natural Resources Page 8 of 21 August 21, 2012

surface casing. Please refer to Part VI Well Evaluation of the Petroleum Drilling Regulations for complete details on wireline log requirements. 6.4 Formation Flow Testing The operator shall ensure that every formation in a well is sampled or tested to obtain fluid flow and reservoir pressure data from the formation where there is an indication that the result of that sample or test will contribute substantially to the evaluation of the formation. Also, an operator shall ensure that a formation flow test is conducted if fluid samples and productivity data are required and wireline formation samples do not provide sufficient information for the evaluation of the formation. Please indicate if formation flow testing is planned at this point. Please note that, the operator will be required to submit a detailed testing program before conducting any formation flow testing. This program shall be in compliance with the requirements stated in Part VII Formation Flow Testing of the Petroleum Drilling Regulations and as per best industry practices. 7.0 Drilling Program 7.1 Subsurface Conditions anticipated during drilling Please outline the subsurface conditions anticipated at the proposed drill site that may affect the safety and efficiency of the drilling operations including the depth and nature of formations where problems such as geo-hazards, lost circulation, swelling shale and abnormal pressure zones are anticipated. This discussion should include, to the extent applicable, wellbore instability, faults, hydrocarbon bearing formations, H 2 S and any other subsurface hazards. Dept. of Natural Resources Page 9 of 21 August 21, 2012

7.2 Offset Well Data Please include a summary or description of the offset well data used in the planning and engineering of the well. 7.3 Drilling-Time Curve Embed in this section of the application, or provide as an Appendix, a time-depth curve for the well. If the drilling program plan includes suspending the well before all drilling activities are completed, then this should be reflected in the time-depth curve. 7.4 Directional Plan The directional plan should be provided as an MS Excel spreadsheet. The minimum required parameters include measured depth, inclination and azimuth, although other parameters may be provided at the Operator s discretion. If the application is for an exploration well, and the well trajectory crosses from one permit to another, then this section of the application should also identify the measured depth at which the well trajectory will cross over the boundary for the two permits The directional plan should contain both surface location and proposed bottom hole coordinates. In the case of an onshore-to-offshore well, plan should identify the measured depth at which the well enters the offshore area, defined as the original low water mark along the open coast of the province. Dept. of Natural Resources Page 10 of 21 August 21, 2012

7.5 Formation and Fracture Pressures Embed in this section of the application, or provide as an Appendix, a plot illustrating the anticipated pore pressure, planned drilling fluid densities and fracture gradient profiles for the well and provide a narrative description of the basis of the pore pressure/fracture gradient prediction. 7.6 Hole Sizes and Depths Complete the table below. In the case where contingency hole sizes are an option, this should be described in the comments section below. Bit Size (mm) Anticipated Total Depth mrt (MD) mrt (TVD) Comments: 7.7 Casing and Cementing Program Casing Design For each proposed casing string, complete the table below. If this application is for a sidetrack, then the ODs, weights and grades of the existing casing strings, that will form part of this well, should also be provided. In the case where contingent casing strings are planned, this should be either included in the table or described in the comments section following the table below. Dept. of Natural Resources Page 11 of 21 August 21, 2012

Interval mkb MD (mkb TVD) Outer Diameter (mm) Weight (kg/m) Grade Burst Collapse Tensile Design Summary Comments 1 Highest Load (kpa) Rating (kpa) 2 Safety Factor 3 Design Summary Comments 1 Highest Load (kpa) Rating (kpa) 2 Safety Factor 3 Design Summary Comments 1 Highest Load (dan) Rating (dan) 2 Safety Factor 3 Notes: 1. Include a summary of the design load cases that were evaluated, together with a description of the worst-case design load and the depth at which the lowest safety factor occurs. 2. Indicate the rating of the casing or the connector (whichever is lowest). In the case where non-api casing is proposed, information respecting the casing burst, collapse and tensile specifications should be provided separately to DNR. 3. The minimum design factors used in the design of well casings shall be: (a) 1.33 for burst, for surface and intermediate casing; (b) 1.0 for burst, for conductor casing, production casing and liners; (c) 1.0 for collapse; and (d) 1.6 for tension. Please refer to Part III of the Petroleum Drilling Regulations Casing for complete casing requirements. Comments: Dept. of Natural Resources Page 12 of 21 August 21, 2012

Cementing Design Complete the table: OD (mm) Cement Classification Slurry Volume (m3) Slurry Density (kg/m 3 ) Lead Tail Lead Tail Proposed Top of Lead Cement mrt (MD) mrt (TVD) Proposed Top of Tail Cement mrt (MD) mrt (TVD) Note: Please refer to Part III of the Petroleum Drilling Regulations Casing for complete details of cementing program requirements Describe below, the proposed composition of the cement slurries for each casing string: Casing and Cementing Pressure Tests Complete the table: OD (mm) Pressure Surface Test Pressure (kpa) Anticipated Fluid Column Density (kg/m 3 ) Comments Notes: 1. Indicate the proposed applied surface pressure as well as the fluid density anticipated during the test. 2. In the comments section, describe the basis for the proposed pressure test in terms of the worst case load condition that the test is based on. Dept. of Natural Resources Page 13 of 21 August 21, 2012

3. Please refer to Sections 61-63 of the Petroleum Drilling Regulations for complete pressure testing requirements. Comments: 7.8 Blowout Preventer System Blowout Preventer Stack Complete the table: Component Size (mm) Rating (kpa) Blowout Preventer Pressure Tests Complete the table (pressures should be provided in kpa). Hole Section (mm) Annulars Pipe Rams Shear Rams Low High Low High Low High Notes: Please refer to Part IV of the Petroleum Drilling Regulations Well Control Equipment for complete details on BOP equipment and pressure testing requirements. Comments: Dept. of Natural Resources Page 14 of 21 August 21, 2012

7.9 Drilling Fluid Program Complete the table: Hole Size (mm) Mud Type E.g., Seawater w/ PHG sweeps (SBM, etc ) Proposed Density (kg/m 3 ) Notes: Please refer to Part V of the Petroleum Drilling Regulations Drilling Operations and Procedures, Sections 70-74 of the Petroleum Drilling Regulations for complete details on Drilling Fluid system and monitoring requirements. Comments: 7.10 Sequence of Drilling Operations Please provide the details of the sequence of drilling operations and procedures to be used for each phase of the hole. This would involve, at a high level, the step-by-step sequence of operations for the proposed drilling program, including planned pressure tests of BOPE and casing strings. If the well is to be suspended before completion of all drilling activities, or if more then one drilling facility is to be used to complete the drilling activities, then this should be reflected in the sequence of operations. Dept. of Natural Resources Page 15 of 21 August 21, 2012

7.11 Well Schematic Embed in this section of the application, or attach as an Appendix, a schematic of the proposed well illustrating the hole sizes, casing program, proposed tops of cement and such other information as may be necessary to illustrate the proposed well design. 7.12 Leak-Off/Formation Integrity Test Provide a summary of the plans for conducting leak-off test or formation integrity test. Note: An operator shall conduct a pressure test in the hole to determine the pressure integrity of the formations present in the hole: (a) before drilling more than 60 metres below the shoe of a casing other than the conductor casing; and (b) when an over-pressured zone is about to be penetrated. This test shall test the formation to a pressure which is the lesser of one and one-third times the indicated formation fluid pressure and the pressure at which the formation begins to accept the test fluid before the point of fracturing. Where a well is to be abandoned, an operator shall pressure test a formation to its fracture point on the request of the director during the abandonment of the well. Dept. of Natural Resources Page 16 of 21 August 21, 2012

8.0 Well Termination 8.1 Well Completion If it is known at the time of submission that the well is to be completed, indicate a general description of the completion. Please note that the operator will be required to submit a detailed completion program and associated Well Termination Form for review prior to carrying out the proposed activities. 8.2 Well Abandonment/Suspension Please outline a description of the estimated abandonment/suspension program and complete the following table outlining the plugs that will be set. This program, along with the site reclamation, will form the basis of the required abandonment estimate and deposit required before the well can be approved. Plug # Description Depth/Interval (mrt MD) Proposed Pressure Test (kpa) To be Tagged (Yes/No) This description should also be supplemented with a well schematic that illustrates the planned location of the plug(s) and any other pertinent information that aids in depicting the proposed configuration of the abandoned or suspended well. Dept. of Natural Resources Page 17 of 21 August 21, 2012

Please refer to Part VIII of the Petroleum Drilling Regulations Well Termination for complete details of well abandonment/suspension requirements. Confirmation should also be provided that the manner in which the well will be abandoned or suspended meets the requirements of the Regulations, particularly as it relates to the need to isolate porous and permeable intervals, abnormally pressured zones, lost circulation zones, etc. If the application involves the suspension of a well, the estimated duration that the well is expected to be suspended should be indicated, together with the future proposed plans for the well; otherwise, indicate Not Applicable. 9.0 Environmental/Regulatory 9.1 Pollution Prevention Plan Where a proposed well is to be located within 100 metres of the normal high water mark of a body of water or permanent stream, the operator shall submit evidence that he or she has obtained prior written approval of his or her plan to prevent pollution of the water from those regulatory bodies that have jurisdiction in respect of the drill site. These plans shall (a) indicate the elevation of the land and water surfaces adjoining the drill site; (b) describe special problems at the drill site; (c) include details of the construction and maintenance of dikes, reservoirs and other installations intended to be constructed; and (d) provide particulars in respect of the method to be used to dispose of mud, oil, water or other fluids associated with the proposed drilling operations. Dept. of Natural Resources Page 18 of 21 August 21, 2012

9.2 Government Approvals Please provide the title, date and registration numbers of any applicable governmental approval or application for approval pertaining to this drilling program. This would include License to Occupy, Water Use License(s), etc. 9.3 Environmental Assessment Provide the title and date of any applicable environmental assessment document pertaining to this drilling program. 10.0 Contact Information Identify the person from whom DNR can seek clarification in the event of any questions with this application. Name: Title: Telephone Number: E-mail Address: ------------------------------------------ End Dept. of Natural Resources Page 19 of 21 August 21, 2012

TABLE 1 Well Evaluation Program Conventional Coring and Logging Hole Size (mm) Interval (m) Dev (Max) Mud Type Conventional Coring LWD Wireline Cased Hole Comments Note: Should a well evaluation program require alteration, the Operator is required to obtain approval of the proposed deviation before proceeding. Provide, in the space on the next page, any additional information or clarifying notes respecting compliance with the well evaluation requirements. In particular, this should include: 1) the objectives of the coring program together with the targeted formation(s) to be cored, the length and diameter of core to be cut and the criteria to be used to determine core point; 2) a Glossary of any abbreviations used in the Table; and 3) The circumstances where any Optional or Contingent logs would be acquired. Dept. of Natural Resources Page 20 of 21 August 21, 2012

Comments: [Please type here]j Glossary of Terms: [Please type here]j Dept. of Natural Resources Page 21 of 21 August 21, 2012