ICHE 2014, Hamburg - Lehfeldt & Kopmann (eds) Bundesanstalt für Wasserbau ISBN

Similar documents
APPLICATIONS OF MATHEMATICAL MODELING TO SEDIMENT RESEARCH IN THE THREE GORGES PROJECT. Ying Tan 1

SEDIMENT RESEARCH FOR THE THREE GORGES PROJECT ON THE YANGTZE RIVER SINCE 1993

Recent changes of suspended sediment yields in the Upper Yangtze River and its headwater tributaries

2016 International Conference on Civil, Structure, Environmental Engineering (I3CSEE 2016)

Enhanced lakebed sediment erosion in Dongting Lake induced by the operation of the Three Gorges Reservoir

Recent Changes of Suspended Sediment Yields in the Upper Yangtze River and Its Headwater Tributaries

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

CASE STUDY NATHPA JHAKRI, INDIA

From micro to macro scale the impact on the sediment discharge after construction of the Three Gorges Dam on Yangtze River (Changjiang)

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

CASE STUDY NATHPA JHAKRI, INDIA

Landscape Development

Erosion Surface Water. moving, transporting, and depositing sediment.

Countermeasures for Preserving Riverine Tidal Flats in a Ship-Bottom Shaped Channel of the Lower Ota River Floodway

Morphological Changes of Reach Two of the Nile River

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

PROGRESS OF SEDIMENTATION RESEARCH FOR THE YANGTZE RIVER

EFFECTS OF ICE ON THE HYDRAULICS OF INNER MONGOLIA REACH OF THE YELLOW RIVER

GTU. Shantilal Shah Engineering College, Bhavnagar

Upper Drac River restoration project

Dam Removal Analysis Guidelines for Sediment

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California

Technical note about the monitoring of hydromorphological restoration/management of the Drava River in Slovenia

NATURAL RIVER. Karima Attia Nile Research Institute

Earth Science Chapter 6 Section 2 Review

Historical channel change on the Upper Gila River, Arizona and New Mexico in response to anthropogenic modifications and extreme floods

Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

State Water Survey Division SURFACE WATER SECTION

WORKSHOP #2 [Modeling and Sediment Transfers Review of alternative solutions] Bucharest 07 October 2015

Do you think sediment transport is a concern?

!"#$%&&'()*+#$%(,-./0*)%(!

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

Pirai river (Bolivia)

GEOL 1121 Earth Processes and Environments

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Technical Memorandum No Sediment Model

3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e

Consequences of river regulation works: altered fluvial processes + increasing flood hazard

Brief outline of the presentation

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

How to predict the sedimentological impacts of reservoir operations?

Immediately downstream effects of Three Gorges Dam on channel sandbars morphodynamics between Yichang-Chenglingji Reach of the Changjiang River, China

Appendix O. Sediment Transport Modelling Technical Memorandum

MATHEMATICAL MODELING OF FLUVIAL SEDIMENT DELIVERY, NEKA RIVER, IRAN. S.E. Kermani H. Golmaee M.Z. Ahmadi

Temporal and Spatial Changing Trends on the Fluvial Sedimentation in the Three Gorges Reservoir, Yangtze River in China

Great Lakes Update. Volume 194: 2015 Annual Summary

HYDRAULIC STRUCTURES, EQUIPMENT AND WATER DATA ACQUISITION SYSTEMS - Vol. I - Hydraulics of Two-Phase Flow: Water and Sediment - G R Basson

LATERAL MIGRATION of ALLUVIAL CHANNELS

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap

Vermont Stream Geomorphic Assessment. Appendix E. River Corridor Delineation Process. VT Agency of Natural Resources. April, E0 - April, 2004

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

Surface Water Short Study Guide

Calculating the suspended sediment load of the Dez River

Running Water: The Geology of Streams and Floods Running Water Chapter 14

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS

Rivers T. Perron

Fresh Water: Streams, Lakes Groundwater & Wetlands

Dams, sediment, and channel changes and why you should care

A New Spatial Interpolation Method Based On Cross-Sections Sampling

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Final Exam. Running Water Erosion and Deposition. Willamette Discharge. Running Water

Quasi-three dimensional computations for flows and bed variations in curved channel with gently sloped outer bank

11/12/2014. Running Water. Introduction. Water on Earth. The Hydrologic Cycle. Fluid Flow

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output

Lab 13: Fluvial Processes and Landforms

Fluvial Systems Lab Environmental Geology Lab Dr. Johnson

ADP-flow velocity profile to interpret hydromorphological features of China s Yangtze Three-Gorges valley

NUMERICAL MODEL FOR MOVABLE BED AS A TOOL FOR THE SIMULATION OF THE RIVER EROSION A CASE STUDY

Numerical modeling of sediment flushing from Lewis and Clark Lake

Appendix A Flood Damages in 2013

Floods Lecture #21 20

Large-Scale Sediment Inflow and Bed-Variation from 12th Typhoon (2011) in the Asahi River Basin

Degradation Concerns related to Bridge Structures in Alberta

Sediment Transport Mechanism and Grain Size Distributions in Stony Bed Rivers. S.FUKUOKA 1 and K.OSADA 2

Application of Time Sequence Model Based on Excluded Seasonality in Daily Runoff Prediction

Application of Energy Approach to Estimating Scour Depth

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

Great Lakes Update. Volume 188: 2012 Annual Summary

Case Study: Delayed Sedimentation Response to Inflow and Operations at Sanmenxia Dam

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

The Hydrologic Cycle STREAM SYSTEMS. Earth s Water and the Hydrologic Cycle. The Hydrologic Cycle. Hydrologic Cycle

Technical Memorandum No

Multi-approach analysis of maximum riverbed scour depth above subway tunnel

STREAM SYSTEMS and FLOODS

Precipitation Evaporation Infiltration Earth s Water and the Hydrologic Cycle. Runoff Transpiration

Bank Erosion and Morphology of the Kaskaskia River

Domino Effect of River Training in Large Sand-Bed Braiding Rivers

UPPER COSUMNES RIVER FLOOD MAPPING

Sedimentation in the Nile River

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26

Flood Capacity of Shirakawa River at Tatsudajinnnai Area in Kumamoto Prefecture

Impact of Dam and Weirs on Cross-Sectional Characteristics of Urmodi Channel, Maharashtra: An Approach to Geoinformatics

PR206 NARRATIVE Updated 16 June 2015

Transcription:

ICHE 2014, Hamburg - Lehfeldt & Kopmann (eds) - 2014 Bundesanstalt für Wasserbau ISBN 978-3-939230-32-8 Comparison of Physical Model Predictions and Prototype Measurements of Fluvial Morphodynamics in the Downstream of the Three Gorges Project Y. Zhu, L. Huang, F. Tang, Q. Geng, X. Guo, F. Li & G. He Key Laboratory of River Regulation and Flood Control of MWR, Changjiang River Scientific Research Institute, Wuhan, China ABSTRACT: The Three Gorges Project (TGP) began to operate since June 2003. So far the hydrological regime and the features of river channel erosion/deposition change significantly in the downstream of the TGP. In this study, the recent variation of the flow and sediment conditions and the erosion/deposition in the river channel downstream of the TGP are briefly analyzed first. Then the predictive results of physical model tests on the morphodynamics of the river channel downstream of the TGP are briefly presented. Comparisons between the model predictions and the prototype measurements are made. The comparative results show that the model tests predict well the development of typical bars in the river, the development of typical cross-sections, and the tendency of river regime variation, etc. Keywords: Physical model predictions,, Three Gorges Project, Fluvial morphody-namics, Hydrological regime. 1 INTRODUCTION The Three Gorges Project (TGP), as the key project for the improvement and development of the Yangtze River, started operation since June 2003, and so far already bring large economic and social benefits in terms of flood protection, electricity generation, irrigation and navigation, etc. The successful protection of the big floods in 2010 and 2012 specially highlights the significant importance of the TGP in the flood protection system of the Basin. Yet, the operation of the TGP changes the flow and sediment conditions (i.e. the hydrological regime) of the downstream river channel as well, and consequently brings far-reaching impacts to the fluvial process of the river channel. In particular, the Jingjiang River (also called the Jingjiang Reach, from Zhicheng to Lianhuatang, about 347 km long, see Figure 1), closely downstream of the TGP, is affected relatively earlier and significant. According to relevant research (see e.g. Xu et al., 2013; CRSRI, 2011; and Guo et al., 2010), significant erosion and deposition already occurred in the Jingjiang River since the operation of the TGP, and the river regime at some river subreaches adjusted clearly. Relying on the Changjiang River Flood Protection Physical Model (see Zhu et al. 2014, and the Changjiang River was formerly named the ), study with physical model tests has been done to predict the erosion and deposition of the downstream river channel from Yangjianao to Luoshan after operation of the TGP (see Figure 1), and to predict the tendency of river regime development. The Changjiang River Flood Protection Physical Model is a physical model covering the from Zhicheng to Luoshan (380km long, including the Jingjiang Reach from Zhicheng to Lianhuatang), the Dongting Lake, the downstream ending reach of the four main tributaries of the lake (i.e. rivers of Xiang, Zi, Yuan and Li, see Figure 1), and the three outlets (i.e. Songzikou, Taipingkou and Ouchikou) and the many small channels connecting the and the Dongting Lake. The horizontal scale of the physical model is 1:400, and the vertical one is 1:100. For more details (including the model verification) readers are referred to Zhu et al. (2014) and CRSRI (2011). In this study, first the change of the flow and sediment conditions of the river channel downstream of the TGP and the channel erosion and deposition are briefly analyzed. Then the physical model predictions 515

are presented, and then comparisons between the model predictions and the prototype measurements are made. Zhijiang Songzikou Zhicheng Yangjianao Shashi Taipingkou Gongan Ouchikou Xinchang Beinianziwan Jianli Li River Shishou Tiaoguan Yanchuantao Xiongjiazhou Qigongling Luoshan Lianhuatang Qilishan Dongting Lake Yuan River Dongting Lake Zi River Xiang River Figure 1. Sketch map of the downstream of the TGP and the Dongting Lake 2 VARIATIONS OF HYDROLOGICAL REGIME OF DOWNSTREAM RIVER CHANNEL AFTER THE TGP OPERATION Since the operation of the TGP in 2003, the flow and sediment conditions (i.e. the hydrological regime) of the river downstream of the TGP already changed significantly so far. Operation of the TGP reduces the peak of big floods and increases the flow rate for dry season. Generally, the flow process is flattening within the year. According to statistics, comparing with the situations before the project operation, the annual runoff at most hydrological stations downstream of the TGP is about 5%~10% less after the operation. Yet, the sediment load decreases dramatically (>70%), and the degree of this decrease declines in the streamwise direction (mainly due to the recovery of sediment concentration caused by erosion along the channel). The stations of Zhicheng, Shashi and Hankou are control hydrological stations for the river channel downstream of the TGP. The average annual sediment loads after the TGP operation (2003-2012) for the above three stations are 0.585 10 8 t, 0.693 10 8 t and 1.143 10 8 t, respectively. Comparing with those before the TGP operation, the sediment loads decreased by 88%, 84% and 71% for the three stations, respectively. After the operation of the TGP, most of the coarse sediment particles are stopped in the reservoir, resulting in fine down of the suspended load discharged from the reservoir. The clear flow discharged from the reservoir causes significant erosion along the downstream river channel, and the suspended load is coarsened distinctly, especially that at the Jianli Station, where d 50 is coarsened from 0.009mm before the TGP operation to the averaged 0.042mm for the years of 2006-2010, and then to 0.065mm of 2011, and 0.211mm of 2012. 516

Due to the significant erosion of the downstream river channel (especially the low water channel, see Section 3) after the TGP operation, water levels at the same flow rates decline clearly, see e.g., Table 1 for the Shashi Hydrological Station. From 2003 to 2011, the decline of water level at the same flow rate of 6000m 3 /s is 1.07m at the Shashi Station. Then along with the increase of the flow rate, this decline of water level tends to getting smaller. At some hydrological stations, as far as the prototype observational data of recent several years is concerned, the water level even shows a little upward trend at high flow rates (e.g. 30000m 3 /s for the Shashi Station, see Table 1). Table 1. Variation of water level at same flow rate after operation of TGP (Shashi Station, unit: m) Period 2003-2008 2008-2010 2010-2011 2003-2011 Flow rate(m 3 /s) 6000-0.34-0.53-0.2-1.07 10000-0.34-0.22-0.11-0.67 20000 0.07 0.02-0.21-0.12 30000 0.06 0.21 The three outlets, i.e. Songzikou, Taipingkou and Ouchikou (see Figure 1), formed mainly due to historical big floods, divert flow and sediment from the to the Dongting Lake. During the last a few decades, under natural conditions the quantity of flow and sediment diverted via the three outlets decreases gradually (Figure 2). Since the operation of the TGP, except 2006 and 2011 which are special low flow years, in which both the flow and sediment diversion has a very significant reduction, in the other years during 2003-2013 the flow diversion shows just slight decrease, while the sediment diversion decreases dramatically. Figure 2. Variation of flow and sediment diversion via the three outlets from Yangtze to Dongting Lake (1951-2013) 3 EROSION AND DEPOSITION OF DOWNSTREAM RIVER CHANNEL AFTER THE TGP OPERATION Based on analysis of the prototype topographical survey data of the river channel, since the operation of the TGP (2002-2012), the quantity of erosion occurred in the bank full channel for the downstream river reach from Zhicheng to Lianhuatang (i.e. the Jingjiang River) amounts to 6.21 10 8 m 3, while this quantity amounts to 5.38 10 8 m 3 for the low water channel (see Table 2). It is therefore indicated from Table 2 that the erosion occurs mainly in the low water channel after the TGP operation, and the averaged erosion intensity is about 0.15 10 6 m 3 /km a. Among the 10 years (2002-2012), the quantity of erosion occurred in the low water channel in the first 5 years (i.e. 2002-2007) is 2.86 10 8 m 3, occupying a 53.1% portion of the whole, which is slightly larger than that of the last 5 years. 517

Table 2. Quantity erosion of river channel from Zhicheng to Lianhuatang after the TGP operation (10 6 m 3 ) 2002-2003 2003-2004 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2002-2012 Low water channel -64-90 -63.8-18.7-49 -6.9-76.1-49.3-79.4-40.5-538 Bank full channel -98.2-130 -73.7-26.6-33.6-1.7-82.5-49.8-75.4-49.4-621 Note: + indicates deposition, - indicates erosion. 4 PHYSICAL MODEL PREDICTIONS OF THE FLUVIAL PROCESS OF THE JINGJIANG RIVER 4.1 Brief introduction of the physical model tests To predict the fluvial process of the river downstream of the TGP after the project operation, study with physical model tests has been done in 2009 with the Changjiang River Flood Protection Physical Model (see e.g. CRSRI, 2011; Huang et al., 2011). In the tests, the modeling river reach is from Yangjianao to Luoshan (about 300km long, see Figure 1). The initial topography of the river bed for the movable bed model adopts the prototype topographic data measured in October 2008. The modeling flow and sediment boundary conditions are provided by the simulation of the long river channel and long period 1D mathematical model of the CRSRI, which was applied for the justification of the TGP decades ago and is improved continually ever after. The prediction period of the physical model tests is from October 2008 to December 2022 (altogether 14years plus 2months). In the tests, the process of river channel erosion and deposition and the adjustment tendency of the river regime are predicted (Zhu et al., 2014). 4.2 Summary of the model test results 4.2.1 Quantity and distribution of channel erosion and deposition According to the physical model predictions, when the TGP operates to 2012, and then to 2017, and then to 2022, erosion occurs mainly in the low water channel for the whole modeling river reach, and among which, the intensity of erosion decreases after 2012 for the river reach from Yangjianao to Yanchuantao (see Figure 1). It is also observed that different river sub-reaches have different intensities of erosion. If sub-divide the modeling river reach into four sub-reaches (see Table 3), it can be seen that the most upstream sub-reach (i.e. Yangjianao~Beinianziwan) has the largest intensity of erosion (2.58 10 6 m 3 /km); the most downstream sub-reach (Lianhuatang~Luoshan) has the smallest intensity of erosion (0.77 10 6 m 3 /km); while the second downstream sub-reach (Yanchuantao~Lianhuatang) has the second largest intensity of erosion (2.52 10 6 m 3 /km). Due to the relatively small channel width, the second upstream sub-reach (Beinianziwan~Yanchuantao) has the largest averaged depth of erosion (2.42m), though the intensity of erosion for this sub-reach only ranks the third. Table 3. Physical model predictions of erosion and deposition during 2008-2022 in Yangjiannao~Luoshan Reach River sub-reach Yangjianao~ Beinianziwan Yanchuantao Lianhuatang Beinianziwan ~Yanchuantao ~Lianhuatang ~Luoshan Quantity erosion (10 8 m 3 ) 3.15 1.54 1.16 0.24 Intensity erosion (10 6 m 3 /km) 2.58 1.97 2.52 0.77 Depth erosion (m) 2.19 2.42 2.18 0.68 4.2.2 Variations of thalweg and alongshore scour pits Physical model predictions indicate that, when the TGP operates to 2022, the river channel from Yangjianao to Luoshan shows a general tendency of erosion and downcutting. The planar variation of the thalweg embodies in mainly, the downstream shift of the section with the thalweg closely nestling against the bank, the downstream shift of the facing point of the thalweg at bending channels, and the swing of the thalweg at transitional river sections. Due to the reduction of sediment load in the flow, the part of channels with the thalweg closely nestling against the bank are generally scoured down, with local lowelevation scour pits formed and developed. 518

4.2.3 Comparison of development of typical bars between physical model predictions and prototype measurements In the physical model tests, some of the typical bars in the river, such as the Sanba Central Bar, the Taipingkou Point Bar, have been modeled with movable bed. Following the Sanba Central Bar is taken as an example to make a comparison between the physical model predictions and the prototype measurements for the development of typical bars (Figure 3). The Waterway Bureau started the protection for the Sanba Central Bar in March 2004, then to October 2008 the protection for the upstream part of the bar was basically finished. However, in recent years the downstream part of the bar (downstream of the Yangtze Bridge) is washed to shrink gradually. From July 2004 to November 2011, the area of the bar above 30m elevation decreased from 1.932km 2 to 0.186km 2. At the same time, at the right side river bank, the downstream part of the Taipingkou Point Bar is silted up and extends to the central river (see the left in Figure 3). The physical model predictions indicate that, when the TGP operates to 2012, the downstream part of the Sanba Central Bar is washed away to almost vanished; correspondingly the Taipingkou Point Bar is silted up and extends to the central river (see the right in Figure 3). It can be seen from the figure that the physical model predictions are in good agreement with the prototype measurements. Yulukou N Yangtge Bridge Jingzhou City Guanyinji Yulukou N Sanba Central Bar Yangtge Bridge Jingzhou City Guanyin Ji 30 Sanba Central Bar Taipingkou Point Bar Taipingkou Point Bar 2006 2011 Legend Buhe 2008 0 0.5 1km Scale Legend 2008 prototype 2012 predictions 0 0.5 1km Scale Figure 3. Recent variation of Sanba Central Bar and Taipingkou Point Bar (Left: prototype measurements; Right: model predictions) 4.2.4 Comparison of development of typical cross-sections between physical model predictions and prototype measurements Following the cross-sections of J56 and J81 are taken as examples to make comparisons between the physical model predictions and the prototype measurements for the development of typical cross-sections (see Figures 4 and 5). Both the two cross-sections are parts of the conventional cross-sections of the Jingjiang River whose section configuration is measured regularly yearly. The J56 section locates at a bifurcated channel (Figure 4). With the operation of the TGP, the right-side channel (i.e. the main channel) is scoured down and develops to the left, while the left-side channel is silted up. For the J81 section (Figure 5), after the TGP operation, the left-side channel changes only slightly from 2002 to 2011, and the right-side river bed is silted up clearly, yet, close to the right-side bank, the channel shows a light degradation. As can be seen from Figures 4 and 5, the physical model predictions (year 2012) are in basic agreement with the prototype measurements (year 2011). Buhe 519

45 40 35 Elevation (m) 30 25 20 15 10 2008 prototype 2011 prototype 2012 prediction 5 0 500 1000 1500 2000 2500 3000 3500 4000 Distance (m) Figure 4. Variation of J56 Section (comparison between model predictions and prototype measurements) 40 35 Elevation (m) 30 25 20 2008 prototype 2011 prototype 2012 prediction 15 10 400 600 800 1000 1200 1400 1600 1800 2000 Distance (m) Figure 5. Variation of J81 Section (comparison between model predictions and prototype measurements) 4.2.5 Comparison of tendency of river regime variation between physical model predictions and prototype measurements The physical model predictions show that when the TGP operates to 2012, and then to 2017, and then to 2022, the overall river regime of the investigated river reach (Yangjianao~Luoshan) has no strong variation comparing with that in October 2008 (i.e. the initial conditions of the model tests), despite significant erosion and deposition occurs to the channel. With the lengthening of the operation period of the TGP, in general the river channel is incised down; the thalweg at transitional river sections swings and moves downstream integrally. However, at certain river sub-reaches, e.g. the curved reaches of Qigongling and Tiaoguan, and the bifurcated reach of Shashi, quite significant variation of the river regime occurs locally. From the point of view of the general tendency of river regime variation, the above physical model predictions conform well to the prototype measurements. Analysis of prototype measurements shows that, since the operation of the TGP, generally the downstream river channel does not change much in the planform. The riverbed deformation is mainly marked with the riverbed downcutting, and the bed form evolves gradually towards a narrow-deep shape. On the whole, no big change occurred in the general river regime of the downstream channel, however, at some river sub-reaches, such as some bifurcated reaches with poor stability, and some curved reaches, relatively remarkable adjustment of river regime took 520

place, a good example is the river sub-reach from Xiongjiazhou to Lianhuatang (in which the curved reach of Qigongling is covered). Following the river sub-reach from Xiongjiazhou to Lianhuatang is taken as an example to illustrate the comparison between the physical model predictions and the prototype measurements in terms of river regime variation. According to the prototype measurements (see the left in Figure 6), in 2002 (and the years before), the thalweg transits from the left in the river at Xiongjiazhou to the right at the entrance of the Qigongling curved reach, and then the main current flows downstream closely along the right bank (concave bank) until to the exit of the curved reach. Then along with the operation of the TGP, the river channel is incised down, and the thalweg at the entrance of the Qigongling curved reach moves downstream gradually. To October 2010 the thalweg does not transits from the left to the right side of the river anymore, instead, the main current flows downstream closely along the left bank (convex bank) until to the lower part of the curved reach, with chute cut-off occurred. Later to 2011 the chute cutoff develops further (see the left in Figure 6). The physical model predictions indicate that (see the right in Figure 6), when the TGP operates to 2012, the Qigongling curved reach is generally scoured continually. Compared with the initial conditions (in 2008) of the physical model, the position of the thalweg changes dramatically in 2012. The main current flows downstream closely along the left bank (convex bank) until to the lower part of the curved reach, instead of transiting from the left to the right at the entrance of the curved reach. The right side thalweg in the upper part of the curved reach is silted up gradually, to the contrary, the left side channel is scoured down and broadened and develops into the thalweg, i.e. chute cutoff occurred in the curved reach. It is concluded from the comparison between the physical model predictions and the prototype measurements that, the physical model tests predicted well the chute cutoff and the adjustment tendency of the river regime in the Qigongling curved reach, though there is slight difference in terms of quantity between the predictions and the prototype measurements. N N Xiongjiazhou Upper Guanyinzhou Xiongjiazhou Upper Guanyinzhou Jinghenao Jinghenao Xing Zhou Qigongling Xing Jinjiangzhou Zhou Lianhuatang Legend thalweg 2002 thalweg 2010 thalweg 2008 thalweg 2011 water edge dike line 0 1 2km Scale Jinjiangzhou Lianhuatang thalweg 2008 prototype thalweg 2012 predictions water edge dike line 0 1 2km Scale Figure 6. Variation of thalweg from Xiongjiazhou to Lianhuatang (Left: prototype measurements; Right: model predictions) Xing Zhou Qigongling Xing Zhou Legend 5 CONCLUSIONS The Three Gorges Project, as the key project for the improvement and development of the, started operation since June 2003, and so far already brings large economic and social benefits. Yet, the operation of the TGP also changes the flow and sediment conditions of the downstream river, and consequently brings significant impacts to the fluvial process of the channel. According to statistics, the annual runoff at most hydrological stations downstream of the TGP is about 5%~10% less after the project operation. Yet, the sediment load decreased by at least 70%. Since the operation of the TGP (2002-2012), the quantity of erosion occurred in the low water river channel from Zhicheng to Lianhuatang (i.e. the Jingjiang River) amounts to 5.38 10 8 m 3. Due to the significant erosion of the downstream river channel (especially the low water channel), water levels at the same (medium and low) flow rates decline clearly after the TGP operation. According to prototype measurements and observations, relatively remarkable adjustment of the river regime at some sub-reaches occurred since the operation of the TGP (e.g. the 521

Qigongling curved reach), though generally the river regime for the downstream channel as a whole does not change too much. Relying on the Changjiang River Flood Protection Physical Model, study with physical model tests has been done to predict the erosion and deposition of the river channel from Yangjianao to Luoshan after operation of the TGP, and to predict the tendency of river regime development. Comparisons between the physical model predictions and the prototype measurements show that the model tests predict well the development of typical bars in the river, the development of typical cross-sections, and the tendency of river regime variation, etc. ACKNOWLEDGEMENT This study was financially supported by the Public Welfare Scientific Research Funding Project of the MWR of China (Grant No. 201401011), the National Natural Science Foundation of China (Grant No. 51339001), and the National Key Technology R&D Program of China (Grant No. 2012BAB04B03). REFERENCES CRSRI. (2011). Evolution and Regulation of the Jingjiang River in the Early Operation Phase of the Three Gorges Project. The Changjiang River Scientific Research Institute, Wuhan, China. (in Chinese) Guo X.H., Zhu, Y.H. and Qu, G. (2010). Research Progress on Relationship between the and Dongting Lake after the Three Gorges Reservoir Regulating. Water Resources and Power, Vol. 28, No. 12, pp. 33-35, 132. (in Chinese) Huang, L., Zhu, Y.H. and Yao, S.M. (2011). Physical Modeling of Fluvial Process and River Regime Control in Shishou Reach of at the Initial Stage of Three Gorges Project. Journal of Scientific Research Institute, Vol. 28, No. 9, pp. 81-86. (in Chinese) Xu, Q.X., Zhu, L.L. and Yuan, J. (2013). Research on Water-Sediment Variation and Deposition-Erosion in Middle and Lower., Vol. 44, No. 23, pp.16-21. (in Chinese) Zhu, Y.H., Lu J.Y., Fan B.L. et al. (2014). On the Progress of Research of the Changjiang River Flood Protection Physical Model. Proceedings of 2013 IAHR World Congress, Chengdu, China. 522