Edmonton International Airport

Similar documents
Edmonton International Airport

Edmonton International Airport

Edmonton International Airport YXD City Centre Airport

Edmonton International Airport YEG Edmonton International

Edmonton International Airport YEG Edmonton International Airport

Edmonton International Airport YEG Edmonton International

City of Camrose Winter Road Maintenance Policy

2014 / 2015 PRESEASON WICHITA MID-CONTINENT AIRPORT. Snow and Ice Control Committee (SICC) WINTER OPERATIONS AND SAFETY MEETING

Airport Winter Maintenance Plan - YPA. Table of Contents

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

TABLE OF CONTENTS 1.0 INTRODUCTION...

Town of Oconomowoc Snow & Ice Control Policy

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

Inspection of. Aerodrome Lighting Federal Aviation 1. Administration

IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY

SNOW CONTROL OPERATIONS

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Auburn Lewiston Airport. Snow and Ice Removal Plan

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

S N O W P L A N / Keflavík International Airport

GCAA ADVISORY CIRCULAR

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

AOP 16 Winter Operations (Aerodrome Operating Procedure)

COUNCIL POLICY MANUAL

Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration. Presented by Mike Carlson September 20, 2012

CEDAR COUNTY ORDINANCE NO. 6

Dunn County Snow Removal Policy

A Guideline for Training Patrol Staff Ontario Good Roads Association

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN November 2017

DELAWARE COUNTY ORDINANCE NO. 3

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015

Municipality of Grey Highlands Policy

John A. Carlson Snow and Ice Removal

Snow Removal Winchester Department of Public Works

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

REQUEST FOR PROPOSALS

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

WINTER STORM Annex II

MUNICIPALITY OF TRENT HILLS WINTER CONTROL QUALITY STANDARDS

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION:

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

CITY OF LANSING SNOW AND ICE REMOVAL OPERATION PLAN, VERSION 2008

INCLEMENT WEATHER CLOSING CODES

City of Hailey Public Works - Street Division

SNOW REMOVAL AND ICE CONTROL OPERATIONS POLICY MARSHALL COUNTY HIGHWAY DEPARTMENT

Town of Grand Falls Windsor Snow Clearing Policy Department of Engineering and Works

CUSTER COUNTY SNOW REMOVAL PROCEDURES

SNOWPLOWING/ICE CONTROL POLICY

NASHUA AIRPORT AUTHORITY SNOW AND ICE CONTROL PLAN

Community and Infrastructure Services Committee

Snow, Ice and Leaves Clearance Policy

AUTHORITY: Town Council POLICY NUMBER:

Meteorology SNOWTAM decoding Guide Made by: Sebastian Rekdal Chief of Training Norway Updated: January 25, 2015

Snow Plow Safety Quick Reference Guide

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Brainerd, Minnesota Snowplowing Policy

TOWN OF GRAND FALLS WINDSOR

RESOLUTION NO INTRODUCTION

Traffic Control Weather Policy

City of Laramie, Wyoming SNOW AND ICE POLICY

Snow and Ice Removal

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES

Approved by: A. Cherrie Epps, Ph.D., President and Chief Executive Officer

NEWS RELEASE. Province boosts winter highway safety measures

ROLLING RIVER SCHOOL DIVISION POLICY

City of Rhinelander Snow and Ice Policy

WE, THE UNDERSIGNED qualified voters of the municipality of Sioux Falls, the state of South Dakota, petition that the following ordinance be

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Maintenance Standards Plan and Policies for Winter Control of Roads Within The Township of Georgian Bluffs

Policy Title: Snow Removal & Ice Control Policy #: PW

AERODROMES PANEL (AP) SECOND MEETING OF THE AERODROMES PANEL WORKING GROUPS (APWGs/2)

KEELE UNIVERSITY SNOW AND SEVERE WEATHER MANAGEMENT PLAN

Winter Maintenance Report

Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services

SNOW AND ICE CONTROL GUIDELINES

Winter Roads Maintenance

COUNCIL POLICY BACKGROUND

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council November 24, 2015

Winter Maintenance on Ontario s Highways

CLEA# Approved Date: Feb Revision Date: Aug 02, May06, Mar08, Jan 09 New ( ) Amends ( ) Rescinds ( ) Pages:

Motorists are urged to drive wisely and cautiously in all winter weather situations:

Municipal Act, 2001 Loi de 2001 sur les municipalités

SNOW & ICE CONTROL PLAN

Snow and Ice Management

DAYTON INTERNATIONAL AIRP0RT DAYTON, OHIO. PFC Quarterly Status Report - Revenue and Expenditures. For the Quarter July 1 through September 30, 2018

Winter Maintenance on Provincial Highways

Transcription:

Edmonton International Airport ZVL Airside Operations Winter Operations Program 2017/18 September, 2017

AIRSIDE WINTER OPERATIONS PROGRAM (AER-002P) DISTRIBUTION/REVISION LIST Distribution Edmonton Airports Vice President, Operations Steve Maybee Edmonton Airports Director, Airside Operations Dean Ervin Edmonton Airports Superintendent, Field Maintenance Gary Lamb Edmonton Airports ZVL Supervisor Rod Marshall Edmonton Airports Manager, Environment, Safety & Rob Hough Operational Compliance NAV CANADA Villeneuve Control Tower

1 GENERAL INFORMATION... 2 1.1 INTRODUCTION... 2 1.2 REGULATIONS / STANDARDS... 2 1.3 CONTACTS... 2 2 RESPONSIBILITIES... 3 2.1 FIELD MAINTENANCE... 3 3 RESOURCES... 3 3.1 EQUIPMENT... 3 3.2 PERSONNEL... 3 3.2.1 Schedules... 3 3.3 ICE CONTROL AGENTS... 3 3.4 SAND... 3 4 SNOW REMOVAL PROCEDURES... 4 4.1 PRIORITIES... 4 4.2 ALLOWABLE ACCUMULATIONS... 5 4.3 RUNWAY... 5 4.4 APRON... 5 4.5 EDGE LIGHTS & PRE-THRESHOLD AREAS... 5 4.6 VISUAL AIDS... 5 4.7 WINDROWS... 5 5 ICE CONTROL... 5 5.1 CHEMICAL ICE CONTROL... 5 6 SURFACE CONDITION REPORTING... 7.1 SURFACE CONDITION REPORTS... 6 7.2 VISUAL INSPECTIONS... 6 7 COMMUNICATION... Appendix A - Daily Airfield Inspection Document. Appendix B Airfield Condition Report.

GENERAL INFORMATION 1.1 Introduction Airside Winter Operations at maintain and monitor all runways, taxiways, aprons and airside roads to ensure safe and continuous operation of the airport during winter conditions. Operations include snow removal, ice control and surface condition reporting on all airside surfaces. 1.2 Regulations / Standards The following standards and procedures were used, in conjunction with historic experience at, in the development of these procedures: TP312: Aerodrome Standards and Recommended Practices. AC 302-013: Airport Winter Maintenance and Planning. 1.3 Contacts Title Phone Cell Vice President, Operations (Steve Maybee) 780-890-8597 780-887-9716 Director, Airside Operations (Dean Ervin) 780-890-8479 780-934-6889 Superintendent, Field Maintenance (Gary Lamb) 780-890-8586 780-908-6894 ZVL Supervisor (Rod Marshall) 780-458-4841 780-908- 6892 Duty Manager Edmonton International Airport 780-890-8327 Field Maintenance Operator on site. 780-458-4841 780-994-1122 Airside Operations Page 2 REVISED: September, 2017

2 RESPONSIBILITIES 2.1 Field Maintenance Field Maintenance is responsible for ensuring the safe operation of airside activities during the winter season. This includes the regular monitoring and reporting of runway conditions, snow removal and ice control. The Superintendent Airside Operations has responsibility for winter operations; however, the Field Maintenance personnel direct daily activities. 3 RESOURCES 3.1 Equipment The use of all equipment by Edmonton Airports personnel must follow Standard Operating Procedures. 3.2 Personnel The winter season runs from November 9 th, 2017 to April 12 th, 2018. The Airport personnel conduct daily runway and airfield checks during this time period. The Manager, Airside Operations and Superintendent, Airside Operations are on duty during standard working hours. Airport personnel provide standby coverage during the months of October and April. 3.2.1 Schedules Airport personnel are on site 0600 21:00, 7 days per week to perform runway and airfield checks. 3.3 Ice Control Agents The chemical used for ice control on airside surfaces is potassium and urea. All de-icing chemicals in use have been approved by Transport Canada. No salt can be used on any airside surface since it is a potential hazard to aircraft. 3.4 Sand To minimise damage to aircraft, all sand used by Edmonton Airports on airside meets the Transport Canada specifications. Airside Operations Page 3 REVISED: September, 2017

4 SNOW REMOVAL PROCEDURES Snow removal will be done on an as required basis, depending on the type of snow, expected duration of the storm and snow accumulations. A standard for allowable accumulations for each area has been established. (See snow accumulations below ). Accumulations under this standard will be removed after the storm. Accumulations over this standard may be removed, depending on the nature of the snow, expected duration, type of snow and wind drifting. The standards are as follows. Standard Accumulation Runways, Taxiways and Apron 5-7 cm Parking areas and roads 8-10 cm 25 behind Runway and Taxiway Lights 15 cm 4.1 Priorities Priorities are determined to ensure the safe operation of the airport and meet Transport Canada's Airport Regulation requirements for operations at the airport. Priority I: The following areas are cleared to maintain the operational capability of the airport: Active Runway (Generally Runway 08-26) Length 5000 Width 100 Active Taxiways (Bravo) Main Apron Priority II: Other operational areas on the airside are to be cleared after Priority I areas have been cleared and accumulations are within tolerable levels. This is to ensure that airport operations may switch to the alternate runway, should conditions warrant. Alternate Runway (Generally Runway 16-34) Length 3496 Width 100 Secondary Taxiways (Alpha) Priority III: The remainder of airside areas are to be cleared after the snowfall: Remaining Apron areas, as required; Remaining Airside Access Roads; Edge lights and Runway End Identification lighting, as required; Pre-threshold areas, as required; Tenant Areas, as contracted. Priorities may be altered, if conditions warrant, by the Superintendent of Airport Operations or Airfield Personnel. As mentioned, the Priority 1 runway is generally Runway (08-26); however, Runway 16-34, and associated taxiways, may be used if conditions such as prevailing winds warrant. Airside Operations Page 4 REVISED: September, 2017

Snow is also removed from several service routes and areas used by Edmonton Airports staff, but not by the public. 4.2 Allowable Accumulations Generally, snow removal on the active (Priority I) runway begins when snow depths reach 5-7 cm. Clearing begins on the alternate (Priority II) runway when clearing of the Priority I areas is complete, regardless of snowfall. Priority III areas are cleared after the snowfall has ceased, unless immediate access is required (as determined by the Field Maintenance Personnel). 4.3 Runway Whenever possible, runways are cleared to a bare and dry surface for their full width. The Priority II runway is cleared after the snowstorm, after all Priority I areas have been cleared. If at any time the cleared width falls below full width, Field Maintenance advises the Control Tower. If possible, clearing takes place in a manner that allows for the continuous operation of the runway during snow removal. 4.4 Apron Snow is removed from the Apron area in a manner that reflects the amount of accumulation. If light snow conditions exist, 4.5 Edge Lights & Pre-Threshold Areas These areas are cleared to Transport Canada standards to provide for safe winter operations at the airport. 4.6 Visual Aids Snow is removed from these areas when it provides an obstacle to a correct approach slope reading. Removal is usually done during clean-up operations. 4.7 Windrows Windrows may be permitted on manoeuvring areas to a maximum height of 30 cm. All efforts will be made to limit the time frame windrows will be on manoeuvring areas. Airfield Maintenance Personnel will advise the control tower when windrows are created on manoeuvring areas. Windrows may be permitted on airside roads, at the discretion of the Superintendent of Airport Operations or the Airfield Maintenance Personnel. 5 ICE CONTROL It is preferable to control the formation of ice rather than try to remove ice that has already formed. To do this, careful monitoring of weather and runway conditions is required. Once ice has formed, it is vital that it is removed as quickly as possible. 5.1 Chemical Ice Control Airside Operations Page 5 REVISED: September, 2017

The chemical used for runway ice control is potassium acetate and or urea. Once ice has already formed; potassium acetate and or urea is used to soften the ice so it can be easily removed by either plows or sweepers. The effectiveness of these chemicals depends on temperature and wind conditions. Their application is at the discretion of the Field Maintenance Personnel. 6 SURFACE CONDITION REPORTING 6.1 Friction Testing Friction testing (CRFI) is done on a runway, and the Canadian Runway Friction Index (CRFI) is included in the Surface Condition Report, if the runway surface has any patches of: ice; compacted snow; slush/ice combination; loose snow (less than 2.5 cm); chemical on ice. Testing will be conducted between the hours of 06:00 21:00. For after hours testing call 780-994-1122. There will be a 3 hour, plus mileage call out charge for after hour (CFRI) testing. (Appendix B) Testing is not done if the runway surface is wet, with no indication of ice build-ups, or has loose snow exceeding 2.5 cm. Airside Operations / Field Maintenance currently have a vehicle equipped with the Friction Testing technology. 6.2 Surface Condition Reports During the winter months, Surface Condition Reports are issued daily via the TRACR II System. If required a verbal report is given to the tower. A copy will be faxed to the Control Tower as well. An advisory of runway conditions is provided to the Control Tower after every runway check or change in runway conditions via TRACR II SNOWiz. 6.3 Visual Inspections Visual inspections of the runway surface are done in conjunction with regular airfield inspections on a daily basis. Any abnormalities are reported to the Control Tower and rectified, if possible. (Appendix A). 7 COMMUNICATION Airside Operations Page 6 REVISED: September, 2017

The Field Maintenance Personnel co-ordinates the communication processes. They are responsible for the completion of Surface Condition Reports and for the co-ordination of snow removal and ice control activities. When snow removal is necessary, the Airfield Maintenance Personnel contacts the Control Tower to determine which runway is active, given the weather and wind conditions. In conjunction with the Control Tower, the Airfield Maintenance Personnel determines an appropriate action plan for snow removal/ice control, to ensure the safe, continuous operation of the airport during the winter season. Airside Operations Page 7 REVISED: September, 2017

Appendix A Daily Airfield Inspection Document

Villeneuve: Daily Airfield Inspection Name (Print): Signature: Date: Time: RWY / Turnoffs 16/34 NTR (Nothing to Report) OBSERVATION/LOCATION/ACTION TAKEN PAVEMENT LIGHTING SIGNAGE WILDLIFE FOD RWY / Turnoffs 08/26 NTR (Nothing to Report) OBSERVATION/LOCATION/ACTION TAKEN PAVEMENT LIGHTING SIGNAGE WILDLIFE FOD TAXIWAY: ALPHA NTR (Nothing to Report) OBSERVATION/LOCATION/ACTION TAKEN PAVEMENT LIGHTING SIGNAGE WILDLIFE FOD TAXIWAY: BRAVO NTR (Nothing to Report) OBSERVATION/LOCATION/ACTION TAKEN PAVEMENT LIGHTING SIGNAGE WILDLIFE FOD APRON: # 1 NTR (Nothing to Report) APRON # OBSERVATION/LOCATION/ACTION TAKEN PAVEMENT FOD Primary Security Fence Line: NTR (Nothing to Report) PSF PSF Roadway OBSERVATION/LOCATION/ACTION TAKEN

OTHER:..... Requirements: Inspections to be conducted start of each shift Daily, No Exceptions (Airside Operations Staff). Major Airside issues are required to be reported to supervisor immediately upon discovery. Completed Form to be signed and submitted to EIA Superintendent Airside Operations after each shift. Accuracy of DATA recorded will be verified. PAVEMENT RWY, TWY, Turnoffs, Apron, Roadways. LIGHTING RWY, TWY, Turnoffs, Aprons, Inspection Description / Requirements Inspect for any irregularities on all pavement structures: RWY, Turnoffs, TWY, Apron Areas and secondary pavement areas (e.g. delimitation, heaving, spalling, evident damage and paint marking issues). Record Observations / Action Taken. Inspect for light fixture damage or obstructions on all airfield substrates: RWY s, Turnoffs, TWY s and Apron Areas. (e.g. light out, missing, damaged, obstructed by snow or weeds). Ensure light damage is reported only. Only qualified electricians are to repair. Record Observations / Action Taken. SIGNAGE Inspect for any damage or obstructions at all signage locations (e.g. light out, damaged, obstructed by snow or weeds). Record Observations / Action taken. WILDLIFE Inspect for any wildlife present (e.g. rabbits, birds and deer, other - description/location/time). Record Observation / Action Taken. FOD Inspect for any FOD present (e.g. FOD picked up description/location/time recorded). Record Observations / Action Taken. Primary Security Fence Line Inspect Integrity of Primary Security Fence Line (e.g. Fence line, gates, barbed wire topping). Record condition of PSF roadway. Record Observations / Action Taken. OTHER Record any other pertinent information or observation during Inspection (e.g. snow levels - ILS/Glides, grass length, weeds etc.) Record Observations / Actions Taken.

Appendix B Airfield Condition Report.