The World Bank. Increased Access to Modern Energy (P110075) Key Dates. Project Development Objectives. Components. Public Disclosure Authorized

Similar documents
The World Bank. Increased Access to Modern Energy (P110075) Key Dates. Project Development Objectives. Components. Public Disclosure Authorized

Public Disclosure Copy

The World Bank Uganda Energy for Rural Transformation III (P133312)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank. Zm: Increased Access to Electricity Services (P077452) Key Dates. Project Development Objectives. Components

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

The World Bank MA- Noor Ouarzazate Concentrated Solar Power Project (P131256)

Public Disclosure Copy

The World Bank Cusco Regional Development (P117318)

Urban Water Supply Project (P156739)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

The World Bank Can Tho Urban Development and Resilience (P152851)

Public Disclosure Copy

The World Bank Zambia Water Resources Development Project (P114949)

Public Disclosure Copy

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

Public Disclosure Copy

The World Bank Cities and Climate Change (P123201)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

The World Bank. DRC Electricity Access & Services Expansion (EASE) (P156208) Key Dates. Project Development Objectives. Components.

Key Dates. Project Development Objectives. Components. Overall Ratings

The World Bank BiH Floods Emergency Recovery Project (P151157)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Cities and Climate Change (P123201)

Key Dates. Global Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank Earthquake Housing Reconstruction Project (P155969)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Senegal Tourism and Enterprise Development Project (P146469)

Public Disclosure Copy

The World Bank Integrated Forest Ecosystem Management (P151102)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Dam Operational Improvement and Safety (P096532)

Sri Lanka Strategic Cities Development Project (P130548)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank OECS Regional Tourism Competitiveness (P152117)

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

Public Disclosure Copy

The World Bank Indonesia National Slum Upgrading Project (P154782)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates

The World Bank Third National Urban Water Sector Reform Project (P123513)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Regional Infrastructure Development Fund (P154947)

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

Third South West Indian Ocean Fisheries Governance and Shared Growth Project (SWIOFish3)

The World Bank Ho Chi Minh City Green Transport Development (P126507)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Public Disclosure Copy

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Coral Reef Rehabilitation and Management Program- Coral Triangle Initiative (COREMAP-CTI) (P127813)

PAMSIMAS Support Trust Fund (P116236)

Public Disclosure Copy

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

Public Disclosure Copy

Name Previous Rating Current Rating

The World Bank Transport Connectivity and Asset Management Project (P132833)

SUSTAINABLE CITIES (P128605)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Livestock Sector Development Support Project (P159476)

The World Bank Decentralized Community Driven Services Project (P117764)

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy. Implementation Status & Results Report Tanzania: Resilient Natural Resource Management for Tourism and Growth (P150523)

The World Bank Local and Regional Competitiveness Project (P154263)

Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA) (P126744)

The World Bank Indonesia National Slum Upgrading Project (P154782)

Public Disclosure Copy. First Part of the Second Phase of the Niger Basin Water Resources Development and Sustainable

EC Ibarra Transport Infrastructure Improvement Project (P147280)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report AGRICULTURAL COMPETITIVENESS IMPROVEMENT PROJECT (P122812)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank Biodiversity Conservation and Rural Livelihoods Improvement (P088520)

The World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates

Public Disclosure Copy

Transcription:

Public Disclosure Authorized Public Disclosure Copy AFRICA Benin Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 12 ARCHIVED on 18-Jan-2017 ISR25167 Implementing Agencies: Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:23-Jun-2009 Planned Mid Term Review Date:30-Jun-2013 Original Closing Date:30-Jun-2015 Project Development Objectives Effectiveness Date:30-Apr-2010 Actual Mid-Term Review Date:14-Oct-2015 Revised Closing Date:30-Jun-2018 Public Disclosure Authorized Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The project's objectives are to improve reliability and efficiency of, and access to, modern energy services in Benin. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Benin GEF Energy Efficiency Program (P115064) Global Environmental Objective (from Project Appraisal Document) The overall objective of this program is to enhance standards and labels for efficient light bulbs and air-conditioners in Benin, and to introduce efficient light bulbs to households through a bulk procurement scheme and awareness. Has the Global Environmental Objective been changed since Board Approval of the Project Objective? No Components Name Component A1-a: Construction of 161 kv interconnections between Onigbolo-Parakou and Sakete - Porto Novo:(Cost $14.59 M) Component A4: Rehabilitation and Reinforcement of the SBEE network. Acquisition of metering equipment.:(cost $25.38 M) Page 1 of 13

Component A5: Improving Lighting and Appliance Efficiency:(Cost $1.82 M) Component B1 a: Planning and Development of Modern Energy Services of rural areas.:(cost $0.54 M) Component B2: Modernizing Biomass Energy Services:(Cost $1.30 M) Component C: Sustainable Energy Services:(Cost $5.14 M) Component B3: Electrification of three priority localities:(cost $1.50 M) Component D: Project Preparation:(Cost $4.30 M) NEW: Component A1-b: Supply and installation of protection and relaying equipment:(cost $1.75 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Low Low Implementation Status and Key Decisions Component A - Electrical Network Upgrading. The construction of substations is completed. Based on a revised construction schedule, the transmission line is expected to be completed in March 2018. The implementation of the distribution activities is completed. The 45 000 prepayment meters are procured and 15 000 are already installed. Component B - Electrification and Modern Energy Services. The rural electrification subcomponent is completed and seven villages are already connected to network and supplied with electricity. An important activity under this component relates to community-based sustainable wood fuel supply systems. The implementation of the plan for 300,000 hectares is ongoing and will be completed by December 2017. The implementation of the activities implemented by the Nordic Development Fund also improved. Component C - Sustainable Energy Services. The development of safeguard document for the power sector and specific environmental and social impact assessment are completed. The studies related to business development and engineering are also completed. The study for the design of a Project monitoring and evaluation system of CEB was dropped because of the accumulated delay. The funds are reallocated to the engineering supervision of the construction of the transmission line Component D - Project Preparation[AB1]. The preparation of studies to advance future investment in transmission and distribution is underway and expected to be completed in the second half of 2017. Page 2 of 13

Page 3 of 13

Page 4 of 13

Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Low Low Macroeconomic -- Low Low Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Low Low Institutional Capacity for Implementation and Sustainability -- Moderate Moderate Fiduciary -- Low Low Environment and Social -- Low Low Stakeholders -- Low Low Other -- Low Low Overall -- Low Low Results Project Development Objective Indicators Power losses in Benin's transmission network (Gigawatt-hour (GWh), Custom) Value 51.00 58.00 58.00 24.00 Date 28-May-2009 03-May-2016 05-Dec-2016 30-Jun-2018 Direct project beneficiaries (Number, Core) Value 0.00 600,000.00 690,000.00 1,200,000.00 Date 07-Oct-2013 03-May-2016 05-Dec-2016 30-Jun-2018 Page 5 of 13

Female beneficiaries (Percentage, Core Supplement) Value 0.00 0.00 25.00 50.00 People provided with access to electricity by household connections (Number, Core) Value 2,700,000.00 3,300,000.00 3,315,000.00 3,900,000.00 Date 07-Oct-2013 03-May-2016 05-Dec-2016 30-Jun-2018 People provided with access to electricity by hhold connections-grid (Number, Core Breakdown) Value 2,700,000.00 3,300,000.00 3,390,000.00 3,900,000.00 Date 07-Oct-2013 03-May-2016 05-Dec-2016 30-Jun-2018 Electricity losses per year in the project area (Percentage, Core) Value 22.00 24.00 24.00 20.00 Date 07-Oct-2013 03-May-2016 05-Dec-2016 30-Jun-2018 Total net injected generation (Megawatt hour(mwh), Core Supplement) Page 6 of 13

Value 0.00 0.00 0.00 0.00 Electricity losses per year in the project area- Technical (Percentage, Core Supplement) Value 11.00 12.00 12.00 10.00 Electricity losses per year in the project area- Non-Technical (Percentage, Core Supplement) Value 11.00 12.00 12.00 10.00 Benin transmission network responds to (N-1) criteria (Text, Custom) Value No No No Yes Date 28-May-2009 03-May-2016 05-Dec-2016 30-Jun-2018 Overall Comments People provided with access to electricity by hhold connections-grid increased because of the installation of 15 000 prepayment meters. Global Environmental Objective Indicators Page 7 of 13

PHINDGEOTBL PHINDGEOTBL Public Disclosure Copy Efficiency standards for appliances developed and applied (Text, Custom) Value No standards developed Standards for CFLs and air conditioners developed and applied Standards for CFLs and air conditioners developed and applied Standards developed and applied Date 23-Jun-2009 03-May-2016 30-Jun-2016 30-Jun-2016 Compact fluorescent light bulbs installed (Number, Custom) Value 0.00 350,000.00 350,000.00 350,000.00 Date 28-May-2010 03-May-2016 05-Dec-2016 30-Jun-2016 Overall CommentsPHGEOCMTS This activity is completed and closed Intermediate Results Indicators Component A4: Distribution-level voltage fluctuations less than 7 percent in the project's network area in key cities in Benin. (Yes/No, Custom) Value N Y Y Y Date 28-May-2009 03-May-2016 05-Dec-2016 30-Jun-2018 Page 8 of 13

Public Disclosure Copy Component B3: Number of people provided with access to electricity under the project by household connections through the electrification of new localities (Number, Custom) Value 0.00 3,000.00 3,000.00 3,000.00 Date 07-Oct-2013 03-May-2016 05-Dec-2016 30-Jun-2016 Component D - D2: Preparation of studies for transmission and distribution project completed (Yes/No, Custom) Value N N N Y Date 07-Dec-2013 03-May-2016 05-Dec-2016 30-Jun-2018 Component D - D1: Adjarala ESIA and RAP updated (Yes/No, Custom) Value N Y Y Y Date 07-Oct-2013 19-Jun-2015 19-Jun-2015 30-Jun-2016 Component A4: Number of prepayment meters installed (Number, Custom) Value 0.00 0.00 15,000.00 45,000.00 Date 07-Oct-2013 19-Jun-2015 05-Dec-2016 30-Jun-2018 Page 9 of 13

Public Disclosure Copy Transmission lines constructed or rehabilitated under the project (Kilometers, Core) Value 0.00 0.00 0.00 310.00 Date 07-Oct-2013 19-Jun-2015 05-Dec-2016 30-Jun-2018 Transmission lines constructed under the project (Kilometers, Core Breakdown) Value 0.00 0.00 0.00 310.00 Date 07-Oct-2013 19-Jun-2015 05-Dec-2016 30-Jun-2018 Component C - C4. Environmental and social safeguards regularly monitored and mitigation measures implemented (Yes/No, Custom) Value N Y Y Y Date 28-May-2009 19-Jun-2015 05-Dec-2016 30-Jun-2018 Component A4. Reduction of Benin's peak load and energy savings (in MW/GWh) (Text, Custom) Value 0.00 0.00 9.7/14 9.7/14 Date 28-May-2009 03-May-2016 05-Dec-2016 30-Jun-2018 Page 10 of 13

Public Disclosure Copy Component A5: Efficiency standards for appliances developed and applied (Text, Custom) Value No standards Standards for CFLs and air conditioners developed and applied Standards for CFLs and air conditioners developed and applied Standards for at least 2 appliances Date 28-May-2009 03-May-2016 05-Dec-2016 30-Jun-2016 Component B1: Rural electrification fund (REF) established and fully operational (Text, Custom) Value REF not functional REF fully functional. REF fully functional. REF fully functional Date 28-May-2009 03-May-2016 03-May-2016 30-Jun-2015 Component B2: Number of decentralized, stand-alone generation systems set up (Number, Custom) Value 0.00 4.00 4.00 4.00 Date 29-May-2009 03-May-2016 03-May-2016 30-Jun-2015 Component B2: Area of managed forest in the context of setting up a community-based sustainable woodfuel supply system (in ha) (Hectare(Ha), Custom) Value 0.00 0.00 150,000.00 300,000.00 Date 28-May-2009 03-May-2016 05-Dec-2016 30-Jun-2018 Page 11 of 13

Public Disclosure Copy Component B2: Number of new workers trained in production of efficient wood stoves, and increased use of energy efficient wood stoves. (Number, Custom) Value 0.00 300.00 300.00 450.00 Date 28-May-2010 03-May-2016 05-Dec-2016 30-Jun-2018 Component C - C1: Energy Sector Master Plan completed and endorsed (Text, Custom) Value No current Master Plan Master plan prepared and endorsed Master plan prepared and endorsed Master Plan endorsed Date 28-May-2009 03-May-2016 05-Dec-2016 30-Jun-2018 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P110075 IDA-45870 Effective USD 70.00 54.38 15.62 40.38 12.55 74% P110075 TF-94664 Closed USD 1.82 1.82 0.00 1.60 0.22 88% P110075 TF-99823 Closed USD 2.00 1.79 0.21 1.79 0.00 100% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P110075 IDA-45870 Effective 23-Jun-2009 13-Jul-2009 30-Apr-2010 30-Jun-2015 30-Jun-2018 P110075 TF-94664 Closed 13-Jul-2009 13-Jul-2009 13-Jul-2009 30-Jun-2015 30-Jun-2016 P110075 TF-99823 Closed 09-Nov-2011 09-Nov-2011 09-Nov-2011 30-Sep-2012 31-Dec-2013 Cumulative Disbursements Page 12 of 13

Restructuring History Level Approved on 12-Oct-2011,Level Approved on 06-Nov-2013,Level 2 Approved on 26-Jun-2015,Level 2 Approved on 13-May-2016 Related Project(s) P115064-Benin GEF Energy Efficiency Program Page 13 of 13