Hydro-Mechanical Modeling of a Shaft Seal in a Deep Geological Repository

Similar documents
Clays in Geological Disposal Systems

Experimental program in the URL

Peter Elder, Vice-President and Chief Science Officer Technical Support Branch October 10, 2017 Kingston, ON. DECOVALEX-2019 Workshop.

Hydrogeology of Deep Borehole Disposal for High-Level Radioactive Waste

Impact of permafrost on repository safety

Thermo-Hydro-Mechanical-Chemical (THMC) Modelling of the Bentonite Barrier in Final Disposal of High Level Nuclear Waste

Thermal and Mechanical Influence of a Deep Geological Repository in Crystalline Rock on the Ground Surface

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository

1. Introduction. 2. Model Description and Assumptions

APPLICATION OF 1D HYDROMECHANICAL COUPLING IN TOUGH2 TO A DEEP GEOLOGICAL REPOSITORY GLACIATION SCENARIO

THE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE

Underground nuclear waste storage

The use of Underground Research Facilities in the development of deep geological disposal

Stress distribution in inclined backfilled stopes

ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3

3D simulations of an injection test done into an unsaturated porous and fractured limestone

WITPRESS WIT Press publishes leading books in Science and Technology. Visit our website for the current list of titles.

Mathematical Modelling of a Fault Slip Induced by Water Injection

A thermo-hydro-mechanically coupled analysis of clay using a thermo-elasto-viscoplastic model

Farimah MASROURI. Professor in Geotechnical Engineering. LAEGO : Research Center In Geomechanics & Geoenvironmental Engineering

Experimental study of the hydromechanical coupling in argillaceous rocks: the example of Boom clay

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Wick Drain

MECHANICAL AND HYDROMECHANICAL BEHAVIOR OF HOST SEDIMENTARY ROCKS FOR DEEP GEOLOGICAL REPOSITORY FOR. Hadj Abdi. Thesis submitted to the

Underground Storage & Disposal - The Salt Concept. Thomas Brasser - GRS

Deep Borehole Disposal Performance Assessment and Criteria for Site Selection

Thermo hydro mechanical coupling for underground waste storage simulations

PROBABILISTIC TRANSPORT PATH ANALYSIS THROUGH THREE-DIMENSIONAL DISCRETE FRACTURE NETWORKS FOR UNDERGROUND RADIOACTIVE WASTE DISPOSAL FACILITIES

Numerical Simulation of Unsaturated Infilled Joints in Shear

Modelling the excavation damaged zone in Callovo-Oxfordian claystone with strain localisation

b) EFFECTIVE STRESS (c) SEEPAGE

In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation

Climate effects on landslides

MODELING OF GAS MIGRATION THROUGH LOW-PERMEABILITY CLAY USING INFORMATION ON PRESSURE AND DEFORMATION FROM FAST AIR INJECTION TESTS

Geoscientific Verification Plan

M. Chijimatsu, T.S. Nguyen, L. Jing, J. De Jonge, M. Kohlmeier, A. Millard, A. Rejeb, J. Rutqvist, M. Souley, Y. Sugita

Initial Borehole Drilling and Testing in Central Huron,

Title. Author(s)Akm Badrul, Alam; Fujii, Yoshiaki; Aramaki, Noritaka. CitationProceedings of Japan Symposium on Rock Mechanics, 14

nuclear science and technology

Modified Dry Mixing (MDM) a new possibility in Deep Mixing

Seismic Stability of Tailings Dams, an Overview

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Postclosure Safety Assessment: Groundwater Modelling

Cyclic Triaxial Behavior of an Unsaturated Silty Soil Subjected to Suction Changes

8.1. What is meant by the shear strength of soils? Solution 8.1 Shear strength of a soil is its internal resistance to shearing stresses.

Assessment of the Chemical Hazard of a Canadian Used Fuel Repository with Copper Containers. M. Gobien*, F. Garisto, N. Hunt, and E. P.

C) D) 3. Which graph best represents the relationship between soil particle size and the rate at which water infiltrates permeable soil?

Initial Borehole Drilling in the Hornepayne and Manitouwadge Area

Deep Borehole Field Test Overview. Presentation Overview

Initial Borehole Drilling and Testing in or Near Ignace

SELF-HEALING OF FRACTURES WITHIN THE EDZ AT THE MT. TERRI ROCK LABORATORY : RESULTS AFTER ONE YEAR OF EXPERIMENTAL WORK

Finite Element Solutions for Geotechnical Engineering

Monitoring of underground construction

Collaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS (CH)

Geomechanical interaction in a nuclear waste disposal vault

Convective drying : experimental campaign and numerical modelling

APPLICATIONS OF ULTRASONIC TECHNIQUES TO IN-SITU INVESTIGATION OF CRITICAL STRUCTURES IN ROCK AND CONCRETE

Mass Wasting. Requirements for Mass Wasting. Slope Stability. Geol 104: mass wasting

Petroleum Geomechanics for Shale Gas

Soil Mechanics for Unsaturated Soils

Prof. Stephen A. Nelson EENS 111. Groundwater

SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE BOULDERS IN GLACIAL DEPOSITS

Geoscientific Research and Links to the Regulatory Framework for the Development of the Safety Case

YOUR HW MUST BE STAPLED YOU MUST USE A PENCIL (no pens)

On the water retention behaviour of shales

Présentation orale par. Oral Statement from. Peter Ottensmeyer. Peter Ottensmeyer PMD 13-P1.139

16 Rainfall on a Slope

Reasoned Argument Why Large-Scale Fracturing Will Not Be Induced by a Deep Geological Repository

10. GEOTECHNICAL EXPLORATION PROGRAM

Safety of Rockfill Dam upon Underwater Explosion Limin Zhang Tianhua Xu

Laboratory Triaxial and Permeability Tests on Tournemire Shale and Cobourg Limestone (Contract : R413.8) FINAL REPORT

Instructor : Dr. Jehad Hamad. Chapter (7)

Supplementary Uniaxial Compressive Strength Testing of DGR-3 and DGR-4 Core

Long-Term Strength Degradation Testing of DGR-3 and DGR-4 Core

NUMERICAL STUDY OF NUCLIDE MIGRATION IN A NONUNIFORM HORIZONTAL FLOW FIELD OF A HIGH-LEVEL RADIOACTIVE WASTE REPOSITORY WITH MULTIPLE CANISTERS

Clay interactions at high temperature by molecular dynamics, thermodynamic modelling and laboratory experiments and analysis

6. Circle the correct answer: SINK A drains faster or SINK B drains faster Why?

A PRESSURE VESSEL FOR TRUE-TRIAXIAL DEFORMATION & FLUID FLOW DURING FRICTIONAL SHEAR

Summary of the BELBaR project

Building a Robust Numerical Model for Mass Transport Through Complex Porous Media

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Teaching Unsaturated Soil Mechanics as Part of the Undergraduate Civil Engineering Curriculum

Treatment of Colloids in the Safety Case

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method

Developments in a Coupled Thermal- Hydraulic-Chemical-Geomechanical Model for Soil and Concrete

Implications of Host Rock Selection for a HLW Repository System in Germany - Consequences for Repository Design and Safety - Wilhelm Bollingerfehr

GEOMENGTER - Geomechanical and Geotechnical Engineering

1.8 Unconfined Compression Test

Numerical Approach to Predict the Strength of St. Peter Sandstone Pillars acted upon by Vertical Loads A case study at Clayton, IA, USA.

Clayey sand (SC)

Desiccation Cracking of Soils

Cavity Expansion Methods in Geomechanics

FLOOD1 report: Appendix 3

LABORATORY MEASUREMENTS OF PULLING FORCE AND GROUND MOVEMENT DURING A PIPE BURSTING TEST

4 Undrained Cylindrical Cavity Expansion in a Cam-Clay Medium

Numerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading

Landslide FE Stability Analysis

Laboratory Geomechanical Strength Testing of DGR-2 to DGR-6 Core

Sandia National Laboratories

China-Mock-up status Annual Reports

Transcription:

Presented at the COMSOL Conference 2010 Boston Hydro-Mechanical Modeling of a Shaft Seal in a Deep Geological Repository D. G. Priyanto Presented at COMSOL Conference 2010 Boston, 2010 October 7-9

Background The Nuclear Waste Management Organization s (NWMO) Adaptive Phased Management (APM) approach to nuclear fuel waste management includes the isolation and containment of used nuclear fuel in a Deep Geological Repository (DGR). A shaft seal is one of the engineered barriers considered in isolating and containing used nuclear fuel in a Deep Geological Repository (DGR). 2

Shaft Sealing Concept Shaft Sealing Concept AE @1993 Shaft Seal A shaft seal would be installed at strategic locations, such as significant fracture zone. Deep Geological Repository (DGR) to limit the potential for fast movement of groundwater from repository level to the surface via the shaft. Shaft Sealing Concept AE @ 1993 3

Full-Scale Shaft Seal at AE s URL (Dixon, Martino & Onagi 2009) The objective of the seals at URL is to limit the mixing of groundwater with higher salinity below the FZ with lower salinity above the FZ. The seal construction is funded by Natural Resources Canada (NRCan) under the Nuclear Legacies Liability Program (NLLP). Monitoring is funded by Enhanced Sealing Project (ESP) (NWMO, Posiva Oy, SKB and ANDRA). Seals at the AE s Underground Research Laboratory (Martino et al. 2010) THM responses being monitored include: temperatures, displacements, strains, pore pressures, & total pressures at selected location. 4

Objective The objective of this presentation is: to evaluate the capability of COMSOL to simulate the hydraulic & mechanical (H-M) processes of a shaft seal installed at a fracture zone in a hypothetical geosphere. The final objective: to simulate all required processes of an actual shaft seal. (e.g., coupling H, M, T, Mass transfer) 5

Hypothetical Shaft Seal Geometry 2D-axisymetrical geometry 100 m Hydraulic Properties of the Geosphere B 100 m K FZ-Center = 10-9 m/s C 3 m K FZ-Side = 10-10 m/s K rocks D E 1 m A C B 6 m 3 m 100 m 4 m 2 m Shaft Elevations (250 m) Legend A : Bentonite-Sand Mixture (BSM) B : Dense Backfill (DBF) C : Concrete D : Fractured Zone (FZ) E : Crystalline Rocks 7.3 m A, B, and C are in unsaturated conditions at installation 6

Stages of Numerical Modeling 1. Stage 1 simulates groundwater flow into open shaft and stress condition prior to seal installation. Duration: time between excavation and shaft seal installation (100 y?) 2. Stage 2 simulates groundwater flow after shaft seal installation. Duration: depending the half life of the nuclear waste (0 1,000,000 y?) Stage 1 Stage 2 DBF Open shaft C 100 y? CS C BSM CS 0-1,000,000 y? DBF 7

Challenges Challenge 1 Sealing components are initially unsaturated, Clay-based sealing components have large volume change coupling of the unsaturated flow with structural mechanics Challenge 2 Properties and conditions at the seal location change abruptly between Stages 1 and 2. Challenge 3 The durations of Stages 1 and 2 considered in this study are anticipated to be in order of 100 years to 1,000, 000 years. reasonable solution time 8

Coupling of HM Formulation for Unsaturated Soil Detailed formulations are provided in (Priyanto 2010) H p C SeS KH p D Qs S t S = f g ( p + f ) k e sat w k 0 3 1 1 1 H 1 m C 1 m 0 s p 2 n 1 m K 2 0 3 0 for for 1 S r S e 1 m k sat k w r H e H 1 m p p 0 0 m for for H H p p 0 0 100 mm Unsaturated flow = Richard s equation with vangenuchten s SWCC and permeability models. Mechanical = Linear elastic model Compare with laboratory triaxial test of the Bentonite-Sand Impermeable Mixture (BSM) 50 mm y Triaxial Specimen (a) 50 mm x line y Impermeable u w = 0.2 MPa x No flow at symmetry Impermeable line Initial u w = 0.2 MPa u a = 0.101 MPa w c = 18.75% (b) Hydraulic Impermeable Initial u a = 0.101 MPa w c = 18.75% y Initial p = 0.5 MPa No y-displacement at symmetry line Initial p = 0.5 MPa x (c) Mechanical 9

Results of HM Numerical Modeling of Unsaturated BSM Specimen Dry density Impermeable X = 0 cm 100 mm 50 mm y Triaxial Specimen (a) 50 mm x line y Impermeable u w = 0.2 MPa No flow at symmetry Impermeable line Initial u w = 0.2 MPa u a = 0.101 MPa w c = 18.75% (b) x Impermeable Initial u a = 0.101 MPa w c = 18.75% y Initial p = 0.5 MPa X = 0.5 cm X = 1.0 cm X = 1.5 cm X = 2.0 cm X = 2.5 cm Degree of saturation No y-displacement at symmetry line Initial p = 0.5 MPa (c) x X = 0 cm X = 0.5 cm X = 1.0 cm X = 1.5 cm X = 2.0 cm Volume of Water Added (ml) 18 16 14 12 10 8 6 4 2 0 Volume of water added to the specimen Laboratory Test COMSOL 0 2 4 6 8 10 Time (days) X = 2.5 cm 10

H-M Modeling of Shaft Seal 100 m Hydraulic Properties of the Geosphere B 100 m K FZ-Center = 10-9 m/s C 3 m K FZ-Side = 10-10 m/s K rocks D E 1 m A C B 6 m 3 m 100 m 4 m 2 m Shaft Elevations (250 m) Legend A : Bentonite-Sand Mixture (BSM) B : Dense Backfill (DBF) C : Concrete D : Fractured Zone (FZ) E : Crystalline Rocks 7.3 m 11

Porewater Pressure, Stage 1 Stage 1, groundwater flow into open shaft 0 1 10 100 [Years] Note that this results is only valid for the hypothetical assumptions and properties used in this study. 12

Porewater Pressure, Stage 2 (0-100 years) Stage 2, groundwater flow into shaft seal 0 1 10 80 100 [Years] Note that this results is only valid for the hypothetical assumptions and properties used in this study. 13

Porewater Pressure, Stage 2 (1e3-1e6 years) Stage 2, groundwater flow into shaft seal 1,000 10,000 100,000 1,000,000 [Years] Note that this results is only valid for the hypothetical assumptions and properties used in this study. 14

Porewater Pressure, Stage 2 Stage 2, groundwater flow into shaft seal 0 1 10 20 40 Note that this results is only valid for the hypothetical assumptions and properties used in this study. 60 80 90 100 1,000 [Years] 15

Saturation Degree and Dry Density of the BSM DBF CS C BSM r CS DBF Time (Years) 1E-03 1E-02 1E-01 1E+00 1E+01 1E+02 1E+03 2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.5 Dry Density [Mg/m 3 ] Case 5: MFR r = 0 r = 1 m r = 2 m r = 3 m r = 3.65 m Note that this results is only valid for the hypothetical assumptions and properties used in this study. Time (Years) 1E-03 1E-02 1E-01 1E+00 1E+01 1E+02 1E+03 100 95 90 85 80 75 70 65 60 Degree of Saturation [%] Case 5: MFR r = 0 r = 1 m r = 2 m r = 3 m r = 3.65 m 16

Conclusions This study has developed custom-additions in COMSOL to couple Richard s equation and linear elastic model to implement a custom SWCC and permeability model observed from the results of laboratory testing of the bentonite-sand mixture specimens. The results of the numerical modeling of a shaft seal using COMSOL shows a logical hydraulic and mechanical processes, which indicated that COMSOL can be used as a tool for further study of a shaft seal in a deep geological repository. Using current computer capability, the solution time required to complete the analysis to simulate 1000000 years HM behavior of a shaft seal described in this study was less than 1 hour, which is beneficial in building more complex model and formulations to simulate an actual shaft seal in actual geosphere conditions. 17

Recommendations Future studies recommended to improve simulation of a shaft seal includes: Development of coupling formulation of multi-phase flow with mechanical constitutive model to improve HM simulation. Coupling between HM processes with other processes such as thermal and mass transport. Implementation of elasto-plastic model. 18

Thank you! Acknowledgements Hydro-Mechanical Modeling of a Shaft Seal in a Deep Geological Repository Atomic Energy of Canada Limited (AE) D. G. Priyanto Nuclear Waste Management Organization (NWMO) COMSOL Conference 2010 Boston, 2010 October 7-9 AE personnel, especially: David Dixon, Paul Thompson, Peter Sargent, Chang-Seok Kim, Blake Holowick, Maureen MacDonald & Marlene Hall. UNRESTRICTED AE - OFFICIAL / ILLIMITÉ USE ONLY / À USAGE EXUSIF - EA 19