RHIC Electron Lens Commissioning

Similar documents
arxiv: v1 [physics.acc-ph] 18 Dec 2013

arxiv: v1 [physics.acc-ph] 21 Oct 2014

Electron cloud experiments, and cures in RHIC

BEAM-BEAM EFFECTS IN RHIC

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

Low Energy RHIC electron Cooling (LEReC)

BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

Chopping High-Intensity Ion Beams at FRANZ

STATUS OF THE NOVOSIBIRSK ENERGY RECOVERY LINAC

Update on Development of High Current Bunched Electron Beam from Magnetized DC Photogun

Cornell Injector Performance

High energy Coulomb-scattered electrons for relativistic particle beam diagnostics

LHC operation in 2015 and prospects for the future

Accelerator Design of High Luminosity Electron-Hadron Collider erhic

Magnetized Beam Update (LDRD)

ERL FOR LOW ENERGY ELECTRON COOLING AT RHIC (LEREC)*

US LHC Accelerator Research Program BNL - FNAL- LBNL - SLAC Hollow e-beam Lens for LHC Scraping

Using an Electron Cooler for Space Charge Compensation in the GSI Synchrotron SIS18 William D. Stem Oliver Boine-Frankenheim

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Issues of Electron Cooling

The TESLA Dogbone Damping Ring

Status of Proof-of-Principle Experiment of Coherent Electron Cooling at BNL

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

Ion Polarization in RHIC/eRHIC

Hollow Electron Beam Collimator: R&D Status Report

Compressor Lattice Design for SPL Beam

US LHC Accelerator Research Program BNL - FNAL- LBNL - SLAC Hollow e-beam Lens for LHC Scraping

The Electron-Ion Collider

Accelerator R&D Opportunities: Sources and Linac. Developing expertise. D. Rubin, Cornell University

INSTRUMENTATION FOR THE PROPOSED LOW ENERGY RHIC ELECTRON COOLING PROJECT WITH ENERGY RECOVERY*

Beam Dynamics and Emittance Growth

PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements

The New Superconducting RF Photoinjector a High-Average Current & High-Brightness Gun

A Luminosity Leveling Method for LHC Luminosity Upgrade using an Early Separation Scheme

SRF GUN CHARACTERIZATION - PHASE SPACE AND DARK CURRENT MEASUREMENTS AT ELBE*

ELIC Design. Center for Advanced Studies of Accelerators. Jefferson Lab. Second Electron-Ion Collider Workshop Jefferson Lab March 15-17, 2004

RHIC OPERATIONAL STATUS

ELECTRON COOLING EXPERIMENTS IN CSR*

LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side

Tolerances for magnetic fields in the Gun-To-Linac region of the LCLS Injector *

Spin Filtering at COSY - First Results

RHIC AND ITS UPGRADE PROGRAMS

SIMULATION STUDY FOR MEIC ELECTRON COOLING*

Overview of LHC Accelerator

A Multi-beamlet Injector for Heavy Ion Fusion: Experiments and Modeling

Commissioning of the SNS Beam Instrumentation

SPIN2010. I.Meshkov 1, Yu.Filatov 1,2. Forschungszentrum Juelich GmbH. 19th International Spin Physics Symposium September 27 October 2, 2010

Accelerator Physics. Accelerator Development

Diagnostics Needs for Energy Recovery Linacs

Tools of Particle Physics I Accelerators

The FAIR Accelerator Facility

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

Introduction to particle accelerators

WG2 on ERL light sources CHESS & LEPP

Tomographic transverse phase space measurements at PITZ.

RUN II LUMINOSITY PROGRESS*

Commissioning of PETRA III. Klaus Balewski on behalf of the PETRA III Team IPAC 2010, 25 May, 2010

The SARAF 40 MeV Proton/Deuteron Accelerator

Coherent Electron Cooling

LOLA: Past, present and future operation

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER

PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC

Main aim: Preparation for high bunch intensity operation with β*=3.5 m and crossing angle (-100 µrad in IR1 and +100 µrad in IR5)

Operational Experience with HERA

Injector Linac Experiences at KEKB / SuperKEKB

AREAL Test Facility for Advanced Accelerator and Radiation Sources Concepts

Particle physics experiments

Transverse beam stability and Landau damping in hadron colliders

A Laser-Compass Magnet Probe for Field Measurements in Solenoids

Advanced Design of the FAIR Storage Ring Complex

Preliminary Mechanical Design Study of the Hollow Electron Lens for HL-LHC

$)ODW%HDP(OHFWURQ6RXUFHIRU/LQHDU&ROOLGHUV

Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory. Chris Melton SLAC Accelerator Operations

Fermilab Collider Run II: Accelerator Status and Upgrades 1

e-cloud DAFNE T. Demma INFN-LNF

Laser Based Diagnostics for Measuring H - Beam Parameters

The MAX IV Thermionic preinjector

Diagnostic Systems for Characterizing Electron Sources at the Photo Injector Test Facility at DESY, Zeuthen site

RHIC - the high luminosity hadron collider

Perspectives in High Intensity Heavy Ion Sources for Future Heavy Ion Accelerators. L. Sun

FACET-II Design, Parameters and Capabilities

Potential use of erhic s ERL for FELs and light sources ERL: Main-stream GeV e - Up-gradable to 20 + GeV e -

Accelerator Physics Final Exam pts.

Luminosity Goals, Critical Parameters

USPAS Accelerator Physics 2017 University of California, Davis. Chapter 11: Space Charge Effects Space Charge, Beam-Beam

Conceptual design of an accumulator ring for the Diamond II upgrade

Beam losses versus BLM locations at the LHC

ThomX Machine Advisory Committee. (LAL Orsay, March ) Ring Beam Dynamics

Beam dynamics measurement during ALBA commissioning

7th IPAC, May 8-13, 2016, Busan, Korea

Status of the EBIT in the ReA3 reaccelerator at NSCL

ELECTRON COOLING OF PB54+ IONS IN LEIR

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

Emittance preservation in TESLA

Experience on Coupling Correction in the ESRF electron storage ring

DEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES*

LAYOUT AND SIMULATIONS OF THE FONT SYSTEM AT ATF2

Transcription:

RHIC Electron Lens Commissioning Xiaofeng Gu Z. Altinbas, M. Anerella, D. Bruno, M. Costanzo, W.C. Dawson, A.K. Drees, W. Fischer, B. M. Frak, D.M. Gassner, K. Hamdi, J. Hock, L.T. Hoff, A.K. Jain, J. Jamilkowski, R. Lambiase, Y. Luo, M. Mapes, A. Marone, C. Mi, R. Michnoff, T. Miller, M. Minty, C. Montag, S. Nemesure, W. Ng, D. Phillips, A.I. Pikin, S.R. Plate, P. J. Rosas, J. Sandberg, P. Sampson, L. Snydstrup, Y. Tan, R. Than, C.W. Theisen, P. Thieberger, J. Tuozzolo, P. Wanderer, and W. Zhang Sep. 29 ~ Oct. 4, 2013, NA-PAC 13. 1

Outline: Motivation (1), Requirements (1) E-lens Hardware Introduction (2) Test Results with e-beam and p-beam (7) Summary (1) 2

Motivation -- Luminosity RHIC proton intensity threshold: 1 During 2013 RHIC run, intensity threshold [1]: 2.2E11 for Blue (beam-beam) 2.0E11 for Yellow (longitudinal stability) 2 By Beam-Beam Tracking, intensity threshold [2]: If intensity >2.0E11, there is no enough space for large beam-beam tune spread Electron lenses (e-p): Increase bunch Intensity threshold =>up to 2 luminosity Coherent Instability: Transverse bunch by bunch damper Larger beta* (beam size) [1]V.H. Ranjbar, et al. RHIC Polarized Proton Operation for 2013. IPAC2013, Shanghai, China, May 12-17, 2013, pp. 1544-1546 (2013). [2]Y. Luo, et al., 6-D weak-strong simulation of head-on beam-beam compensation in the Relativistic Heavy Ion Collider. Phys. Rev. ST Accel. Beams 15, 051004 (2012). 3

Requirements 1. Electron beam size in the main solenoid and current RMS beam size: 0.3 mm - 0.8 mm (issue: relatively small), 0.85A 2. Gaussian shape of electron beam good fit to 2.8 (issue: cathodes have limited size) 3. Straightness of magnetic field in main solenoid target of ± 50 mm after correction (issue: good overlap of e and p beam) 4. Steering electron beam in e-lens maximum shifting : ± 5 mm in X and Y planes maximum angle : 0.1 mrad 5. Stability of electron current power supplies stability better than 10-3 6. Overlap of electron and proton beams robust real-time measurement with resolution better than 100 mm 4

Layout and hardware (one e-lens) p p e e e 1. Main Solenoid: 6T, Beam size and coherent instability. 2. Superconducting Correctors: proton beam alignment and field straightness 5

Instrumentations and Modulator YAG Screen Pinhole BPM Detector 1. YAG and Pinhole Scanner are for beam profile measurement. 2. BPMs and Backscattering Detector are used for e-p beam alignment. Provides Voltage on anode (gun) Operation Modes: Single, Pulse, 78k Hz,DC Frequency: DC 80kHz Pulse Width: 500ns DC Pulse Mode: positive and inverted Voltage: 15kV. Presently we are using 10kV Rise time and fall time: < 50ns Water cooled Behlke switches 6

Test with e and p beam 3T SM SOLENOID 1 1. Two e-lenses: The blue e-lens is on the left and yellow on the right. 2. E-gun is put in center. 3. Blue e-lens system (hardware and software) commissioning was done. 4. Solenoid #2 was replaced with a 3T superconducting magnet. 5. Yellow warm solenoids were tested. Detectors are not ready. 7

Beam Propagation and E-gun Performance Fast CT Current Measurement 78k Hz beam = 1A (10.14KV). E-gun Perveance =1.0 E-6 A V^-(3/2) DC beam = 1.256 A (6.28V * 0.2A/V) 1. Electron beam was propagated from gun to collector 2. Perveance is high enough with 10kV modulator voltage. (Needs 0.85A ) 3. High duty (78k Hz and DC) beam was tested with more than 1A beam. 8

Beam Profile Measured via YAG & Pinhole YAG image 70mA beam Gaussian Fitting Experimental Data Pinhole image (1150mA beam) 1. Gaussian beam with small flat top for both YAG and Pinhole results. 2. Radius/Sigma=2.76 and it should be 2.8 from model. 9

E-lens BPM Test with Proton and Electron Assembly gaps between drift tube 1. Two blue BPMs were tested with proton and electron beam 2. Calibration with proton beam position: linearity is good. 3. Cross-talk between V and H can be improved by re-survey. 10

System Reliability and Failure Scenarios Anode Voltage 78k Hz, 14 hours Vacuum in Collector Disable MPS Run Beam Collector Temperature DC, 9.5 hours Vacuum 11

E-lens Warm Magnets & Proton Store ZDC Signal Emittance E-lens Magnets E-lens Magnets Orbit Beam Loss E-lens Magnets E-lens Magnets 1. Some effects on Y-orbit with warm magnets. 2. Didn t find visible effects on beam with orbit feedback on. 3. No effects with tune & orbit feedback with 0.6T solenoid #1 and 3T EBIS spare. 12

Solenoid Horizontal Test & Field Measurement Anti-Fringe Coil: Full Current #2: Main Coil 5.5T (424A-6T) #1: Main Coil 5T (470A-6T) 1. Solenoid #1: 5T (Horizontal, 2 quenches), Solenoid #2: 5.5T (5 quenches, vertical) 2. Solenoid #2: +/- 50 um is satisfied in X/Y for about +/-900mm without correctors. 13 Courtesy of A. Jain

Summary 1. Blue e-lens hardware and software are tested and fully functional, except e-p alignment detector. 2. Electron beam current 1.256A and Gaussian beam profile have been measured. 3. System reliability was tested. Several failure scenarios were also finished. 4. Two solenoids field have been tested to >=5T. Field straightness of solenoid #2 was measured last week. 5. Installation is underway, both e-lenses will be ready for commissioning during 2014 run. 14

Thank you! We are grateful for the valuable discussions with the FNAL TEL staffs, in particular with V. Shiltsev, A. Valishev, and G. Stancari. We would like to acknowledge the help of our instrumentation group, vacuum group and controls group. 15