Remedial Program. GE Hudson Falls Plant Site. GE Hudson Falls Plant Site. TDCS Status

Similar documents
Soil Sampling Results Former Truck Maintenance Garage

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Habitat Monitoring Update Hudson River CAG November 16, 2017

Imagine the result Sediment Sampling Plan. 1½-Mile Reach of the Housatonic River. General Electric Company Pittsfield, Massachusetts

INNOVATIVE TECHNIQUES TO INVESTIGATE CONTAMINATION IN FRACTURED BEDROCK

Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee. Quarterly Report October 1 December 31, 2014

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016

Drilled Shafts for Bridge Foundation Stability Improvement Ohio 833 Bridge over the Ohio River An Update

Geosynthetics Applications and Performance Reviews Select Case Histories

10. GEOTECHNICAL EXPLORATION PROGRAM

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Data Report for White Point Landslide Boring B-12 W.O. E Task Order Solicitation San Pedro District Los Angeles, California

DESIGN-PHASE GEOLOGIC FRAMEWORK MODELING FOR LARGE CONSTRUCTION PROJECTS

Update on Archaeological Resources Assessment for Phase 1 Dredge Areas

AECOM tel 8000 Virginia Manor Road Suite fax Beltsville, Maryland 20705

Use of Non-Invasive Near-Surface Geophysics for Managing Brine Releases

Geophysical Exploration in Water Resources Assessment. John Mundell, P.E., L.P.G., P.G. Ryan Brumbaugh, L.P.G. Mundell & Associates, Inc.

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY RE.GION BROADWAY NEW YORK, NEW YORK

Formation Stratigraphy and Interfingering at the Port of Miami

CSO Post-Construction Monitoring and Performance Assessment

BOS 100 Overburden and Bedrock Groundwater Remediation Former Dry Cleaning Facility

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

enclosure: Avalanche Defense Work Study for the Timber Falls Corporation, Vail, Colo.

Krasny license: Operational update February 2016

Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources

February 22, 2011 Picatinny Team Meeting Edison, New Jersey

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

Stakeholders Advisory Working Groups (SAWGs) Environmental SAWG Meeting #10

Pressure Grouting of Fractured Bedrock to Control Acid Mine Drainage

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

Drilled Shafts for Bridge Foundation Stability Improvement: Ohio 833 Bridge over the Ohio River. Meigs County, Ohio Mason County, West Virginia

Revisions to Text Based on Completion of Tier III Validation. Section 1. Section 4.2

Moglicë HPP - Albania. Jorge Terron

East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project

Remedial Investigation of Sediments in NJDEP s Site Remediation and Waste Management Program

Geophysical Methods for Screening and Investigating Utility Waste Landfill Sites in Karst Terrain

Geological Models for Infrastructure Design:

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Appendix D Rock Blasting Report

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

BUFFALO RIVER COALITION PO Box 101, Jasper, AR (870)

4.12 Mineral Resources

Vegetation and Wildlife Habitat Mapping Study in the Upper and Middle Susitna Basin Study Plan Section 11.5

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

NSW MINING Health, Safety, Environment & Community

SECTION 2 AMBIENT AIR MONITORING PROGRAM PLAN AMENDMENT FORM: ISSUE 18 DATE FORM SUBMITTED: 2/10/11

QAPP AMENDMENT FORM: Amendment # 18

3.12 Geology and Topography Affected Environment

Update on the seismic evaluation of the plans for Shaft #4 in the Cayuga Salt Mine, New York State April 11, 2017

Initial Borehole Drilling in the Hornepayne and Manitouwadge Area

Maximizing the Capital Efficiency of Contaminated Upstream Oil and Gas Sites Assessments by Using Geostatistical Modeling Approach

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Mitigation of Gypsum Mine Voids Under SR-2 in Ottawa County, Ohio

Permeable Treatment Wall Project

Bedrock Associated with the Ranch House at the Tallgrass Prairie National Preserve, Chase County, Kansas

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017

MISSISSIPPI COASTAL IMPROVEMENTS

GM POWERTRAIN BEDFORD FACILITY BEDFORD, INDIANA

FRIENDS OF THE EEL RIVER

Former Williams AFB Restoration Advisory Board (RAB)

Use of Tracer Dyes to Understand Fractured Bedrock Flow during a Pumping Test

GROUNDWATER MONITORING DATA 2016 SAMPLING EVENT HARSHAW CHEMICAL COMPANY FUSRAP SITE

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report

Rock Suitability Classification for POPLU

Estimating Remedial Volumes for a GLLA Project on the Milwaukee River

Needs Assessment: Permitting, i Data Management, Operations

Standardizing Visual Characterization of NAPL in Sediment Cores to Facilitate Remedial Decision-Making

ONONDAGA LAKE PRE-DESIGN INVESTIGATION: PHASE III WORK PLAN - ADDENDUM 2 Syracuse, New York

Bedrock Characterization Mottolo Pig Farm Superfund Site

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

GEOLOGY, SOILS, AND SEISMICITY

-- Lessons from a successful salmon stream and estuary relocation on Gravina Island

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Rock, Mosquito and Hummingbird: A Prehistory of Governors Island

SCEK Report on Phase I ( ) Induced Seismicity Monitoring Project (ISMP) Carlos Salas, VP Oil & Gas, Geoscience BC

February For. U.S. Environmental Protection Agency Region II and U.S. Army Corps of Engineers Kansas City District. Volume 2C Book 1 of 3

3.0 GEOLOGY AND HYDROGEOLOGY

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

1. Rock Mechanics and mining engineering

iii CONTENTS vii ACKNOWLEDGMENTS EXECUTIVE SUMMARY INTRODUCTION Study Area Data Sources Preparation of Geologic Maps

the Quarrying Industry Dewatering and the Quarrying Industry the Quarrying Industry

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

APPENDIX B SUBSURFACE EXPLORATIONS

Azimuthal Resistivity to Characterize Fractures in a Glacial Till. Mark Boris, University of Saskatchewan Jim Merriam, University of Saskatchewan

Initial Borehole Drilling and Testing in or Near Ignace

Geology, Soils, and Seismicity

A High Resolution Vertical Gradient Approach for Delineation of Hydrogeologic Units at a Contaminated Sedimentary Rock Field Site

CHAPTER 7 GEOLOGY AND SOILS

An Hypothesis Concerning a Confined Groundwater Zone in Slopes of Weathered Igneous Rocks

Engineering Geophysical Application to Mine Subsidence Risk Assessment

Precision of Environmental Dredging Factors and Processes

Association of Environmental & Engineering Geologists (AEG) To join AEG: Student membership is Free! Ask about our scholarships.

Transcription:

Updates on Remedial Programs at the GE Hudson Falls Plant Site and GE Fort Edward Plant Site GE Hudson Falls USEPA Community Advisory Group Meeting September 11, 2008 GE Fort Edward Division of Environmental Remediation New York State Department of Environmental Conservation Remedial Program GE Hudson Falls Plant Site GE Hudson Falls Plant Site Tunnel Drain Collection System Construction Status Update Record of Decision (ROD) - issued March 16, 2004 Ongoing work includes construction of the Tunnel Drain Collection System to prevent migration of PCB oil and contaminated groundwater from the bedrock beneath the site to the river Tunnel Drain Collection System Construction began in August 2007 Four phases shaft excavation, tunnel excavation, drain installation, tunnel fit-out TDCS Status Vertical shaft completed in March 2008 Tunnel excavation nearly complete; likely completion by October 2008 Phase 3 contractor work plan to be submitted 1

Tunnel Realignment Designed Tunnel Layout After evaluating geotechnical monitoring requirements in the vicinity of the Bakers Falls Dam during tunnel excavation, a realignment of the tunnel system was developed. The revised tunnel layout was approved by NYSDEC in June 2008. Designed Tunnel Layout Final Tunnel Layout Final Tunnel Layout Current Progress of Tunnel Excavation 2

Blasting Program Ground vibration and blast overpressure monitoring are being done to measure the impacts of blasting Nearby structures, including the Bakers Falls dam, are being monitored (survey of established control points after each blast) to measure impacts, if any, of blasting 3

Community Protection Air monitoring is being performed during all intrusive activities Dust monitoring during all operations PCB monitoring during operations once contractor was excavating in portions of the rock which could contain PCB DNAPL Air Quality and Mitigation Over the course of construction, mitigation measures were implemented to limit potential for PCB concentrations to exceed project criteria Mitigation measures included covering and watering spoils piles, and limiting activities during periods of high temperatures Mitigation measures were successful in limiting exceedances of project criteria Next Steps Phase 3 (Drain Installation) Work Plan October 2008 Phase 3 Implementation starting this fall, five months duration scheduled Phase 4 (Tunnel Fit Out) Work Plan early 2009 Phase 4 Implementation 2009, six months duration scheduled GE Fort Edward Plant Site Investigation of PCB oil in bedrock associated with the former 004 outfall area 4

GE Hudson Falls 004 Outfall Area GE Fort Edward GE Fort Edward Plant Site Bedrock Investigation 004 Outfall Area Initial Bedrock Investigations 2003, during implementation of Operable Unit 4 remedy Preliminary Investigations 2005 Remedial Investigation starting in 2007 Ongoing Remedial Investigation (RI) GE currently implementing the RI with State oversight The objective of the investigation is to delineate the extent of PCB oil in bedrock 5

Investigation Work Monitoring wells have been installed at a number of locations in the vicinity of the former outfall structure, and to the south and east All wells are being cored; each identified discrete open horizon was evaluated for well completion Rock core samples are sent to lab for rapid turn around PCB analyses Investigation Work Wells bailed / developed to check for DNAPL presence Groundwater samples collected for rapid turn around PCB and VOC analyses Some well locations adjusted in the field in response to initial investigation results Additional well locations / depths continue to be added Findings To Date PCB DNAPL identified at depth (> 200 feet) in vicinity of former outfall structure and to the south PCB DNAPL vertical or horizontal extent not yet delineated Discrete fractures in bedrock found to contain PCB in rock core samples Next Steps The overall scale at which the investigation is being performed continues to be modified; the PCB oil in bedrock is not limited to the immediate vicinity of the former outfall The next targeted stratigraphic interval is the upper Glens Falls limestone unit; ~ 300 ft depth Next Steps Additional monitoring wells are being installed this fall to the south, and west (across the river) DNAPL bail-down tests will also be performed to evaluate the potential for oil recovery from existing wells For More Information Kevin L. Farrar NYSDEC 625 Broadway 12 th Floor Albany NY 12233-7013 518-402-9778 kxfarrar@gw.dec.state.ny.us 6