INDEPENDENT MARKET TESTING AND OPERATIONAL EVALUATION OF GROUNDS MAINTENANCE SERVICE PROVISION. Chris Frake, APSE solutions associate

Similar documents
Introduction to Forecasting

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

Winter Season Resource Adequacy Analysis Status Report

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

DEPARTMENT OF THE ARMY MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND (SDDC) 1 SOLDIER WAY SCOTT AFB, IL 62225

Outage Coordination and Business Practices

= observed volume on day l for bin j = base volume in jth bin, and = residual error, assumed independent with mean zero.

Drexel Woods Homeowner s Association, Inc Baltimore National Pike, Box 158 Catonsville, MD 21228

REPORT ON LABOUR FORECASTING FOR CONSTRUCTION

Public Disclosure Copy

Computing & Telecommunications Services Monthly Report January CaTS Help Desk. Wright State University (937)

Computing & Telecommunications Services

BUSI 460 Suggested Answers to Selected Review and Discussion Questions Lesson 7

2015 Costs and Returns Estimate Eastern Idaho: Alfalfa Hay Establishment in Grain Stubble Paul E. Patterson Background and Assumptions

Design of a Weather-Normalization Forecasting Model

INVOICE EXPLAINER GAS

Background and Assumptions

Statement of indicative wholesale water charges and charges scheme

2018 Annual Review of Availability Assessment Hours

Public Disclosure Copy. Implementation Status & Results Report Haiti - Urban Community Driven Development Project / PRODEPUR (P106699)

The World Bank EGYPT-Farm-level Irrigation Modernization (P117745)

The World Bank CG Rep. LISUNGI Safety Nets System Project (P145263)

The World Bank Haiti Business Development and Investment Project (P123974)

Public Disclosure Copy

Paul Patterson Background and Assumptions

Background and Assumptions

Technical note on seasonal adjustment for Capital goods imports

Effective Gross Revenue 3,335,005 3,130,591 3,320,552 3,338,276 3,467,475 3,606,962 3,509,653 3,981,103 3,984,065 4,147,197 4,300,790

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

peak half-hourly New South Wales

Paul Patterson and Steven Hines Background and Assumptions

The World Bank India: Andhra Pradesh Rural Inclusive Growth Project (P152210)

FEB DASHBOARD FEB JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

CAISO Participating Intermittent Resource Program for Wind Generation

The World Bank Health System Performance Reinforcement Project (P156679)

Site Description: Tower Site

The World Bank Decentralized Community Driven Services Project (P117764)

Typical Hydrologic Period Report (Final)

Background and Assumptions

Distribution Date: 27-Aug-07

Implementation Status & Results Chad Urban Development Project (P072030)

Multivariate Regression Model Results

Public Disclosure Copy

Lecture Prepared By: Mohammad Kamrul Arefin Lecturer, School of Business, North South University

Public Disclosure Copy

Payment of Funds

Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA) (P126744)

SHORT TERM LOAD FORECASTING

Florida Courts E-Filing Authority Board. Service Desk Report March 2019

NI - INTEGRATED PUBLIC PROVISION OF HEALTH CARE SERVICES (P164452)

SOUTH KARAKALPAKSTAN WATER RESOURCES MGMT IMPROVEMENT (P127764)

Implementation Status & Results Chad Urban Development Project (P072030)

Supplementary appendix

Monitoring on Subsidence Claims. John Parvin Subsidence Claims Manager

Operations Management

Seasonality in recorded crime: preliminary findings

225 Bush Street Suite 1700 San Francisco, CA phone fax

The World Bank Ho Chi Minh City Green Transport Development (P126507)

Technical note on seasonal adjustment for M0

Project No India Basin Shadow Study San Francisco, California, USA

The World Bank Second Rural Transport Improvement Project (P123828)

Public Disclosure Copy

The World Bank Haiti Business Development and Investment Project (P123974)

Lecture Prepared By: Mohammad Kamrul Arefin Lecturer, School of Business, North South University

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4

Exercise 6. Solar Panel Orientation EXERCISE OBJECTIVE DISCUSSION OUTLINE. Introduction to the importance of solar panel orientation DISCUSSION

The weather effect: what it means for global sugar markets. Platts 8th Annual Kingsman Asia Sugar Conference September 8, 2017

Public Disclosure Copy

CWV Review London Weather Station Move

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3

Corn Basis Information By Tennessee Crop Reporting District

Financial Review. No member of the Board of Directors has reported accepting any gifts or incentive from any vendor contracted by the association.

Public Disclosure Copy

2013 GROWTH INCENTIVES PROGRAM FAQS

GAMINGRE 8/1/ of 7

Multiple Regression Analysis

The World Bank Telangana Rural Inclusive Growth Project (P143608)

Time Series Analysis

Public Disclosure Copy

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

Terms of Reference for the Comparative Environmental Review (CER) of. Options for the Mactaquac Project, Mactaquac, New Brunswick

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Background and Assumptions

MONTE CARLO SIMULATION RISK ANALYSIS AND ITS APPLICATION IN MODELLING THE INCLEMENT WEATHER FOR PROGRAMMING CIVIL ENGINEERING PROJECTS

A DISCOUNT MINI STORAGE

Statistics for IT Managers

Forecasting using R. Rob J Hyndman. 1.3 Seasonality and trends. Forecasting using R 1

Pilot to Improve the Development and Nutrition of Young Children in Poor Rural Areas in Guatemala

Background and Assumptions

The World Bank Dam Operational Improvement and Safety (P096532)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

Public Disclosure Copy

BLUE JAY NATION Summarized Balance Sheet As of December 31, 2018 and June 30, Total

Economic, Productive & Financial Performance Of Alberta Cow/Calf Operations

NSP Electric - Minnesota Annual Report Peak Demand and Annual Electric Consumption Forecast

City of Scottsbluff, Nebraska Monday, July 16, 2018 Regular Meeting

THE BUILDING SAFETY GROUP HEALTH AND SAFETY TRAINING COURSES 2018 DATES AND PRICES

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

Transcription:

INDEPENDENT MARKET TESTING AND OPERATIONAL EVALUATION OF GROUNDS MAINTENANCE SERVICE PROVISION Chris Frake, APSE solutions associate

GROUNDS MAINTENANCE

Detailed Market Testing process involves independent assessment of: Competitiveness Optimum resource requirements Operational performance service delivery

Market testing current key issues Lack of meaningful/accurate financial information relevant to service provision Lack of baseline operational data essential to identify resource requirements Impact of single status, i.e. sickness levels, reduction in working hours Scale of rechargeable costs to the service

Market testing Fewer number of grounds maintenance contracts exposed to open competition since C.C.T affecting: The availability of market schedule of rate costs for cyclical operations Market testing of in house S.O.R. Prices with benchmark cost is effective but not conclusive

RATES COMPARISON Code Description UOM S.M.V. S.M.V. inc allowance Cost Compare S.M.V. Compare Cost AMD3 Rake Beds And Remove Leaves 10 sq m 6 6.9 1.71 9.29 2.78 ASM1 Apply Residual Weedkiller To Hard Areas 100 sq m 5 6.25 1.55 9.45 3.56 BGO1 Brush Bowls Green 1 green 19 23.75 5.89 36.12 10.8 BGO1 Mow Bowling Green x 3/Week 1 green 65 81.25 20.14 81.9 24.5 BGO1 Roll Bowling Green 1 green 136 170 42.13 115.5 34.54 BGO1 Scarify Bowls Green 1 green 66 82.5 20.45 93.45 27.95 BGO1 Sisis Spike Bowls Green 1 green 89 111.25 27.57 103.95 31.09 BPG1 Apply Selective Herbicide 100 sq m 4 5 2.24 5.83 1.95 BPG1 Cut And Collect Putting Green 100 sq m 14.06 17.58 4.36 5.25 1.57 BPG1 Cut Grass Strimming 100 sq m 20.5 25.63 6.35 27.3 8.17 BPG1 Remove Leaves From Lawn 100 sq m 11.5 14.38 3.56 21 6.28 BPG2 Cut Grass - Compact 100 sq m 3.25 4.06 1.01 4.2 1.26 BPG2 Cut Grass - Pedestrian 100 sq m 11.25 14.06 3.48 8.72 2.6 BPSB Prune Selective Shrubs (Summer) 10 sq m 4 5 1.24 4.07 1.22 BPSB Prune Selective Shrubs (Winter) 10 sq m 7.5 9.38 2.32 8.75 2.61 CAO1 Edge With Half Moon 10 lm 5 6.25 1.55 5.88 1.76 CAO1 Harrow Area 100 sq m 1.1 1.38 0.38 0.33 0.09 CAO1 Mow Grass Central Area 100 sq m 2.7 3.38 0.84 3.05 0.9 CAO1 Spike Area 100 sq m 1.2 1.5 0.41 1.02 0.3 CAO1 Trim With Long Handled Shears 10 lm 3.5 4.38 1.09 4.94 1.48 CBO1 Remove Leaves 10 sq m 2 2.5 0.62 2.1 0.63 CKG1 Roll Wicket Prior To Match 1 wicket 60 75 18.59 66.6 19.91 CPT1 Pick Up Litter / Debris 100 sq m 1.75 2.19 0.54 0.26 0.07

MARKET TESTING The preferred approach is to establish your own S.O.R. Cost base for each activity and subsequent overall lump sum costs using: Bills of quantity Work specification / indicative frequencies Competitive unit cost, i.e. Hourly rate Productivity values for each activity

COST BASE RULE OF THUMB PRICE FOR A GROUNDS MAINTENANCE SERVICE 32K 34K PER OPERATIVE PER ANNUM COMPETITIVE UNIT COST BASE FOR GROUNDS MAINTENANCE SERVICES BETWEEN 18.00 18.75 PER HOUR PLUS MATERIALS MAIN REASONS FOR EXCESSIVE HOURLY RATE COST: DOUBLE COUNTING OF HOLIDAY AND SICKNESS RECOVERY OR INCLUSION OF MATERIALS WITHIN HOURLY RATE COST INCLUSION OF CLIENT RELATED COSTS EXCLUSIVE OF RELEVANT INCOME NON INTRODUCTION OR MISAPPROPRIATE SEASONAL WORKING HOURS RESULTING IN: MACHINERY / EQUIPMENT UNDER UTILIZATION REQUIREMENT FOR ADDITIONAL SEASONAL STAFF

GROUNDS MAINTENANCE MACHINERY PROVISION ACCOUNTS FOR 18% - 22% OF TOTAL COST MOST GROUNDS MAINTENANCE SERVICES ARE GUILTY OF UNDER UTILIZING MACHINERY POOR UTILIZATION MANAGEMENT INEFFICIENT WORKING PRACTICES UNSATISFACTORY SEASONAL WORKING HOUR ARRANGEMENTS

ANNEXE I - SOR COSTING LABOUR RATE 17.41 DESCRIPTION MEAS UOM NOV DEC FREQ YR SMV LABOUR /Occ MATLS /Occ RATE COST PER YEAR Conservation Areas 1Sm Tractor Mow 1Sm 2 0.017 0.00 0.0049 0.01 Strim Perimeter 0.1121Lm 2 0.16 0.05 0.0464 0.01 Remove Arisings 1Sm 2 0.15 0.04 0.0435 0.09 Port Meadow Conservation Area 1Sm Tractor Mow and Remove Arisings 1Sm 2 0.011 0.00 0.0032 0.01 Low Maintenance / Rough areas 1Sm Rotary Mow 1Sm 4 0.013 0.00 0.0038 0.02 Strim 0.5988Lm 4 0.16 0.05 0.0464 0.11 Half Moon 0.011Lm 1 0.6 0.17 0.1741 0.00 Maintain Amenity Open Space Grass 1Sq m Mow Amenity Grass 1Sm 2 20 0.028 0.01 0.008125 0.16 Strim 0.0315Lm 4 0.16 0.05 0.0464 0.01 Apply Liquid Resid. Herb. To Fence Lines 0.075Sm 1 0.043 0.01 0.0038 0.0163 0.00 Apply Liquid Resid. Herb. To Hedge Bases 0.002Lm 1 0.042 0.01 0.0038 0.0160 0.00 Spot Treat W/- Resid Herb. To Gulleys 0.0266Sm 2 0.2 0.06 0.0642 0.1222 0.01 Half Moon Edge 0.3Lm 0.25 0.25 1 0.6 0.17 0.1741 0.05

RESOURCE PROFILING EVALUATION OF OPTIMUM RESOURCE REQUIREMENTS FOCUSES UPON CYCLICAL GROUNDS MAINTENANCE OPERATIONS KEY STAGES EVALUATION OF THE OPERATING HOURS GENERATED BY ACTIVITY USING QUANTITY, METHOD OF OPERATION AND PRODUCTIVITY ESTABLISH MONTHLY WORK PATTERN, i.e. CUMULATIVE HOURS EVALUATE MOST APPROPRIATE SEASONAL WORKING HOUR ARRANGEMENTS AND OPTIMUM RESOURCE REQUIRMENTS RESOURCE / HOURS STUDY CAN BE USED TO DETERMINE WORK SCHEDULES

GROUNDS BOQ HOURS PER MONTH Description MeasUOM MAY JUN JUL AUG SEP OCT NOV DEC Rate Armory Close Annual Cost Alex Tennis Courts Amenity Area 2114.33Sm 2.79 2.49 2.49 2.67 2.49 2.49 3.56 1.59 0.2283 482.76 Sports 6478.22Sm 1.60 3.87 1.58 1.90 1.58 2.82 1.34 0.55 0.0518 335.29 Shrubs Standard 20.25Sm 0.23 0.23 0.23 0.23 0.23 0.23 0.24 0.24 2.1744 44.02 Dog Bins 2.00Item 3.40 3.40 3.40 3.40 3.40 3.40 3.40 3.40 355.16 710.33 Litter x 2/wk 8612.80Sm 3.98 3.98 3.98 3.98 3.98 3.98 3.98 3.98 0.0966 831.72 Removal Of Leaves x 3 occ 2153.20Sm 0.00 0.00 0.00 0.00 0.00 0.00 1.08 1.08 0.0261 56.23 120.8 105.2 107.0 153.8 Tennis Court Grass Mtce 12.00Court 0 0 0 99.00 0 86.00 0.00 0.00 1580.47 18965.63 Tennis Court Hard 6.00Court 15.50 15.00 15.50 15.50 15.00 4.50 0.00 0.00 320.35 1922.07 Angel Greyhound Meadow Grass Conservation Area 6177.85Sm 19.04 0.00 0.00 0.00 19.04 0.00 0.00 0.00 0.1073 663.04 Amenity Area 30806.29Sm 40.64 36.21 36.21 38.94 36.21 36.21 51.86 23.10 0.2283 7033.86 Shrubs Standard 566.51Sm 6.54 6.54 6.54 6.54 6.54 6.54 6.77 6.77 2.1744 1231.81 Dog Bins 1.00Item 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 355.16 355.16 Litter x 2/wk 37550.66Sm 17.36 17.36 17.36 17.36 17.36 17.36 17.36 17.36 0.0966 3626.17 Removal Of Leaves x 3 occ 9387.66Sm 0.00 0.00 0.00 0.00 0.00 0.00 4.69 4.69 0.0261 245.16

GROUNDS BOQ HOURS PER MONTH MAY JUN JUL AUG SEP OCT NOV DEC Annual Description Meas UOM Rate Cost Grass Conservation Area 186.73 Sm 0.58 0 0 0 0.58 0 0 0 0.1073 20.04 Amenity Area 597.17 Sm 0.79 0.7 0.7 0.75 0.7 0.7 1.01 0.45 0.2283 136.35 Dog Bins 1Item 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 355.16 355.16 Litter x 2/wk 783.9 Sm 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.0966 75.7 Removal Of Leaves x 3 occ 195.97 Sm 0 0 0 0 0 0 0.1 0.1 0.0261 5.12 Wolvercote Play Area (see Godstow) Litter x 3/Wk Sm 0 0 0 0 0 0 0 0 0.1449 0 Woodfarm Green Amenity Area 5847.17 Sm 7.71 6.87 6.87 7.39 6.87 6.87 9.84 4.39 0.2283 1335.06 Shrubs Standard 421.07 Sm 4.86 4.86 4.86 4.86 4.86 4.86 5.03 5.03 2.1744 915.57 Dog Bins 2Item 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 355.16 710.33 Litter x 2/wk 6268.25 Sm 2.9 2.9 2.9 2.9 2.9 2.9 2.9 2.9 0.0966 605.31 Hedge Cutting Miscellaneous 40641.3 Maintain Hedges (Flail) 4 Sq m 0 0 0 203.2 203.21 0 0 0 0.1741 7075.66 Maintain Hedges 1558.42 Sq m 19.48 19.48 0 0 19.48 19.48 0 0 0.8705 1356.6 TOTALS 6582 4939 4761 5221 6695 5449 5272 3701 1,084,282

SPECIMEN PRICE QUALITY TENDER EVALUATION The weighting system that will be applied is as follows: PRICE 60% or 600 points QUALITY 40% or 400 points

QUALITY EVALUATION CRITERIA The score for Quality will be determined from the following weighting: Management of the Contract 10% or 40 points Setting up of Service Provision 36% or 144 points Provision of the Service to include Resources & Methodology 26% or 104 points Quality Control Systems 4% or 16 points Training 4% or 16 points Health and Safety 5% or 20 points Policies and Procedure 5% or 20 points Exit Strategy 10% or 40 points Irrespective of price, all tenderers will have to meet a minimum quality threshold.

PRICE POINTS CONVERSION Having scored the weighted quality criteria, it will then be necessary to convert the tendered prices to allow a true balance of price and quality. The prices submitted will be scored and weighted by the Authority s Tender Management Evaluation Panel. The procedure adopted is outlined in the CIPFA Code of Practice for Compulsive Competition and is as follows: Tenders which are too low to be deemed credible or too high to be acceptable, will be eliminated. The mean (arithmetic average) price of the remaining tenders will be calculated. Half the points (300) will be awarded to the mean price. For prices below the mean, 2% of the total points (12) will be in addition for each 1% of the tender price above the mean. For prices above the mean, 2% of the total price points (12) will be deducted for each 1% of the tender price above the mean

ALLOWABLE COSTS Tender prices may be adjusted at the evaluation stage for prospective costs which include: Payments for the premature termination of leases, maintenance agreements and contracts for the purchase of goods for any staff to whom TUPE would not apply.

METHOD STATEMENT EXAMPLE 3.0 PROVISION OF THE SERVICE 104 POINTS Detailed account of how you propose to provide an appropriate level of service having regard to: 3.1 Resource proposals including Emergency Arrangements, Public Holiday Arrangements and Holiday and Sickness Cover, Seasonal Arrangements. (see Annexe I) 3.2 Proposed Methods of Work (see Annexe II) The Resource and Method statements should be completed as comprehensively as possible, in order that the priced Tender may be supported by evidence of managerial and technical and organisational capacity and capability. 3.3 Operational Hours Proposals (see Annexe III) 3.4 Organisational Arrangements for Receipts of Orders, Records and Maintenance. 3.5 Customer Care, Publicity and Advice. 3.6 Procedures for Dealing with Risks and Accidents.