FORMWORK SAVINGS ADAPTABILITY LIGHT WEIGHT ECONOMICAL ALUMINIUM SLAB FORMWORK. BV Cert

Similar documents
High-performance safety slab formwork. French design

Air distribution systems. Radial outlet RA-N2...

Krantz Components. Twist outlet DD-N... for ceiling installation. Air distribution systems

Latest generation testo air velocity & IAQ probes with cable handle. Instruction manual

3000 Residential 4000 Commercial 5000 Industrial Aluminum Fence Systems Lifetime Limited Warranty

2D - STRIP ANCHOR LIFTING SYSTEM

3000 Residential 4000 Commercial Aluminum Fence Systems Lifetime Limited Warranty

Installation guide 862 MIT / MIR

CIRCO. Sound-attenuating transfer unit QUICK FACTS

2D - STRIP ANCHOR LIFTING SYSTEM

Assembly Manual for the Brevard Astronomical Society 16 inch F4.5 Dobsonian Telescope Brevard Astronomical Society P.O. Box 1084 Cocoa, FL 32922

40 CD RANGE FLUSH-MOUNTING DISTRIBUTION BOARDS AND ENCLOSURES

SHARK Snow Plow. 52 (132 cm) / 60 (152 cm) Complete system blade INSTRUCTIONS / ESTABLISHMENT

Section 8 Column radiators

Air distribution systems. Jet nozzle DW-N2... Swivel jet nozzle DW-V2... Twist nozzle DW-V2-...-DR

DRIFTER PLOW-IN-A-BOX ASSEMBLY / OWNER S MANUAL

Cabinets G " integrated in upright Handle strip in side panel Easy solution for shortened doors

12.1 Schlüter -KERDI-BOARD

HELLA. Linear slot diffuser. Ordering codes. HELLA - Linear diffuser. Linear Diffusers 1 / 18. Example of the ordering code HELLA B-0-0-AN

Air distribution systems. Adjustable induction outlet IN-V...

12.1 Product data sheet

Ceiling Diffuser. Type ADLR with circular face. Type ADLR-Q with square face 2/16/EN/8

DRIFTER PLOW-IN-A-BOX

ISO INTERNATIONAL STANDARD

product manual H-3220A Benkelman Beam

Connections Standard. Description

Grille. Min. - max. dimensions

PUSH TUBE STANDARD DUTY

SPECIFICATION SHEET : FHS2-UNV-36L

Lamp and Control Panel (Lamp Panel)

A.R.M. 52 PLOW With QUICK ATTACH MOUNTING SYSTEM MODEL NUMBER BLACK MODEL NUMBER GRAY. Owner s Manual

Snow Blade Operator s/assembly Instructions

Plain diffuser. Dimensions

ATV WP2 FRONT MOUNT PUSH TUBE

Schlüter -KERDI-SHOWER. System components for floor level showers

Nozzle diffuser. Dimensions

Schlüter -TROBA-LEVEL

How to Check Your G4 Spread Pattern

V S L C O N S T R U C T I O N S Y S T E M S

Hanson Overhead Garage Door Company proudly presents: Residential 400 Series

INTRODUCING HORIZONTAL

Must Read Before Installation TadPoleTM Safety and Warnings

SYNTHETIC ROOFING TILES

Made in Italy HOSE REELS CATALOGUE TECHNOLOGY FOR FLUIDYNAMICS. No. E14/A1

INSTALLATION INSTRUCTIONS ProVantage Plow Pulley Part Number: 84526

PELICAN Ceiling. Square ceiling air diffuser for supply air and extract air QUICK FACTS

Slot diffuser. Type VSD35 2/2.6/B/3. with 35 mm wide slot

Underlayment. bonded impact sound insulation

Positive Signal The most technologically advanced. double coated dichroic filters are used, which transmit

MR medium rating busbar

BISHOP S CASTLE TOWN COUNCIL HEALTH AND SAFETY POLICY FOR CLOCK WINDING. Introduction

The Highland - List of materials needed to construct a weather tight home.

G-FIRE FLANGE ADAPTERS

FOREMAN ASSEMBLY / OWNER S MANUAL

SWIFT Ceiling. Square ceiling air diffuser for supply air QUICK FACTS

PELICAN Ceiling HF. Square extract air diffuser QUICK FACTS


For Customer Service, Rev A - 6/ OF 6

zehnder stratos CS CS CS CSW CSW Product Overview Model Code (example)

Krantz. Variable twist outlet with guide ring DD-VL... jet straightener DD-VG... Air distribution systems

CDD/CDR. Circular ceiling diffuser for supply air QUICK FACTS

SL27C SL32C. ScreenLine. Technical Catalogue. english. double-glazed unit 27 mm 32 mm

MODULAR AND CUSTOM EXHIBIT SOLUTIONS

Ballistic pendulum Operating Instructions Fig. 1: Ballistic pendulum SAFETY PRECAUTIONS

Conductivity sensor for hygienic applications

Standardized Chemical Pumps. Fields of Application. Designation. Design. Operating Data. Type Series Booklet /7-10 G2 CPK-H

General characteristics

Carlson CR Robotic/Reflectorless Total Station

Instructions for the use of mobile curving machine on site. Zambelli RIB-ROOF GmbH & Co. KG Zambelli Dach + Fassadentechnik GmbH

TUTORIAL SHEET 1. magnitude of P and the values of ø and θ. Ans: ø =74 0 and θ= 53 0

12.1 Product data sheet

Air distribution systems. Adjustable radial outlet RA-V...

CPI SNOW PLOW KIT ASSEMBLY INSTRUCTIONS

CNA-CNB. Centrifugal fans

SWIFTTM. Ceiling. Square ceiling air diffuser for supply air

FLT5A FLT5A. abc. abc. Thermometer User Guide. Thermometer User Guide. Internet:

CDD/CDR. Single cone ceiling diffusers for supply air. Quick facts. Quick guide CDD/CDR A I R F L O W - S O U N D L E V E L

Krantz. Radial slot outlet with square blade array RL-Q2... circular blade array RL-R2... Air distribution systems DS 4186 E 09.

Swirl Diffuser. Type SDW T 2.2/1/B/1. recommended for room heights from approx m

Plain diffuser. Dimensions

Installation instructions, accessories. Snow chains

PREMIUM PM Automatic horizontal sliding car door EN compliance

GTH. Rectangular double deflection grille QUICK FACTS

VX25 Enclosure System. Technical documentation PE conductor connection, current carrying capacity

Dimensions. Order code. Materials and finish. lindab ceiling diffusers

NFRC THERMAL TEST SUMMARY REPORT January 27, 1999 Test Specimen

s s t L e 46 APACHE TRACK SYSTEM ALUMINUM FRAME LINK LARGER FOOTPRINT 14.4 CM INTERMEDIATE WHEELS OVERSIZE 25.4 CM CORNER WHEELS

INSTALLATION INSTRUCTIONS ATV Plow Blade Part Number: (50 ), (54 ), or (60 ) Application: All Terrain Vehicles

Reflex Red Dot Sight. Model # / AR / AR730005C. Lit #: /03-13

October 30-31, 2014 Paris

ISEmax CAS40D. Technical Information

INSTALLATION INSTRUCTIONS FRONT PLOW MOUNT KIT Part Number: Application: Polaris Sportsman 400, 500, 800

Assembly Instructions for the 1-Wire Weather Station V2.0/V3.0

Eppendorf SmartBlock. Instructions for use

VK2 volume flow controller Overview

Kingspan Smart-Lite Kite Luminaire

Instruction Manual. Model #: (Reflector) Lit #: / 06-07

FRB. Exposed passive chilled beam for suspended installation

ValkPitched - Trapezoidal

FOR CAN-AM ATV s P/N ASSEMBLY / OWNERS MANUAL

Transcription:

FORMWORK SAVINGS ADAPTABILITY LIGHT WEIGHT ECONOMICAL ALUMINIUM SLAB FORMWORK BV Cert. 6150814

Dalphi Economical aluminium slab formwork 2

FORMWORK The economical, high-performance Dalphi floor formwork system suits all types of buildings: offices, housing, residential care homes, correctional facilities, etc. It can be installed at a productivity rate of 25 m 2 /person/day. Its aluminium components make it one of the most lightweight formwork systems on the market. The drop-head integrated in the prop (patented by Alphi) ensures safe removal. Site: Chambéry hospital maternity ward car park Client: Bouygues Construction Location: Chambéry 3

Dalphi Economical aluminium slab formwork PRODUCTIVITY BV Cert. 6150814 Installation 25 m 2 /person/day. Quick equipment turnarounds Small quantity of equipment used thanks to quick turnarounds. Easy removal The drop-head for fast removal integrated in the technical support (Alphi patented system) keeps the slab supported during formwork removal. Easier identification The beams are colour-coded, in compliance with the layout drawings drafted by the Alphi design office. Hand-portable The simple components in the Dalphi system make it possible to work independently, with no need for a crane. This leaves the crane available for other tasks. LIGHTWEIGHT AND HAND-PORTABLE EQUIPMENT The integrated drop-head for fast removal enables a quicker turnaround of the aluminium structure The drop-head integrated in the prop allows for fast formwork removal without releasing pressure on the slab 4

FORMWORK ADAPTABILITY Wide choice of lengths The beam size is chosen to suit the needs of each project. 4 primary beam lengths and 3 secondary beam lengths are available Flexible use "Primary on primary" assembly allows the Dalphi system to adapt to the exact dimensions of the cells. Beams can also be fitted on shoring towers. QUALITY Cast concrete thickness of up to 1.23 m Regulations The beams are designed in compliance with the formwork standard NF P 93-322. THEFT PROTECTION: PROTECTED ALUMINIUM Theft protection The chemical process developed by Alphi prevents fraudulent aluminium beam recycling. PROTECTED ALUMINIUM D O N OT R E M E LT ALL DALPHI COMPONENTS HAVE BEEN TESTED BY THE INDEPENDENT LABORATORY LOCIE AT THE UNIVERSITY OF SAVOIE MONT BLANC. Protection identifiable by red insert 5

Dalphi 3 SIMPLE COMPONENTS 1 Technical support (ST) with integrated drop-head Name Colour Height (cm) Unit weight (kg) Description Technical supports ST1 197-300 18.50 ST2 221-350 20.50 Integrated drop-head for fast removal (patented system) Base web Hot-dip galvanised Cast iron sleeve ST3 250-400 23.50 2 Primary beam Name Colour Length (cm) Unit weight (kg) Description Primary PP 90 90 5.40 PP 110 110 6.60 Theft protection Can be mounted in a drawer 30 mm timber inserts, for nailing on plywood using 40 mm nails PP 150 150 9.00 PP 180 180 10.80 3 Secondary beam Name Colour Length (cm) Unit weight (kg) Description Secondary PS 110 110 3.00 PS 150 150 4.10 Theft protection Timber inserts for nailing on plywood using 40 mm nails Compatible with other formwork solutions PS 180 180 4.90 6

FORMWORK USE CALCULATION CHARTS Beams According to the thickness of the floor to be cast, with a centre distance of up to 45 cm between the secondary beams, to observe a deflection of L/400. 1.2 1.0 concrete thickness (m) 1.01 0.96 1.23 0.8 0.39 0.46 0.38 0.52 0.52 0.40 0.38 0.65 0.56 0.38 0.73 0.78 0.6 0.65 0.56 0.38 0.38 0.65 0.4 0.2 0.25 0.33 0.32 0.32 0.0 180 150 110 180 150 110 180 150 110 180 150 110 Secondary beam Secondary beam Secondary beam Secondary beam PP PS Load on prop less than 32 kn Load on prop greater than 32 kn (zone requiring specific study by Alphi design office) Primary beam Secondary beam ST technical supports with integrated drop-head Name Colour Height (cm) Weight (kg) Shored height (m) / Working load (kn) min-max 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 4.0 ST1 197-300 18.5 40 39 38 37 36 35 35 34 33 33 32 32 ST2 221-350 20.5 40 39 39 38 37 36 36 35 35 34 34 33 32 32 ST3 250-400 23.5 40 39 39 38 37 37 36 35 34 34 33 33 33 32 32 32 Hot-dip galvanised - Sleeve or nut colour coding - As per Eurocode safety coefficients 0 and 3. 7

Dalphi DALPHI ACCESSORIES Grid* Dimensions W x H (m) Weight (kg) Description 1.25 x 1.30 7.60 The wire grid is galvanised, with polyester powder coating 2.40 x 1.30 13.90 2.50 x 1.30 14.50 Galvanised post* Cross-section (cm 2 ) Height (m) Weight (kg) Safety 3.5 x 3.5 1.34 3.50 Alphi formwork adapters* Primary adapter Prop adapter Weight (kg) Primary adapter Weight (kg) Prop adapter 2.30 2.10 *Compliant with EN 13374 standard Electrogalvanised insulated head Bores (mm) Height (cm) Unit weight (kg) Maximum allowable load (kn) 4 x Ø12 x 80 33 3.80 40 Additional Bracket Non-tilt safety fork (FSAB) Unit weight bracket (kg) Maximum allowable load (kn) Unit weight FSAB (kg) Tube diameter (mm) Description 1.05 3.5 1.15 35 Bracket: butterfly fastening nut FSAB: hammer head screw 8

FORMWORK Nanovib range Leborgne product characteristics Leborgne tools Tools suitable for fitting and removing Alphi formwork: hammers, hammer holder, prop key Vibration and noise reduction distributes Click here to view details on Leborgne tools Rack Ranges Vertical storage rack Galvanised rack on wheels Galvanised handling rack Handling TransÉtais housing Click here to view details on racks Description Easier prop handling Makes it possible to pass through door openings Click here to view details on TransÉtais housing 9

Dalphi DALPHI ACCESSORIES Plywood cutting support Dimensions W x L x H (m) 140 x 2.06 x 86 Description For sale only Circular saw kit and electrical extension available as an option Aids for use Rolling safety ladder Working height (m) Description 2.5 to 4.33 For sale only 10

FORMWORK ALPHISAFE COLLECTIVE PROTECTION AlphiSafe is a collective protection system for formwork and slab edges. The technical innovations in the system allow safe installation and automatic locking. A robust system, AlphiSafe is certified by Ginger CEBTP, as per the EN 13374 standard of July 2013, with certain components classed A and B. AlphiSafe is distinguished by its height of 1.30 m which is above the minimum height of 1.00 m set by the standard, and protects traditional slab formwork up to 30 cm thick. The grid is locked at the top by the anti-lifting pin and locked in rotation at the base. Installation of AlphiSafe safety system in cantilever configuration Installation of AlphiSafe safety system on technical support (progressive fitting) 11

Dalphi WARNING - To use our products safely, please observe the regulations in force in each country. - The elements and set-ups presented in this brochure match the characteristics of the equipment on the date of publication of the document. There might have been some changes since then. - The use of our systems in conjunction with those other manufacturers is not without risk and requires specific monitoring. - Before starting to set up, remember to secure the area. Click here or scan the QR code to access the instruction video. PREPARATORY STAGE distributes Do not place the props against the wall Caution: it is essential to lock the head 12 NB: even if they are not always visible in the image, Dalphi is mounted by 2 form fitters. Reception of equipment on the worksite: check quantities and validate delivery note. Precise distribution of the equipment according to the first phases of formwork defined by the layout drawing. Prop height adjustment and cased positioning of formwork heads: lock with hammer.

FORMWORK PROCEDURE: FORMWORK 1 prop + tripod 2 - Starting from a corner of the room, set up a primary beam on 2 technical supports (ST) stabilised by tripods. - Start mounting a secondary beam on a third ST. - Store the plywood panels on the deck or in wheeled racks. - Use a lightweight rolling safety ladder in compliance with regulations. Caution: engage the primary beams on the large bushings of the technical support. - Set up a second primary beam on another ST. ÎÎ Refer to calculation chart. 3 4 Gap = 39 cm - Finish setting up the secondary beams. - Do not leave gaps greater than 39 cm. - Use a template to observe 39 cm spacing. ÎÎ Observe the layout drawing. - Set up another primary beam on ST. 13

Dalphi PROCEDURE: FORMWORK 5 6 - Fit the secondary beams as you move along. - Finish setting up the secondary beams. 7 8 - Set up another secondary beam on ST. - Set up another primary beam on ST. 14

FORMWORK 9 10 - Fit the secondary beams as you move along. - Set up another primary beam on ST. 11 12 - Fit the secondary beams as you move along, observing a 39 cm gap. - Finish setting up the secondary beams. 15

Dalphi PROCEDURE: FORMWORK, FINISHING & CASTING 13 14 - Adjust the level using a laser level, ST by ST. - A gauge stick hanging from the formwork allows laser adjustment to be performed by one person. Perform a final head locking check at this stage. - When the structure is finished and the height has been adjusted: lay the plywood. - Use of plywood cutting support (see Accessories p. 10). ÎÎ Peripheral safety (skin, girder, etc.) ensured beforehand. 15 16 distributes - Nailing using 40 mm (max.) nails. - Ensure that a load-bearing member is present under the plywood sheet join. - Check the sealing of the formwork between plywood sheets and at the edges. Walking on plywood panels is restricted to personnel trained and authorised to lay plywood panels. - Lay the concrete slag. Î Î Spread the concrete on the formwork without overloading the beams and the technical supports. 16

FORMWORK PROCEDURE: FORMWORK REMOVAL 17 18 distributes - Slab formwork removal: strike down the formwork heads from the STs as you progress. - The primary beams and the secondary beams drop by 17 cm. - The STs remain in position. - Slab formwork removal: remove, as you progress, the secondary beams and finally the primary beams. - Store them in the wheeled racks. 19 20 distributes - Slab formwork removal: remove the ST positioned at the cell edges. - Leave the other STs in place for at least 3 days (according to the concrete type and external temperature). - Lower the panel elevator to mid-height. - Remove the plywood sheet. 17

Dalphi PROCEDURE: FORMWORK REMOVAL 21 22 - Position the panel elevator and remove the corresponding ST. - Remove the plywood panel using a panel elevator. - Install the first drying prop, allowing one prop per 5 m 2 (general case). 23 24 - Repeat steps 21 and 22. - Repeat the operations from step 1 on a higher level. 18

FORMWORK SPECIAL CASES USE WITH NON-TILT FORK 20 cm Restricted space - Use of fork (assembly without using fast formwork removal). Fork Bracket Front face overhang management - Use in cantilever configuration with fork and bracket. - The fork can be used to position the STs under the primaries and not at the ends, offering additional adjustment. ⅓ of beam max Fork Girder formwork - Drop less than 35 cm. Fork 19

Dalphi SPECIAL APPLICATIONS PRE-SLAB SHORING - Lines of piles defined according to pre-slab manufacturer's recommendations. Provide for stability (see layout drawing). OFFSET SLAB FORMWORK TIMBER SECURING BLOCK 20

FORMWORK PRECISE ADAPTABILITY TO CELL DIMENSIONS * Setting Setting Setting * Drawer system Drawer type assembly consists of a primary beam supported in the grooves of two perpendicular primary beams. JOIST FORMWORK - Primary on primary assembly. 21

Dalphi SPECIAL APPLICATIONS FORMWORK AGAINST A SLANTING WALL Securing with timber beam Securing with timber beam 22

FORMWORK DALPHI FORMWORK INSTALLATION AT HEIGHTS 1 - Starting from a corner of the room, set up a primary beam on 2 technical supports (ST) stabilised by a prop frame. - Start mounting a secondary beam on a third ST. - Store the plywood panels on the deck or in wheeled racks. - Use a lightweight rolling safety ladder. ÎÎ Refer to calculation chart. 2 - Set up a second primary beam on another ST. 23

Dalphi DALPHI FORMWORK INSTALLATION AT HEIGHTS 3 - Finish setting up the secondary beams. - Do not leave gaps greater than 39 cm. - Use a template to observe 39 cm spacing. - Observe the layout drawing. 4 - Set up another primary beam on ST. - Repeat the operation as for standard heights. ÎÎ Use frames instead of tripods: 1 prop frame per 40 m 2 of formwork. 24

FORMWORK GRID FOR PRIMARY BEAMS GRID FOR PRIMARY BEAMS FROM 0 TO 10 M P200 P180 P150 P110 P90 lengths between walls 0 0 0 0 1 120.00 0 0 0 1 0 140.00 0 0 1 0 0 180.00 0 1 0 0 0 210.00 0 0 0 0 2 220.00 1 0 0 0 0 230.00 0 0 0 1 1 240.00 0 0 0 2 0 260.00 0 0 1 0 1 280.00 0 0 1 1 0 300.00 0 1 0 0 1 310.00 0 0 0 0 3 320.00 1 0 0 0 1 330.00 0 1 0 1 0 330.00 0 0 2 0 0 340.00 0 0 0 1 2 340.00 1 0 0 1 0 350.00 0 0 0 2 1 360.00 0 1 1 0 0 370.00 0 0 1 0 2 380.00 0 0 0 3 0 380.00 1 0 1 0 0 390.00 0 2 0 0 0 400.00 0 0 1 1 1 400.00 0 1 0 0 2 410.00 1 1 0 0 0 420.00 0 0 1 2 0 420.00 0 0 0 0 4 420.00 1 0 0 0 2 430.00 0 1 0 1 1 430.00 2 0 0 0 0 440.00 0 0 2 0 1 440.00 0 0 0 1 3 440.00 1 0 0 1 1 450.00 0 1 0 2 0 450.00 0 0 2 1 0 460.00 0 0 0 2 2 460.00 1 0 0 2 0 470.00 0 1 1 0 1 470.00 0 0 1 0 3 480.00 0 0 0 3 1 480.00 1 0 1 0 1 490.00 0 1 1 1 0 490.00 0 2 0 0 1 500.00 0 0 3 0 0 500.00 0 0 1 1 2 500.00 Using a non-tilt safety fork provides a further 15 cm adjustment gap (see page 19). P200 P180 P150 P110 P90 lengths between walls 0 0 0 4 0 500.00 1 0 1 1 0 510.00 0 1 0 0 3 510.00 1 1 0 0 1 520.00 0 2 0 1 0 520.00 0 0 1 2 1 520.00 0 0 0 0 5 520.00 1 0 0 0 3 530.00 0 1 2 0 0 530.00 0 1 0 1 2 530.00 2 0 0 0 1 540.00 1 1 0 1 0 540.00 0 0 2 0 2 540.00 0 0 1 3 0 540.00 0 0 0 1 4 540.00 1 0 2 0 0 550.00 1 0 0 1 2 550.00 0 1 0 2 1 550.00 2 0 0 1 0 560.00 0 2 1 0 0 560.00 0 0 2 1 1 560.00 0 0 0 2 3 560.00 1 0 0 2 1 570.00 0 1 1 0 2 570.00 0 1 0 3 0 570.00 1 1 1 0 0 580.00 0 0 2 2 0 580.00 0 0 1 0 4 580.00 0 0 0 3 2 580.00 1 0 1 0 2 590.00 1 0 0 3 0 590.00 0 3 0 0 0 590.00 0 1 1 1 1 590.00 2 0 1 0 0 600.00 0 2 0 0 2 600.00 0 0 3 0 1 600.00 0 0 1 1 3 600.00 0 0 0 4 1 600.00 1 2 0 0 0 610.00 1 0 1 1 1 610.00 0 1 1 2 0 610.00 0 1 0 0 4 610.00 1 1 0 0 2 620.00 0 2 0 1 1 620.00 0 0 3 1 0 620.00 0 0 1 2 2 620.00 0 0 0 5 0 620.00 0 0 0 0 6 620.00 2 1 0 0 0 630.00 25

Dalphi GRID FOR PRIMARY BEAMS P200 P180 P150 P110 P90 lengths between walls P200 P180 P150 P110 P90 lengths between walls 1 0 1 2 0 630.00 1 0 0 0 4 630.00 0 1 2 0 1 630.00 0 1 0 1 3 630.00 2 0 0 0 2 640.00 1 1 0 1 1 640.00 0 2 0 2 0 640.00 0 0 2 0 3 640.00 0 0 1 3 1 640.00 0 0 0 1 5 640.00 3 0 0 0 0 650.00 1 0 2 0 1 650.00 1 0 0 1 3 650.00 0 1 2 1 0 650.00 0 1 0 2 2 650.00 2 0 0 1 1 660.00 1 1 0 2 0 660.00 0 2 1 0 1 660.00 0 0 4 0 0 660.00 0 0 2 1 2 660.00 0 0 1 4 0 660.00 0 0 0 2 4 660.00 1 0 2 1 0 670.00 1 0 0 2 2 670.00 0 1 1 0 3 670.00 0 1 0 3 1 670.00 2 0 0 2 0 680.00 1 1 1 0 1 680.00 0 2 1 1 0 680.00 0 0 2 2 1 680.00 0 0 1 0 5 680.00 0 0 0 3 3 680.00 1 0 1 0 3 690.00 1 0 0 3 1 690.00 0 3 0 0 1 690.00 0 1 3 0 0 690.00 0 1 1 1 2 690.00 0 1 0 4 0 690.00 2 0 1 0 1 700.00 1 1 1 1 0 700.00 0 2 0 0 3 700.00 0 0 3 0 2 700.00 0 0 2 3 0 700.00 0 0 1 1 4 700.00 0 0 0 4 2 700.00 1 2 0 0 1 710.00 1 0 3 0 0 710.00 1 0 1 1 2 710.00 1 0 0 4 0 710.00 0 3 0 1 0 710.00 0 1 1 2 1 710.00 0 1 0 0 5 710.00 2 0 1 1 0 720.00 1 1 0 0 3 720.00 0 2 2 0 0 720.00 0 2 0 1 2 720.00 0 0 3 1 1 720.00 0 0 1 2 3 720.00 0 0 0 5 1 720.00 0 0 0 0 7 720.00 2 1 0 0 1 730.00 1 2 0 1 0 730.00 1 0 1 2 1 730.00 1 0 0 0 5 730.00 0 1 2 0 2 730.00 0 1 1 3 0 730.00 0 1 0 1 4 730.00 2 0 0 0 3 740.00 1 1 2 0 0 740.00 1 1 0 1 2 740.00 0 2 0 2 1 740.00 0 0 3 2 0 740.00 0 0 2 0 4 740.00 0 0 1 3 2 740.00 0 0 0 6 0 740.00 0 0 0 1 6 740.00 3 0 0 0 1 750.00 2 1 0 1 0 750.00 1 0 2 0 2 750.00 1 0 1 3 0 750.00 1 0 0 1 4 750.00 0 3 1 0 0 750.00 0 1 2 1 1 750.00 0 1 0 2 3 750.00 2 0 2 0 0 760.00 2 0 0 1 2 760.00 1 1 0 2 1 760.00 0 2 1 0 2 760.00 0 2 0 3 0 760.00 0 0 4 0 1 760.00 0 0 2 1 3 760.00 0 0 1 4 1 760.00 0 0 0 2 5 760.00 3 0 0 1 0 770.00 1 2 1 0 0 770.00 1 0 2 1 1 770.00 1 0 0 2 3 770.00 0 1 2 2 0 770.00 26

FORMWORK P200 P180 P150 P110 P90 lengths between walls P200 P180 P150 P110 P90 lengths between walls 0 1 1 0 4 770.00 0 1 0 3 2 770.00 2 0 0 2 1 780.00 1 1 1 0 2 780.00 1 1 0 3 0 780.00 0 4 0 0 0 780.00 0 2 1 1 1 780.00 0 0 4 1 0 780.00 0 0 2 2 2 780.00 0 0 1 5 0 780.00 0 0 1 0 6 780.00 0 0 0 3 4 780.00 2 1 1 0 0 790.00 1 0 2 2 0 790.00 1 0 1 0 4 790.00 1 0 0 3 2 790.00 0 3 0 0 2 790.00 0 1 3 0 1 790.00 0 1 1 1 3 790.00 0 1 0 4 1 790.00 2 0 1 0 2 800.00 2 0 0 3 0 800.00 1 3 0 0 0 800.00 1 1 1 1 1 800.00 0 2 1 2 0 800.00 0 2 0 0 4 800.00 0 0 3 0 3 800.00 0 0 2 3 1 800.00 0 0 1 1 5 800.00 0 0 0 4 3 800.00 3 0 1 0 0 810.00 1 2 0 0 2 810.00 1 0 3 0 1 810.00 1 0 1 1 3 810.00 1 0 0 4 1 810.00 0 3 0 1 1 810.00 0 1 3 1 0 810.00 0 1 1 2 2 810.00 0 1 0 5 0 810.00 0 1 0 0 6 810.00 2 2 0 0 0 820.00 2 0 1 1 1 820.00 1 1 1 2 0 820.00 1 1 0 0 4 820.00 0 2 2 0 1 820.00 0 2 0 1 3 820.00 0 0 5 0 0 820.00 0 0 3 1 2 820.00 0 0 2 4 0 820.00 0 0 1 2 4 820.00 0 0 0 5 2 820.00 0 0 0 0 8 820.00 2 1 0 0 2 830.00 1 2 0 1 1 830.00 1 0 3 1 0 830.00 1 0 1 2 2 830.00 1 0 0 5 0 830.00 1 0 0 0 6 830.00 0 3 0 2 0 830.00 0 1 2 0 3 830.00 0 1 1 3 1 830.00 0 1 0 1 5 830.00 3 1 0 0 0 840.00 2 0 1 2 0 840.00 2 0 0 0 4 840.00 1 1 2 0 1 840.00 1 1 0 1 3 840.00 0 2 2 1 0 840.00 0 2 0 2 2 840.00 0 0 3 2 1 840.00 0 0 2 0 5 840.00 0 0 1 3 3 840.00 0 0 0 6 1 840.00 0 0 0 1 7 840.00 3 0 0 0 2 850.00 2 1 0 1 1 850.00 1 2 0 2 0 850.00 1 0 2 0 3 850.00 1 0 1 3 1 850.00 1 0 0 1 5 850.00 0 3 1 0 1 850.00 0 1 4 0 0 850.00 0 1 2 1 2 850.00 0 1 1 4 0 850.00 0 1 0 2 4 850.00 4 0 0 0 0 860.00 2 0 2 0 1 860.00 2 0 0 1 3 860.00 1 1 2 1 0 860.00 1 1 0 2 2 860.00 0 2 1 0 3 860.00 0 2 0 3 1 860.00 0 0 4 0 2 860.00 0 0 3 3 0 860.00 0 0 2 1 4 860.00 0 0 1 4 2 860.00 0 0 0 7 0 860.00 0 0 0 2 6 860.00 27

Dalphi GRID FOR PRIMARY BEAMS P200 P180 P150 P110 P90 lengths between walls P200 P180 P150 P110 P90 lengths between walls 3 0 0 1 1 870.00 2 1 0 2 0 870.00 1 2 1 0 1 870.00 1 0 4 0 0 870.00 1 0 2 1 2 870.00 1 0 1 4 0 870.00 1 0 0 2 4 870.00 0 3 1 1 0 870.00 0 1 2 2 1 870.00 0 1 1 0 5 870.00 0 1 0 3 3 870.00 2 0 2 1 0 880.00 2 0 0 2 2 880.00 1 1 1 0 3 880.00 1 1 0 3 1 880.00 0 4 0 0 1 880.00 0 2 3 0 0 880.00 0 2 1 1 2 880.00 0 2 0 4 0 880.00 0 0 4 1 1 880.00 0 0 2 2 3 880.00 0 0 1 5 1 880.00 0 0 1 0 7 880.00 0 0 0 3 5 880.00 3 0 0 2 0 890.00 2 1 1 0 1 890.00 1 2 1 1 0 890.00 1 0 2 2 1 890.00 1 0 1 0 5 890.00 1 0 0 3 3 890.00 0 3 0 0 3 890.00 0 1 3 0 2 890.00 0 1 2 3 0 890.00 0 1 1 1 4 890.00 0 1 0 4 2 890.00 2 0 1 0 3 900.00 2 0 0 3 1 900.00 1 3 0 0 1 900.00 1 1 3 0 0 900.00 1 1 1 1 2 900.00 1 1 0 4 0 900.00 0 4 0 1 0 900.00 0 2 1 2 1 900.00 0 2 0 0 5 900.00 0 0 4 2 0 900.00 0 0 3 0 4 900.00 0 0 2 3 2 900.00 0 0 1 6 0 900.00 0 0 1 1 6 900.00 0 0 0 4 4 900.00 3 0 1 0 1 910.00 2 1 1 1 0 910.00 1 2 0 0 3 910.00 1 0 3 0 2 910.00 1 0 2 3 0 910.00 1 0 1 1 4 910.00 1 0 0 4 2 910.00 0 3 2 0 0 910.00 0 3 0 1 2 910.00 0 1 3 1 1 910.00 0 1 1 2 3 910.00 0 1 0 5 1 910.00 0 1 0 0 7 910.00 2 2 0 0 1 920.00 2 0 3 0 0 920.00 2 0 1 1 2 920.00 2 0 0 4 0 920.00 1 3 0 1 0 920.00 1 1 1 2 1 920.00 1 1 0 0 5 920.00 0 2 2 0 2 920.00 0 2 1 3 0 920.00 0 2 0 1 4 920.00 0 0 5 0 1 920.00 0 0 3 1 3 920.00 0 0 2 4 1 920.00 0 0 1 2 5 920.00 0 0 0 5 3 920.00 0 0 0 0 9 920.00 3 0 1 1 0 930.00 2 1 0 0 3 930.00 1 2 2 0 0 930.00 1 2 0 1 2 930.00 1 0 3 1 1 930.00 1 0 1 2 3 930.00 1 0 0 5 1 930.00 1 0 0 0 7 930.00 0 3 0 2 1 930.00 0 1 3 2 0 930.00 0 1 2 0 4 930.00 0 1 1 3 2 930.00 0 1 0 6 0 930.00 0 1 0 1 6 930.00 3 1 0 0 1 940.00 2 2 0 1 0 940.00 2 0 1 2 1 940.00 2 0 0 0 5 940.00 1 1 2 0 2 940.00 28

FORMWORK P200 P180 P150 P110 P90 lengths between walls P200 P180 P150 P110 P90 lengths between walls 1 1 1 3 0 940.00 1 1 0 1 4 940.00 0 4 1 0 0 940.00 0 2 2 1 1 940.00 0 2 0 2 3 940.00 0 0 5 1 0 940.00 0 0 3 2 2 940.00 0 0 2 5 0 940.00 0 0 2 0 6 940.00 0 0 1 3 4 940.00 0 0 0 6 2 940.00 0 0 0 1 8 940.00 3 0 0 0 3 950.00 2 1 2 0 0 950.00 2 1 0 1 2 950.00 1 2 0 2 1 950.00 1 0 3 2 0 950.00 1 0 2 0 4 950.00 1 0 1 3 2 950.00 1 0 0 6 0 950.00 1 0 0 1 6 950.00 0 3 1 0 2 950.00 0 3 0 3 0 950.00 0 1 4 0 1 950.00 0 1 2 1 3 950.00 0 1 1 4 1 950.00 0 1 0 2 5 950.00 4 0 0 0 1 960.00 3 1 0 1 0 960.00 2 0 2 0 2 960.00 2 0 1 3 0 960.00 2 0 0 1 4 960.00 1 3 1 0 0 960.00 1 1 2 1 1 960.00 1 1 0 2 3 960.00 0 2 2 2 0 960.00 0 2 1 0 4 960.00 0 2 0 3 2 960.00 0 0 4 0 3 960.00 0 0 3 3 1 960.00 0 0 2 1 5 960.00 0 0 1 4 3 960.00 0 0 0 7 1 960.00 0 0 0 2 7 960.00 3 0 2 0 0 970.00 3 0 0 1 2 970.00 2 1 0 2 1 970.00 1 2 1 0 2 970.00 1 0 4 0 1 970.00 1 0 2 1 3 970.00 1 0 1 4 1 970.00 1 0 0 2 5 970.00 0 5 0 0 0 970.00 0 3 1 1 1 970.00 0 1 4 1 0 970.00 0 1 2 2 2 970.00 0 1 1 5 0 970.00 0 1 1 0 6 970.00 0 1 0 3 4 970.00 4 0 0 1 0 980.00 2 2 1 0 0 980.00 2 0 2 1 1 980.00 2 0 0 2 3 980.00 1 1 2 2 0 980.00 1 1 1 0 4 980.00 1 1 0 3 2 980.00 0 4 0 0 2 980.00 0 2 3 0 1 980.00 0 2 1 1 3 980.00 0 2 0 4 1 980.00 0 0 6 0 0 980.00 0 0 4 1 2 980.00 0 0 3 4 0 980.00 0 0 2 2 4 980.00 0 0 1 5 2 980.00 0 0 1 0 8 980.00 0 0 0 8 0 980.00 0 0 0 3 6 980.00 3 0 0 2 1 990.00 2 1 1 0 2 990.00 2 1 0 3 0 990.00 1 4 0 0 0 990.00 1 2 1 1 1 990.00 1 0 4 1 0 990.00 1 0 2 2 2 990.00 1 0 1 5 0 990.00 1 0 1 0 6 990.00 1 0 0 3 4 990.00 0 3 1 2 0 990.00 0 3 0 0 4 990.00 0 1 3 0 3 990.00 0 1 2 3 1 990.00 0 1 1 1 5 990.00 0 1 0 4 3 990.00 3 1 1 0 0 1,000.00 2 0 2 2 0 1,000.00 2 0 1 0 4 1,000.00 2 0 0 3 2 1,000.00 1 3 0 0 2 1,000.00 29

Dalphi GRID FOR SECONDARY BEAMS GRID FOR SECONDARY BEAMS UP TO 10 M PS180 PS150 PS110 lengths between walls 0 0 1 140.00 0 1 0 180.00 1 0 0 210.00 0 0 2 260.00 0 1 1 300.00 1 0 1 330.00 0 2 0 340.00 1 1 0 370.00 0 0 3 380.00 2 0 0 400.00 0 1 2 420.00 1 0 2 450.00 0 2 1 460.00 1 1 1 490.00 0 3 0 500.00 0 0 4 500.00 2 0 1 520.00 1 2 0 530.00 0 1 3 540.00 2 1 0 560.00 1 0 3 570.00 0 2 2 580.00 3 0 0 590.00 1 1 2 610.00 0 3 1 620.00 0 0 5 620.00 2 0 2 640.00 1 2 1 650.00 0 4 0 660.00 0 1 4 660.00 2 1 1 680.00 1 3 0 690.00 1 0 4 690.00 0 2 3 700.00 3 0 1 710.00 2 2 0 720.00 1 1 3 730.00 0 3 2 740.00 0 0 6 740.00 3 1 0 750.00 2 0 3 760.00 1 2 2 770.00 4 0 0 780.00 0 4 1 780.00 0 1 5 780.00 2 1 2 800.00 1 3 1 810.00 PS180 PS150 PS110 lengths between walls 1 0 5 810.00 0 5 0 820.00 0 2 4 820.00 3 0 2 830.00 2 2 1 840.00 1 4 0 850.00 1 1 4 850.00 0 3 3 860.00 0 0 7 860.00 3 1 1 870.00 2 3 0 880.00 2 0 4 880.00 1 2 3 890.00 4 0 1 900.00 0 4 2 900.00 0 1 6 900.00 3 2 0 910.00 2 1 3 920.00 1 3 2 930.00 1 0 6 930.00 4 1 0 940.00 0 5 1 940.00 0 2 5 940.00 3 0 3 950.00 2 2 2 960.00 5 0 0 970.00 1 4 1 970.00 1 1 5 970.00 0 6 0 980.00 0 3 4 980.00 0 0 8 980.00 3 1 2 990.00 2 3 1 1,000.00 2 0 5 1,000.00 30

ALPHI, FRANCE'S LEADING SLAB FORMWORK MANUFACTURER Its first quality is its versatility, the second is its price. Dalphi, the firm's "legacy" formwork can be adapted to all types of buildings. Lightweight and economical, it includes the Alphi-patented integrated drop-head for fast removal. Savoie Hexapole, Actipole 5 - Rue Maurice Herzog 73420 Viviers-du-Lac FRANCE Tel. +33 (0)4 79 61 85 90 - Fax +33 (0)4 79 61 85 99 - info@alphi.fr Design office: Tel. +33 (0)4 79 61 85 91 - be@alphi.fr Logistic department: Tel. +33 (0)4 79 61 85 92 newaru - Dalphi GB - February 2018 - PDF version - Photos: Alphi, newaru Designed in France www.alphi.fr