Consequences of river regulation works: altered fluvial processes + increasing flood hazard

Similar documents
Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

Wetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont. Mike Kline and Laura Lapierre Vermont DEC

Streams. Stream Water Flow

3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e

Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College

Fresh Water: Streams, Lakes Groundwater & Wetlands

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

Step 5: Channel Bed and Planform Changes

Assessment. Assessment

Figure 1. Which part of the river is labelled in Figure 1? a) Mouth b) Source c) Lower course d) channel

Environmental Geology Chapter 9 Rivers and Flooding

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Influence of the Major Drainages to the Mississippi River and Implications for System Level Management

Defining the Limit of Regulated Areas. C.1 Defining the River or Stream Flood Hazard 138. C.2 Defining the River or Stream Erosion Hazard 139

27. Running Water I (p ; )

Discharge. Discharge (Streamflow) is: Q = Velocity (L T -1 ) x Area (L 2 ) Units: L 3 T -1 e.g., m 3 s -1. Velocity. Area

NATURAL RIVER. Karima Attia Nile Research Institute

New Approaches to Restoring NH s Rivers Natural Channel Design and Dam Removal

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.

Erosion Surface Water. moving, transporting, and depositing sediment.

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

MATHEMATICAL MODELING OF FLUVIAL SEDIMENT DELIVERY, NEKA RIVER, IRAN. S.E. Kermani H. Golmaee M.Z. Ahmadi

Landscape Development

GLG362/GLG598 Geomorphology K. Whipple October, 2009 I. Characteristics of Alluvial Channels

Natural Shoreline Landscapes on Michigan Inland Lakes

Dolores River Watershed Study

Earth Science Chapter 6 Section 2 Review

Lecture Outlines PowerPoint. Chapter 5 Earth Science 11e Tarbuck/Lutgens

6.1 Water. The Water Cycle

Prentice Hall EARTH SCIENCE

Fluvial Geomorphology

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time

River/Stream Erosion Notes

Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles

ES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b.

Floods Lecture #21 20

RESTORATION DESIGN FOR REROUTED WATERCOURSES

Ms. A. Mormando's Class *

Identifying, Understanding and Addressing Flood-Related Hazards

River Restoration and Rehabilitation. Pierre Y. Julien

Surface Processes Focus on Mass Wasting (Chapter 10)

Bank Erosion and Morphology of the Kaskaskia River

Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis

Important Copyright Information

UNIVERSITY OF SZEGED Faculty of Sciences Doctorate School of Earth Sciences Department of Physical Geography and Geoinformatics

Fluvial Systems Lab Environmental Geology Lab Dr. Johnson

Griswold Creek August 22, 2013

Subject Name: SOIL AND WATER CONSERVATION ENGINEERING 3(2+1) COURSE OUTLINE

Hydrologic hazards can be considered in three categories; An indication of flooding potential for areas located

WATER ON AND UNDER GROUND. Objectives. The Hydrologic Cycle

River floodplain regime and stratigraphy. Drs. Nanette C. Kingma.

Overview of fluvial and geotechnical processes for TMDL assessment

Streams. Water. Hydrologic Cycle. Geol 104: Streams

Fluvial Driven Alluvial Fans

Laboratory Exercise #3 The Hydrologic Cycle and Running Water Processes

hydrosphere notes nwebsite.notebook November 30, 2015 The Hydrosphere

Surface Water Short Study Guide

Removal of riverbank protection along the River Rhine (the Netherlands)

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California

The Hydrologic Cycle STREAM SYSTEMS. Earth s Water and the Hydrologic Cycle. The Hydrologic Cycle. Hydrologic Cycle

In the space provided, write the letter of the description that best matches the term or phrase. a. any form of water that falls to Earth s

Diagnostic Geomorphic Methods for Understanding Future Behavior of Lake Superior Streams What Have We Learned in Two Decades?

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant

OBJECTIVES. Fluvial Geomorphology? STREAM CLASSIFICATION & RIVER ASSESSMENT

Thesis of Dissertation

Rivers T. Perron

Human Impacts to Rivers

Physical landscapes River landscapes in the UK

Pat Dryer Half Moon Lake: A True Oxbow Lake? Geography 364 April 1 st, 2007

PHYSICAL GEOGRAPHY. By Brett Lucas

Working with Natural Stream Systems

Historical channel change on the Upper Gila River, Arizona and New Mexico in response to anthropogenic modifications and extreme floods

!"#$%&&'()*+#$%(,-./0*)%(!

Integrated methodology for assessing the effects of geomorphological river restoration on fish habitat and riparian vegetation

Kaskaskia Morphology Study Headwaters to Lake Shelbyville

Learning Objectives: I can identify and interpret river flows and directions.

Domino Effect of River Training in Large Sand-Bed Braiding Rivers

Conceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar

Essential Questions. What is erosion? What is mass wasting?

Running Water: The Geology of Streams and Floods Running Water Chapter 14

MORPHOLOGICAL PROCESSES AND EFFECTIVE RIVER EROSION MANAGEMENT: A CASE STUDY OF THE ARIAL KHAN RIVER IN BANGLADESH

GEOL 1121 Earth Processes and Environments

Why Geomorphology for Fish Passage

11/12/2014. Running Water. Introduction. Water on Earth. The Hydrologic Cycle. Fluid Flow

Nutrient and Sediment Cycling and Retention in Urban Floodplain Wetlands

What is weathering and how does it change Earth s surface? Answer the question using

WORKSHOP #2 Modelling and sediment transfers. Bucharest 07 October 2015

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

Four Mile Run Levee Corridor Stream Restoration

WORKSHOP #2 [Modeling and Sediment Transfers Review of alternative solutions] Bucharest 07 October 2015

FOREST RESEARCH INSTITUTE, DEHRADUN

UGRC 144 Science and Technology in Our Lives/Geohazards

APPROACH TO THE SPANISH WATER ORGANISATION IMPROVING FLOOD HAZARD MAPPING, LAWS AND AUTHORITIES COORDINATION

Monitoring Headwater Streams for Landscape Response to

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan

Transcription:

Consequences of river regulation works: altered fluvial processes + increasing flood hazard Dr. Tímea Kiss assistant professor Department of Physical Geography and Geoinformatics, University of Szeged, Hungary 2006. WVU, Morgantown Map of Hungary

What is the problem? 2001 2006 2001 2006 Problem: Increasing flood level hazard Increase in flood levels between 1901 and 2006 Yearly highest water levels on the fluviometer at Mindszent

What can be the possible causesc of the increasing flood levels? Changes on the catchment Climate (storminess) Land-use (canopy) Changes on the floodplain Roughness (vegetation) Aggradation Buildings, new constructions Changes on the channel Horizontal (migration) Vertical (narrowing) Increasing height and frequency of floods Artificial vs. natural Content 1. Natural and economic conditions before regulation works (mid-19 th c.) 2. Engineering works (late 19 th c., early 20 th c.) 4. Present-day situation

1. Conditions before regulations Natural: -Huge floodplain (swamps) -Long-lasting floods Social-economic: -increasing population -Opened W-Eu market -Eneneering -Financial background + PEACE! 2. History of river management The great (19 th c.) river regulations From 1846 until the 1890 s Uniform ideas on the whole catchment

2. History of river management The great (19th c.) river regulations 1. Cut-offs (Tisza isza: 102 places) decreased length (1214 761 km) increased gradient (3,7 7cm/km) 7cm/km) Semi-natural channel development 2. Levee construction flood protected area 26,500 km 2 length: 2940 km Semi natural floodplain development 3. Drainage system (40,000 km) 2. History of river management River management in the 20 th century Floodplain: hardly maintained (dense vegetation, aggradation, (il)legal constructions) Levees: continuous heightening (local,, not enough) Channel: bank stabilisation following local ideas and design 1. Revetments 260 km on the 590 km long section 2. Groynes 189

Shortened Increased gradient Cut-offs Fish population Fast, GREAT floods Land-use changes Climate change Pattern change INCISION widening Extra sediment load Floodplain aggradation Lowering the water table Land slides : Cut-offs Channel slope changes Present slope conditions

: Cut-offs incision : Cut-offs incision Area (m 2 ) width depth Max (m) mean (m) max (m) mean (m) shape index

: Cut-offs pattern change levee constructions Artificial (active) floodplain Protected (inactive) floodplain Large sediment imput High floods (5 m waterdepth) narrow Intensive aggradation High friction Altered land-use, Invasive species GREAT, large floods Soil alterations (salinization, dry-land solis) Decreased area of wetlands Micro-climate change (dryer, warmer) Need of irrigation Lowered water table Inland water problems (active subsidence, no accumulation)

levee construction Intensive accumulation levee construction Intensive accumulation

(m) 3,0 2,5 2,0 1,5 1,0 levee construction Intensive accumulation 0,5 0,0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 szelvények Amount of aggradation (m) hullámtéri akkumuláció mértéke I. Military survey (late 18 th c.) levee construction Wet-land reductions II. Military survey (late 19 th c.)

I. Military survey (late 18 th c.) levee construction Wet-land reductions Topographical map (1980) levee construction Salinization

Slight incision revetment constructions No lateral erosion Smaller cross-section Smaller flood conductivity Active point-bar formation GREATer, large floods Sharper bends Large sediment imput Narrowing due to dense riparian vegetation Slope decrease Something wrong!! Discharge Stage (water level) Falling stage Rising stage Same discharge increasing flood height Tisza, Szolnok

SIXTH INTERNATIONAL CONFERENCE In case of freely developing meanders revetment construction revetment construction Revetment construction (1940), upper section straightened (1886)

Cross-sectional sectional changes Decrease of cross-s. area 2-3% at inflexion point Decrease of cross-s. area 4-6 % in axis of meander Decrease of cross-s. area 6-19 % at revetment Flood conductivity?? Flood conductivity chages due to altered cross- sectional parameters

Conclusions River management vs. channel development Planimetry Cross-sections sections Flood conductivity Natural state high sinuosity narrow bends wide channel large area normal 19 th c. regulations (1890-1929) cut-offs 20 th c. regulations (since 1930 s) revetments lower sinuosity large bends low sinuosity narrowing bends wide, deeper channel area increase narrower, deep channel area decrease higher +2-3 3 % declining - 6-13 % (worse than in natural state) What to do now? To do nothing = heroic work, spending money during flood (on nothing)

What to do now? River restoration? New ways of river and watershed management? Changes on the catchment Climate (storminess) Land-use (canopy) Changes on the floodplain Roughness (vegetation) Aggradation Buildings, new constructions Changes on the channel Horizontal (migration) Vertical (narrowing) Decrease run-off: Stream restoration? Land-use optimalization? Storage lakes? Decrease roughness: Floodplain restoration? Land-use optimalization?? Increase flood conductivity: Channel restoration? Removal of levees? Land-use optimalization?? Learn from our mistakes! -Long river regulation history -To monitor changes: long hydrological data set: water level data (since the 1860 s) spatial data: precise Q data (since 1960 s) map series (first survey 1790 s) cross sections (since 1890) -Easy to start the devil s circle (continuous maintenance should be needed)