Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine

Similar documents
Highland Lake Bathymetric Survey

MaxDepth Aquatics, Inc.

Bishopville Prong Study

STRUCTURAL STABILITY ASSESSMENT

Appendix O. Sediment Transport Modelling Technical Memorandum

Feasibility Study for Potential Removal of McLane & Goldman Dams Souhegan River, Milford, NH. Public Kick-off Meeting

STUDY PERFORMANCE REPORT

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

Do you think sediment transport is a concern?

Project Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26

Why Geomorphology for Fish Passage

Seagrass Transplantation & Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst.

Sediment Transport Mechanism and Grain Size Distributions in Stony Bed Rivers. S.FUKUOKA 1 and K.OSADA 2

Fish Passage at Road Crossings

Appendix G. Meso-Habitat Surveys. DRAFT Annual Technical Report

Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River

Coarse Sediment Augmentation on Regulated Rivers. Scott McBain McBain & Trush, Inc.

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.

Lake Sedimentation Survey of Siloam Springs State Park Lake, Adams County, Illinois

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

Chapter 5 CALIBRATION AND VERIFICATION

Technical Memorandum No Sediment Model

GEOL 652. Poudre River Fieldtrip

Stop 1: Marmot Dam Stop 1: Marmot Dam

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

Physical modeling to guide river restoration projects: An Overview

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility

Dam Removal Analysis Guidelines for Sediment

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

Technical Memorandum

Island Design. UMRS EMP Regional Workshop. Presentation for the

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal

Why Stabilizing the Stream As-Is is Not Enough

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

SAVANNAH HARBOR EXPANSION BANK EROSION STUDY UPDATE

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

3301 East 120 th Avenue Assited Living & Memory Care

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

Appendix F Channel Grade Control Structures

Jasper Beach, Machiasport, Maine

Vegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA

Old Stone Sewer Main Street

Lake Forest Mapping ANALYSIS OF SHOALING AND POOL VOLUMES

6 PREPARING THE SAMPLING AND ANALYSIS PLAN (SAP)

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

3. MARINE HABITAT RESTORATION

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Simulating Sediment Transport in the Patapsco River following Dam Removal with Dam Removal Express Assessment Model-1 (DREAM-1)

Annual transport rates at two locations on the fore-slope.

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

J.B. Shaw and D. Mohrig

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

EAGLES NEST AND PIASA ISLANDS

CFD Modeling for Structure Designs in Environmental Impacts Mitigation

LAKE FOREST MAPPING STUDY

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

ENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST

Materials. Use materials meeting the following.

Considerations for Mechanical Dredging, Hydraulic Dredging and Mechanical Dewatering of Sediments

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan

Estimating Remedial Volumes for a GLLA Project on the Milwaukee River

Red River Levee Panel

~ W 89 CONTENTS J-1 J-1 J-6 J-7 J-9 J-10 J-10 J-10

Two-Dimensional Simulation of Truckee River Hydrodynamics

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

Stream Simulation: A Simple Example

State Water Survey Division SURFACE WATER SECTION

Eastlake Assited Living & Memory Care

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Sandy Point Beach, Cousins Island, Yarmouth, Maine

Evaluation of Geomorphic Effects of Removal of Marmot and Little Sandy Dams and Potential Impacts on Anadromous Salmonids

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Special Public Notice

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation

Lake Worth Lagoon Hydrographic Survey Report

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

17-20 November 2007 Incidental Take Monitoring Methodology and Results

Lower Susquehanna River Integrated Sediment & Nutrient Monitoring Program

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Habitat Assessment. Peggy Compton UW-Extension Water Action Volunteers Program Coordinator

Michael Walsworth, Ryan Sullivan, Simi Odueyungbo, William Budd

NORTHUMBERLAND COUNTY, PA

Illinois State Water Survey Division

!"#$%&&'()*+#$%(,-./0*)%(!

SUSTAINABLE SEDIMENT MANAGEMENT

MAINTENANCE DREDGE BENTHIC ASSESSMENT SUNSET POINT FARM LLC LONG POINT KEY MONROE COUNTY, FLORIDA. Prepared by:

COUNCIL POLICY MANUAL

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

Brief outline of the presentation

Transcription:

University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2015 Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine Stantec Follow this and additional works at: http://digitalcommons.usm.maine.edu/cbep-publications Recommended Citation Stantec. (2015). Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine. Portland, ME: University of Southern Maine, Muskie School of Public Service, Casco Bay Estuary Partnership. This Report is brought to you for free and open access by the Casco Bay Estuary Partnership (CBEP) at USM Digital Commons. It has been accepted for inclusion in Publications by an authorized administrator of USM Digital Commons. For more information, please contact jessica.c.hovey@maine.edu.

Estimated Sediment Volume: Bridge Street Dam Impoundment Estimated Volume of Accumulated Sediment Bridge Street Dam Impoundment Royal River, Yarmouth, Maine Prepared for: Steven S. Johnson, P.E. Town Engineer Yarmouth, Maine 04096 Prepared by: Stantec Consulting Services Inc. 30 Park Drive Topsham, Maine 04086

Sign-off Sheet This document entitled Estimated Sediment Volume: Bridge Street Dam Impoundment was prepared by Stantec Consulting Services Inc. ( Stantec ) for the account of the Town of Yarmouth, Maine (the Client ). Any reliance on this document by any third party is strictly prohibited. The material in it reflects Stantec s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. In preparing the document, Stantec did not verify information supplied to it by others. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document. Prepared by Michael Chelminski, P.E. (signature) Reviewed by David Huntress, P.E. (signature)

Table of Contents 1.0 INTRODUCTION...1.1 1.1 BACKGROUND INFORMATION... 1.1 2.0 FIELD STUDY...2.2 2.1 PREPARATION FOR FIELD STUDY... 2.2 2.2 FIELD STUDY... 2.2 3.0 DATA ANALYSIS...3.6 3.1 SEDIMENT COMPOSITION... 3.6 4.0 RESULTS AND DISCUSSION...4.6 4.1 SEDIMENT COMPOSITION AND DISTRIBUTION... 4.7 4.2 ACCUMULATION OF SEDIMENT IN YARMOUTH HARBOR... 4.8 LIST OF FIGURES Figure 1: Sediment Probing Transects and Probing Locations... 2.5 LIST OF APPENDICES APPENDIX A FIELD NOTES... A.1

Introduction 1.0 INTRODUCTION This report presents information on the composition, volume, and potential mobility of accumulated sediment in the Bridge Street Dam impoundment on the Royal River in Yarmouth, Maine, and was prepared for the Town of Yarmouth, Maine (Town) by Stantec Consulting Services Inc. (Stantec). The objective of this study is to provide estimates of the volume and composition of accumulated sediment in the Bridge Street Dam impoundment. The dam impoundment, which is the area that is influenced by the backwater created by the dam, extends from the dam upstream to Middle Falls on the Royal River, and has an overall length of approximately 2,000 feet (ft). The normal pool surface area of the impoundment is approximately 9 acres, and the maximum depth of water at the normal pool water surface elevation is approximately 15 ft. 1.1 BACKGROUND INFORMATION Bridge Street Dam is owned by the Town and located approximately 2,000 feet (ft) upstream from the head-of-tide in the Royal River in the vicinity of the East Main Street (State Route 88 Bridge). The Town is evaluating potential alternatives to maintaining the dam, including removal of the dam, and has convened a group of stakeholders to address concerns related to removal of the dam. The primary identified concern to removal of the dam is the potential for remobilization of sediment from the Bridge Street Dam impoundment and transport and deposition of remobilized sediment in the tidally affected reach of the Royal River seaward from the East Main Street and Interstate 295 (I295) bridges. Specific concern associated with remobilization of sediment from the Bridge Street Dam impoundment include 1) the potential for this material to contribute to shoaling in Yarmouth Harbor, and 2) remobilization of environmental contaminants that may be present in the impoundment and deposition of this material in the harbor. Information obtained as part of previous project studies indicate that there is little accumulated sediment in the Bridge Street Dam impoundment, and that impoundment is subject to scour during high-flow events. Factors that may contribute to the apparent lack of accumulation of sediment in this impoundment appear to include: 1) limited transport of coarse sediment (i.e., gravel-size material and larger) into this impoundment, and 2) relatively high-speed flow in the impoundment during high-flow events that continually remobilize finer-grained sediments and deliver them to the downstream reach of the river. Observations during a drawdown of the impoundment appear to support the above mentioned factors, in that relatively shallow bedrock outcrops with little to no accumulated material were observed in areas of the impoundment during the prior drawdown and during a drawdown on November 12, 2014, during the field study described in this report. mrc v:\1956\active\195600838\report\nov 2014 sediment bridge street dam sediment probing\rpt_20150619_bridgestreetdam_sedestimate_fnl.docx 1.1

Field Study 2.0 FIELD STUDY 2.1 PREPARATION FOR FIELD STUDY Sediment probing locations were established prior to the initiation of field studies to provide approximate locations of 13 survey transects. Prior to the field study, the endpoints of each transect were loaded in into a Global Positioning System (GPS) receiver to facilitate locating the survey transects during the field study. 2.2 FIELD STUDY The field study was performed on Wednesday, November 12, 2014, and coincided with a drawdown of the Bridge Street Dam impoundment. Field surveys were performed by a twoperson crew from a small boat and wading in shallow areas. Sediments were manually probed using a fiberglass survey rod at intervals of approximately 20 ft along 13 transects spaced approximately 150 ft apart along the impoundment, and provided measurements at 109 locations in the impoundment. Sediment depths were recorded as the difference between the measured depth of water and the measured depth-to-refusal based on manually advancing the survey rod into sediment. The horizontal position of probed locations was obtained with a Wide Area Augmentation System-enabled GPS receiver. The locations of the 13 transects across the Bridge Street Dam impoundment are depicted in Figure 1. The survey transects (red lines in Figure 1) are numbered sequentially (1 13) progressing upstream from the dam, and the locations were sediment depths were measured to refusal area depicted (red dots) along each transect. Depths were recorded relative to the water surface during the field studies and not to a specific elevation. The height of the water surface below the right upstream training wall of the fishpass was measured as 4.6 ft prior to the initiation of the sediment probing work at 7:10 AM and as 4.5 ft at 15:15 pm at the completion of the sediment probing field surveys. Of note is that the impoundment drawdown result in exposure of bedrock ledge (Photo 1) upstream from the footbridge over the Royal River along the Beth Condon Memorial Trail. When exposed, this ledge forms the hydraulic control for the upstream reach of the river to the base of Middle Falls and results in higher water surface elevations relative to the reach of the impoundment downstream from the ledge. mrc v:\1956\active\195600838\report\nov 2014 sediment bridge street dam sediment probing\rpt_20150619_bridgestreetdam_sedestimate_fnl.docx 2.2

Field Study Photo 1: Ledge Upstream from Beth Condon Memorial Trail Footbridge (flow is from right to left) In addition to the measurements of sediment depth in the impoundment, 8 sediment probes were performed at two locations along the left 1 side of the impoundment in areas along the edge of the normal impoundment, including an area of emergent vegetation downstream from the U.S Route 1 Bridge. Probing in these locations was performed using a 4-2 steel rod. These probe locations are depicted as yellow dots in Figure 1. Sediment characteristics were estimated and recorded at selected sediment locations. The sediment characteristics were estimated based on the felt response during the sediment probe and referenced to each location in the field notes and in the codes entered into the GPS receiver at the selected locations. A copy of the field notes is included as Appendix A. Following the sediment probing on November 12, 2014, Stantec canoed the perimeter of the impoundment between Bridge Street Dam and the exposed ledge to observe apparent conditions. Observations during this cruise confirm the presence of accumulations of fine sediment along the margins of the dewatered sediment, including benches that may support emergent vegetation, and a number of areas with localized accumulations of fine sediment (sand). Localized accumulations of fine sediment were observed immediately upstream from the Sparhawk Mill hydroelectric facility trashrack and at two locations where stormwater is discharged to the impoundment. 1 Directionals left and right are based on an observer facing downstream. mrc v:\1956\active\195600838\report\nov 2014 sediment bridge street dam sediment probing\rpt_20150619_bridgestreetdam_sedestimate_fnl.docx 2.3

Field Study Photo 2: Accumulated Sediment at Stormwater Outfall (left side of river immediately upstream from U.S. Route 1 Bridge) mrc v:\1956\active\195600838\report\nov 2014 sediment bridge street dam sediment probing\rpt_20150619_bridgestreetdam_sedestimate_fnl.docx 2.4

13 12 FLO W 11 10 AL ROY R E RIV 9 FL OW 8 7 6 ROUTE 1 5 ROU TE 1 AL ROY R E RIV 4 W FLO 3 2 1 DRAFT FOR REVIEW ONLY

13 12 FLO W 11 10 AL ROY R E RIV 9 FL OW 8 7 6 ROUTE 1 5 ROU TE 1 AL ROY R E RIV 4 W FLO 3 2 1 DRAFT FOR REVIEW ONLY

Data Analysis 3.0 DATA ANALYSIS The sediment probing data was post-processed to provide graphical depictions of the sediment probing locations in plan and profile along each transect and to estimate the volume of probed sediment. Profiles along the 13 sediment probing transects are depicted in Figure 1 and annotated with the estimated sediment characteristics. The volume of the probed sediment was calculated using a volumetric surface defined by a triangulated irregular network with horizontal coordinates at each probed location with heights at each measurement location represented by the measured sediment depth. The estimated volume of probed material in this volumetric surface is 4,200 cubic yards (CY), which includes approximately 750 CY between Middle Falls and the exposed ledge upstream from the Beth Condon Memorial Trail footbridge and approximately 3,450 CY between the exposed ledge and the dam. Note that this estimate does not include material located outside of the wetted perimeter of the impoundment, such as those points that are depicted as yellow dots on Figure 1. 3.1 SEDIMENT COMPOSITION The sediment probing identified muck, sand, gravel/cobble/boulder, and bedrock substrate along the probed transects in the impoundment. Probing in the two areas along the left side of the impoundment in areas that are above the normal water surface elevation of the impoundment indicated that fine material is the dominant sediment in these areas. The use of manual probes does not allow for penetration through coarse-grained sediments, such as gravel, cobble, or boulder material. It is therefore estimated that most of the probed material is comprised of fine-grained material (sand or smaller). 4.0 RESULTS AND DISCUSSION Information obtained as part of the sediment probing work indicates that accumulated sediment in the Bridge Street Dam impoundment includes muck, sand, gravel/cobble/boulders, and that the bottom is scoured to bedrock in some locations. In general, depths of accumulated sediment are larger along the margins of the impoundment; this finding suggests that high-speed flows during high-flow events limit accumulation of sediment in the impoundment. As previously noted, the estimated volume of accumulated sediment based on the sediment probing in the impoundment is 4,200 CY. Based on observed localized deposits of fine sediment, it is suggested that a contingency of 20% (840 CY) be added to the estimated volume of accumulate sediment to reflect observed localized sediment deposits, including the observed mrc v:\1956\active\195600838\report\nov 2014 sediment bridge street dam sediment probing\rpt_20150619_bridgestreetdam_sedestimate_fnl.docx 4.6

Results and Discussion material immediately upstream from the Sparhawk Mill hydroelectric facility trashracks and adjacent to stormwater outfalls and coarse-grained sediment that was not probed. The estimated volume of material based on the 20% contingency is therefore 5,040 CY. The estimated volume of accumulated sediment does not include material located outside of the normal pool limits of the impoundment (i.e., along the margins of the impoundment), including material that was probed and denoted by yellow dots in Figure 1. Observations of the project reach of the Royal River during high-flow conditions suggest that most of the finer-grained material in the Bridge Street Dam impoundment would be remobilized during a higher flow event (e.g., 10-year return-interval flow) if the dam is removed. However, it is expected that remobilization of this material would occur over multiple high-flow events. Based on information obtained as part of previous project studies, it is expected that material that is remobilized from the Bridge Street Dam impoundment during high-flow events would be replaced by material that is delivered to the impoundment from the upstream reach of the Royal River. 4.1 SEDIMENT COMPOSITION AND DISTRIBUTION Most of the probed material in the Bridge Street Dam impoundment was located along the edges of the impoundment and is comprised of fine-grained material (sand or smaller). The apparent dominance of fine-grained material is consistent with the size of material that is expected to be regularly transported downstream at the East Elm Street Dam approximately 1,300 ft upstream from Middle Falls. It is not expected that the volume of accumulated sediment in the Bridge Street Dam may change in response to high-flow events, but it is expected that the existing volume of sediment is representative of the typical volume of sediment. The basis for this determination is that Bridge Street Dam has been in place for over 100 years. It is not expected that the volume of accumulated sediment varies seasonally. It is expected that most of the fine-grained sediment could be remobilized following removal of the dam, but the duration of time during which remobilization would occur is indeterminate. Note, however, that the sediment probing did not extend substantially landward from the edge of the impoundment. While some additional sediment along the impoundment margins may be subject to remobilization, sediment in areas which are persistently vegetated, such as the area along the left bank between the U.S Route 1 Bridge and the dam, may not be subject to ready remobilization. mrc v:\1956\active\195600838\report\nov 2014 sediment bridge street dam sediment probing\rpt_20150619_bridgestreetdam_sedestimate_fnl.docx 4.7

Results and Discussion 4.2 ACCUMULATION OF SEDIMENT IN YARMOUTH HARBOR Approximately 60,000 CY of material was removed from Yarmouth Harbor during dredge work in the fall of 2014, and others have estimated that the average accumulation rate of sediment in the harbor is approximately 10,000 CY per year. Based on these estimates, the estimated volume of sediment in the Bridge Street Dam impoundment constitutes approximately 10% of the volume of the recent dredge or a half-year of the average annual accumulation of sediment. Coarse grained materials, including gravel, cobble, and boulder-size material, could be remobilized from the Bridge Street Dam impoundment if the dam is removed. However, it is not expected that this material could substantially contribute to sedimentation in the harbor because the larger material is expected to accumulate in the immediate vicinity of the Interstate 295 Bridge. mrc v:\1956\active\195600838\report\nov 2014 sediment bridge street dam sediment probing\rpt_20150619_bridgestreetdam_sedestimate_fnl.docx 4.8

Appendices

Appendix A Field Notes Appendix A FIELD NOTES A.1