River Ice Modelling. Hydraulic Modelling of Mackenzie River at Ft. Province, NWT, Canada

Similar documents
Beaver Creek Corridor Design and Analysis. By: Alex Previte

Updated Hydrotechnical Information for the Mackenzie River Bridge at Fort Providence

EFFECTS OF ICE ON THE HYDRAULICS OF INNER MONGOLIA REACH OF THE YELLOW RIVER

Modelling flood levels associated with ice consolidation events triggered by upstream ice jam release waves in the Hay River Delta, NWT

Calibration of Manning s Friction Factor for Rivers in Iraq Using Hydraulic Model (Al-Kufa River as Case study)

Applying HEC-RAS to simulate river ice jams: snags and practical hints

ESTIMATION OF THE HYDRAULIC ROUGHNESS OF RIVER ICE USING DATA ASSIMILATION

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Modelling Ice Jam Formation in the Hay River Delta during 2009 Breakup

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

Estimating of Manning s Roughness Coefficient for Hilla River through Calibration Using HEC-RAS Model

CE 6403 APPLIED HYDRAULIC ENGINEERING UNIT - II GRADUALLY VARIED FLOW

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

Technical Memorandum No

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

UPPER COSUMNES RIVER FLOOD MAPPING

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

River Current Resource Assessment and Characterization Considering Ice Conditions

1.060 Engineering Mechanics II Spring Problem Set 8

Vegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA

Tanjung Priok GFPPEP. Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring Office Jl. KS Tubun I/2 Petamburan, Jakarta

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River

THE HYDRAULIC PERFORMANCE OF ORIENTED SPUR DIKE IMPLEMENTATION IN OPEN CHANNEL

Q = Flow of water in the River (cubic metres per second) y o = depth (metres) and is a function of. y o Q

Sediment transport and river bed evolution

River ice-jam modelling in MESH. Karl-Erich Lindenschmidt Prabin Rokaya, Luis Morales-Marín, Howard Wheater

Presented by: Civil Engineering Academy

A STUDY ON HYDRODYNAMIC AND SHORT TERM FLASH FLOOD ANALYSIS OF SURMA RIVER USING DELFT3D MODEL

Dynamique des rivières. res


What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash?

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

Opanuku Stream Benchmark Validation 1. Introduction. 2. The Opanuku Stream Model

Evaluation of Scour Depth around Bridge Piers with Various Geometrical Shapes

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Monitoring the ice cover evolution of a medium size river from RADARSAT-1 : preliminary results

Lecture Note for Open Channel Hydraulics

Chapter 5 CALIBRATION AND VERIFICATION

Nipigon River Landslide, Ontario, Canada

Gradually Varied Flow I+II. Hydromechanics VVR090

Extreme Phenomena in Dobrogea - Floods and Droughts

International Journal of Scientific & Engineering Research, Volume 6, Issue 3, March ISSN

Two-Dimensional Simulation of Truckee River Hydrodynamics

CEE 3310 Open Channel Flow, Nov. 26,

JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME

State Water Survey Division SURFACE WATER SECTION

State of the Art Two- Dimensional Hydraulic Modeling Tools Model Benchmark Testing

3.2 CRITICAL DEPTH IN NONRECTANGULAR CHANNELS AND OCCUR- RENCE OF CRITICAL DEPTH

Lateral Inflow into High-Velocity Channels

Preparation of a Hydrodynamic model of. Detroit River- St. Clair River waterways. with Telemac-2D

PART 2:! FLUVIAL HYDRAULICS" HYDROEUROPE

Hydrodynamic model of St. Clair River with Telemac-2D Phase 2 report

Hydraulics of bendway weirs

IGHEM 2008 MILANO 3 rd -6 th September International Group for Hydraulic Efficiency Measurements

Technical Memorandum No Sediment Model

Appendix A Flood Damages in 2013

Closed duct flows are full of fluid, have no free surface within, and are driven by a pressure gradient along the duct axis.

Modelling of flow and sediment transport in rivers and freshwater deltas Peggy Zinke

St. Clair River Conveyance Change 2007 to 2012

Modelling probabilities of ice jam flooding from artificial breakup of the Athabasca River ice cover at Fort McMurray

Analysis of Cost-Effective Rehabilitation: Principles and Tools for Reducing Uncertainty in Design

Open Channel Flow Part 2. Ch 10 Young, notes, handouts

P10.5 Water flows down a rectangular channel that is 4 ft wide and 3 ft deep. The flow rate is 15,000 gal/min. Estimate the Froude number of the flow.

Modelling the Impacts of Dam Rehabilitation on River Ice Jam: A Case Study on the Matane River, QC, Canada

FAILURES IN THE AMAZON RIVERBANKS, IQUITOS, PERU

Lab 7: Nonuniform Flow and Open Channel Transitions

IMPLICIT NUMERICAL SCHEME FOR REGULATING UNSTEADY FLOW IN OPEN CHANNEL Mohamed. T. Shamaa 1, and Hmida M. Karkuri 2

Ways To Identify Background Verses Accelerated Erosion

HEC-RAS River Analysis System

Laboratory Investigation of Submerged Vane Shapes Effect on River Banks Protection

Table E1. Site details for reaches selected for PHABSIM surveys in 2007

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Hydraulics Prof. Dr. Arup Kumar Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati

Volume 3, Issue 4: (2013) (Received: May 27, 2013; Accepted: July 03, 2013; Published: July 30, 2013) ISSN

PR122A NARRATIVE Updated 25 July 2014

Rock Sizing for Waterway & Gully Chutes

Flood zoning estimation and river management by using HEC-RAS and GIS model

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC

Fluid Mechanics Prof. S.K. Som Department of Mechanical Engineering Indian Institute of Technology, Kharagpur

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey.

Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River

Geology 550 Spring 2005 LAB 3: HYDRAULICS OF PRAIRIE CREEK

FLOOD ROUTING FOR A SPECIFIC ORIENTATION OF PLANNED DEVELOPMENTS FOR AL-SHAMIYA RIVER IN IRAQ AS CASE STUDY

Lecture 10: River Channels

Determining the Suitable Sediment extraction Locations of Existing Sand and Gravel Mines on Boshar River in Iran using HEC-RAS Modeling

U.S. Army Engineer Research and Development Center, Hanover, New Hampshire

Flood Forecasting Tools for Ungauged Streams in Alberta: Status and Lessons from the Flood of 2013

A NONLINEAR OPTIMIZATION MODEL FOR ESTIMATING MANNING S ROUGHNESS COEFFICIENT

APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS

External Flow and Boundary Layer Concepts

Canadian Mapping Big Book

Evaluation of Dredging Operations for Tigris River within Baghdad, Iraq

Hydro-engineers.ch HEC-RAS ANALAYSIS. River: L Aïre Mesfin Tewolde. Hydro-engineers.ch 23 oct. 2017

1.060 Engineering Mechanics II Spring Problem Set 4

Ice Phenomena on the Lower Vistula

Transcription:

River Ice Modelling Hydraulic Modelling of Mackenzie River at Ft. Province, NWT, Canada Submitted to F.E. Hicks, PhD, PEng, FCSCE Professor, Dept. of Civil and Environmental Engineering University of Alberta Submitted by Md. Zahidul Islam (ID: 1143605) March 15, 2007

Table of Content Chapter Page 1. Introduction 3 2. Study Reach 3 3. Geometry, Flow and Ice cover data 3 4. Model Calibration and Verification 4 4.1 Open Water Calibration 4 4.2 Open Water Validation 4 4.3 Ice Cover Calibration 5 5. Estimation of Discharge 7 6. Calibration of Ice Jam Profile 7 7. Equilibrium Ice Jam Profile 9 8. Sensitivity Analysis 10 9. Conclusions 12 10 References 12 2

1. Introduction Hydraulic modelling of ice covered river is important for determination of the water surface profile during winter especially when the ice jam occurred. In this project the hydraulic modelling of Mackenzie River will be conducted for a particular reach using ICEJAM model. ICEJAM model forms the basis of the solution algorithm in the ice jam calculation that has been implemented in HEC-RAS (Healy et al. 1999) 2. Study reach Source :http://www.aquatic.uoguelph.ca/rivers/mac1.htm Figure 1: Mackenzie River (circle showing the study reach) The Mackenzie River being the longest river in Canada flows in north direction and covers a distance of around 1800 km from Great Slave Lake in the Northwest Territories up to the Arctic Ocean. The study reach extends from Great Slave Lake past Ft. Province to Mills Lake 3. Geometry, flow and ice cover data The cross section geometry of the river between Great Slave Lake and Mills Lake was developed based on the soundings taken in July of 1992 (Hicks et al. 1995). Flow data consists of two open water profile during the period August 29 to September 1, 1991 and on July 11, 1992; two water surface profile under late winter condition on 6 and 27 April 1992; two water surface profile after jam shoving events on 3 and 7 May, 1992. The ice thickness data were measured between the periods late March to early May, 1992. 3

160 155 Mackenzie River Ice Modelling 145 135 89.5 km Orange... 79.5 km Ft. Pro... 77.4 km Boat Launc... 75 km Campground 72.7 km Big River Resta... 67.3 km Coast Guard 65.3 km Ferry 63.7 km Dory Point 60.7 km (duplicate x-sec) 130 0 20 40 60 80 100 52.6 km Burnt Point 47.5 km Beaver Lake 34.2 km Kakisa River 16.7 km South Channel 4.2km Great Slave Lake Figure 2: The study reach 4. Model Calibration and Verification 4.1 Open water calibration Open water calibration was conducted using the discharge and water surface profile measured on 11 July 1992. The entire study reach was divided into four sub-reaches depending on the variation of the water surface profile and also the geometry of the cross sections. Manning s n kept constant for each sub-reach and allowed to vary from sub-reach to sub-reach until the observed and simulated water surface profile matched well. Figure 3 shows the variation of the Manning s n for different sub reaches and how the observed and the simulated water surface are matched together. It was found that the variation in observed and simulated water surface is maximum 4% (with respect to depth) and has an average value of 1.36%, which is quite acceptable. 4.2 Open water validation The open water calibrated model was verified using flow data of 29 August, 1991 (average discharge is 16% lower than 11 July, 1992. As there is no water level data downstream of RCMP and upstream of the Beaver Lake for this profile so the model validation conducted for the reach from Beaver Lake to RCMP. ). Figure 4 shows the results. The variation in observed and simulated water surface is maximum 4.6 % (with respect to depth) and has an average value of 2.08%. 4

Mackenzie River Ice Modelling Calibration for Bed Roughness (n) 160 155 n= 0.019 n= 0.033 n= 0.020 n= 0.022 O 145 135 2 Orange Cabin 3 Ft. Prov. Do... 5 Boat Launch 7 Campground 8 Big River Restauran... 10 Coast Guard 11 Ferry 14 Dory Point 16 130 0 20 40 60 80 100 18 Burnt Point 19 Beaver Lake 20 Kakisa River 21 South Channel 22 Great Slave Lake Figure 3: Open Water Calibration Mackenzie Riv er Ice Modelling Valiadtion of calibrated model f or 29 August 1991 prof ile O 142 138 136 134 6 76.7 km Water Intak... 7 75 km Campground 8 72.7 km Big River Rest... 9 71.5 km Blue Quonset 10 67.3 km Coast Guard 11 65.3 km Ferry 13 64.5 km (duplicate x-sec) 14 63.7 km Dory Point 15 62.2 km (duplicate x-sec) 16 60.7 km (duplicate x-sec) 132 0 5 10 15 20 25 30 35 17 59.2 km Ice Bridge 18 52.6 km Burnt Point 19 47.5 km Beaver Lake 4.3 Ice cover calibration Figure 4: Model Validation After open water validation the model was calibrated for the ice cover roughness using the late winter profile (27 April, 1992). In this calibration the ice thickness is an input parameter. The rough and border ice measurement take for the period 25 to 28 April was used as the basis of selecting ice thickness. Incase of missing data for the mentioned period the ice 5

thickness data of other date close to April 27 was used. The average ice thickness at every section is consists of border ice and rough ice. The border ice thickness was assumed constants all through the reach. Now it is necessary to set up the proportion of border ice and rough ice for different sub-reaches. It was observed that border ice particularly extensive in Beaver Lake (Hicks et al. 1995) so a greater proportion was assumed at the reaches close to Beaver Lake and gradually the proportion decreased in the downstream direction. Figure 5 shows the proportion of border ice and rough ice, and the average ice thickness at different sub-reaches of the study reach. Input Ice Thickness 27 April 1992 Ice Thickness (m) 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 6 11 16 21 10 9 8 7 6 5 4 3 2 1 0 Average Ice thickness Border Ice Rough Ice Border Ice to Rough Ice Ratio River Station Figure 5: Average ice thickness for 27 April, 1992 Mackenzie Riv er Ice Modelling Ice cover calibration f or 27 April, 1992 160 155 n= 0.04 n= Composit roughness n= 0.02 O 145 4 77.9 RCM... 7 75 km Ca... 8 72.7 km Big... 10 67.3 km Coast G... 11 65.3 km Ferry 14 63.7 km Dory Point 15 62.2 km (duplicate x-... 16 60.7 km (duplicate x-s... 17 59.2 km Ice Bridge 18 52.6 km Burnt Point 19 47.5 km Beaver Lake 135 0 20 40 60 80 20 34.2 km Kakisa River Figure 6: Ice cover calibration for 27 April, 1992 21 16.7 km South Channel 22 4.2km Great Slave Lake 6

During calibration the entire study reach was subdivided into three sub-reaches depending on the ice cover, water surface profile and channel geometry vary the Manning s roughness for ice cover. Figure 6 the calibration result. It was found that the composite roughness varied from 0.02 to 0.04. From Beaver Lake to upstream of the Big River it was 0.02 and increased further downstream. The variation of observed and simulated water surface is on average 2.5 % having a maximum value of 8%. 5. Estimation of discharge The calibrated late winter hydraulic model was used to estimate the discharge based on the measured water surface profile on April 6, 1992. The ice thickness data was selected in a similar manner as discussed in the Section 4.3. The model was run for different discharge and the simulated and observed water level was cheeked. The discharge corresponds to best matches between computed and observed water surface was taken as the estimated discharge. Figure 7 shows the final result and the corresponding discharge was 3500 m 3 /s. Mackenzie Riv er Ice Modelling Eastimation of discharge on 6 April, 1992 160 155 O 145 4 77.9 RCM... 7 75 km Ca... 8 72.7 km Big... 10 67.3 km Coast G... 11 65.3 km Ferry 14 63.7 km Dory Point 15 62.2 km (duplicate x-... 16 60.7 km (duplicate x-s... 17 59.2 km Ice Bridge 18 52.6 km Burnt Point 19 47.5 km Beaver Lake 135 0 20 40 60 80 20 34.2 km Kakisa River 21 16.7 km South Channel 22 4.2km Great Slave Lake Figure 7: Estimation of discharge for April 6, 1992. 6. Calibration of Ice jam profile Two ice jam profiles viz. as 3 May 1992 and 7 may 1992 was calibrated using the measured water surface profile on the corresponding day. As the head and toe of the both jumps were defined so the length of the jam set fixed in calibration. The jam parameters angle of internal friction (φ) and Stress ratio (K 1 ) was set as 55 and 0.12 respectively so that the Jam Strength parameter (μ) and the Passive pressure coefficient (K x ) have their average values as μ=1.0 and K x =10.0. The other parameter kept as default. In case of ice jam profile of 7 May, 1992 7

there was no measured water surface data downstream of the toe. So an interpolated cross section was included 200 meter downstream of the Ft. Province Dock and the boundary condition was set as normal depth assuming a water surface slope equal to the bed slope. In order to get a smooth ice jam profile several interpolated cross sections are added between the head and the toe of the jam. The Manning s roughness for ice jam was set constant for the entire jam and allowed to vary for fitting the simulated and observed water surface. Mackenzie Riv er Ice Modelling Ice Jam Prof ile 3 May O Ice Cover 142 5 5.5* 6 6.22222... 6.44444... 6.6666... 6.8888... 8 9 10 11 138 0 2 4 6 8 10 12 14 Figure 8: Ice Jam profile for May 3, 1992 Mackenzie Riv er Ice Modelling Ice Jam Prof ile 7 May O Ice Cover 142 138 3.125... 3.375* 3.625* 3.875* 4.33333* 5 5.5* 6 6.22222* 6.44444* 6.66666* 6.88888* 8 136 0 2 4 6 8 10 12 14 16 9 10 11 Figure 9: Ice Jam profile for May 7, 1992 8

Figure 8 and 9 shows the calibration of the ice jam profile for May 3 and May 7, 1992 respectively. The simulated and observed water surface matched well in both cases. The calibrated Manning s composite roughness was 0.04 for the both cases. 7. Equilibrium Ice jam profile Analyzing the two ice jam profile viz. as 3 May and 7 May, 1992 it was obviously found that both jam was too short to develop the equilibrium jam thickness. So the calibrated 7 May ice jam profile was tested for equilibrium ice jam thickness by changing its head from Big River to Ice Bridge. Five simulations were carried out changing the head at Blue Quonset, Coast Guard N, Ferry N, Dory Point N and Ice Brdige N respectively and their jam profile was compared. Figure 10 shows the comparison. It was observed that the ice jam having head at Ice Bridge shows that a significant portion of equivalent jam thickness. 158 Mackenzie River Ice Modelling Equlibrium Ice Jam Thickness RIVER-1 Reach-1 Ice Top Chan PF 1 - Head at RS7 Ice Btm Chan (m), Ice Top Chan (m) 156 Ice Top Chan PF 1 - Head at RS 9 Ice Top Chan PF 1 - Head at RS 10 Ice Top Chan PF 1 - Head at RS 11 Ice Top Chan PF 1 - Head at RS 14 Ice Top Chan PF 1 - Head at RS 17 Ice Btm Chan PF 1 - Head at RS 11 Ice Btm Chan PF 1 - Head at RS7 Ice Btm Chan PF 1 - Head at RS 14 Ice Btm Chan PF 1 - Head at RS 10 Ice Btm Chan PF 1 - Head at RS 17 Ice Btm Chan PF 1 - Head at RS 9 0 5 10 15 20 25 Figure 10: Equilibrium Ice Jam Profile for May 7, 1992 The water surface for this jam was determined. Figure 11 shows the water surface profile of the equilibrium jam together with the ROB elevation in order to see the flooding occurs on the north side of the river as the town Ft. Province is located on the north side of the channel. It was observed that the entire reach upstream of the Big River and downstream of the South channel is flooded due to the ice jam. As the Ft. Province town is located in the vicinity of RCMP and Ft. Province Dock so the town is out of danger as at that reach the water surface is sufficiently below the right bank elevation. 9

170 165 160 Mackenzie Riv er Ice Modelling Water Surface Prof ile f or Equilibrium Ice Jam RIVER-1 Reach-1 ROB Ice Cover 155 145 3.75* 5.75* 6.66666*... 7.33333* 7.91666* 9 9.33333* 9.66666* 10 10.7* 13 14.375* 15.25* 16.125* 17 18 19 135 0 20 40 60 80 20 21 22 Figure 11: Water Surface Profile for Equilibrium Ice Jam, May 7, 1992 158 Mackenzie River Ice Modelling Sensitiv ity of Jam strength parameter RIVER-1 Reach-1 Ice Btm Chan (m), Ice Top Chan (m) 156 Ice Top Chan PF 1 - Jam Strength=0.8 Ice Top Chan PF 1 - Jam Strength=1.2 Ice Btm Chan PF 1 - Jam Strength=1.2 Ice Btm Chan PF 1 - Jam Strength=0.8 0 5 10 15 20 25 Figure 12: Sensitivity of μ for Equilibrium Ice Jam, May 7, 1992 8. Sensitivity Analysis The sensitivity analysis of the equilibrium jam profile was conducted to see the effect of different jam parameter. Three parameters were selected to test their sensitivity viz. as Jam 10

strength parameter (μ), Passive pressure coefficient (K x ) and the Maximum velocity under ice cover (V max ). Figure 12, 13 and 14 shows the results. It was seen that the jam profile is more sensitive to K x and V max than μ. Especially for V max =1.0 m/s it was found that the thickness of the jam at toe decreased considerably. 158 Mackenzie River Ice Modelling Sensitivity of Kx RIVER-1 Reach-1 Ice Btm Chan (m), Ice Top Chan (m) 156 Ice Top Chan PF 1 - Kx=8 Ice Top Chan PF 1 - Kx=12 Ice Btm Chan PF 1 - Kx=12 Ice Btm Chan PF 1 - Kx=8 0 5 10 15 20 25 Figure 13: Sensitivity of K x for Equilibrium Ice Jam, May 7, 1992 158 Mackenzie River Ice Modelling Sensitivity of Vmax RIVER-1 Reach-1 Ice Btm Chan (m), Ice Top Chan (m) 156 Ice Top Chan PF 1 - Vmax=1 Ice Top Chan PF 1 - Vmax=2 Ice Btm Chan PF 1 - Vmax=2 Ice Btm Chan PF 1 - Vmax=1 142 0 5 10 15 20 25 Figure 14: Sensitivity of V max for Equilibrium Ice Jam, May 7, 1992 11

9. Conclusions Several conclusions are found from this project. They are: 1. The bed roughness of Mackenzie River varies from 0.019 to 0.033 within the reach from Great Slave Lake to Mills Lake. The channel is bed more roughly from Big River to Ft. Province Dock. 2. The composite roughness of the river during late winter ice covered condition is about 0.04 downstream of the Big River and 0.02 upstream of the Big River. 3. Equilibrium ice jam profile extended from ice bridge to Ft. Province Dock causes flooding upstream of the Big River. 4. The ICEJAM model is more sensitive to K x and V max than μ. 10. References Healy, D. and Hicks, F., (1999) A Comparison of the ICEJAM and RIVJAM Ice Jam Profile Models, American Society of Civil Engineering: Journal of Cold Regions Engineering, 13(4): 180-198. Hicks, F., Chen, X. and Andres, D., (1995) Effects of ice on the hydraulics of Mackenzie River at the outlet of Great Slave Lake, NmWmTm: a case study Canadian Journal of Civil Engineering, 22, 43-54. 12