Organized Chain-Up and VSL

Similar documents
WRTM and Active Transportation and Demand Management

Weather Responsive Traffic Management. Wyoming DOT Variable Speed Limit (VSL) Project. March 2012

National Rural ITS Conference 2006

Weather Responsive Traffic Management. WYDOT VSL Project. October 2011

NEWS RELEASE. Province boosts winter highway safety measures

Transportation and Road Weather

Winter Maintenance on Ontario s Highways

Weather Information for Road Managers

PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS

10/18/2016 The Hoosier Co. Inc W. 86th Street, Indianapolis, IN

UDOT Weather Program Traffic Operations Center

National Symposium on Extreme Weather Event Impacts on Transportation Infrastructure

Identify the letter of the choice that best completes the statement or answers the question.

Traffic Control Weather Policy

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description

MDSS and Advanced Forecasting STSMO Weather Workshop Dave Huft, SDDOT Research Program Manager September 12, 2017

Plow Camera and Location Sharing Practices. National Rural ITS Conference October 23, 2018

FHWA Road Weather Management Program Update

Snow Response in an Urban Setting

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS

Dunn County Snow Removal Policy

Town of Windsor. Department of Public Works

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

10/18/2016 The Hoosier Co. Inc W. 86th Street, Indianapolis, IN

Significant Events: A Multi-Level Approach to Significant Event Response

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

City of Laramie, Wyoming SNOW AND ICE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

GREEN SHEET. California Department of Forestry and Fire Protection (CAL FIRE)

CEE 320 Midterm Examination (50 minutes)

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

Work Sheet. Adverse Condition Factors Module 9

Planed treatment recommendations

MTO s Road Weather Information System (RWIS)

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

Opportunities to Improve Work Zone & Road Weather Management with Connected Vehicles

A Guideline for Training Patrol Staff Ontario Good Roads Association

How Can DOT Operations and Maintenance Prepare for Extreme Weather Events?

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director

WHITE PAPER. Winter Tires

Quality Pavement Markings

CEDAR COUNTY ORDINANCE NO. 6

TMC Monthly Operational Summary

Topics. Test Objective. Participating Manufacturers 2/23/2010. ITE/IMSA Joint Conference SeaTac Doubletree Hotel February 22, 2010.

City of Camrose Winter Road Maintenance Policy

YOUR VEHICLE WINDOWS

Chapter 3 Snow & Ice Training Program Annual Review Checklist Wing Plow Operational Guidelines

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

Town of Oconomowoc Snow & Ice Control Policy

The Montague Doppler Radar, An Overview

What we are trying to accomplish during the winter season

TMC Monthly Operational Summary

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

ALASKA ITS. Vehicles and Observations in the cloud

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

Winter Storm Response - January 2016 Due to the uncertainty of the event, we must be prepared

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

Winter Plowing and Deicing: Saving Money, Salt and Labor by Distinguishing Best Practices From Urban Legends. Stephen J. Druschel, PhD, PE, F.

Winter Maintenance Report

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

Motorists are urged to drive wisely and cautiously in all winter weather situations:

Commercial Salt Applicator Certification

ICE STORM! Emergency Preparedness Exercise February 20, 2008

Coconino County Common Snow Plow Questions/Concerns

CELSIUS - ALL WEATHER TIRES

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution

Innovations in Road Weather. Jon Tarleton Senior Marketing Manager / Meteorologist

Research Needs for Weather-Responsive Traffic Management

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

WINTER STORM Annex II

DELAWARE COUNTY ORDINANCE NO. 3

Maintenance Office Provincial Highways Management Division Ministry of Transportation. Winter Highway Maintenance Action Plan

Karl Reichle. Mark Owens. and. present :

Deploying the Winter Maintenance Support System (MDSS) in Iowa

IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY

Effect of Environmental Factors on Free-Flow Speed

Session 6: and Evaluation. M c Farland Management, LLC

CHAPTER 3. CAPACITY OF SIGNALIZED INTERSECTIONS

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

John A. Carlson Snow and Ice Removal

Evaluating the Potential of Remote Sensing Rural Road and Travel Conditions

The Reporting of Winter Road Conditions A panel discussion of how and the implications of reporting road status and conditions

Portable Changeable Message Sign (PCMS) Speed Study

Dalton Highway Flood - Disaster in the Arctic

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

1st Annual Southwest Ohio Snow Conference April 8, 2010 Abner F. Johnson, Office of Maintenance - RWIS Coordinator

Dust Storms in Arizona: The Challenge to Ensure Motorist Safety Jennifer Toth, P.E. Deputy Director for Transportation

SNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)

RESOLUTION NO INTRODUCTION

1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment

Weather Information for Surface Transportation (WIST): Update on Weather Impacts and WIST Progress

Deicing Chemicals - State of Practice

The Next Generation of Traffic Management Systems

2016 APWA Snow Conference. Web-based GIS for Municipal Snow Operations

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081

Winter Roads Maintenance

Snow and Ice Management

Transcription:

Organized Chain-Up and VSL Jim Mahugh, PE WSDOT SC Region Traffic Engineer North/West Passage VSL Peer Exchange January 28, 2015

Snoqualmie Pass 2

Limits of VSL EB: MP 48.12 to 66.56 WB: MP 46.69 to 66.90 VSL FACTS: Started in mid 1990s Was created primarily for winter weather conditions Originally included infrastructure to vehicle communication Originally had a program with a speed limit algorithm that would adjust the speed Originally had RWIS and radar input and tried to use a scientific method to set speed limits 3

VSL as we Currently Use It: Winter weather Maintenance and construction activities WSDOT workers set the speed limit using a speed limit reference chart RWIS and radar information are not used to set the speed limit Source: www.aaroads.com/west/washington090/i-090_wb_exit_047_02.jpg 4

Date, time and initials of last edit 5

Speed Limit Traction Requirements DRAFT Speed Limit Reference Table DRAFT Pavement Condition Weather 70/65* None Dry or bare/wet Fair to moderate rain Incidents Incident on shoulder not impeding the flow of traffic 60 None N/A N/A N/A 55 45 35 Traction Tires Advised Oversize Loads Prohibited Light snow, slush, or ice in places Traction Tires Compact snow, deep Required slush, areas of Vehicles over 10,000 shallow water Must Chain Up Chains Required On All Vehicles except 4WD Severe freezing rain, deep snow, slush or standing water Heavy Fog, hard rain or moderate snowfall Heavy rain or heavy snowfall Heavy snowfall Incident on shoulder and fire/ambulance are present Lane(s) blocked but traffic is still moving Lanes blocked and traffic stopped ahead Maintenance or Construction Activity Workers are off the highway or on the shoulder and not immediately adjacent to an active lane Very short duration work zone Mobile operations on the shoulder Rolling slowdowns. Use the right twothirds of the VSL to message that rolling slowdowns are taking place. Workers are adjacent to an active lane separated from adjacent traffic only by cones Work zone with traffic control devices deployed Mainline down to one lane Mobile operations in the lane Narrow lanes and shoulders with barrier separation Not allowed. Maintenance or construction activity that requires a greater than 10 mph reduction in speed limit must be approved by the State Traffic Engineer per Directive 1060 * 60 mph maximum for trucks. EB between MP 48.12 & 66.56 and WB between MP 46.69 and 66.90 the maximum allowable speed limit is 65 mph with 60 mph for trucks Date, time and initials of last edit 6

Variable Speed Limits and Organized Chain-Up How we use variable speed limits and organized chain-up to improve flow Date, time and initials of last edit 7

I-90 Organize Chain-up (OCU) The Problem: 70 times a year snow and ice cover I-90 requiring chains. Around 300 trucks per hour (plus cars) in a disorganized fashion overwhelm the space creating conditions that have been described as utter chaos. 8

I-90 Chain-up The Problems Several problems converge to create the congestion: Chain-up areas were designed in the early 70 s and are too small to accommodate today s traffic volumes. Some trucks park waiting for the conditions to improve (rest and go off the books ), thereby reducing the space available. Lane stripes are effectively eliminated. The right-hand lane(s) become part of the chain-up area. 9

I-90 Organized Chain-up The beginning 2005: Funding approved to expand 5 miles of I-90 near the summit of Snoqualmie Pass to three lanes. October 2007: A cross sectional group of WSDOT staff and consultants began discussing the problems and objectives for chainup operations. A world wide search found that no one was attempting to facilitate a technological solution for chain-up operations. 10

Organized Chain-Up Goals If we can get the chain-up area organized, we will: Improve safety by providing: Buffer area between moving traffic and those chaining up Defined paths for vehicle movement Keep vehicles from being locked in by double parking Reduce freight delays Increase thru-put Keep traffic moving Allow for plowing 11

250 Truck Volumes during the 12/6/12 Snow Event S903 (10 min east of Gold Creek) - Input Volumes S902 (10 min west of Gold Creek) - Output volumes 200 150 100 The downstream volumes decrease greatly during a chain up event. Output volumes went up only after chains were no longer required. 50 Traction Tires Required 0 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 12

Date, time and initials of last edit 13

I-90 Gold Creek Geometrics Former chain up area was designed for only 1 truck wide overall length was 5800 feet long New area offers a 30 wide chain area and length of 9300 feet long 14

Increased Geometrics & no ITS, Same old problems 15

Organized Chain-Up: Final Design An overview of the Gold Creek organized chain-up System 16

Organized Chain-up: Temporary Configuration Parts of the Gold Creek OCU system not available winter 13-14 17

Organized Chain-Up: Temporary Configuration Signing will direct trucks to form a single lane guide you to open spaces along the 9000 stretch. 18

Temporary Configuration Advanced Messaging Advanced VMS 3.75 mi When Traction Tires Required become required advanced messaging will be used to usher passenger vehicles to the left lane and trucks over 10,000 GVW to use the right lane Once I-90 phase 1C is completed three full size VMS in ½ mile spacing will provide more enhanced messaging. Advance Meter VMS 400 19

Organized Chain-Up Software Interface 20

Speed Limit Traction Requirements DRAFT Speed Limit Reference Table DRAFT Pavement Condition Weather 70/65* None Dry or bare/wet Fair to moderate rain Incidents Incident on shoulder not impeding the flow of traffic 60 None N/A N/A N/A 55 45 35 Traction Tires Advised Oversize Loads Prohibited Light snow, slush, or ice in places Traction Tires Compact snow, deep Required slush, areas of Vehicles over 10,000 shallow water Must Chain Up Chains Required On All Vehicles except 4WD Severe freezing rain, deep snow, slush or standing water Heavy Fog, hard rain or moderate snowfall Heavy rain or heavy snowfall Heavy snowfall Incident on shoulder and fire/ambulance are present Lane(s) blocked but traffic is still moving Lanes blocked and traffic stopped ahead Maintenance or Construction Activity Workers are off the highway or on the shoulder and not immediately adjacent to an active lane Very short duration work zone Mobile operations on the shoulder Rolling slowdowns. Use the right twothirds of the VSL to message that rolling slowdowns are taking place. Workers are adjacent to an active lane separated from adjacent traffic only by cones Work zone with traffic control devices deployed Mainline down to one lane Mobile operations in the lane Narrow lanes and shoulders with barrier separation Not allowed. Maintenance or construction activity that requires a greater than 10 mph reduction in speed limit must be approved by the State Traffic Engineer per Directive 1060 * 60 mph maximum for trucks. EB between MP 48.12 & 66.56 and WB between MP 46.69 and 66.90 the maximum allowable speed limit is 65 mph with 60 mph for trucks Date, time and initials of last edit 21

Operational Pictures 22

23

Sometimes hard to see anything! 24

What Obstacles Are We Overcoming Misconceptions and educational opportunities along the way: Learning curve may take several seasons Adjustments may be required as we gain experience This process is one of a kind, therefore new to everyone Worse case, we shut it off and we return to how it was We will have phases for special cases including: Pass closures Stuck vehicles and more With support and effort we will move closer to accomplishing our goals of increased flow, reduced congestion, greater safety and less delays 25

Public Outreach Efforts Information on the organized chain-up system and how it works at: Truck Stops Weigh Stations Rest Areas Presentations Web site and portfolios information WSP joint participation http://www.wsdot.wa.gov/winter/chainup. 26

Organized Chain-Up What does the future hold?

Organized Chain-Up: Future An overview of the Gold Creek organized chain-up System 28

5/3/2013 3:51 PM jtd Organized Chain-Up: Future By Doubling the lanes of chain up we can also double the capacity 2 lanes x 9300 = 18,600 Parking 300% more than prior to construction 29

Organized Chain-Up: Future Phase 1 Phase 2 Phase 3 30

Organized Chain-Up: Pull Thru Lane Filling the spaces while ensuring space is available is key to the operation Trucks may queue up in right lane to enter the area waiting for an available space Trucks enter on green once space is available for them Keeping a pull through lane open is key to avoid trapping vehicles and allow new vehicles to enter the chain-up area 31

Organized Chain-Up: Concerns Concerns with implementation Pull through lane Liability Closing active travel lane for chain up parking Safety Enforcement Not having full system in place 32

Enforcement will be Important Enforcement will require coordination between Washington State Patrol (WSP) and the TMC operators. Keeping the pull thru lane open and cleared of vehicles. People behave better when the blue lights are present. Source: http://media.bonnint.net/seattle/7/709/70938.jpg 33

Lessons Learned Be ready for the phone calls Get stakeholders on board early (WSP & Truckers) Failure resulted in curtailed deployment & results. Have advanced VMS installed for messaging. We will not have a complete system for about 3 years. Don t count on construction project timelines. Write it into contract specifications if you must have certain items installed at certain times. Have a programmer on staff Plan on the Engineers running the new system a few times before handing over to the TMC operators. Try to eliminate human opinion of an appropriate speed limit Train the operators on appropriate speed limits Have a VMS at the very end of the Chain-Up area 34

Lessons Learned Max 30 minutes parking is key Use VMS approaching the area to warn truckers of the max 30 minutes parking Make presentations at your local trucking association Give handouts to the Commercial Vehicle Enforcement Officers Put handouts in weight stations Educate law enforcement 35

If you have a long chain-up area, do not activate the whole system at the beginning of the storm. Activate it in sections. The downstream section first and then move upstream. 36

For more information http://www.wsdot.wa.gov/winter/chainup. Jim Mahugh, P.E. WSDOT South Central Region Region Traffic Engineer mahughj@wsdot.wa.gov 37