North Carolina Department of Environment and Natural Resources Division Energy, Mineral, and Land Resources Land Quality Section

Similar documents
Woodford County Erosion Prevention Plan and Permit. Application #

Specifications Whitcomb Elementary School Demolition January 15, 2016

Materials. Use materials meeting the following.

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Culvert and Pipe Phasing

TPDES: Soil, Erosion and Sedimentation Methods

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

Suitable Applications Sediment traps should be considered for use:

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

APPENDIX B WORKSHEETS & EXHIBITS

Guide to the use of the Erosion and Sediment Control Evaluation Tool

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

CONSTRUCTION EXIT SEDIMENT BARRIER

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Coarse Sediment Traps

Rock & Aggregate Drop Inlet Protection

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

U-Shaped Sediment Traps

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stone Outlet Sediment Trap

Stormwater Inlet Sediment Traps

Template for Sediment and Erosion Control Plan General Instructions

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

December 11, 2006 File:

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

11/21/2014. Erosion and Sedimentation Control Planning and Design Workshop December 2, 2014

Rock Sizing for Multi-Pipe & Culvert Outlets

WATER MANAGEMENT REPORT FOR PAGE ESTATES

Rock Sizing for Small Dam Spillways

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load

WELCOME Lake Wabukayne OPEN HOUSE

Chapter Introduction EROSION AND SEDIMENT CONTROL. Erosion

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

Instream Sediment Control Systems

NORTHUMBERLAND COUNTY, PA

TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 1.5% Sediment Load

Construction Exits Vibration grids

Stormwater Outlet Sediment Traps

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

CASE STUDIES. Introduction

**Temporary Erosion Control**

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

Chapter 3 Erosion in the Las Vegas Wash

EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT

April 9, Phosphate Mining and Reclamation Overview

SILT FENCE EFFECTIVENESS

Lincoln County Board of Commissioner s Agenda Item Cover Sheet

Electronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315)

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

Independent Environmental Audit Erosion and Sediment Control

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

2. There is evidence of oil field waste discharged to an unnamed tributary to Bad Luck Creek. This is a violation of 40 CFR Part

Sediment and Erosion Control Techniques on Stream Restoration Projects

A regular meeting of the Village of Victor Planning Board was held on Wednesday, July 26, 2017, at the Village Hall, 60 East Main Street.

Rock Sizing for Batter Chutes

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

Chutes Part 5: Rock linings

D. B. G R A Y E N G I N E E R I N G I N C.

STORMWATER MANAGEMENT REPORT

Local Conditions-NE Minnesota

Caledon Villas Corporation

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Construction Exits Rock pads

REQUEST FOR PROPOSALS

Table 1 - Infiltration Rates

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

M. Sloat, AAg., CPESC R.J. Redden, R.P.Bio., A.Sc.T., CPESC. EDI Environmental Dynamics Inc Continental Way Prince George, B.C.

Transcription:

Tracy E. Davis, PE, CPM Director City of Greenville Attention: Scott Godefroy 1500 Beatty Street Greenville, NC 27834 North Carolina Department of Environment and Natural Resources Division Energy, Mineral, and Land Resources Land Quality Section Subject: Sedimentation and Erosion Control Local Program Review Dear Mr. Godefroy: Pat McCrory, Governor Donald van der Vaart, Secretary On January 27, 2016, Allison Ward and Karyn Pageau conducted a review of the City of Greenville Local Program. Two positions would to contribute 1.4 full time equivalents to the erosion control program, these positions are currently vacant and the program is being managed by the City Engineer and another member of the his staff. The city has 12 active projects. During the past year, the City has reviewed 21 plans, with 20 approvals and 1 disapproval, and has conducted 4 inspections. The City has not issued any notices of violations nor has it assessed any civil penalties in the past 12 months. Four projects were reviewed and inspected in the field. Two projects were located in the Neuse and two in the Tar-Pamlico River Basin. The following is a summary of the projects that were inspected: 1. Vidant Cancer Center This site is a 9acre commercial project. The file for this project included adequate documentation. The erosion and sediment control plan was approved and was adequate. No previous inspections were performed on this site. The site has not received a Notice of Violations. The site was active at the time of the inspection and was out of compliance. The violations found were: failure to follow approved plan, failure to take all reasonable measures, failure to self-inspect, and failure to maintain erosion control measures. Corrective Actions: 1) Maintain construction entrance, additional clean stone is needed. 2) Provide impervious liner for concrete washout area installed. 3) Maintain perimeter silt fence. 4) Additional clean stone needed at yard inlets. 5) Provide copy of NPDES/Self-Inspection records. Provide revised plan to address additional sediment control and dewatering needed behind building on site. Comment: Provide adequate ground cover on all bare and inactive areas. Additional silt fence needed along perimeter. Self-inspection and monitoring records should be kept and maintained onsite. 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 919-707-9220 / FAX: 919-733-2876 512 North Salisbury Street, Raleigh, North Carolina, 27604 Internet: http://portal.ncdenr.org/web/lr/land-quality An Equal Opportunity \ Affirmative Action Employer 30% Post Consumer Paper

City of Greenville Page 2 of 5 2. Berkley Apartments This site is a 19.5 acre multi-family residential project. The file for this project included adequate documentation. The erosion and sediment control plan was approved and was not adequate. Some details were not shown on the drawings for planned sediment and erosion control measures, also NPDES requirements not shown including concrete washout areas, stockpiles, groundcover stabilization timeframes. The last inspection was conducted on 12/16/2014 and the site was out of compliance. The site has not received a Notice of Violations. The site was active at the time of the inspection and was out of compliance. The violations found were: failure to follow approved plan, failure to take all reasonable measures, unprotected exposed slopes, and failure to maintain erosion control measures. Corrective Actions: 1) Maintain construction entrance, additional clean stone is needed. 2) Provide groundcover on stockpiles and on backside of perimeter slope near sediment basin. 3) Maintain perimeter silt fence and provide additional silt fence upstream of sediment basin along tree line. 4) Additional clean stone needed at yard inlets. 5) Provide copy of NPDES/Self- Inspection records. Comment: Provide adequate ground cover on all bare and inactive areas. A revised plan is needed to show lined concrete washout with detail and additional sediment control downstream of stockpile near perimeter silt fence breach. Site has a high potential for offsite sediment. 3. GCF Donation Center This site is a 1.4 acre commercial project. The file for this project did not contain adequate documentation, the landowner and FRP were different and no landowner authorization was observed in the file. The erosion and sediment control plan was approved and was not adequate. No inspections were documented in the file. The site has not received a Notice of Violations. The site was active at the time of the inspection and was out of compliance. The violations found were: failure to follow approved plan, failure to take all reasonable measures, failure to selfinspect, and failure to maintain erosion control measures. Corrective Actions: 1) Maintain and repair perimeter silt fence. 2) Replace inlet protection with hardware cloth and gravel. Replace inlet protection at pipes awaiting junction box with that shown on drawings. Provide curb inlet near construction entrance with inlet protection.3) Maintain construction entrance and provide clean stone. 4) Provide revised plan for basin upstream of culvert near construction entrance. 5) Provide copy of NPDES/Self-Inspection records. Comments: Provide adequate ground cover on all bare and inactive areas. A revised plan is needed to show lined concrete washout with detail. 4. Langston Farms, Phase 7 This site is a 4.5 acre residential project. The file for this project did contain adequate documentation. The erosion and sediment control plan was approved and was adequate. No recent inspections were documented in the file. The site has not received a Notice of Violations. The site was not active at the time of the inspection and was in compliance. Comments: Provide adequate ground cover on all bare and inactive areas. A revised plan is needed to show lined concrete washout with detail.

City of Greenville Page 3 of 5 Conclusion: The City of Greenville Local Program has made significant changes since out last review including requiring phased erosion and sediment control plans, pre-construction meetings, and all the new files were well organized. The local program plans to have two staff positions dedicated to this program and these positions are being advertised. The local program should implement the following recommendations to improve the program: 1) Continue to check for self-inspection records on site. 2) Remember to implement all of the new NPDES requirements during the plan review process. 3) Document inspections made on each of approved sites. Projects should be inspected at least monthly. 4) Organize paperwork in files to adequately document the plan review process, approval letters/certificate of plan approvals, FRO forms, inspection reports, deeds, and landowner authorization letters(when applicable). 5) Document consent of landowner with signed and notarized landowner authorization letters for projects where the financially responsible party is not the landowner. A summary of the review will be presented to the Sedimentation Control Commission (SCC) on February 4, 2016. Staff will recommend continued program delegation. Thank you again for the efforts of you and your staff to protect the State s waters from sedimentation. Sincerely, Karyn Pageau, EI, CPESC Assistant State Sedimentation Specialist Ashley Rodgers, PE State Sedimentation Specialist cc: Richard Peed, CPESC, Acting Washington Regional Engineer Allison Ward, Environmental Specialist

City of Greenville Page 4 of 5 Site 1 - Revised plan needed to address additional sediment control needs at inlet draining offsite. Site 2 Concrete washout area needed for site.

City of Greenville Page 5 of 5 Site 3 Revised plan needed to address additional sediment control for culvert that drains offsite. Site 4 Sediment and erosion control installation underway.

Tracy E. Davis, PE, CPM Director North Carolina Department of Environment and Natural Resources Division Energy, Mineral, and Land Resources Durham County Attention: Ryan Eaves 120 East Parrish Street, 1 st Floor Durham, NC 27701 Land Quality Section Subject: Sedimentation and Erosion Control Local Program Review Dear Mr. Eaves: Pat McCrory, Governor Donald van der Vaart, Secretary On October 26, 2015, Joe Dupree, Tessa Monday, and Karyn Pageau conducted a review of the Durham County Local Program. Three staff positions contribute 3 full time equivalents to the erosion control program. The lead erosion control position is currently vacant and the program is currently being managed by a member of the stormwater staff until that position is filled. The county has 119 active projects. During the past year, the County has reviewed 135 plans, with 135 approvals, 0 disapprovals, and has conducted 1,433 inspections. The County issued 16 notices of violations, no stop work orders, and has assessed 0 civil penalties in the past 12 months. Four projects were reviewed and inspected in the field. The following is a summary of the projects that were inspected: 1. Star Solar This site is a 33.9 acre commercial project. The file for this project included adequate documentation. The erosion and sediment control plan was approved and was adequate. No previous inspections were performed on this site. The site has not received a Notice of Violations. The last inspection was conducted on 10/12/2015 and the site had not started. The site was not active at the time of the inspection and was in compliance. Comment: Installation of erosion and sediment control measures underway. Construction entrance and some of perimeter silt fence installed. Continue to install measures prior to land disturbance. 2. New Hope Church Phase 2 This site is a 4.74 acre commercial project. The file for this project did not include adequate documentation. Calculations for diversions, slope drains, and some energy dissipators were missing. The erosion and sediment control plan was approved and appeared adequate. The last inspection was conducted on 10/5/2015 and the site was in compliance. The site has not received a Notice of Violations. The site was active at the time of the inspection and was out of compliance. The violations found were: failure to follow approved plan, failure to take all reasonable measures, and failure to maintain erosion control measures. 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 919-707-9220 / FAX: 919-733-2876 512 North Salisbury Street, Raleigh, North Carolina, 27604 Internet: http://portal.ncdenr.org/web/lr/land-quality An Equal Opportunity \ Affirmative Action Employer 30% Post Consumer Paper

Durham County Page 2 of 5 Corrective Actions: 1) Maintain and repair silt fence and silt fence outlets along perimeter of site. Provide check dam type silt fence outlet downstream of sediment basin outlet. Extend gravel beyond hardware cloth at silt fence outlets. 2) Provide groundcover on stockpiles and on slopes of sediment basin. 3) Replace welded wire at inlets with hardware cloth. 4) Re-install skimmer. Comment: Provide adequate ground cover on all bare and inactive areas. Basin conversion to permanent stormwater pond underway, skimmer removed prematurely. Sediment beyond silt fence at two silt fence outlet locations, but still on tract. Contractor working on cleanup prior to leaving site. 3. Liberty Ridge This site is a 29.5 acre industrial project. The file for this project did not contain adequate documentation. Supporting calculations were missing for temporary diversions and roadside swales. The erosion and sediment control plan was approved and was not adequate. Runoff conveyance into and exiting basins were not stable. Skimmer orifice sizes not shown on the plans. The last inspection was on 10/6/2015 and the site was in compliance. The site has not received a Notice of Violations. The site was active at the time of the inspection and was out of compliance. The violations found were: failure to follow approved plan, failure to take all reasonable measures, insufficient measures to retain sediment on site, and failure to maintain erosion control measures. Corrective Actions: 1) Maintain and repair silt fence outlets. Remove deposition and stabilize. 2) Provide groundcover on all stockpiles and silt fence around all stockpiles. 3) Provide additional silt fence outlets downstream of skimmer basins. Repair area behind skimmer basin where it is eroding along weir. 4) Remove sediment downstream of skimmer basin outlet toward silt fence. Comments: Provide adequate ground cover on all bare and inactive areas. A revised plan was submitted for this project and is under review. This site has a high potential for additional offsite sediment. 4. Sierra Phase 1/Laurel Grove (Fendol Farms) This site is a 150.6 acre residential project. The file for this project did contain adequate documentation. The erosion and sediment control plan was approved and was not adequate. Additional sediment controls needed for site, phased erosion control needed, additional runoff conveyance and basins needed for clearing and grubbing phase, no information shown on the plans for existing streams to be crossed, and no calculations for supporting erosion and sediment control measures. The site was last inspected on 10/20/15 and was found out of compliance. The site was under a Notice of Violations at time of inspection with DWR, DEMLR, and Durham County. The site was not active at the time of the inspection and was out of compliance. The violations found were: failure to follow approved plan, failure to take all reasonable measures, insufficient measures to retain sediment on site, inadequate buffer zone, and failure to maintain erosion control measures. Corrective Actions: 1) A revised plan is needed to provide a phased erosion and sediment control plan with additional runoff conveyance and sediment control. 2) Additional groundcover is needed on site. 3) Removal of sediment from stream and buffer zones should be accomplished to the satisfaction of DWR.

Durham County Page 3 of 5 Conclusion: Comments: Provide adequate ground cover on all bare and inactive areas. A revised plan is needed immediately to prevent further offsite deposition to adjacent properties and stream. Additional sediment controls need to be installed immediately to prevent further offsite deposition. Sub-contractor onsite repairing failed weir section in one of basins. This site has a high potential for additional offsite sediment. The Durham County Local Program went without an inspector for approximately 10 months in the last year and hired a temporary employee to assist with inspections until a full time person could be hired. The local program found deficiencies in the temporary employee hired and terminated that contract. Durham County has since hired a full time inspector, but has lost the lead erosion control officer. The local program should implement the following recommendations to improve the program: 1) Continue to check for self-inspection records on site. 2) Remember to implement all of the new NPDES requirements during the plan review process. Ensure sequence for converting sediment basins to permanent stormwater measures (including dewatering sequence), stream crossing sequence/detail, and slope drains are considered during the plan approval process. 3) Organize paperwork in files to adequately document the plan review process, including calculations, DWR authorizations, and sites that fall in the Upper Falls Lake Watershed, etc. A summary of the review will be presented to the Sedimentation Control Commission (SCC) on February 4, 2016. Staff would recommend no decision be made regarding this delegation until the lead erosion control position is filled. An additional review of the Durham Program was recently cancelled due to inclement weather, this review will be re-scheduled and additional assistance will be provided to this delegation. Staff will provide an update at the May Commission meeting, based on the Commission s decision. Thank you again for the efforts of you and your staff to protect the State s waters from sedimentation. Sincerely, Karyn Pageau, EI, CPESC Assistant State Sedimentation Specialist Ashley Rodgers, PE State Sedimentation Specialist cc: John Holley, PE, CPESC, Raleigh Regional Engineer Joe Dupree, Senior Environmental Specialist Tessa Monday, Environmental Engineer

Durham County Page 4 of 5 Site 1 Installation of measures just beginning, site still vegetated. Site 2 Bare slopes of sediment basin being converted to Stormwater pond.

Durham County Page 5 of 5 Site 3 Offsite sediment downstream of sediment basin and skimmer outlet. Site 4 Offsite deposition in jurisdictional stream.