Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document

Similar documents
Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document

Lunar Reconnaissance Orbiter Project. Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Mechanical Interface Control Document

DRAFT. Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter 431-ICD Date: September 15, 2005

DRAFT. Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter (LRO)

CRaTER Thermal Analysis

Lunar Reconnaissance Orbiter Project. Radiation Requirements. September 14, 2006

May 15, Lunar Reconnaissance Orbiter (LRO) Instrument Thermal Balance and Thermal Vacuum Direction. Rev. (Initial) j Mission

Lunar Reconnaissance Orbiter Project. Radiation Requirements. August 5, 2005

Lunar Reconnaissance Orbiter Project. Thermal System Specification

THERMAL CONTROL SUBSYSTEM

EO-1 Technology Validation Report for the Carbon/Carbon Radiator

RESERVE THALES ALENIA SPACE CHANGE RECORDS ISSUE DATE DESCRIPTION OF CHANGES AUTHOR

Thermal Design and Analysis of the BroadBand Radiometer. Oliver Poyntz-Wright (Rutherford Appleton Laboratory, United Kingdom)

Mechanical Design, CRaTER Assembly and Electronics Assembly Preliminary Design Review

Modular Thermal Design Concepts: Thermal Design of a Spacecraft on a Module Level for LEO Missions

CRaTER Instrument Requirements Document Instrument Performance and Data Products Specification. Dwg. No

2.4m Space Telescopes

Thermal Vacuum Test: Plans and Procedures

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil)

November 3, 2014 Eric P. Smith JWST Program Office

CRaTER Pre-Ship Review (PSR) Instrument Calibration Science Requirements Compliance

CRaTER Pre-Environmental Review (I-PER) Science Requirements Update

DRAFT. Lunar Reconnaissance Orbiter (LRO) General Thermal Subsystem Specification. Date: May 5, Document No. 431-SPEC

CRaTER Project Monthly Technical Progress and Schedule Status Report (NNG05EB92C DRD 20 & 21) April 2005

The time period while the spacecraft is in transit to lunar orbit shall be used to verify the functionality of the spacecraft.

THERMAL PERFORMANCE OF THE HUBBLE SPACE TELESCOPE (HST) SOLAR ARRAY-3 DURING THE DISTURBANCE VERIFICATION TEST (DVT)

The Cosmic Ray Telescope for the Effects of Radiation (CRaTER) Investigation for the Lunar Reconnaissance Orbiter

THERMAL CONTROL DESIGN FOR A MICROSATELLITE. Kaipo Kent Department of Electrical Engineering University of Hawai i at Mānoa Honolulu, HI 96822

LRO/CRaTER. Technical Interchange Meeting. LRO Mechanical Systems. Giulio Rosanova / /

Your Partner in Environment Monitoring

GLAST Large Area Telescope. LAT Systems Engineering. LAT Systems Engineering LAT Test Plan Update. Tom Leisgang. Gamma-ray Large Area Space Telescope

PREFERRED RELIABILITY PRACTICES. Practice:

The Silicon-Tungsten Tracker of the DAMPE Mission

CRaTER Project Monthly Technical Progress and Schedule Status Report (NNG05EB92C DRD 20 & 21) May 2005

Telescope Mechanical Design

James Webb Space Telescope Thermal Pathfinder Test Development

Exploration Carriers UPC-Orion Launch Opportunities for Lunar Missions. presented to The Joint Annual Meeting of LEAG-ICEUM-SRR

The MSX Thermal Design

OCO-2 Cryocooler Development, Integration, and Test

High Altitude Extremophiles. Request For Proposal

The Cassegrain ADC for Keck I Preliminary Design Review Process and Charter September 15, 2003 By Sean Adkins

STS41-D Solar Array Flight Experiment

Thermal and structural design constraints for radiometers operating in geostationary orbits. G. E. Zurmehly, R. A. Hookman

THERMAL-VACUUM TESTS OF THE AMAZONIA-1 SATELLITE TM PERFORMED AT INPE WITH SUCCESS

IAC-08-A MONTE CARLO SIMULATIONS OF ENERGY LOSSES BY SPACE PROTONS IN THE CRATER DETECTOR

BepiColombo. Project and MPO Status. Comprehensive Explora1on of Planet Mercury

Unconventional Thermal Propellant Gauging System

SPD QM Thermal Vacuum Testing

Appendix G. Solar Orbiter SPICE Thermal Design, Analysis and Testing. Samuel Tustain (RAL Space, United Kingdom)

Plans for an International Lunar Network

Thermal Design and Analysis

On-orbit Potential Measurement of H-II Transfer Vehicle

GOSAT MISSION and SPACECRAFT PARTS REQUIRMENTS

Mechanical and Thermal Design of XMM

Satellite Modular and Reconfigurable Thermal System (SMARTS)

CRaTER Science Requirements

Kepler: A Search for Terrestrial Planets

TROPOMI. Sentinel 5 Precursor instrument for air quality and climate observations. R. Voors Dutch Space. ICSO, 11 October 2012

March 4, 2013 Eric P. Smith JWST Program Office

DOCUMENT CHANGE NOTICE (DCN) SHEET 1 OF 1

Lunar Reconnaissance Orbiter Project. Radiation Environment Specification. August 25, 2005

NASA: BACK TO THE MOON

STEP FM SOLAR ORBITER ENERGETIC PARTICLE DETECTOR STEP FM. Thermal Cycling Test Plan and Procedure. Document ID: SO-EPD-KIE-TP-0041.

Developing a Compact Doppler/Magnetograph for Solar Diagnostics

Design, Fabrication and Performance of the Silicon Charge Detector for the ISS-CREAM

Flight Demonstration of Electrostatic Thruster Under Micro-Gravity

FORMOSAT-3 Satellite Thermal Control Design and Analysis *

A DETAILED IMPACT RISK ASSESSMENT OF POSSIBLE PROTECTION ENHANCEMENTS TO TWO LEO SPACECRAFT

Appendix D. Thermal Modelling of Luna 27 Landing Site. Hannah Rana Vito Laneve Philipp Hager Thierry Tirolien (ESA/ESTEC, The Netherlands)

Correlation of MLI Performance Measurement with a Custom MATLAB Tool. Lars Tiedemann Peter Lindenmaier (HPS GmbH, Germany)

An Astrophysics Mission of Opportunity on the International Space Station

Life Cycle Analysis of a SpaceCube Printed Circuit Board Assembly Using Physics of Failure Methodologies

Gateway to Space Spring 2006 Design Document

Team X Study Summary for ASMCS Theia. Jet Propulsion Laboratory, California Institute of Technology. with contributions from the Theia Team

Lunar Precursor Robotics Program

Six Days at the Edge of Space: 10 Years of HASP Balloon Flight Operations

Lunar Flashlight Project

Baffle Telescope Tube. Bus Module Bus MLI

REVISIONS SYMBOL DESCRIPTION DATE APPROVAL

ASIM LEGO Model in 1:12

Thermal Design of NEAR

Improvements of a Thermal Method for the Determination of Solar Absorptance and Thermal Emittance of Spacecraft Coatings

NASA Procedural Requirements

StellarXplorers IV Qualifying Round 2 (QR2) Quiz Answer Key

WFIRST Project Response to post-wietr direction. Jeffrey Kruk WFIRST Project Scientist

GLAST Large Area Telescope

CIRiS: Compact Infrared Radiometer in Space LCPM, August 16, 2017 David Osterman PI, CIRiS Mission

HV CAPACITOR SCREENING PROCEDURE FOR THE GYROSCOPE SUSPENSION SYSTEM (GSS) HV AMP/BRIDGE (HVA) BOARD. GP-B Procedure P0688 Rev -

Development of the Space Debris Sensor (SDS) Joe Hamilton SDS Principal Investigator January

Appendix T. GENETIK+ Introducing genetic algorithm into thermal control development process. Guillaume Mas (CNES, France)

Lunar, L1 and L2 A Communications guide based on the James Webb Space Telescope experience

Predicting Long-Term Telemetry Behavior for Lunar Orbiting, Deep Space, Planetary and Earth Orbiting Satellites

Development of Microwave Engine

NASA Plan for Development of Optical Communication for Space Applications

Inside Wall Temperature Measurements of DSTs Using an Infrared Temperature Sensor

LITE-ON TECHNOLOGY CORPORATION

Mars Sample Return Mission

The James Webb Space Telescope

PERFORMANCE MEASUREMENTS OF THE SUB MILLIMETER WAVE ASTRONOMY SATELLITE (SWAS) SOLAR ARRAY DEPLOYMENT SYSTEM

RASE 2009 Development of Sunshield Panels for Passive Radiant Cooler On Board Meteorological Instruments of ISRO.

Transcription:

Effective Date: 01/11/2007 Expiration Date: 01/11/2012 Lunar Reconnaissance Orbiter Project Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document December 19, 2006 LRO GSFC CMO January 11, 2007 RELEASED Goddard Space Flight Center Greenbelt, Maryland National Aeronautics and Space Administration

CM FOREWORD This document is a Lunar Reconnaissance Orbiter (LRO) Configuration Management (CM)- controlled document. Changes to this document require prior approval of the applicable Configuration Control Board (CCB) Chairperson or designee. Proposed changes shall be submitted to the LRO CM Office (CMO), along with supportive material justifying the proposed change. Changes to this document will be made by complete revision. Questions or comments concerning this document should be addressed to: LRO Configuration Management Office Mail Stop 451 Goddard Space Flight Center Greenbelt, Maryland 20771

SIGNATURE PAGE Prepared by: Leslie Hartz LRO Payload Systems Engineer GSFC/NASA, Code 59942 Date Reviewed by: Charles Baker LRO Thermal Lead Engineer GSFC/NASA, Code 545 Date Arlin Bartels LRO Payload Systems Manager GSFC/NASA, Code 4531 Date Approved by: Dave Everett LRO Mission System Engineer GSFC/NASA, Code 599 Date Robert Goeke CRaTER Project Engineer MIT/Kavli Institute Date

LUNAR RECONNAISSANCE ORBITER PROJECT REV LEVEL DOCUMENT CHANGE RECORD Sheet: 1 of 1 DESCRIPTION OF CHANGE APPROVED BY DATE APPROVED Rev Released per 431-CCR-000071 C. Tooley 2/2/2006 Rev A Released per 431-CCR-000172 A. Bartels 7/11/2006 Rev B Released per 431-CCR-000256 D. Everett 01/11/2007

TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1-1 1.1 GENERAL... 1-1 1.2 PURPOSE... 1-1 1.3 RESPONSIBILITY... 1-1 1.4 APPLICABLE DOCUMENTS... 1-2 1.5 Definition... 1-2 2.0 LRO REFERENCE COORDINATE SYSTEM... 2-3 3.0 THERMAL INTERFACES... 3-1 3.1 INTERFACE DEFINITIONS... 3-1 3.2 INSTRUMENT REFERENCE LOCATIONS... 3-1 3.3 INSTRUMENT TEMPERATURE LIMITS... 3-1 3.4 SPECIFICATION OF INSTRUMENT-SIDE TEMPERATURES... 3-1 3.5 ADDITIONAL THERMAL INFORMATION... 3-1 4.0 CRaTER THERMAL DESIGN CONCEPT... 4-1 4.1 THERMAL COUPLING... 4-1 4.1.1 CRaTER-To-Spacecraft Conductive Coupling... 4-1 4.1.2 CRaTER-To-Spacecraft Radiative Coupling... 4-1 4.2 INTERNAL CONTROLS... 4-2 4.3 INTERNAL POWER DISSIPATIONS... 4-2 4.4 THERMAL CONTROL COATINGS... 4-2 4.5 THERMAL BLANKETS... 4-2 4.5.1 Venting Requirements... 4-2 4.5.2 Grounding Requirements... 4-2 4.5.3 Cleanliness Requirements... 4-34-2 4.5.4 Blanket Interface with Spacecraft... 4-3 5.0 INTERFACE TEMPERATURE REQUIREMENTS... 5-1 5.1 TEMPERATURE RANGE REQUIREMENTS... 5-1 5.2 TEMPERATURE RATE-OF-CHANGE REQUIREMENTS... 5-1 5.3 TEMPERATURE GRADIENT REQUIREMENTS... 5-1 6.0 TEMPERATURE MONITORING... 6-2 6.1 CRaTER REFERENCE LOCATIONS... 6-2 6.2 EXTERNALLY MOUNTED SPacecraft TEMPERATURE SENSORS... 6-3 6.3 INTERNALLY MOUNTED SPacecraft TEMPERATURE SENSORS... 6-3 6.4 INSTRUMENT MONITORED TEMPERATURE SENSORS... 6-3 6.5 TEMPERATURE LIMITS... 6-3 ii

TABLE OF CONTENTS (CONTINUED) Page 7.0 HEATERS... 7-1 7.1 GENERAL REQUIREMENTS... 7-1 7.2 OPERATIONAL HEATERS... 7-1 7.3 SURVIVAL HEATERS... 7-1 7.4 DECONTAMINATION HEATERS... 7-1 8.0 THERMAL MODEL REQUIREMENTS and format... 8-1 9.0 THERMAL VACUUM TEST CONSIDERATIONS... 9-1 9.1 HIGH-VOLTAGE POWER SUPPLIES... 9-1 9.2 TEST HEATERS... 9-1 9.3 TEST SENSORS... 9-1 9.4 GREEN TAG ITEMS... 9-1 9.5 RED TAG ITEMS... 9-1 APPENDIX A. ABBREVIATIONS AND ACRONYMS... A-1 LIST OF FIGURES Figure Page Figure 4-1. CRaTER Instrument... 4-1 LIST OF TABLES Table Page Table 6-1. CRaTER Reference Locations... 6-2 Table 6-2. CRaTER Reference Location Temperature Limits... 6-3 iii

1.0 INTRODUCTION The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Lunar Percursor and Robotic Program (LPRP). The LRO mission objective is to conduct investigations that will be specifically targeted to prepare for and support future human exploration of the Moon. This mission is currently scheduled to launch in October 2008 and is planned to take measurements of the Moon for at least one year. 1.1 GENERAL This Thermal Interface Control Document (TICD) defines and controls the top level thermal interface between the LRO spacecraft and the Cosmic Ray Telescope for the Effects of Radiation (CRaTER) instrument necessary to manifest, build, test, and successfully fly the LRO mission. 1.2 PURPOSE The purpose of this TICD is to ensure compatibility between the CRaTER instrument and the LRO spacecraft by: a. Defining and controlling the interfaces between the instrument and the spacecraft; and b. Defining top level constraints that shall be observed by the instrument and the LRO spacecraft. The top-level requirements are the general requirements that all subsystems must comply with to fly aboard the LRO mission. 1.3 RESPONSIBILITY The Goddard Space Flight Center (GSFC) has the final responsibility for the design of the Thermal Control System (TCS) for the LRO spacecraft, its subsystems, and any requirements specifically assigned to LRO in this document. Boston University (BU) has the final responsibility for the design of the TCS for the CRaTER instrument, its subsystems, and any requirements specifically assigned to CRaTER in this document. CRaTER shall be accompanied by all mechanical, electrical, and thermal ground support equipment (GSE) necessary to allow for full handling and thermal testing and will be provided by BU. 1-1

1.4 APPLICABLE DOCUMENTS 431-ICD-000085 431-PLAN-000110 431-RQMT-000092 431-SPEC-000008 431-SPEC-000091 Cosmic Ray Telescope for Effects of Radiation to Spacecraft Mechanical Interface Control Document Lunar Reconnaissance Orbiter Contamination Control Plan Lunar Reconnaissance Orbiter Thermal Math Model Requirements Lunar Reconnaissance Orbiter Electrical Systems Specification Lunar Reconnaissance Orbiter Thermal Systems Specification 32-06005.01 Cosmic Ray Telescope for the Effects of Radiation Thermal-Vacuum Test Procedure 32-02003.02 Cosmic Ray Telescope for the Effects of Radiation Mechanical- Thermal Interface Drawing 1.5 DEFINITION In this document, a requirement is identified by shall, a good practice by should, permission by may or can, expectation by will, and descriptive material by is. 1-2

2.0 LRO REFERENCE COORDINATE SYSTEM The LRO mechanical and thermal reference coordinate system is defined in the Cosmic Ray Telescope for Effects of Radiation to Spacecraft Mechanical Interface Control Document (431- ICD-000085). Unless otherwise noted, this document shall refer to the LRO reference coordinate system. 2-3

3.0 THERMAL INTERFACES 3.1 INTERFACE DEFINITIONS The spacecraft-side interface is defined as the mounting surface on the spacecraft side of the interface. The instrument-side interface is defined as the mounting surface on the CRaTER side of the interface plus any required thermally conductive materials. 3.2 INSTRUMENT REFERENCE LOCATIONS BU shall choose at least one reference location on the CRaTER instrument where temperature measurements can validate the design and monitor the health and safety of the instrument. To support this validation, each location must be equipped with a spacecraft-monitored temperature sensor, be thermally separate from the spacecraft (at least to the degree that heat flow to/from the spacecraft can be quantified) and correspond to a node in the thermal model. 3.3 INSTRUMENT TEMPERATURE LIMITS BU shall provide flight design, operational, survival, and qualification temperature limits associated with the above reference location(s). Refer to Section 2.1 of the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091) for a complete definition of these temperature limit types. 3.4 SPECIFICATION OF INSTRUMENT-SIDE TEMPERATURES BU shall, in this document: a. Provide the reference location(s) and a brief description of each location and its significance b. Provide temperature limits associated with each reference location per Sections 3.2 and 3.3 of this document c. Identify the node in the reduced thermal models delivered to the GSFC corresponding to each reference location 3.5 ADDITIONAL THERMAL INFORMATION For locations in the instrument that have significantly different temperature limits from the reference location, BU shall make each such location a node in its thermal model to be delivered to GSFC. For locations in the instrument that have significantly different temperature limits from the reference location, BU shall provide the flight design limit for each node to the LRO Lead Thermal 3-1

Engineer. No spacecraft-monitored temperature sensors are required for these additional locations; however, it may be advantageous to place instrument monitored temperature sensors at some or all of these locations. 3-2

4.0 CRATER THERMAL DESIGN CONCEPT CRaTER is conductively coupled to the spacecraft through the footprint of its six (6) mounting feet. All exterior surfaces of the instrument excluding the scope apertures are insulated using 15- layered multi-layer insulation (MLI) blanket with a Germanium Black Kapton outer layer. The scope apertures are covered with a single layer of Kapton. Optical properties of these surfaces are defined in the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091). Electronics Assembly NADIR +Z (Moon) SIM Table ZENITH -Z (Space) Telescope Assembly Figure 4-1. CRaTER Instrument 4.1 THERMAL COUPLING 4.1.1 CRaTER-To-Spacecraft Conductive Coupling The LRO spacecraft to CRaTER instrument interface will be a bare aluminum to aluminum interface. The maximum heat flow across the CRaTER/Spacecraft interface shall be no greater than 9 Watts. 4.1.2 CRaTER-To-Spacecraft Radiative Coupling The spacecraft in the vicinity of CRaTER shall be covered by MLI. The outer layer of the MLI shall be Germanium Black Kapton with an emittance as specified in the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091). 4-1

The spacecraft directly underneath CRaTER s footprint shall be aluminum. The surface finish of the facesheet will have an emittance as specified in the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091). 4.2 INTERNAL CONTROLS CRaTER has no operational heaters. 4.3 INTERNAL POWER DISSIPATIONS CRaTER s internal thermal power dissipation is listed in the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091). 4.4 THERMAL CONTROL COATINGS CRaTER s mounting panel directly facing the spacecraft shall be conversion coated aluminum. The surface finish of the mounting panel will have an emittance as specified in the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091). 4.5 THERMAL BLANKETS BU shall provide and install all MLI that will cover the CRaTER instrument. The outermost layer of MLI viewing the spacecraft and neighboring instruments/components shall be Germanium Black Kapton. The CRaTER thermal blanket is being built by the GSFC blanket shop. Details of the CRaTER thermal blanket will be documented??? (Charles can you answer this?) Blanket details are specified in the CRaTER Mechanical-Thermal Interface Drawing (32-02003.02). 4.5.1 Venting Requirements Blankets shall be adequately vented in accordance with the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091). Blanket venting details for the CRaTER instrument are provided in the CRaTER Mechanical- Thermal Interface Drawing (32-02003.02). 4.5.2 Grounding Requirements The CRaTER instrument MLI shall comply with the grounding requirements in Section 3.2 of the Lunar Reconnaissance Orbiter Electrical Systems Specification (431-SPEC-000008). Grounding tabs for the thermal blankets are shown on the CRaTER Mechanical-Thermal Interface Drawing (32-02003.02). 4-2

4.5.3 Cleanliness Requirements Blankets shall be baked-out and meet cleanliness requirements in accordance with the Lunar Reconnaissance Orbiter Contamination Control Plan (431-PLAN-000110). 4.5.4 Blanket Interface with Spacecraft The CRaTER thermal blanket is being built by the GSFC blanket shop. The CRaTER blanket interface with the spacecraft will be determined by the GSFC blanket shop.interface to the spacecraft thermal blanket shall be specified on the CRaTER Mechanical-Thermal Interface Drawing (32-02003.02). 4-3

5.0 INTERFACE TEMPERATURE REQUIREMENTS 5.1 TEMPERATURE RANGE REQUIREMENTS The spacecraft has two (2) thermal modes of operation, the operational mode and survival mode. The spacecraft TCS shall maintain the temperature on the spacecraft-side of the interface within the temperature ranges specified in Section 2.3 of the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091). The spacecraft temperature limits for the CRaTER instrument are: for operation -30 to +30 C; for survival -40 to +35 C; for qualification -40 to +50 C. BU is responsible for meeting all performance requirements for the CRaTER instrument under the specified temperature range during all mission modes. 5.2 TEMPERATURE RATE-OF-CHANGE REQUIREMENTS CRaTER has no temperature rate-of-change requirements. 5.3 TEMPERATURE GRADIENT REQUIREMENTS CRaTER has no temperature gradient requirements. 5-1

6.0 TEMPERATURE MONITORING 6.1 CRATER REFERENCE LOCATIONS The spacecraft shall allocate one spacecraft-monitored temperature sensor to the CRaTER instrument to be located on the instrument-side of the interface at BU s discretion. GSFC is responsible for providing the temperature sensors. The type of sensor used is specified in the Lunar Reconnaissance Orbiter Thermal Systems Specification (431-SPEC-000091). A description of the sensor location along with their representative node in the thermal model is provided in Table 6-1. Temperature limits for this location are provided in Section 6-5 of this document. Figure 6-1 shows the location of the temperature sensor. Table 6-1. CRaTER Reference Locations # DESCRIPTION INT. / EXT. NODE # 1 Telescope Wall Internal CR_XMAX7 Figure 6-2: CRaTER Reference Temperature Location 6-2

6.2 EXTERNALLY MOUNTED SPACECRAFT TEMPERATURE SENSORS CRaTER will not have any externally mounted temperature sensors. 6.3 INTERNALLY MOUNTED SPACECRAFT TEMPERATURE SENSORS BU is responsible for installing the internally mounted spacecraft-monitored temperature sensor located at the telescope wall. specified in the CRaTER Mechanical-Thermal Interface Drawing (32-02003.02). 6.4 INSTRUMENT MONITORED TEMPERATURE SENSORS CRaTER has five instrument monitored temperature sensors. The locations and temperature limits for these sensors are shown in the CRaTER Thermal-Vacuum Test Procedure (32-06005.01). does not have any instrument monitored temperature sensors. 6.5 TEMPERATURE LIMITS During all mission operational modes when the instrument is powered ON and the spacecraft is maintaining the CRaTER instrument interface temperature within the operational temperature limits described in section 5.1, the CRaTER instrument reference temperature shall stay within the operational temperature limits shown in Table 6-3.GSFC shall be responsible for maintaining the instrument within its operational temperature limits via the spacecraft TCS. During all mission modes when the instrument is powered OFF and the spacecraft is maintaining the CRaTER instrument interface temperature within the survival temperature limits described in section 5.1, the CRaTER instrument reference temperature shall stay within the survival temperature limits shown in Table 6-3., GSFC shall be responsible for maintaining the instrument interface within its survival temperature limits via the spacecraft TCS. CRaTER shall survive without damage or permanent performance degradation if powered ON anywhere within the survival temperature range. During the qualification testing of the CRaTER instrument, the instrument reference temperature shall remain within the qualification limits shown in Table 6-3. A list of operational and survival temperature limits, along with flight design and qualification limits, is provided in Table 6-2. Table 6-3. CRaTER Reference Location Temperature Limits # DESCRIPTION NODE# MIN/MAX TEMP. LIMITS ( C) OPER. SURV. QUAL. 6-3

MIN/MAX TEMP. LIMITS ( C) # DESCRIPTION NODE# OPER. SURV. QUAL. 1 Telescope Wall CR_XMAX7-30 to 30-40 to 50-40 to 40 6-4

7.0 HEATERS 7.1 GENERAL REQUIREMENTS Sizing of operational and survival heater capacity shall be based on 70% duty cycle (1/0.7=1.43 or 43% margin) at 27 Volts (V) bus voltage and cold case thermal conditions. Heater elements must be capable of operating over the voltage range of 28 ± 7V. Watt densities of the operational and survival heaters shall be appropriate for the type of heater and bonding method. Watt densities (at the maximum voltage) above 0.16 Watts per centimeter squared (W/cm 2 )(1.0 Watts per inch squared [W/in 2 ]) shall be discussed with the GSFC LRO Lead Thermal Engineer and may require (if a Kapton heater) bonding with Stycast 2850FT and aluminum over-taping up to 1.24 W/cm 2 (8.0 W/in 2 ). 7.2 OPERATIONAL HEATERS GSFC shall provide any operational heaters, cabling and thermostats that are necessary. Any such heaters and associated hardware may be mounted on the spacecraft, the CRaTER instrument, or both. The placement of heaters shall be negotiated between GSFC and BU and documented in the CRaTER Mechanical-Thermal Interface Drawing (32-02003.02). GSFC shall install and the spacecraft shall control any such operational heaters, as needed, to maintain the temperatures of the instrument to within the operational temperature range specified in Table 6-2 of this document. 7.3 SURVIVAL HEATERS GSFC shall provide any survival heaters, cabling and thermostats that are necessary. CRaTER s survival heaters and thermostats shall be located external to the instrument housing. GSFC shall mount any necessary survival heaters on the spacecraft side of the LRO/CRaTER interface. These heaters will be used to maintain the CRaTER interface to within the survival limits listed in the LRO Thermal Systems Specification (431-SPEC-000091). 7.4 DECONTAMINATION HEATERS CRaTER has no decontamination heaters. 7-1

8.0 THERMAL MODEL REQUIREMENTS AND FORMAT BU will develop their thermal models using Thermal Desktop. Reduced Thermal Synthesizer System (TSS) and Systems Improved Numerical Differencing Analyzer (SINDA) models shall be developed for delivery to GSFC. The Lunar Reconnaissance Orbiter Thermal Math Model Requirements (431-RQMT-000092) provides specific requirements for model formats, naming conventions, etc. to facilitate integration of instrument models with the spacecraft model and shall be strictly adhered to. LRO will deliver backload information for BU to input into their thermal model. 8-1

9.0 THERMAL VACUUM TEST CONSIDERATIONS The purpose of this section is to encourage the CRaTER team to anticipate, as much as possible, any special requirements and/or needs that may arise during Orbiter Thermal Vacuum (TVAC) testing. These may include, but are not necessarily limited to, such items as test heaters or internal test temperature sensors as described below. 9.1 HIGH-VOLTAGE POWER SUPPLIES CRaTER has a single 300 Volts Direct Current (VDC) detector high voltage (bias) supply. 9.2 TEST HEATERS BU should consider that during Orbiter TVAC testing, the test configuration of the Orbiter in the vicinity of each instrument may not be flight like due to placement of heater panels and cold plates to facilitate testing that will obviously not be present during flight. The primary objectives of the Orbiter TVAC test are to qualify the spacecraft design and achieve steady state and transient thermal balances. It may not be possible to do this with thermal targets alone. The BU and GSFC may decide to add test heaters as required. The best approach for successfully satisfying these objectives will be negotiated when the thermal vacuum test plans for the instrument and observatory are written. During Orbiter TVAC testing, the CRaTER instrument will be kept within its survival limits at all times. No test heaters will be installed on the instrument to meet this requirement. 9.3 TEST SENSORS Where there is a desire to monitor temperatures of internal components during TVAC, BU shall deliver CRaTER with the temperature sensor already installed. Temperature sensors used only during testing need not be flight qualified, but these sensors must meet outgassing, contamination and parts requirements so that they do not jeopardize the flight hardware or mission. Temperature sensor leads should be properly labeled and be of sufficient length to allow connection to test chamber wire harnesses. 9.4 GREEN TAG ITEMS Green tag items are those that must be installed prior to flight or environmental testing. CRaTER has no green tag items. 9.5 RED TAG ITEMS Red tag items are those that must be removed prior to flight or environmental testing. CRaTER has no red tag items. 9-1

APPENDIX A. ABBREVIATIONS AND ACRONYMS Abbreviation/ Acronym DEFINITION BU Boston University CCB Configuration Control Board CCR Configuration Change Request CM Configuration Management CMO Configuration Management Office CRaTER Cosmic Ray Telescope for the Effects of Radiation ºC Degrees Centigrade GSE Ground Support Equipment GSFC Goddard Space Flight Center ICD Interface Control Document in/cm 2 Inch per centimeter squared LPRP Lunar Percursor and Robotic Program LRO Lunar Reconnaissance Orbiter MIT Massachusetts Institute of Technology MLI Multi-Layer Insulation NASA National Aeronautics and Space Administration RQMT Requirement SINDA Systems Improved Numerical Differencing Analyzer SPEC Specification TCS Thermal Control System TICD Thermal Interface Control Document TSS Thermal Synthesizer System TVAC Thermal Vacuume V Volts VDC Volts Direct Current W/cm 2 Watts per centimeter squared A-1