The World Bank EGYPT-Farm-level Irrigation Modernization (P117745)

Similar documents
Public Disclosure Copy

Public Disclosure Copy

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank Uganda Energy for Rural Transformation III (P133312)

The World Bank Ecuador - Sustainable Family Farming Modernization Project (P151963)

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180)

Public Disclosure Copy

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Ecuador - Sustainable Family Farming Modernization Project (P151963)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

The World Bank Dam Operational Improvement and Safety (P096532)

Public Disclosure Copy

The World Bank Zambia Water Resources Development Project (P114949)

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report DJ-Rural Community Development and Water Mobilization Project (PRODERMO) (P117355)

Public Disclosure Copy

The World Bank Second Irrigation and Drainage Improvement Project (P086592)

PAMSIMAS Support Trust Fund (P116236)

The World Bank Local and Regional Competitiveness Project (P154263)

Name Previous Rating Current Rating

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

Public Disclosure Copy

Public Disclosure Copy

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

The World Bank Cusco Regional Development (P117318)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Integrated Forest Ecosystem Management (P151102)

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Regional Infrastructure Development Fund (P154947)

Public Disclosure Copy

Public Disclosure Copy

SOUTH KARAKALPAKSTAN WATER RESOURCES MGMT IMPROVEMENT (P127764)

The World Bank Strengthening Social Safety Net Project (P145699)

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

Public Disclosure Copy

The World Bank Can Tho Urban Development and Resilience (P152851)

Urban Water Supply Project (P156739)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Tanzania: Resilient Natural Resource Management for Tourism and Growth (P150523)

The World Bank Second Irrigation and Drainage Improvement Project (P086592)

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441)

Public Disclosure Copy. First Part of the Second Phase of the Niger Basin Water Resources Development and Sustainable

Public Disclosure Copy

The World Bank Mali Reconstruction and Economic Recovery (P144442)

Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA) (P126744)

Public Disclosure Copy. Implementation Status & Results Report Cambodia Global Partnership for Education Second Education Support Project (P144715)

Public Disclosure Copy

The World Bank Guilin Integrated Environment Management (P133017)

The World Bank Mali Reconstruction and Economic Recovery (P144442)

Public Disclosure Copy

The World Bank Ho Chi Minh City Green Transport Development (P126507)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

EC Ibarra Transport Infrastructure Improvement Project (P147280)

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

Public Disclosure Copy

Third South West Indian Ocean Fisheries Governance and Shared Growth Project (SWIOFish3)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Earthquake Housing Reconstruction Project (P155969)

Public Disclosure Copy

Implementation Status & Results Report Red Sea and Gulf of Aden Strategic Ecosystem Management GEF Project (P113794)

Public Disclosure Copy

Public Disclosure Copy

The World Bank BiH Floods Emergency Recovery Project (P151157)

The World Bank Ghana - Maternal, Child Health and Nutrition Project (P145792)

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591)

Climate Adaptation and Mitigation Program for Aral Sea Basin CAMP4ASB (P151363)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

West Bank and Gaza: Finance for Jobs (P151089)

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Sri Lanka Strategic Cities Development Project (P130548)

SUSTAINABLE CITIES (P128605)

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

The World Bank Indonesia National Slum Upgrading Project (P154782)

The World Bank Senegal Tourism and Enterprise Development Project (P146469)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Girls Education and Womens Empowerment and Livelihood Project (P151451)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

Transcription:

Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 15 ARCHIVED on 24-Jul-2017 ISR28917 Implementing Agencies: Government of Egypt, Ministry of International Cooperation, Ministry of Agriculture and Land Reclamation Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:14-Dec-2010 Planned Mid Term Review Date:05-Oct-2015 Original Closing Date:30-Jun-2016 Project Development Objectives Effectiveness Date:10-Jul-2012 Actual Mid-Term Review Date:09-Jun-2015 Revised Closing Date:31-Dec-2017 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) 10. The project development objective is to increase agricultural profitability and improve equity in access to higher-quality water for up to 140,000 small-scale farmers on up to 200,000 feddans (80,000 hectares) in the command areas of Mahmoudia, Manaifa and Meet Yazid located in the Nile Delta. This would be conducted specifically in areas where upstream irrigation improvement interventions, both physical and institutional, have occurred and are fully functional. These objectives would be achieved through both structural improvements and a strengthening of farmer support services. Has the Project Development Objective been changed since Board Approval of the Project Objective? Yes Board Approved Revised Project Development Objective (If project is formally restructured)phrpdodel The revised project development objective is to increase access to improved irrigation systems in the project areas of Mahmoudia, Manaifa and Meet Yazid located in the Nile Delta, in an equitable manner. Public Disclosure Authorized Components Name Component 1: Marwa and Farm-Level Irrigation Improvements (approximately US$139.3 million excluding contingencies).:(cost $139.30 M) Component 2: Farm-level Technology Modernization (approximately US$ 14.1 million excluding contingencies).:(cost $14.10 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory 7/24/2017 Page 1 of 10

Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions After several months of stalled progress because of the depreciation of the Egyptian currency, the pace of progress has picked up of late. Pumping stations are being renovated with new electrical pumps and refurbished stand-by diesel pumps. Thus, farmers are paying less for irrigation costs, spending less time on irrigation and enjoying other environmental and health benefits. Contract supervision has been enhanced through expert consultants, and contract implementation issues (e.g. payment of invoices) are being swiftly resolved. There are other notable project achievements, such as a functioning Geographic Information System, enhanced transparency and accountability through complaints centers, training of farmers in the operation of the modernized pumping stations and improved agricultural practices through Farmer Field Schools. Arrangements are being put in place to accelerate remaining works in light of the approaching closing date of the project. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Substantial Substantial Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Substantial Moderate Fiduciary -- Substantial Substantial Environment and Social -- Moderate Moderate Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Substantial Substantial Results Project Development Objective Indicators PHINDPDOTBL Water users provided with new/improved irrigation and drainage services (number) (Number, Custom) Value 0.00 60,000.00 84,528.00 140,000.00 7/24/2017 Page 2 of 10

Date 01-Feb-2015 30-Mar-2016 21-Jul-2017 31-Dec-2017 PHINDPDOTBL Water users provided with irrigation and drainage services - female (number) (Number, Custom Breakdown) Value 0.00 3,000.00 6,776.00 14,000.00 Date 01-Feb-2015 30-Mar-2016 21-Jul-2017 31-Dec-2017 PHINDPDOTBL Irrigation operating and maintenance cost reduced (Percentage, Custom) Value 0.00 12.00 12.00 30.00 Date 05-Jan-2011 20-Nov-2016 21-Jul-2017 31-Dec-2017 The indicator on irrigation operating and maintenance costs reduced (%) is measured seasonally. It will next be measured in September 2017 and is projected to increase substantially. PHINDPDOTBL Ratio of water availability (in cubic meters/hour) measured at tail and head ends (Percentage, Custom) Value 50.00 60.00 64.00 75.00 Date 01-Feb-2015 20-Nov-2016 21-Jul-2017 31-Dec-2017 PHINDPDOTBL Operational water user associations created and/or strengthened (number) (Number, Custom) 7/24/2017 Page 3 of 10

Value 0.00 0.00 1,283.00 1,000.00 Date 01-May-2011 05-Oct-2016 21-Jul-2017 31-Dec-2017 The indicator on operational water user associations created and/ or strengthened has been changed to reflect the strengthening of WUAs through trainings given during the mesqa pump improvements. Previously, PMU was reporting on Marwa Committees, which is important but is not in the evaluation criteria as set in the Legal Agreement. Overall Intermediate Results Indicators Direct project beneficiaries (Number, Custom) Value 0.00 62,140.00 96,645.00 140,000.00 Date 01-May-2011 20-Nov-2016 21-Jul-2017 31-Dec-2017 Female beneficiaries (Percentage, Custom Supplement) Value 0.00 5.00 6.50 10.00 7/24/2017 Page 4 of 10

Area provided with new/improved irrigation or drainage services (Hectare(Ha), Corporate) Value 0.00 28,720.00 39,092.00 80,000.00 Date 01-May-2011 20-Nov-2016 21-Jul-2017 31-Dec-2017 Current figure of 39,092ha is equivalent to 98,497 feddans. However, the end target needs to be clarified. There appears to be a mistake in the conversion from 80,000 hectares to feddans. 1 ha = 0.42 feddans, implying that 80,000 ha = 190,000 feddans. However, the Legal Agreement notes a conversion of 170,000 feddans in the comments section of this indicator, while the PAD notes 180,000 feddans. The TTL will seek the relevant Operations expert for advice on the appropriate target that PMU should use for measurement purposes. Area provided with new irrigation or drainage services (Hectare(Ha), Corporate Breakdown) Value 0.00 20,000.00 39,092.00 80,000.00 Date 01-May-2011 30-Mar-2016 21-Jul-2017 31-Dec-2017 Electric pump installed on mesquas (Number, Custom) Value 0.00 65,000.00 100,000.00 150,000.00 Date 05-Jan-2011 20-Nov-2016 21-Jul-2017 31-Dec-2017 The previous measurement of 65,000 feddans was an estimate. The current measurement reflects the area (ie feddans) not the number of electric pumps installed. 7/24/2017 Page 5 of 10

Water pumping costs reduced (Percentage, Custom) Value 0.00 15.00 50.00 30.00 Date 05-Jan-2011 20-Nov-2016 21-Jul-2017 31-Dec-2017 Labor time savings for farmers (Percentage, Custom) Value 0.00 10.00 40.00 30.00 Date 05-Jan-2011 20-Nov-2016 21-Jul-2017 31-Dec-2017 The figure refers to time savings as per the Legal Agreement results framework.b Targeted clients satisfied with agricultural services (percentage) (Percentage, Custom) Value 0.00 57.00 63.00 70.00 Date 01-May-2014 20-Nov-2016 21-Jul-2017 31-Dec-2017 Targeted clients satisfied with agricultural services - male (number) (Number, Custom Supplement) Value 0.00 3,606.00 4,559.00 7,000.00 7/24/2017 Page 6 of 10

Targeted clients satisfied with agricultural services - female (number) (Number, Custom Supplement) Value 0.00 350.00 541.00 700.00 Targeted clients- male (number) (Number, Custom Supplement) Value 0.00 500.00 996.00 1,000.00 Targeted clients female (number) (Number, Custom Supplement) Value 0.00 500.00 500.00 1,000.00 Client days of training provided (Number, Custom) Value 0.00 1,500.00 4,147.00 7,500.00 Date 01-Jan-2015 02-May-2016 21-Jul-2017 31-Dec-2017 7/24/2017 Page 7 of 10

Technologies demonstrated in the project areas (number) (Number, Custom) Value 0.00 6.00 14.00 15.00 Date 01-May-2011 20-Nov-2016 21-Jul-2017 31-Dec-2017 Area with higher-value horticultural crops grown (number of feddan) (Number, Custom) Value 0.00 0.00 0.00 100.00 Date 05-Jan-2011 05-Oct-2016 21-Jul-2017 31-Dec-2017 The lack of progress is due to the difficulty in finding suitable areas for horticulture up to now. During the July 2017 mission, PMU identified the area and will start irrigating with low-head bubblers. The indicator will likely be met by the next mission (September 2017). Monitoring and evaluation system established and applied (Percentage, Custom) Value 0.00 60.00 100.00 100.00 Date 05-Jan-2011 30-Mar-2016 21-Jul-2017 31-Dec-2017 Overall There have been some inconsistencies in how certain indicators are being measured. Some of these have been updated in this ISR but subsequent progress reports and ISRs will report on an improved results framework that adheres to the Legal Agreement s results framework. Data on Financial Performance Disbursements (by loan) 7/24/2017 Page 8 of 10

Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P117745 IBRD-79840 Effective USD 100.00 100.00 0.00 60.42 39.58 60% P117745 TF-13794 Closed USD 3.88 0.00 3.88 0.00 0.00 60% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P117745 IBRD-79840 Effective 14-Dec-2010 23-Sep-2011 10-Jul-2012 30-Jun-2016 31-Dec-2017 P117745 TF-13794 Closed 06-Jun-2013 13-Jun-2013 13-Jun-2013 30-Jun-2016 30-Jun-2016 Cumulative Disbursements Restructuring History Level 1 Approved on 21-Jun-2016,Level 2 Approved on 31-May-2017 Related Project(s) 7/24/2017 Page 9 of 10

There are no related projects. 7/24/2017 Page 10 of 10