Fort McClellan Calhoun County, Alabama. Prepared for: U.S. Army Corps of Engineers, Mobile District 109 St. Joseph Street Mobile, Alabama 36602

Similar documents
Prepared for: U.S. Army Corps of Engineers, Mobile District 109 St. Joseph Street, Mobile, Alabama Prepared by:

Unexploded Ordnance on Auckland s Doorstep. WasteMINZ November 2017

Geographic Information Systems Conceptual Site Model for Ordnance and Explosives Remediation at the Formerly Used Defense Site Camp Beale

DEMING PRECISION BOMBING RANGE (PBR) NO

CCR Rule Annual Inspection Report (cont.) 2

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

EXTREMELY FAST IP USED TO DELINEATE BURIED LANDFILLS. Norman R. Carlson, Cris Mauldin Mayerle, and Kenneth L. Zonge

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

GEOSYNTEC CONSULTANTS

Former Williams AFB Restoration Advisory Board (RAB)

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

INNOVATIVE TECHNIQUES TO INVESTIGATE CONTAMINATION IN FRACTURED BEDROCK

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

TABLE OF CONTENTS. TABLE OF CONTENTS...i. LIST OF ACRONYMS AND ABBREVIATIONS...v EXECUTIVE SUMMARY...ES-1

Facilities Management

The Following was Noted: US Army Corps of Engineers Philadelphia District Geotechnical Section, CENAP-EN-DG

Figure Choccolocco Mountains. Skeleton Mountains. Surface Water Hydrology and Drainage Basins Map Fort McClellan Calhoun County, Alabama

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

ELECTRICAL RESISTIVITY SURVEY OF INTREPID POTASH INJECTION WELL SITE: EDDY COUNTY, NEW MEXICO

Location of Abandoned Water Wells by Magnetic Surveys over the Edwards Aquifer in the San Antonio Area, Texas. Abstract. 1.

FIN STABILIZER OPERATIONS TRAINING COURSE

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

Appendix D Rock Blasting Report

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Former Guterl Specialty Steel Site

February 9, 2018 GeoInsight Project

Florida Department of Environmental Protection Inspection Checklist N. SIDE OF HWY. 20-W.OF FREEPT

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

Materials. Use materials meeting the following.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

Dolores Public Lands Office Highway 184 Dolores, CO Ph (970) Fax (970)

COUNCIL POLICY MANUAL

THE UTILITY OF HORIZONTAL COMPONENT MEASUREMENTS IN RANDOM-WALK TEM SURVEYS. Abstract

Rock Scaling Recommendations Logan Creek Drive Cut Slope

Executive Summaries for the Century City Area Tunneling Safety Report and Fault Investigation Report

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

Advanced Geologic Exploration, Inc.

City of Laramie, Wyoming SNOW AND ICE POLICY

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

Summary of Indium Soil Vapor Monitoring Points Decommissioning Former Lockheed Martin French Road Facility Utica, NY

CHAPTER 7 GEOLOGY AND SOILS

Former Williams AFB Restoration Advisory Board (RAB)

Annex B Natural No-Notice Event

Collecting, Analyzing, and Visualizing Environmental Data Using Innovative GIS Techniques at Camp Sibert

Food Safety and Quality Management System

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

Soil Sampling Results Former Truck Maintenance Garage

Common Exploration Methods.

Magnetics: Fundamentals and Parameter Extraction

John A. Carlson Snow and Ice Removal

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ.

POLICY MEDICAL UNIVERSITY OF SOUTH CAROLINA OFFICE OF PARKING MANAGEMENT POLICY AND PROCEDURES MANUAL. SUBJECT: Emergency Weather Conditions PAGE 1

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

Roadmap to Stability

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

MESOZOIC BASINS. North Carolina Geological Survey

USE OF GEOPHYSICAL SURVEYS FOR FILL CHARACTERIZATION AND QUANTITY ESTIMATION AT BROWNFIELD SITES A CASE HISTORY. Abstract

Gotechnical Investigations and Sampling

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

2. Initial Summary of Preliminary Expert Opinion of Converse and Psomas Reports

Geotechnical Geotechnical Assessment

NORTHUMBERLAND COUNTY, PA

Report on the Geophysical survey undertaken at Kouphovouno between 28 th June and 2 nd July.

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

Snow Plow Safety Quick Reference Guide

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

Early Exploration Permit Activity Information

Memorandum. Air Sampling

ANALYSIS OF LOCALIZED HIGH MAGNETIC SUSCEPTIBILITY ZONES AT JEFFERSON PROVING GROUND, INDIANA

AOP 16 Winter Operations (Aerodrome Operating Procedure)

GM POWERTRAIN BEDFORD FACILITY BEDFORD, INDIANA

APPENDIX B: REPORT ON GEOPHYSICAL SURVEY, JULY 1998

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Early Exploration Plan Activity Information

10. GEOTECHNICAL EXPLORATION PROGRAM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

City of Brainerd, Minnesota Snowplowing Policy

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

Tornado Preparedness. Monthly Safety Meeting

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Town of Oconomowoc Snow & Ice Control Policy

SNOW CONTROL OPERATIONS

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

U-Shaped Sediment Traps

Geophysical Survey. Ballymount Co. Dublin. Licence Ref. 02R029. By John Nicholls Margaret Gowen & Co. Ltd. For LRT

Transcription:

Final Site-Specific Unexploded Ordnance Safety Plan Attachment Supplemental Remedial Investigation at Ranges Near Training Area T-24A, Parcels 187(7), 112Q, 113Q-X, 213Q, and 214Q Fort McClellan Calhoun County, Alabama Prepared for: U.S. Army Corps of Engineers, Mobile District 109 St. Joseph Street Mobile, Alabama 36602 Prepared by: IT Corporation 312 Directors Drive Knoxville, Tennessee 37923 Task Order CK10 Contract No. DACA21-96-D-0018 IT Project No. 796887 September 2000 Revision 1 KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM)

Table of Contents Page List of Acronyms... ii 1.0 Introduction...1 2.0 UXO Team Composition...2 3.0 Responsibilities...3 4.0 Authority...3 5.0 Anomaly Avoidance Procedures for Sampling Activities...4 6.0 UXO/OE Disposition...7 7.0 Safety...7 8.0 Quality...7 9.0 Reference...7 KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) i

List of Acronyms See Attachment 1, List of Abbreviations and Acronyms, of the Site-Specific Field Sampling Plan Attachment contained in this binder. KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) ii

1.0 Introduction This document defines anomaly avoidance procedures for activities to be performed by IT Corporation (IT) in conjunction with the supplemental remedial investigation activities at the Ranges Near Training Area T-24A, Parcels 187(7), 112Q, 113Q-X, 213Q, and 214Q, at Fort McClellan (FTMC), Calhoun County, Alabama. IT will perform visual surveys and collect surface soil, subsurface soil, groundwater, surface water, and sediment samples for chemical analysis at Ranges Near Training Area T-24A, Parcels 187(7), 112Q, 113Q-X, 213Q, and 214Q. In performing these activities, IT will require unexploded ordnance (UXO) anomaly avoidance services to avoid any potential surface UXO or subsurface anomalies during sampling activities. Intrusive anomaly investigation is not authorized for this supplemental remedial investigation work. The Ranges near Training Area T-24A, consist of the following five parcels: Former Chemical Munitions Disposal Area, Parcel 187(7) Former Machine Gun Range, Parcel 112Q Former Demolition Area, Parcel 113Q-X Former Bandholtz Machine Gun Qualification Range, Parcel 213Q Bandholtz Field Firing Range, Parcel 214Q. The Former Chemical Munitions Disposal Area, Parcel 187(7) occupies approximately 1.5 acres. The parcel is fenced and posted. This former chemical munitions disposal training site was used from an unknown date until 1973. Training sites within the parcel included two square burning pits, each measuring approximately 16 by 16 feet. Training activities conducted at this site reportedly included disposal of chemical warfare munitions filled with phosgene, 3-quinuclidinyl benzilate, Sarin, and distilled mustard. The decontaminants reportedly used on this site were supertropical bleach, and Decontamination Solution Number 2. The Former Machine Gun Range, Parcel 112Q covers approximately 1,400 acres. The dates of use and types of ordnance fired at this range are unknown, but the range appears on a 1959 map. A linear east-west trending mound parallel to the access road is present in the western portion of the study area. The Former Demolition Area, Parcel 113Q-X is located in the central portion of the study area and overlaps the area designated as Parcel 187(7). The Former Demolition Area, Parcel 113Q- KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) 1

X, occupies approximately 3 acres. The dates of use and types of activities that occurred here are unknown, but this area is identified as a demolition area on a 1959 map. The area of Parcel 213Q is approximately 460 acres. Evidence of the firing line of the Former Bandholtz Machine Gun Qualification Range, Parcel 213Q appears as a north-south trending level area along an east-facing slope at the study area. The impact area for this range appears to be approximately 1,600 feet to 2,000 feet due east of the firing line in an area characterized by conical mounds and circular surface depressions interconnected with shallow (less than 1 foot to 3 feet deep) trenches. Ordnance fired at this range is assumed to have been restricted to small arms. The Bandholtz Field Firing Range, Parcel 214Q has an area of over 1,900 acres. The firing line appears as a northwest-southeast trending level area on the east-facing slope of the study area. The target area and probable impact areas were not observed in a recent site walk by IT, but are likely to be in the vicinity of a west-facing slope approximately 1,000 feet northeast of the firing line. Ordnance fired at this range is assumed to have been restricted to small arms. The elevation at the Ranges Near Training Area T-24A ranges from approximately 985 feet to 1,145 feet above mean sea level, with the ground surface sloping from the southeast to the northwest across the study area. A small creek, which bisects several of the ranges, flows north along a small valley to the South Branch of Cane Creek. 2.0 UXO Team Composition A UXO team will be on site during all sampling activities for anomaly avoidance on a site with known or suspected ordnance and explosives (OE). a) The UXO team will be composed of two UXO qualified personnel, depending on the tasks to be performed. One UXO team member will be a UXO Technician III and the other will be, as a minimum, a UXO Technician II. Qualifications of these personnel are published in Engineering Pamphlet 1110-1-18 and stated in Section 2.0 of the installation-wide OE management plan (IT, 2000). b) For the work to be performed in accordance with this work plan, IT will use a Schonstedt GA-72 magnetometer to assist in surface and subsurface sweeps. The Schonstedt GA-230 magnetometer will be the instrument used for downhole anomaly avoidance. KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) 2

(1) A geophysical proveout test grid will be established and each geophysical instrument will be checked for operational reliability and calibration against this known response prior to field use each day. If calibration checks indicate that the instrument is not functioning within an acceptable range, and field adjustments do not resolve the performance discrepancy, the instrument will be tagged and removed from service. (2) Preventive maintenance will be performed on a regularly scheduled basis. If an equipment problem is encountered, maintenance will be performed as soon as possible; records of the unscheduled maintenance and corrective action will be collected and retained for future reference. 3.0 Responsibilities The UXO team member(s) will have the following responsibilities for anomaly avoidance procedures at the sites specified in this work plan. a) Provide the explosive ordnance recognition, location, and safety functions for IT employees and any subcontractors during sampling activities. Sampling activities include surface and subsurface soil sampling, drilling and sampling of monitoring wells, survey of sample points, and safe access and egress to the site. b) Conduct UXO safety briefings for all site personnel and visitors. 4.0 Authority For this investigation, the UXO team will not perform any disposal activities. If the team identifies an OE item, it will clearly mark the item, and direct operations to another location for safe execution of the investigation. The UXO team will not destroy the item. The UXO team will report the item to the IT site manager and the FTMC transition force at FTMC for disposition of the item. KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) 3

5.0 Anomaly Avoidance Procedures for Sampling Activities When conducting sampling activities in the areas described in this work plan, consideration must be given for possible OE contamination. Since these areas may contain OE contamination, the UXO team must conduct a surface access survey and a subsurface survey of UXO before any type of activities commence, including foot and vehicular traffic. a) Access Surveys. (1) The UXO team will conduct access surveys of the footpaths and vehicular lanes approaching and leaving each of the investigation sites. If UXO is found during the access survey, the ordnance will be conspicuously marked and avoided. No personnel will be allowed outside of the surveyed areas. (2) The UXO team will locate an access route to and from the proposed investigation site that is free of surface and near-surface UXO using an appropriate geophysical detection instrument as required. The access route should be as wide as the minimum number of feet of the widest vehicle. (3) Geophysical instrumentation should be used to locate potential UXO just below the surface that may be encountered through erosion from rain, continual vehicular traffic, or subsurface sampling and drilling activities. If surface UXO or subsurface UXO-related anomalies are encountered, the access route must be diverted to avoid contact. (4) The boundary of each access route and investigation site should be marked using white survey flagging and pin flags. Non-UXO qualified personnel will not be allowed outside designated access areas without proper UXO escort. Near-surface anomaly locations will be prominently identified with yellow survey flagging or pin flags. Red flagging will be placed adjacent to any discovered UXO for subsequent visual reference. (5) At the actual investigation site, the UXO team must also complete an access survey of an area sufficient to support mechanical excavation equipment maneuverability, parking of support vehicles, and establishment of decontamination stations, as appropriate for site activities. As a minimum, the surveyed area should have a dimension in all directions equal to twice the length of the largest vehicle or piece of equipment to be bought on site. Intrusive activities will not proceed if an anomaly is detected that cannot be positively identified as inert material. In this event, the sampling personnel must select an alternate investigation KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) 4

area or configuration. b) Surface/Near Surface-Sampling. Surface soil samples are normally collected at depths of 0 to 12 inches below ground surface. The UXO team will visually survey the surface of the selected surface soil sampling sites for any indication of UXO or UXO-related contamination. In addition, the UXO team will utilize a magnetometer over the site before sampling begins. Any anomalies detected will be prominently marked with a yellow survey flag or pin flag for avoidance during sampling activities. If too many anomalies are found within an area of interest, the sampling personnel will select an alternate sampling location for collection of surface/near surface samples. c) Subsurface Soil Sampling and Monitoring Well Installations. Subsurface soil sampling is considered to be the collection of samples below a nominal depth of approximately 12 inches from a split-spoon, Shelby tube, or bucket auger soil sampler using drilling techniques. Drilling techniques are also used to install groundwater-monitoring wells for investigative sampling. (1) The UXO team must conduct an access survey to locate an access route to the proposed sampling or drilling location as well as an access survey at the proposed drilling site that is large enough to support drill rig maneuverability, parking of support vehicles, and establishment of decontamination stations. As a minimum, the surveyed area should have a minimum dimension in all directions equal to twice the length of the largest vehicle or piece of equipment to be brought on site. The UXO team will clearly mark the boundaries of the cleared soil sampling or well site. Personnel will not go outside the cleared area. If a preselected area indicates magnetic anomalies, a new sampling/drilling site will be chosen. (2) The UXO team must complete a subsurface geophysical survey of the proposed drill hole location(s). If the subsurface sampling depth is greater than the geophysical instrumentation detection capabilities below existing ground surface, then the UXO team must incrementally complete the geophysical survey as outlined below. (a) (b) Underground Utilities. Utility clearance and/or excavation permits are not required for the areas covered by this document. In the event subsurface utilities are suspected in an excavation area, the UXO team must attempt to verify their location using geophysical instrumentation. Note that only utilities with a ferrous content are detectable with a geophysical instrument. All located utilities should be marked with a series of pin flags to visually delineate their approximate subsurface routing. Pilot Hole. An incremental geophysical survey of the drill hole location(s) will be initially accomplished using a hand auger to install a pilot hole. An access survey of the immediate vicinity of the pilot hole location will KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) 5

precede its installation. The UXO team using a manual or mechanical portable auger will install the pilot hole. The augured hole will be inspected for anomalies with a geophysical instrument (configured for down hole utilization) at 2-foot increments as the hole is advanced below ground surface. The pilot hole will also be inspected with the geophysical instrument upon reaching the final depth of the hand auger providing a total clearance depth equal to pilot hole depth plus 2 feet. If the proposed site is still free of magnetic anomalies, the drilling equipment may be brought on site and utilized. Hand augering of a hole will not proceed if an anomaly is detected that cannot be positively identified as inert material. If OE is encountered or an anomaly cannot be positively identified as inert material, the sampling personnel must select a new drill hole location. (c) (d) Monitoring of Drilling by Others. Once a drilling site has been surface cleared and a pilot hole installed as described above, the drilling contractor will be notified that the site is available for subsurface sampling or monitoring well installation. The drilling contractor s actual drill hole must be located within a 2-foot radius of the pilot hole installed by the UXO team. The UXO team will continue to complete a subsurface inspection for anomalies with a geophysical instrument configured for down hole utilization at 2-foot increments as the drilling is advanced from the clearance depth of the pilot hole until achievement of one of the following indicators: the drilling activity is completed; the drilling is extended to depths greater than 30 feet below ground surface; or a qualified geologist determines that virgin soil is found. Drilling equipment and/or metallic support materials (e.g., drill rig, augers, drill rods, casings, etc.) may create an interference affecting the operation of the geophysical survey instrumentation during the incremental depth inspection process. In such event, the item(s) creating the interference must be relocated outside the interference range of the geophysical instrument during each incremental depth inspection of the drill hole for the presence of anomalies. Drilling of a hole will not proceed if OE is encountered or if an anomaly is detected that cannot be positively identified as inert material. In this event, the sampling personnel must select a new drill hole location. KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) 6

6.0 UXO/OE Disposition Since the purpose of UXO support during activities is anomaly avoidance, the UXO team is not tasked to perform UXO/OE disposal. The UXO team will notify the site manager and the FTMC transition force if UXO is encountered that cannot be avoided or if the item presents an imminent hazard requiring immediate action based on the items fuzing or current condition. The UXO/OE item will be marked and recorded and all project personnel will evacuate the area. 7.0 Safety In addition to the requirements of the site-specific safety and health plan prepared for this site, the UXO team will ensure the following: a) During the access and subsurface surveys conducted with a geophysical instrument, the UXO team members will not wear safety shoes or other footwear that would cause the instrument to present a false response. b) The UXO team will not be required to wear protective helmets unless a head threat is present. 8.0 Quality A UXO quality control specialist is not required for this work. However, quality control instructions and procedures listed in Section 9.0 of the installation-wide OE management plan (IT, 2000) will be followed as appropriate to this task. 9.0 Reference IT Corporation (IT), 2000, Final Installation-Wide Sampling and Analysis Plan, Fort McClellan, Calhoun County, Alabama, March. KN/4040/T24A/UXO/T-24A UXO.doc/02/21/06(2:10 PM) 7