FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED

Similar documents
SEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK

CAUSES FOR CHANGE IN STREAM-CHANNEL MORPHOLOGY

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

Module/Unit: Landforms Grade Level: Fifth

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

Squaw Creek. General Information

Vermont Stream Geomorphic Assessment. Appendix E. River Corridor Delineation Process. VT Agency of Natural Resources. April, E0 - April, 2004

Great Lakes Tributary Modeling: Canaseraga Creek Watershed

Highland Lake Bathymetric Survey

Technical Memorandum No

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

CE415L Applied Fluid Mechanics Laboratory

Why Geomorphology for Fish Passage

Assessment of Lake Forest Lake Sediment Trapping Efficiency and Capacity. Marlon R. Cook Groundwater Assessment Program Geological Survey of Alabama

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

SILT FENCE EFFECTIVENESS

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Tenmile Lakes Delta Building Study

Lecture Outlines PowerPoint. Chapter 5 Earth Science 11e Tarbuck/Lutgens

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

Laboratory Exercise #3 The Hydrologic Cycle and Running Water Processes

The subject paper is being submitted for approval for publication in the annual volume entitled Geological Survey Research.

Flood and Stream Restoration

PUBLIC OUTREACH THROUGH GIS

Each basin is surrounded & defined by a drainage divide (high point from which water flows away) Channel initiation

PHYSICAL GEOGRAPHY. By Brett Lucas

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26

Field Trip Number One. By: Pat Dryer. Geography 360

Countermeasure Calculations and Design

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

The last three sections of the main body of this report consist of:

Sedimentation Rate Change in the Winooski River Delta

Garner State Park Pavilion Preservation Study

Unit 7.2 W.E.D. & Topography Test

CASE STUDIES. Introduction

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

Case Study 2: Twenty-mile Creek Rock Fords

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time

WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION

J-river engineering for Vietnam

Earth Science Chapter 6 Section 2 Review

Pirai river (Bolivia)

ARMORED DITCH DEGRADATION AND ISSUES WITH EROSION

Figure 1. Which part of the river is labelled in Figure 1? a) Mouth b) Source c) Lower course d) channel

3.12 Geology and Topography Affected Environment

Four Mile Run Levee Corridor Stream Restoration

Stone Outlet Sediment Trap

Case Study 14. Rocky Creek Vented Box Culvert Ford

Study Module for RIVER PROCESSES. Geo Lab at Nordland National Park Centre. HANDBOOK for TEACHERS

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Prentice Hall EARTH SCIENCE

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Little Blackfoot TPA 2009 Sediment and Habitat Assessment QAQC Review March 9, 2010

Sherman Falls -Virtual Field Trip-

SECTION G SEDIMENT BUDGET

Stop 1: Marmot Dam Stop 1: Marmot Dam

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

A River Runs Through It

UPPER COSUMNES RIVER FLOOD MAPPING

Name: Mid-Year Review #2 SAR

EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

The Yellow River Initiative: The Birth of a System Approach to Challenges Facing the Everglades of the North

Session 1 Healthy Streams Stream Hydraulics Natural Channel Design

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

Bank Erosion and Morphology of the Kaskaskia River

Watershed concepts for community environmental planning

Big Wood River. General Information

33. Eroding downstream left bank, new bridge, Attlebridge (TG ).

11. ALPINE GLACIAL LANDFORMS

Chapter 6 Mapping and Online Tools

Steven Noble MDEQ - WRD Enbridge Response Unit

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill

Physical Geology Horton s Laws

Erosion Surface Water. moving, transporting, and depositing sediment.

Topographic Maps. More than a Road Map

PHASE 1 STUDIES UPDATE EROSION WORKING GROUP

HW #2 Landscape Travel from A to B 12,

Erosion Information Paper Eagle City and Eagle Village, Alaska Current as of January 21, 2008

Development of a Fluvial Erosion Hazard Mitigation Program for Indiana

Watershed Detectives:

Streams. Stream Water Flow

Chapter 7 Mudflow Analysis

1. Identify the Earth motion that provides the basis for our system of local time and time zones.

Diego Burgos. Geology 394. Advisors: Dr. Prestegaard. Phillip Goodling

5/4/2017 Fountain Creek. Gage Analysis. Homework 6. Clifton, Cundiff, Pour, Queen, and Zey CIVE 717

Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles

Upper Mississippi River Basin Environmental Management Program Workshop

APPENDIX 3B OCCURRENCE OF SIGNIFICANT RIVER ALLUVIUM AQUIFERS IN THE PLATEAU REGION

December 11, 2006 File:

Fish Passage Studies III: Sediment Redistribution and Impact Analysis: Springborn Dam - Enfield, Connecticut

STABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE. Introduction.

Griswold Creek August 22, 2013

Technical Memorandum No Sediment Model

Chapter 3 Erosion and Deposition. The Big Question:

Transcription:

FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED Justin R. Beebe, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. jrb308@jaguar1.usouthal.edu. Spring Creek is a tributary within the Dog River watershed, located in Mobile, Alabama. In February 2002 the lower portion of the creek underwent a physical modification called channelization. Significant amounts of sediment have been deposited since the channelization project, contributing to an environmental impact on the Dog River watershed. I prove this by measuring the amount of sediment that has been deposited at certain points in the creek. Gabions were placed along the bottom and sides of the creek, so measuring the total gabion height minus the exposed height from the current creek floor; I was able to approximate a deposition depth. Since the project end, sedimentation has occurred at Spring Creek, filling nearly half of the total gabion height. With the results of this project, groups like the Dog River Clearwater Revival Program can support projects that have the least amount of impact on the watershed. Groups concerned with the watershed can also stand against future efforts of channelization based on undesired results now outlined by this project. Keyword: Channelization, Spring Creek, Gabion Introduction Spring Creek is a tributary within the Dog River watershed, located in Mobile, Alabama. A watershed of a particular stream is all the area that contributes to overland flow and groundwater to that stream (McKnight 2002). In February 2002 the lower portion of Spring Creek underwent a physical modification called channelization. A channel is a trough through which water runs at the bottom of a valley (Press 2001). Steven Summersell acquired baseline data of the physical changes to Spring Creek and the relations to the Dog River watershed in 2003 as a student in field work at USA. Stevens s study outlined an importance in finding the overall health of the sub-watershed before, during, and after modifications took place. This study will acquire and document data on sedimentation in the channel approximately five years after the modifications were made to the area. Sedimentation is the geological process whereby material is added to a landform (Wikipedia 2007). Before the project began, Spring Creek was mostly natural with the exception of some riprap in areas that erosion was severe. Spring Creek

was channelized for better flow, in an attempt to stop flooding in certain areas of the watershed and gabions were also placed in the creek for bank stabilization. Gabion is defined as a corrosion resistant wire container filled with stone used for structural purposes. They are fastened together and used for retaining walls, revetments, slope protection, channel linings and other structures. (IECA 2007). The project was authorized by the City of Mobile, and cost $1,247,675.60. The stated purpose of the Spring Creek drainage project was to lower the water surface elevation and prevent the continuation of severe erosion along the existing channel through out the drainage basin. (Land and Water 2003). Research Question Has sedimentation occurred in the channelized portion of Spring Creek in five years since the project ended? Methods In order to determine any change in sedimentation, the use of before and after photographs at portions of Spring Creek were used. Field reconnaissance to Spring Creek was also helpful in determining change since the project end in 2002. I broke down the area of construction into three parts so that I could analyze recorded data better. The first part of the Spring Creek construction was labeled section 1, it is found between Girby Road, and Highway 90. 2 of the creek was then labeled from the area running between Highway 90 and Halls Mill Road. 3 was labeled as the area south of Halls Mill Road beside the property of Two Dollar Bills Restaurant (Figure 1).

I determined the amount of sediment deposition by recording how many gabion shelves were placed at the time of construction. This data came from photographs obtained during construction. I then utilized photographs of the same area after completed construction, to the recent spring of 2007. The yearly photographs after construction allowed me to estimate how much sediment had been deposited by counting the gabion shelves still exposed. By knowing the approximate heights of each gabion shelf, I counted the number of visible shelves, and then subtracted that by the total number of shelves. The number obtained by that process was then multiplied by the height of each gabion shelf, thus giving me the amount of deposition. I then had to add one foot to this calculation due to the scour protection apron placed for foundation of the gabion walls. Figure 1. Spring Creek with markers at 1, 2 and 3.

Results The data collected was recorded and summarized in Table 1 below. Sedimentation in section one totaled 5 ft, while section two totaled 5.5 ft. three totaled 4 ft. The total approximate deposition for each section was then averaged. I found that sedimentation occurring in Spring Creek after construction has averaged 4 feet 10 inches in the span of 5 years. The average depth of gabion construction was 9 feet. Photo-interpretive analysis also shows that sedimentation has occurred, and can give the observer an idea of change over time (Figures 2,3,4). Table 1 1 2 3 # Gabion Shelves 3 3 ft 2 ft Approximate Shelf Height 3 3 ft 3 ft Shelves * Heights 9 9 ft 6 ft Exposed Gabion Height 5 ft 4.5 ft 3 ft Shelve Height - Exposed Height 4 ft 4.5 ft 3 ft Scour Protection Apron 1 ft 1 ft 1 ft Total Approximate Deposition 5 ft 5.5 ft 4 ft Figure 2 During and after pictures of Spring Creek at section three.

Figure 3 During and after construction looking downstream from section two. Figure 4 Before and after construction looking upstream from section three. Conclusion To conclude, I found that sedimentation has occurred in the channelized portion of Spring Creek since 2002. Before and after photographs show this along with the data presented. It is clear that sediment has been deposited, and according to my data, filling on average just over half of the total height of the gabion walls. This is significant in that knowing what is occurring as far as sedimentation goes, and further actions to mitigate this could be studied. Finding the

source of sedimentation might prove useful in future studies and explanations of phenomena associated with gabion structures to the Dog River watershed. References Cited Gabions.net 2007. Spring Creek Mobile, AL USA. MGS Erosion and Flood Control Specialist. http://www.gabions.net/flash/spring_creek.html Accessed 4-05-07. IECA.org 2007. Gabion Illustrations. International Erosion Control Association http://www.ieca.org/photogallery/gabionillustrations.asp Accessed on 3-10-07. Tom L. McKnight, Darrel Hess. (2002). Physical Geography (7 th ed.) New Jersey: Prentice Hall. Frank Press, Raymond Siever. (2001). Understanding Earth (3 rd ed.) New York: W.H. Freeman and Company. Bob Oertel. Land and Water. 2003. pg 26-29. Prestigious Award for Hobbling Spring Creek. Steven G. Summersell. Department of Earth Sciences, University of South Alabama. 2003. Channelization In The Spring Creek Sub-Watershed. Wikipedia. Deposition(sediment). Deposition http://en.wikipedia.org/wiki/deposition_(sediment). Accessed 3-09-07.