Public Disclosure Copy

Similar documents
Public Disclosure Copy

Implementation Status & Results Vietnam Distribution Efficiency Project (P125996)

The World Bank Ho Chi Minh City Green Transport Development (P126507)

The World Bank MA- Noor Ouarzazate Concentrated Solar Power Project (P131256)

The World Bank Regional Infrastructure Development Fund (P154947)

Public Disclosure Copy

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Name Previous Rating Current Rating

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

The World Bank Uganda Energy for Rural Transformation III (P133312)

The World Bank Guilin Integrated Environment Management (P133017)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank Local and Regional Competitiveness Project (P154263)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

SUSTAINABLE CITIES (P128605)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

The World Bank Zambia Water Resources Development Project (P114949)

Public Disclosure Copy

Public Disclosure Copy

PAMSIMAS Support Trust Fund (P116236)

SÃO PAULO METRO LINE 4 (PHASE 2) (P106390)

The World Bank BiH Floods Emergency Recovery Project (P151157)

Public Disclosure Copy

The World Bank Can Tho Urban Development and Resilience (P152851)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

Public Disclosure Copy

Public Disclosure Copy

West Bank and Gaza: Finance for Jobs (P151089)

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Urban Water Supply Project (P156739)

The World Bank Cusco Regional Development (P117318)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank. Increased Access to Modern Energy (P110075) Key Dates. Project Development Objectives. Components. Public Disclosure Authorized

Public Disclosure Copy

EC Ibarra Transport Infrastructure Improvement Project (P147280)

The World Bank. Zm: Increased Access to Electricity Services (P077452) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Public Disclosure Copy. Implementation Status & Results Report Cambodia Global Partnership for Education Second Education Support Project (P144715)

The World Bank OECS Regional Tourism Competitiveness (P152117)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591)

The World Bank Dam Operational Improvement and Safety (P096532)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy

The World Bank. DRC Electricity Access & Services Expansion (EASE) (P156208) Key Dates. Project Development Objectives. Components.

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Public Disclosure Copy. Implementation Status & Results Report Pacific Islands Regional Oceanscape Program - Solomon Islands (P151777)

The World Bank Integrated Forest Ecosystem Management (P151102)

The World Bank Livestock Sector Development Support Project (P159476)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

The World Bank Indonesia National Slum Upgrading Project (P154782)

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

Public Disclosure Copy

The World Bank Mali Reconstruction and Economic Recovery (P144442)

Third South West Indian Ocean Fisheries Governance and Shared Growth Project (SWIOFish3)

Public Disclosure Copy

The World Bank Third National Urban Water Sector Reform Project (P123513)

Public Disclosure Copy. Implementation Status & Results Report Girls Education and Womens Empowerment and Livelihood Project (P151451)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Key Dates. Global Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy. Implementation Status & Results Report DJ-Rural Community Development and Water Mobilization Project (PRODERMO) (P117355)

Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project (P127245)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

Transcription:

Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 08-Dec-2017 ISR30255 Implementing Agencies: Electricity Regulatory Authority of Vietnam (ERAV), Electricity of Vietnam, Electricity of Vietnam Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:11-Sep-2012 Planned Mid Term Review Date:26-Oct-2015 Original Closing Date:31-Dec-2018 Project Development Objectives Effectiveness Date:07-Feb-2013 Actual Mid-Term Review Date:19-Oct-2015 Revised Closing Date:31-Dec-2018 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The project development objective is to improve the performance of Vietnam s Power Corporations in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Component (A): System Expansion and Reinforcement:(Cost $355.50 M) Public Disclosure Authorized Component (B): Introduction of Smart Grid Technologies in Distribution:(Cost $23.90 M) Component (C): Technical Assistance and Capacity Building:(Cost $10.50 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions 12/8/2017 Page 1 of 12

The project is progressing satisfactorily. All components are progressing as planned. The implementation of subprojects under Component A (System Expansion and Reinforcement) and Component B (Introduction of Smart Grid Technologies) are on track with 90% of total work volume of both components completed. The technical assistance activities under Component C were completed before the Trust Fund Closing Date of June 30, 2016 as scheduled. Hanoi Power Corporation (HNPC) and Ho chi Minh City Power Corporation (HCM PC) are implementing IDA-financed TA and capacity building activities. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Moderate Moderate Fiduciary -- Moderate Moderate Environment and Social -- Moderate Moderate Stakeholders -- Low Low Other -- -- -- Overall -- Moderate Moderate Results Project Development Objective Indicators Avoided GHG (3) - Northern Power Corporation (NPC) (Tones/year, Custom) Value 0.00 0.00 0.00 118,015.00 Indicator on Total Distribution Losses: 3. Hanoi Power Corporation (HNPC) Losses in project areas (Percentage, Custom) 12/8/2017 Page 2 of 12

Value 19.00 9.90 9.90 12.00 Avoided GHG (3) - TOTAL Northern Power Corporation (NPC), Ho Chi Minh City Power Corporation (HCM PC), Hanoi Power Corporation (HN PC) and Central Power Corporation (CPC) (Tones/year, Custom) Value 0.00 0.00 0.00 269,148.00 Date 31-Dec-2011 31-Dec-2015 31-Oct-2017 31-Dec-2018 Avoided GHG (3) - Central Power Corporation (CPC) (Tones/year, Custom) Value 0.00 0.00 0.00 38,425.00 Date 31-Dec-2011 31-Dec-2015 31-Oct-2017 31-Dec-2018 Avoided GHG (3) - Ho Chi Minh City Power Corporation (HCM PC) (Tones/year, Custom) Value 0.00 0.00 0.00 67,818.00 4. Indicator consumption reduction for AMI consumers (2) - Central Power Corporation (CPC) (Gigawatt-hour (GWh), Custom) 12/8/2017 Page 3 of 12

Value 0.00 0.00 0.00 59.10 Indicator on Total Distribution Losses: 3. Southern Power Corporation (SPC) - Losses in project areas (Percentage, Custom) Value 10.24 5.19 5.19 7.60 4. Indicator consumption reduction for AMI consumers (2) - Total Northern Power Corporation (NPC), Ho Chi Minh City Power Corporation (HCM PC), Hanoi Power Corporation (HN PC) and Central Power Corpor (Gigawatt-hour (GWh), Custom) Value 0.00 0.00 0.00 414.10 4. Indicator consumption reduction for AMI consumers (2) - Hanoi Power Corporation (Gigawatt-hour (GWh), Custom) Value 0.00 0.00 0.00 69.10 4. Indicator consumption reduction for AMI consumers (2) - Northern Power Corporation (NPC) (Gigawatt-hour (GWh), Custom) 12/8/2017 Page 4 of 12

Value 0.00 0.00 0.00 181.60 Indicator on Total Distribution Losses: 3:Central Power Corporation (CPC) - Losses in project areas (Percentage, Custom) Value 13.58 5.33 5.33 10.39 Indicator on Power Quality: 2. : Ho Chi Minh City Power Corporation and Hanoi Power Corporation - Voltage excursion outside +/-5% at 110kV/MV transformers, in project areas (Years, Custom) Value 0.00 0.00 0.00 0.00 Date 31-Dec-2011 01-May-2017 31-Oct-2017 31-Dec-2011 Indicator on Power Quality: 2. Central Power Corporation (CPC) - Voltage excursion outside +/-5% at 110kV/MV transformers, in project areas (Years, Custom) Value 0.00 0.00 0.00 0.00 Indicator on Total Distribution Losses: 3. Ho Chi Minh City Power Corporation (HCMPC) - Losses in project areas (Percentage, Custom) 12/8/2017 Page 5 of 12

Value 7.86 3.64 3.64 5.50 Indicator on Power Quality: 2. Northern Power Corporation (NPC) - Voltage excursion outside +/-5% at 110kV/MV transformers, in project areas (Years, Custom) Value 60.00 50.00 50.00 40.00 1.2 Hanoi Power Corporation (HNPC)- System Average Interruption Frequency Index (SAIFI) in project areas calculated as in Distribution Code (1). (Number, Custom) Value 1.73 1.63 1.63 1.67 1.2 Ho Chi Minh City Power Corporation (HCMPC) - System Average Interruption Frequency Index (SAIFI) in project areas calculated as in Distribution Code (1). (Number, Custom) Value 7.62 2.60 2.60 2.50 Avoided GHG (3) - Hanoi Power Corporation (HNPC) (Tones/year, Custom) 12/8/2017 Page 6 of 12

Value 0.00 0.00 0.00 44,890.00 4. Indicator consumption reduction for AMI consumers (2) - Ho Chi Minh City Power Corporation (HCMPC) (Gigawatt-hour (GWh), Custom) Value 0.00 0.00 0.00 104.30 1.1 Ho Chi Minh City Power Corporation (HCMPC) - System Average Interruption Duration Index (SAIDI) in project areas, calculated as in Distribution Code (1) (Minutes, Custom) Value 1,682.00 339.00 339.00 384.00 1.1 Southern Power Corporation (SPC) - System Average Interruption Duration Index (SAIDI) in project areas, calculated as in Distribution Code (1) (Minutes, Custom) Value 6,958.00 1,496.00 1,496.00 5,525.00 1.1 Central Power Corporation (CPC) - System Average Interruption Duration Index (SAIDI) in project areas, calculated as in Distribution Code (1) (Minutes, Custom) 12/8/2017 Page 7 of 12

Value 3,631.00 3,151.00 3,151.00 3,234.00 Indicator on Total Distribution Losses: 3. Northern Power Corporation (NPC) - Losses in project areas (Percentage, Custom) Value 24.38 6.09 6.09 11.39 Indicator on Power Quality: 2. Southern Power Corporation (SPC) - Voltage excursion outside +/-5% at 110kV/MV transformers, in project areas (Years, Custom) Value 25.00 6.00 6.00 4.00 1.2 Southern Power Company (SPC) - System Average Interruption Frequency Index (SAIFI) in project areas calculated as in Distribution Code (1). (Number, Custom) Value 24.30 5.09 5.09 21.60 1.2 Central Power Corporation (CPC) - System Average Interruption Frequency Index (SAIFI) in project areas calculated as in Distribution Code (1). (Number, Custom) 12/8/2017 Page 8 of 12

Value 23.53 11.80 11.80 20.95 1.2 Northern Power Corporation (NPC) - System Average Interruption Frequency Index (SAIFI) in project areas calculated as in Distribution Code (1). (Number, Custom) Value 19.80 18.00 18.00 18.65 Date 31-Dec-2011 31-Dec-2015 31-Dec-2015 31-Dec-2018 1.1 Hanoi Power Corporation (HNPC) - System Average Interruption Duration Index (SAIDI) in project areas, calculated as in Distribution Code (1) (Minutes, Custom) Value 299.00 268.00 268.00 291.00 Date 31-Dec-2013 31-Dec-2016 31-Dec-2016 31-Dec-2018 1.1 Northern Power Corporation (NPC) - System Average Interruption Duration Index (SAIDI) in project areas, calculated as in Distribution Code (1) (Minutes, Custom) Value 5,145.00 1,866.00 1,866.00 4,656.00 Overall Comments The reliability and quality indicators are measured and calculated in a yearly basis (to be issued in 31 December) AMI systems are under installation, indicators of AMI consumers consumption reduction, avoided GHG for PCs have not yet been available. It is expected that the systems will be completed by the end of December 2017. Collection of these data will be started in the first half of 2018. 12/8/2017 Page 9 of 12

PHINDIRITBL PHINDIRITBL PHINDIRITBL PHINDIRITBL Intermediate Results Indicators Intermediate Result indicator for Component B: Implementation progress of SCADA system - NPC, CPC, SPC, HCM PC, HN PC (Percentage, Custom) Value 10.00 98.00 100.00 100.00 Intermediate Result indicator for Component A: Implementation progress of 35/22/0.4 kv Lines - NPC, CPC, SPC, HCM PC, HN PC (Percentage, Custom) Value 10.00 98.00 99.00 100.00 Intermediate Result indicator for Component A: Implementation progress of 110 kv substations - NPC, CPC, SPC, HCM PC, HN PC (Percentage, Custom) Value 10.00 86.00 89.00 100.00 Intermediate Result indicator for Component C: PCs & ERAV (Percentage, Custom) Value 30.00 100.00 100.00 100.00 12/8/2017 Page 10 of 12

PHINDIRITBL PHINDIRITBL PHINDIRITBL Intermediate Result indicator for Component B: Implementation of progress of AMI System - NPC, CPC, SPC, HCMPC, HNPC (Percentage, Custom) Value 0.00 92.00 96.00 100.00 Intermediate Result indicator for Component A: Implementation progress of 110 kv lines - NPC, CPC, SPC, HCM PC, HN PC (Percentage, Custom) Value 10.00 86.00 89.00 100.00 Intermediate Result indicator for Component A: Implementation progress of 35/22/0.4 substations - NPC, CPC, SPC, HCM PC, HN PC (Percentage, Custom) Value 10.00 98.00 99.00 100.00 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P125996 IDA-51560 Effective USD 448.90 448.90 0.00 400.86 32.80 89% P125996 TF-13456 Closed USD 5.63 5.09 0.54 5.23 0.00 103% 12/8/2017 Page 11 of 12

P125996 TF-13468 Effective USD 30.00 30.00 0.00 20.14 9.87 67% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P125996 IDA-51560 Effective 11-Sep-2012 08-Nov-2012 07-Feb-2013 31-Dec-2018 31-Dec-2018 P125996 TF-13456 Closed 08-Nov-2012 08-Nov-2012 07-Feb-2013 30-Jun-2016 30-Jun-2016 P125996 TF-13468 Effective 11-Sep-2012 08-Nov-2012 07-Feb-2013 31-Dec-2018 31-Dec-2018 Cumulative Disbursements Restructuring History Level 2 Approved on 22-Jun-2016 Related Project(s) There are no related projects. 12/8/2017 Page 12 of 12