The Advanced Technology Solar Telescope and NSO. Jim Ulvestad Craig Foltz March 7, 2013

Similar documents
NSF/AST Update to CAA. Richard Green Division Director, MPS/AST

Princeton Astrophysics Community Meeting

an NSF Facility Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

Welcome to the NRC. Nuclear Energy Tribal Working Group 10/13/2016

Introduction to the Chinese Giant Solar Telescope

AURA MEMBER INSTITUTIONS

The Kentucky Mesonet: Entering a New Phase

Table of Contents and Executive Summary Final Report, ReSTAR Committee Renewing Small Telescopes for Astronomical Research (ReSTAR)

POLICY ISSUE (INFORMATION)

The Cassegrain ADC for Keck I Preliminary Design Review Process and Charter September 15, 2003 By Sean Adkins

Giant Magellan Telescope Project Byeong-Gon Park Korea Astronomy and Space Science Institute

New Worlds, New Horizons in Astronomy and Astrophysics

NSF s Role in Funding Laboratory Astrophysics

Dr. William Smith, President Dr. Heidi B. Hammel, Vice President Association of Universities for Research in Astronomy

Internal Audit Report

MAJOR SCIENTIFIC INSTRUMENTATION

FY15 President s Budget Request for NASA Astrophysics

For personal use only

Why Study Magnetic Reconnection?

NASA s Contribution to International Living With a Star

DOE Office of High Energy Physics Perspective on DUSEL

Cornell Caltech Atacama Telescope Project Status. Simon Radford 2005 October 10. Study Status

Kitt Peak Nightly Observing Program

Fujiwara, H., et al. 2009, ApJL, 695, L88 Hot debris dust around HD

MAJOR SCIENTIFIC INSTRUMENTATION

Dr. Steven Koch Director, NOAA National Severe Storms Laboratory Chair, WRN Workshop Executive Committee. Photo Credit: Associated Press

NSF Division of Astronomical Sciences. Senior Review. Town Meetings

March 4, 2013 Eric P. Smith JWST Program Office

2018 Annual Review of Availability Assessment Hours

2014 Annual Mitigation Plan Review Meeting

Solar Activity during the Rising Phase of Solar Cycle 24

Status Report SubarU Users Meeting. Instrument & Facility Development MSE Update Strategic Outreach New Programs Building Community Bridges & Outlook

Northern Alberta Institute of Technology

Earth Science Flight Mission Overview

Dark Sky Initiative Draft Terms of Reference

RETA 6422: Mainstreaming Environment for Poverty Reduction Category 2 Subproject

Establishment of Space Weather Information Service

Presentation to: Committee on Strategic NASA Science Missions 7 December Jacqueline N. Hewitt Chair, New Worlds New Horizons Midterm Assessment

SDT Interim Reports. Paul Hertz. Director, Astrophysics Division Science Mission Directorate. March 26, 2014

Federal Aviation Administration

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Temple City Unified School District A District of High Achieving Schools

Committee to Assess Beyond Einstein Missions: Study Work Plan and Schedule

McMath-Pierce Adaptive Optics Overview. Christoph Keller National Solar Observatory, Tucson

Overview of Thirty Meter Telescope Project

Six Days at the Edge of Space: 10 Years of HASP Balloon Flight Operations

NOAA S2S Planning. Dave DeWitt Fred Toepfer

Hubble Space Telescope: NASA s Plans for a Servicing Mission

Current Outlook for Scientific Research with Super Pressure Balloons

International Dark Sky Park Designation Annual Report Nomination Package

HST AND BEYOND EXPLORATION AND THE SEARCH FOR ORIGINS: A VISION FOR ULTRAVIOLET- OPTICAL-INFRARED SPACE ASTRONOMY

Status report on current and future satellite systems by EUMETSAT Presented to CGMS-44, Plenary session, agenda item D.1

Solar photovoltaic energy production comparison of east, west, south-facing and tracked arrays

November 3, 2014 Eric P. Smith JWST Program Office

Progress Report. Data Manager Activity. Regional Cooperation for Limited Area Modeling in Central Europe. Prepared by: Period: Date:

Implementation Status & Results Belize Municipal Development (P111928)

DISCUSSION ITEM DEVELOPMENTS REGARDING THE THIRTY METER TELESCOPE AND THE PARTICIPATION OF THE UNIVERSITY OF CALIFORNIA EXECUTIVE SUMMARY

Midterm Assessment of the Heliophysics Decadal Survey

5 February 2004 MEMORANDUM. To: Dan Fabricant From: Scott Kenyon Subject: Time Allocation at FLWO and the MMT

NEW CGMS BASELINE FOR THE SPACE-BASED GOS. (Submitted by the WMO Secretariat) Summary and Purpose of Document

Heidi B. Hammel. AURA Executive Vice President. Presented to the NRC OIR System Committee 13 October 2014

Proposal for a US strategy towards physics & detectors at future lepton colliders

Vermont Soil Climate Analysis Network (SCAN) sites at Lye Brook and Mount Mansfield

INTERNATIONAL. Member Observatory. The Boquete Optical SETI Observatory. (11/5/15)

OHIO S NEW CLASS II REGULATIONS AND ITS PROACTIVE APPROACH TO SEISMIC MONITORING AND INDUCED SEISMICITY

FIVE FUNDED* RESEARCH POSITIONS

DMR Support for National User Facilities and Major Instrumentation Projects

Science and Status of the Maunakea Spectroscopic Explorer

The Frequency Agile Solar Radiotelescope

CAISO Participating Intermittent Resource Program for Wind Generation

NASA s Activities in Europe

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

Lifetime and Durability Study of Perovskite Solar Cells

June 2016 E-Newsletter of the Sonoma County Astronomical Society

Revised Test Plan for Seasonal Monitoring Program using HWD Testing

The Vaisala AUTOSONDE AS41 OPERATIONAL EFFICIENCY AND RELIABILITY TO A TOTALLY NEW LEVEL.

Community and Infrastructure Services Committee

Implementation Status & Results Ethiopia Tana & Beles Integrated Water Resources Development (P096323)

The importance of ground-based observations of the solar corona

District Office Pacing Calendar Science Grade 8

Unidata Policy Committee NOAA/NWS Update

Fleming County Schools Long Range Plan Teacher(s):

UNESCO Thematic Initiative. Astronomy and World Heritage

From the Ground Up: Balancing the NSF Astronomy Program

Table of Contents and Executive Summary Final Report, ALTAIR Committee Access to Large Telescopes for Astronomical Instruction and Research (ALTAIR)

Bringing Renewables to the Grid. John Dumas Director Wholesale Market Operations ERCOT

Project Scientist Status Report Al Wootten Interim Project Scientist JAO/NRAO

Newsletter Newsletter Published on Division for Planetary Sciences ( Issue 16-40, October 16, 2016

(Towards) a km 3 detector in the Mediterranean Sea

Proposed National Large Solar Telescope. Jagdev Singh Indian Institute of Astrophysics, Bangalore , India.

The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325)

PRMS WHITE PAPER 2014 NORTH ATLANTIC HURRICANE SEASON OUTLOOK. June RMS Event Response

Which Earth latitude receives the greatest intensity of insolation when Earth is at the position shown in the diagram? A) 0 B) 23 N C) 55 N D) 90 N

Introduction to the Harvard- Smithsonian Center for Astrophysics

UPDATED 7 SEPTEMBER 2018

Multivariate Regression Model Results

SONOMA COUNTY ASTRONOMICAL SOCIETY

District Office Pacing Calendar Science Grade 8

Seasons Page 520. A. What Causes Seasons?

U.S. Geological Survey Agency Briefing for MAPPS Mark L. DeMulder Director, National Geospatial Program. March 12, 2013

Transcription:

The Advanced Technology Solar Telescope and NSO Jim Ulvestad Craig Foltz March 7, 2013

The ATST Science Case ATST s relevance re-affirmed by recent NRC Solar and Space Physics and Astronomy & Astrophysics Decadal Surveys. The Sun s atmosphere is highly dynamic. This dynamic nature is driven by interplay of turbulent convection and magnetic fields, the origin, interaction, and annihilation of which we do not understand. Changes in the solar magnetic field produce solar flares, coronal mass ejections, and variations in the solar wind, the manifestations of space weather. Space weather has potentially profound impacts on human society ATST will probe the magnetic fields at all levels of the solar atmosphere down to equilibrium length scales (20-30 km). No other facility, existing or planned, ground- or space-based, can do this.

ATST Milestones Final Design Review established project baseline May 2009 Awards totaling $298M authorized (NSB-09-57) August 6, 2009 Federal environmental compliance completed December 2, 2009 Construction funding (ARRA &MREFC) awarded January 2010 Anticipated access to Haleakala site June 2010 Conservation District Use Permit granted by BLNR December 2, 2010 CDUP challenged by Kilakila o Haleakala December 3, 2010 Contested case hearing July 2011 Final arguments presented to BLNR September 14, 2012 BLNR issues final decision affirming the CDUP November 9, 2012 Access to site December 1, 2012 Total delay of ~29 months.

Ramifications and Next Steps 2009 project baseline is no longer valid. Progress measured against original resource-loaded schedule shows large negative variances. The delay has cost implications and additional budgetary complexity arises due to coupling of delays with the expiration of ARRA funds. Project de-scopes have been implemented. Further de-scopes would have significant impact on performance. New baseline i.e., cost, schedule, and risk was reviewed by an expert panel October 16-18. Panel issued a generally positive report strong PM, safety program, requirements tracking, etc., but noted some deficiencies in the new baseline: insufficient schedule contingency, inconsistencies in methodology for contingency determination. Project is acting on review recommendations. Final review report expected in Mid-March. AST will bring the new baseline to the NSF Director and NSB for discussion this spring and summer.

Current Status Fabrication of the Telescope Mount Assembly is ongoing at Ingersoll Machine Tool, Rockport, IL. Fabrication of the Enclosure is ongoing at AEC-Idom (Spain). Final M1 blank in fabrication at Schott. On Haleakala: Major excavation is complete. Concrete pouring has begun. Infrastructure improvements (utility conduits, power improvements) nearly complete. Endangered species (Hawaiian Petrel) habitat conservation programs in their second year. Installation of ungulate fence awaits permit from the Board on Land and Natural Resources. Mountain activities are slightly ahead of schedule. Current schedule has completion in mid-2019, budget permitting.

The ATST primary mirror commissioning blank, fully exposed, on its support structure being examined by technical staff from Large Optics Shop at the College of Optical Sciences, University of Arizona. Foundation preparation for the enclosure factory assembly work in the Tallares Hilfa factory in Basauri, Spain. Image courtesy of AEC-Idom, January 2013. The spare M5 Silicon Carbide mirror mounted to the tip tilt module and its adjustable platform (that will eventually mount to the top of the tower on ATST ).

NSO Status Current cooperative agreement (CA) will be extended through FY 2014. Renewal CA will not be competed. Renewal proposal will be submitted after budget guidance is provided by NSF, after release of the President s Budget Request. Possible NSO move to Boulder will be considered as part of this renewal proposal. Search for a new NSO Director is nearing completion (AURA activity). NSO is actively seeking operators for the McMath/Pierce telescope and potential future occupants of the Sac Peak site.

MPS/AST Portfolio Review Because budget outlook is much below assumptions of all decadal surveys, the MPS Directorate empaneled an AST Portfolio Review Committee in 2011 2 of 17 members have significant solar physics expertise Report delivered in August 2012 Main NSO-related recommendations Continued high priority for ATST; Dunn Solar Telescope to remain open until two years before ATST reaches operational state Divestment of McMath-Pierce, which was already planned AST should spend no more than $2M/yr on synoptic program (GONG and SOLIS); seek partners for remaining cost or else divest completely. Divestment decisions not yet made for recommended lower priority AST facilities (including other radio and night-time optical telescopes), but all have been encouraged to seek partnerships and/or explore lower-cost operations models.