Hydra Fault Current Limiting HTS Cable to be Installed in the Consolidated Edison Grid

Similar documents
Status and Progress of a Fault Current Limiting HTS Cable To Be Installed In The Consolidated Edison Grid

Superconducting cables Development status at Ultera

Cryogenic and Electrical Test Results of a 30 M HTS Power Cable

INSTALLATION AND COMMISSIONING OF TRIAX HTS CABLE

Plasma Response Control Using Advanced Feedback Techniques

TYPE TESTING OF A 13.2 KV, 69 MVA TRIAX HTS CABLE

To be published in the Proceedings of ICEC-22, Seoul Korea, July 2008 MICE Note 232 1

Fault Current Limiter Based on Coated Conductor

Latest Status of High Temperature Superconducting Cable Projects

Conductor Requirements for Superconducting Fault Current Limiters

Commissioning testing of a 1 MVA Superconducting transformer featuring 2G HTS Roebel cable

Grid Issues and Challenges Addressed by High Temperature Superconductor (HTS) Technology

Experiences with Superconducting Cable & Fault Current Limiter in a German City Center Mark Stemmle

Peak Reliability Delivering near real-time phase angle deltas using Inter-Control Center Communication Protocol (ICCP)

Feasibility of HTS DC Cables on Board a Ship

High-Performance 2G HTS Wire for an Efficient and Reliable Electricity Supply

Development of a High Intensity EBIT for Basic and Applied Science

EXPLOSIVE PARTICLES PARVLENE ENCAPSUTION. lac0 b Sando v a t. Normal Process Development OCTOBER DEVEZOPMENT D I V I S I O N DEZEMBER 1971

GA A22677 THERMAL ANALYSIS AND TESTING FOR DIII D OHMIC HEATING COIL

PROJECT PROGRESS REPORT (03/lfi?lfibr-~/15/1998):

Design of Current Leads for the MICE Coupling Magnet

Superconducting Cables

Partial Discharge Characterization of High-Voltage Cables and Components

Process Systems Engineering

+LJK7HPSHUDWXUH 6XSHUFRQGXFWLQJ&DEOH

New Transmission Options Case Study Superconductor Cables. Transmission Policy Institute Sheraton Downtown Denver, Colorado April 20-21, 2011

Bulk Modulus Capacitor Load Cells

KIT-ENERGY CENTRE. KIT The research University in the Helmholtz Association

Superconducting Fault Current Limiters

Superconducting Fault Current Limiters

The development of a Roebel cable based 1 MVA HTS transformer

BWXT Y-12 Y-12. A BWXT/Bechtel Enterprise SMALL, PORTABLE, LIGHTWEIGHT DT NEUTRON GENERATOR FOR USE WITH NMIS

(4) How do you develop an optimal signal detection technique from the knowledge of

R&D of 22.9kV/50MVA HTS Transmission Power Cable in Korea

Magnetic and Cryogenic Design of the MICE Coupling Solenoid Magnet System

RESULTS OF ON-GRID OPERATION OF SUPERCONDUCTOR DYNAMIC SYNCHRONOUS CONDENSER

BASAL CAMBRIAN BASELINE GEOLOGICAL CHARACTERIZATION COMPLETED

UPGRADED CALIBRATIONS OF THE THOMSON SYSTEM AT DIII D

Current Lead Optimization for Cryogenic Operation at Intermediate Temperatures. L. Bromberg, P.C. Michael, J.V. Minervini and C.

Progress in Scale-up of 2G HTS Wire at SuperPower Part III

Superconductivity for Electric Systems DOE 2006 Wire Development Workshop

The Present Status and Prospective of the power transmission by Superconductors in China

Status and Future Direction of HTS Power Application in KEPCO

Plutonium 239 Equivalency Calculations

Transmission Level HTS Fault Current Limiter

INTERMOLECULAR POTENTIAL FUNCTIONS AND HIGH RESOLUTION MOLECULAR SPECTROSCOPY OF WEAKLY BOUND COMPLEXES. Final Progress Report

FUSION TECHNOLOGY INSTITUTE

Magnetic Measurements of the Elliptical Multipole Wiggler Prototype

Analysis of Shane Telescope Aberration and After Collimation

Instruction. Vacuum Circuit Breaker Operator Module. Type 3AH 4.16kV to 38kV. Power Transmission & Distribution

GA A22689 SLOW LINER FUSION

GA A27857 IMPACT OF PLASMA RESPONSE ON RMP ELM SUPPRESSION IN DIII-D

EPRI Technology Watch 2010 Superconducting Cables Fault Current Limiters

Flipping Bits in the James Webb Space Telescope s Cameras

Multicusp Sources for Ion Beam Lithography Applications

Modeling Laser and e-beam Generated Plasma-Plume Experiments Using LASNEX

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Milestone Report. Cryogenic Scenarios for the Cold Powering System

UNIT OPERATIONS AND CHEMICAL PROCESSES. Alan M. Krichinsky

Simulation of Double-Null Divertor Plasmas with the UEDGE Code

Inside Wall Temperature Measurements of DSTs Using an Infrared Temperature Sensor

RESEARCH OPPORTUNITIES AT THE CNS (Y-12 AND PANTEX) NUCLEAR DETECTION AND SENSOR TESTING CENTERS (NDSTC)

GA A23736 EFFECTS OF CROSS-SECTION SHAPE ON L MODE AND H MODE ENERGY TRANSPORT

OAK RIDGE NATIONAL LABORATORY

Keywords: Superconducting Fault Current Limiter (SFCL), Resistive Type SFCL, MATLAB/SIMULINK. Introductions A rapid growth in the power generation

Princeton Plasma Physics Laboratory

Combined HTS Cable and Fault Current Limiter Project in Germany

Tell uric prof i 1 es across the Darrough Known Geothermal Resource Area, Nevada. Harold Kaufniann. Open-file Report No.

Fission-Fusion Neutron Source

Optimization of NSLS-II Blade X-ray Beam Position Monitors: from Photoemission type to Diamond Detector. P. Ilinski

Russian Development Program on HTS Power Cables

Transforming the Grid with Superconductivity

Quarterly Report April 1 - June 30, By: Shirley P. Dutton. Work Performed Under Contract No.: DE-FC22-95BC14936

Half-Cell, Steady-State Flow-Battery Experiments. Robert M. Darling and Mike L. Perry

2G HTS Wire Status in the USA

Cable Tracking System Proposal. Nick Friedman Experimenta1 Facilities Division. June 25,1993. Advanced Photon Source Argonne National Laboratory

PROJECT PROGRESS REPORT (06/16/1998-9/15/1998):

OF A HELIUM-COOLED MODULE

URD Cable Fault Prediction Model

Project Number (DE-FE ) Jason Rush (W. Lynn Watney, Joint PI) Kansas Geological Survey University of Kansas

Three-Dimensional Silicon Photonic Crystals

Equivalencing the Collector System of a Large Wind Power Plant

TRANSFORMERS. Pascal Tixador. Grenoble INP - Institut Néel / G2Elab. Introduction

HTS Roadmap for Electric Power Systems October 2015

Determine the Inside Wall Temperature of DSTs using an Infrared Temperature Sensor

GA A22722 CENTRAL THOMSON SCATTERING UPGRADE ON DIII D

OSTI PROCESSED FROM BEST AVAILABLE COPY T$#3. Operations vith Tritium Neutral Beam on TFTR. P.0.Box 451, Princeton, New Jersey USA

T e s t Results for a Bi-2223 HTS Racetrack Coil for Generator Applications

ION EXCHANGE SEPARATION OF PLUTONIUM AND GALLIUM (1) Resource and Inventory Requirements, (2) Waste, Emissions, and Effluent, and (3) Facility Size

2 nd Generation High-Temperature Superconducting Wires for Fault Current Limiter Applications

Fault Current Limiters

Short-circuit protection to a fault: Superconducting fault current limiters

Second Generation HTS Wire for Electric Power Applications

GA A THERMAL ION ORBIT LOSS AND RADIAL ELECTRIC FIELD IN DIII-D by J.S. degrassie, J.A. BOEDO, B.A. GRIERSON, and R.J.

An Investigation of the Current Distribution in an HTS Triaxial Power Cable and its Operational Impacts on a Power System

SciDAC CENTER FOR SIMULATION OF WAVE-PLASMA INTERACTIONS

Critical Current Properties of HTS Twisted Stacked-Tape Cable in Subcooled- and Pressurized-Liquid Nitrogen

GA A24166 SUPER-INTENSE QUASI-NEUTRAL PROTON BEAMS INTERACTING WITH PLASMA: A NUMERICAL INVESTIGATION

Determine the Inside Wall Temperature of DSTs using an Infrared Temperature Sensor

Risk mitigation in the development of a Roebel cable based 1 MVA HTS transformer

O Plus Dry Bushing 69 kv system, 350 kv BIL, 3000 A. Table of contents

Transcription:

Hydra Fault Current Limiting HTS Cable to be Installed in the Consolidated Edison Grid J. McCall, J. Yuan, D. Folts, N. Henderson, American Superconductor D. Knoll, Southwire M. Gouge, R. Duckworth, J. Demko, ORNL Z. Wolff, S. Sagareli, Y. Abouyaala, Consolidated Edison 11th EPRI Superconductivity Conference October 28-30, 2013 Houston, TX

Outline Hydra Project Primary Objectives Hydra Project Overview Fault Current Limiting Cable Operation Principles Paralleling Urban Buses FCL Cable System Components 25m Prototype Cable Test Results Phase 1 Achievements Phase 2 Status Hydra Project Summary

Hydra Project Primary Objectives Develop and Demonstrate Fault Current Limiting HTS Cable to protect critical urban power network infrastructure Phase 1- Develop inherently Fault Current Limiting Cable design - Passed all Industry Qualification tests and engineering studies - Con Edison approved for installation in urban power network Phase 2- System design, installation and 1-year operational demonstration - Site design, construction permitting and system design underway - Operation connecting two Con Edison 13.8kV substations

Hydra Project Overview HTS FCL Cable Electrical Characteristics - Design Voltage/Current 13.8kV, 4000 amp ~96MVA - Design Fault Current 40kA @ 67ms Physical Characteristics - Length ~ 170m - HTS Conductor Length ~ 53km - Cold Dielectric, Triax Design Hardware Deliverables - One ~170m Long, 3 Phase HTS Cable - Two 13.8kV Outdoor Terminations - One Refrigeration System - Protection and SCADA Systems World s First FCL Distribution Cable to be Installed in Power Grid

Team Roles and Responsibilities DHS Science & Technology Directorate AMSC Prime Contractor ORNL Test Agency AMSC Altran Solutions Consolidated Edison DH Industries Ultera System Design Site Design Utility Requirements Cooling System Cable & Accessory Design 25 m Prototype Cable Test Site Wire Development Construction Management Installation Support Cable Manufacturing Technical Support Project Management Wire Manufacturing Permitting Civil Work O & M Contract Cable & Accessory Installation & Operational Support Technical Oversight System Planning System Hardware Development

Fault Current Limiting Cable Operation Principles Load Current high resistance layer zero resistance superconductor layer Superconductor wire has zero resistance up to the critical current Fault Current high resistance layer switched high resistance superconductor layer Simplified View of Superconductor wire AMSC supplies a superconductor wire that instantly introduces high resistance above the critical current Immediate limitation of fault current magnitudes Insertion of resistance decreases X/R and fault asymmetry Allows the construction of fault current limiting cables

Paralleling Urban Buses: The Appeal Typical 2-transformer urban substations Typical Loading Practice Total Load 60% total transformer MVA Total Load 60% total transformer MVA Advantages of Paralleled Substations Simple Case Connect additional load without additional transformers or new substations Increases transformer asset utilization Reduces cost of N-1 contingency planning; only 1 transformer required versus 2 Increased interconnectivity protects vulnerable, critical loads in the event of a catastrophic failure Paralleling Dense Urban Load Centers Leads to Operational Efficiencies

General Electrical Configuration (Existing) Rockview Area Substation 13.8 kv Distribution to Yonkers Customers T3 138 kv Transmission G5 Power flow Step-down Transformer 13.8 kv Distribution to Yonkers Customers Circuit Breaker Granite Hill Area Substation

General Electrical Configuration (Proposed) Rockview Area Substation 13.8 kv Sub-transmission to Yonkers Customers T3 138 kv Transmission G5 Superconductor 13.8 kv Power flow Step-down Transformer Circuit Breaker 13.8 kv Sub-transmission to Yonkers Customers Granite Hill Area Substation

Proposed System Layout N Granite Hill Termination Rockview Termination: - Refrigeration - Aux Power and Controls - Series Reactor

Granite Hill Paralleling Circuit

Rockview Paralleling Circuit

Hydra HTS Cable System Heat Power Supply HTS Cable Return Refrigerator Main Components of HTS Cable Systems HTS Cable Cryostat Terminations Cryogenic Cooling System

Components of the HTS Cable System Superconducting Cable System - Cable Core Transport the current Limit the fault current Withstand the voltage - Cryostat Insulate thermally keep the cable cold Transport the liquid nitrogen - Termination Connect the system to the grid Manage the transition between cold temperature and room temperature Provide connection to the cooling system

Cable Design - Triax by Southwire Phase 1 Superconductor Former Dielectric Phase 3 Superconductor Dielectric Cryostat Supply LN2 Phase 2 Superconductor Dielectric Copper Neutral Photo courtesy of Ultera Triax is a trademark of Southwire

25m HTS Prototype Cable Test Setup Refrigeration system Termination 25m HTS Triax Cable

25m HTS Cable Test LN2 Flow Diagram Subcooler LN2 Pump V3 V2 V1 Triax HTS Cable Termination Termination V5 V4

25m HTS FCL Cable Test Plan 25m Prototype Cable Tests Performance Characteristics Thermal Tests Dielectric Tests Other Tests Cable Resistance Thermal Stability Voltage Soak Leak Check DC Critical Current Thermal Cycle Partial Discharge Post-BIL AC Loss AC Withstand Partial Discharge FCL Low Voltage Lightning Impulse AC Withstand FCL High Voltage Post BIL& FCL DC Ic Post Thermal Cycle DC Ic

Current (ka) 80 70 60 50 40 30 20 10 0-10 -20-30 -40-50 -60-70 25m HTS Cable FCL Test Measured Limited Current (ka) Meas Unlimited Current Simulated Limited Current (ka) Measured & Simulated Limited Current Unlimited Fault Current Measured versus Simulated Results Symmetrical Fault -80 0.0000 0.0083 0.0167 0.0250 0.0333 0.0417 0.0500 0.0583 0.0667 0.0750 0.0833 0.0917 0.1000 Time (S)

25m Cable and Termination Dielectric Tests - 25m Cable type tests have been completed to a test requirement that was discussed and agreed to by the Team Three phase voltage soak test 15.2kV, 60 minutes Partial discharge measurement in accordance with Southwire s HTS cable standard AC withstand test 37.5 kv, 5 minutes Lightning impulse voltage test ±110 kv, 10 shots Post BIL partial discharge test Post BIL AC withstand 37.5kV, 5 minutes Cable has passed all type tests listed above

Hydra Project Phase 1 Achievements System Specs Wire Development Wire Bulk Properties Verified Temperature Rise Verified Over-current Behavior Verified 3m Prototype Cable 25m Prototype Cable HTS FCL Cable Qualified for Power Network Operating Current 4kA Verified Manufacturability Verified Refrigeration Requirements Verified Fault Current Limiting Verified Thermal Stability Verified Manufacturability Verified System Operating Parameters Verified Operating Capacity Verified Dielectric Performance Verified FCL Performance Verified Engineering Models Validated Passed Industry Qualification Tests Con Edison approved for installation between two urban substations

Hydra Project Phase 2 Status HTS FCL Cable installation site selected in Westchester County connecting two 13.8kV substations HTS FCL Cable will allow asset sharing of 13.8 kv transformer combined with fault current protection to equipment First-of-kind grid architecture requires new approach to relay protection and tap changer controls Site design and construction permitting progressing Equipment procurement and manufacture underway System control design and integration on-going

Hydra HTS FCL Cable Manufacture AMSC provided 53km of HTS FCL wire to Southwire Southwire/nkt cables ( Ultera ) manufacture of HTS FCL Cable underway Cable installation plan in process Cable termination materials on order for integration with cable assembly at substations 25m HTS Triax TM FCL cable Full Scale Terminations

Hydra Refrigeration System Specification Primary Cooler Back-up Cooler DH Industries (Stirling) System - Modular design uses three (3) SPC-4 Cryogenerators Buffer Tank Subcooler Specification - 6.2 kw at 72 K (~1kW for auxiliary loads) - Pressure drop less than 3 Bar - 90 liters/minute LN2 flow rate LN2 Pump V1 V2 Termination ~170m Triax HTS Cable Termination V3 V5 V4

Hydra Refrigeration System Manufacture Reliability - Redundancy accomplished at component level (modular design) - No first-order single points of failure allowed - Designed with 20% safety margin to the expected losses Manufacture - Electrical design and fabrication completed - Vessels and vacuum-jacketed lines being manufactured - Assembly and factory testing in early 2014

Hydra Project Summary HTS FCL Cable passed all Industry Qualification tests 25 meter cable test results validated FCL performance model predictions Equipment procurement and manufacture progressing Below grade construction package out for bid Construction expected to start in early 2014, followed by equipment installation and commissioning tests Operational demonstration will connect two Con Edison substations enabling 13.8kV asset sharing in the power network

Acknowledgment: This material is based upon work supported by the Department of Homeland Security, Science & Technology Directorate, under contract #HSHQDC-08-9-00001. Disclaimer: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.