August 28, 2013 PN: 53225GE. Geotechnical Engineering Subsurface Exploration The Proposed LAPLAWD Phase 1E 12 Main Water Line Durango, Colorado

Similar documents
Geotechnical Engineering Subsurface Exploration The Proposed LAPLAWD Phase 2B 12 Main Water Line Durango, Colorado

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

Northern Colorado Geotech

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Assistant Chief-Bureau of Structures and Geotechnical Services

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

10 May Rod Walls - Director Facilities New Construction, Sustainability Hays CISD IH 35 Kyle, Texas 78640

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

Data Report for White Point Landslide Boring B-12 W.O. E Task Order Solicitation San Pedro District Los Angeles, California


16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

APPENDIX E SOILS TEST REPORTS

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

UAS Student Residence

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

AN EMPLOYEE OWNED COMPANY

August 10, 2007 File:

Appendix A. Producer Statement Advisory Note

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

GEOTECHNICAL EXPLORATION REPORT

REPORT OF SUBSURFACE EXPLORATION

Geotechnical Data Report

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

Use of the Light Falling Weight Deflectometer (LFWD) as a site investigation tool for residual soils and weak rock

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

APPENDIX H SOIL SURVEY

F_._G_. _.E_._,_L_T_D_ ~-11'-~~L ~

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO. December 12, 2012

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

An Introduction to Field Explorations for Foundations

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

Dry Muliwai Sample Location Map

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

Report on Site Classification & Construction Testing

Should you have any questions regarding this clarification, please contact the undersigned at or (925)

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

CONQUEST ENGINEERING LTD.

UTC R161. Geotechnical Site Characterization of Transportation Construction Sites and Structures. Neil L. Anderson. Derek B. Apel.

Geotechnical Engineering Report

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

Soil Sampling Results Former Truck Maintenance Garage

The attitude he maintains in his relation to the engineer is very well stated in his own words:

SEISMIC REFRACTION SURVEY RIPPABILITY STUDY

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS

Township 34 North, Range 9 West, NMPM (NUL) Section 3: E/2

Appendix M Preliminary Geotechnical Report, SR 32 Widening Project Study Report

Sabal Trail Pipeline Project Evaluation of Karst Topography and Sinkhole Potential for Pipeline and Facilities

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

September 7, 2017 (Revised November 1, 2017)

Geotechnical Engineering Report


Pierce County Department of Planning and Land Services Development Engineering Section

CONQUEST ENGINEERING LTD.

Sabal Trail Pipeline Project Evaluation of Karst Topography and Sinkhole Potential for Pipeline and Facilities

Slopes VOLUME 1 OF 2. Scioto County, Ohio. November 16, Rock Cut Slopes Portsmouth Bypass Project SCI Portsmou uth Bypass

APPENDIX C HYDROGEOLOGIC INVESTIGATION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

PREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER

EIGHT POINT WIND LLC

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND

ATTACHMENT A WEAVER BOTTOMS SEDIMENT BASIN MAINTENANCE PROJECT PROJECT REPORT SUMMARY (APRIL 7, 2014)

LIMITED GEOTECHNICAL STUDY TEMPORARY EXCAVATIONS MOORPARK FEEDER UNIT 2 STRENGTHENING PROJECT MOORPARK, CALIFORNIA

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

Diamond and RC Drilling Completed, RAB drilling extended - RAB holes show important geology continues to the south west at the Sorpresa Project

ENGINEERING ASSOCIATES

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To:

SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a

SITE INVESTIGATION 1

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

ELECTRICAL RESISTIVITY SURVEYS AT THE ANDERSON RESIDENCE SITE, PORT CLYDE, ME. For: St.Germain-Collins

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

SUMMARY OF SOIL CONDITIONS CITYWIDE SIDEWALK IMPROVEMENT PROJECT JIMMY DURANTE BOULEVARD, VIA DE LA VALLE, AND CAMINO DEL MAR DEL MAR, CALIFORNIA

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

HDD PA-IN RD (W-N57 and W-N56)

EXTREMELY FAST IP USED TO DELINEATE BURIED LANDFILLS. Norman R. Carlson, Cris Mauldin Mayerle, and Kenneth L. Zonge

Geotechnical Report Rifle Roundabouts Interstate 70 and Taughenbaugh Boulevard Rifle, Colorado

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

Transcription:

August 8, La Plata Archuleta Water District c/o Harris Water Engeerg, P.E. 9 East nd Avenue, Suite Durango, Colorado 8 brett@durangowater.com Subject: Geotechnical Engeerg Subsurface Exploration The Proposed Ma Water Le Durango, Colorado PN: GE Mr. Sherman, This letter presents our test bore logs from our field exploration for the Ma Water Le along the east and north side of County Road between the tersections of La Plata County Road and La Plata County Road A. The figure below shows the approximate locations of our test borgs, and where potential shallow formational material may be encountered durg the water le trench excavation. The logs of our test borgs are attached to this letter. We encountered formational material Test Borgs Three, Five, Eight, and Ne Phase E at depths that ranged from one () to two and one-half ( /) below the existg ground surface. The formational material encountered Test Borg Three was consisted of hard claystone material. The formational material encountered Test Borg Eight and Ne consisted of very hard sandstone material. We encountered extremely weathered claystone material Test Borg Five at one () foot below the ground surface. In addition to the test borgs, we observed formational material adjacent to the roadway and the proposed waterle alignment locations depicted on the attached figure. In the remag test borgs, we encountered sandy clay soil with few gravels and cobbles to the bottom of the test borgs at depths that ranged from four () to eight (8). We anticipate that the weathered formational material can be excavated with conventional excavation equipment, but may require substantial effort some areas or where competent formational material is encountered. Please contact us if you have any questions, or if we may be of additional service. Respectfully, TRAUTNER GEOTECH Tom R. Harrison, P.E.

August 8, Page Potential Shallow Formational Material and Test Borg Map for LAPLAWD PHASE E. TB-7 TB- TB-9 TB-8 TB-6 TB- TB- TB- LEGEND Potential Shallow Formational Material TB- Test Borg TB-

Field Engeer Hole Diameter Drillg Method : T. Harrison : " Solid : Contuous Flight Auger LOG OF BORING TB- Samplg Method : Date Drilled : 8/6/ Total (approx.) : : See Figure Letter Harris Water Engeerg Sample Type Durg Drillg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist 8-9- T:\Current GE\GE, LAPLAWD Phase D\Logs of Test Borgs\LAPLAWD Phase D TB-.bor Bottom of test borg at four ()

Field Engeer Hole Diameter Drillg Method : T. Harrison : " Solid : Contuous Flight Auger LOG OF BORING TB- Samplg Method : Date Drilled : 8/6/ Total (approx.) : : See Figure Letter Harris Water Engeerg Sample Type Durg Drillg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist 8-9- T:\Current GE\GE, LAPLAWD Phase D\Logs of Test Borgs\LAPLAWD Phase D TB-.bor Bottom of test borg at four ()

Field Engeer Hole Diameter Drillg Method : T. Harrison : " Solid : Contuous Flight Auger LOG OF BORING TB- Samplg Method : Date Drilled : 8/6/ Total (approx.) :. : See Figure Letter Harris Water Engeerg Sample Type Durg Drillg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist 8-9- T:\Current GE\PE, \Logs of Test Borgs\ TB-.bor Formational material, claystone, hard, slightly moist, tan Bottom of test borg at four and one-half (.) /6 /6

Field Engeer Hole Diameter Drillg Method : T. Harrison : " Solid : Contuous Flight Auger LOG OF BORING TB- Samplg Method : Date Drilled : 8/6/ Total (approx.) : : See Figure Letter Harris Water Engeerg Sample Type Durg Drillg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist 8-9- T:\Current GE\GE, LAPLAWD Phase D\Logs of Test Borgs\LAPLAWD Phase D TB-.bor Bottom of test borg at four ()

Sample Type Field Engeer : T. Harrison Hole Diameter : " Solid Drillg Method : Contuous Flight Auger Samplg Method : Date Drilled : 8/6/ Total (approx.) : : See Figure Letter Durg Drillg LOG OF BORING TB- Harris Water Engeerg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist Weathered Formational material, clay and claystone, hard, slightly moist, tan 8-9- T:\Current GE\PE, \Logs of Test Borgs\ TB-.bor Bottom of test borg at four ()

Sample Type Field Engeer : T. Harrison Hole Diameter : " Solid Drillg Method : Contuous Flight Auger Samplg Method : Date Drilled : 8/6/ Total (approx.) : 8 : See Figure Letter Durg Drillg LOG OF BORING TB-6 Harris Water Engeerg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist 8-9- T:\Current GE\PE, \Logs of Test Borgs\ TB-6.bor 6 7 8 9 Bottom of test borg at eight (8)

Field Engeer Hole Diameter Drillg Method : T. Harrison : " Solid : Contuous Flight Auger LOG OF BORING TB-7 Samplg Method : Date Drilled : 8/6/ Total (approx.) : : See Figure Letter Harris Water Engeerg Sample Type Durg Drillg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist 8-9- T:\Current GE\PE, \Logs of Test Borgs\ TB-7.bor Bottom of test borg at four ()

Sample Type Field Engeer : T. Harrison Hole Diameter : " Solid Drillg Method : Contuous Flight Auger Samplg Method : Date Drilled : 8/6/ Total (approx.) : : See Figure Letter Durg Drillg LOG OF BORING TB-8 Harris Water Engeerg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist Formational material, sandstone, very hard, slightly moist, tan 8-9- T:\Current GE\PE, \Logs of Test Borgs\ TB-.bor Bottom of test borg at four () SS /

Sample Type Field Engeer : T. Harrison Hole Diameter : " Solid Drillg Method : Contuous Flight Auger Samplg Method : Date Drilled : 8/6/ Total (approx.) : : See Figure Letter Durg Drillg LOG OF BORING TB-9 Harris Water Engeerg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist 8-9- T:\Current GE\PE, \Logs of Test Borgs\ TB-.bor Formational material, sandstone, very hard, slightly moist, tan Bottom of test borg at four () SS /

Field Engeer Hole Diameter Drillg Method : T. Harrison : " Solid : Contuous Flight Auger LOG OF BORING TB- Samplg Method : Date Drilled : 8/6/ Total (approx.) : : See Figure Letter Harris Water Engeerg Sample Type Durg Drillg After Drillg AY, sandy, few gravels, few cobbles, stiff, slightly moist 8-9- T:\Current GE\PE, \Logs of Test Borgs\ TB-7.bor Bottom of test borg at four ()