2D Modeling of Flood Propagation due to the Failure of Way Ela Natural Dam

Similar documents
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

HYDRAULIC SIMULATION OF FLASH FLOOD AS TRIGGERED BY NATURAL DAM BREAK

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey.

FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS

Better estimation of Flood Wave Propagation Time in Meandering Reaches by using 2D-modelling

ISSN Vol.03,Issue.10 May-2014, Pages:

9. Flood Routing. chapter Two

ENGINEERING HYDROLOGY

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Numerical Hydraulics

Dam Break Analysis of Idukki Dam using HEC RAS

3D Numerical Modeling of Flow in Sedimentation Basin

Inverse distance weighting interpolated soil properties and their related landslide occurrences

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Transactions on Ecology and the Environment vol 8, 1994 WIT Press, ISSN

Calibration of Manning s Friction Factor for Rivers in Iraq Using Hydraulic Model (Al-Kufa River as Case study)

INTRODUCTION TO HEC-HMS

Grant 0299-NEP: Water Resources Project Preparatory Facility

D. MATHEMATICAL MODEL AND SIMULATION

Rapid Hazard Assessment of Heavy Rainfall Triggered Landslide Dams A Review

Dam Break Analysis Using HEC-RAS and HEC-GeoRAS A Case Study of Ajwa Reservoir

Vulnerability of Flood Hazard in Selected Ayeyarwady Delta Region, Myanmar

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA

Technical Memorandum No

Section 4: Model Development and Application

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

A distributed runoff model for flood prediction in ungauged basins

EFFECT OF SAND MINING ACTIVITY ON THE SEDIMENT CONTROL SYSTEM (A CASE STUDY OF SOMBE-LEWARA RIVER, DONGGALA, INDONESIA)

A Simple Procedure for Estimating Loss of Life from Dam Failure. Wayne J. Graham, P.E. 1

Two-dimensional urban flood simulation: Fukuoka flood disaster in 1999

UNIVERSITY OF BOLTON. ENGINEERING, SPORTS and SCIENCES BSC CIVIL ENGINEERING SEMESTER 1 EXAMINATION 2014/2015 WATER ENGINEERING MODULE NO: BLT3023

Prediction of landslide-induced debris flow hydrograph: the Atsumari debris flow disaster in Japan

Engineering Hydrology

Use of Geospatial data for disaster managements

FLOOD HAZARD AND RISK ASSESSMENT IN MID- EASTERN PART OF DHAKA, BANGLADESH

Leveraging new models and data to improve flood stage forecast. Improving Flood Stage Forecasting in the Feather River Watershed. September 11 th 2015

8 Current Issues and Research on Sediment Movement in the River Catchments of Japan

Zainab Mohamed Yusof*, Syura Fazreen Hamzah 1 & Shahabuddin Amerudin 2

FLOOD ROUTING FOR A SPECIFIC ORIENTATION OF PLANNED DEVELOPMENTS FOR AL-SHAMIYA RIVER IN IRAQ AS CASE STUDY

EFFICIENCY OF THE INTEGRATED RESERVOIR OPERATION FOR FLOOD CONTROL IN THE UPPER TONE RIVER OF JAPAN CONSIDERING SPATIAL DISTRIBUTION OF RAINFALL

International Journal Of Scientific & Engineering Research, Volume 7, Issue 7, July ISSN

Flash Flood Guidance System On-going Enhancements

Numerical modeling of sediment flushing from Lewis and Clark Lake

FLOODPLAIN MAPPING OF RIVER KRISHNANA USING HEC-RAS MODEL AT TWO STREACHES NAMELY KUDACHI AND UGAR VILLAGES OF BELAGAVI DISTRICT, KARNATAKA

Flood Hazard Inundation Mapping. Presentation. Flood Hazard Mapping

Bushkill Creek 3 rd Street Dam Removal Analysis

NUMERICAL MODEL FOR MOVABLE BED AS A TOOL FOR THE SIMULATION OF THE RIVER EROSION A CASE STUDY

Comparative Analysis of Flood Routing Methods

URBAN AREA HYDROLOGY AND FLOOD MODELLING

U.S. ARMY CORPS OF ENGINEERS

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

Integrating Weather Forecasts into Folsom Reservoir Operations

Rebuilding Flood-Conscious Society

COPPER MOUNTAIN MINE TAILINGS MANAGEMENT FACILITY DAM BREACH INUNDATION STUDY REVISION 1. Submitted to: Copper Mountain Mine (BC) Ltd.

Dr. S.SURIYA. Assistant professor. Department of Civil Engineering. B. S. Abdur Rahman University. Chennai

MATHEMATICAL MODELING OF FLUVIAL SEDIMENT DELIVERY, NEKA RIVER, IRAN. S.E. Kermani H. Golmaee M.Z. Ahmadi

4 th Joint Project Team Meeting for Sentinel Asia 2011

Chapter 4 Hydrodynamic Modelling of Glacial Lake Outburst Floods

Determination of flood risks in the yeniçiftlik stream basin by using remote sensing and GIS techniques

Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT

Predictions on arrival times of water of the St. Francis dam break flood using ANUGA

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Extreme Phenomena in Dobrogea - Floods and Droughts

3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e

Comparing HEC-RAS v5.0 2-D Results with Verification Datasets

HYDRAULIC MODELLING OF NENJIANG RIVER FLOODPLAIN IN NORTHEAST CHINA

Evaluation of Scour Depth around Bridge Piers with Various Geometrical Shapes

Beaver Creek Corridor Design and Analysis. By: Alex Previte

Interpretive Map Series 24

Haiti and Dominican Republic Flash Flood Initial Planning Meeting

Application of Mathematical Modeling to Study Flood Wave Behavior in Natural Rivers as Function of Hydraulic and Hydrological Parameters of the Basin

THE HYDROLOGICAL MODELING OF THE USTUROI VALLEY - USING TWO MODELING PROGRAMS - WetSpa and HecRas

Results of the Sava River Model

THE DEVELOPMENT OF RAIN-BASED URBAN FLOOD FORECASTING METHOD FOR RIVER MANAGEMENT PRACTICE USING X-MP RADAR OBSERVATION

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir

ASFPM - Rapid Floodplain Mapping

APPENDIX B HYDROLOGY

EFFECT OF TWO SUCCESIVE CHECK DAMS ON DEBRIS FLOW DEPOSITION

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc.

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS

Study 16.5 Probable Maximum Flood (PMF)

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner

Evaluation of flood management plan on Cilemer river basin, Indonesia

Abstract. 1 Introduction

SEDIMENTATION EFFECTS IN RESERVOIR TOWARD THE DECLINING FUNCTION OF FLOOD CONTROL

GIS Techniques for Floodplain Delineation. Dean Djokic

A Cloud-Based Flood Warning System For Forecasting Impacts to Transportation Infrastructure Systems

A fuzzy dynamic wave routing model

CWMS Modeling for Real-Time Water Management

Watershed Processes and Modeling

Guo, James C.Y. (1999). "Critical Flow Section in a Collector Channel," ASCE J. of Hydraulic Engineering, Vol 125, No. 4, April.

Stage Discharge Tabulation for Only Orifice Flow

FLOOD RISK MAPPING AND ANALYSIS OF THE M ZAB VALLEY, ALGERIA

Evaluation of Deposition Pattern of Wonogiri Reservoir Sedimentation

Practical aspects of dam break analysis

Preliminary Viability Assessment (PVA) for Lake Mendocino Forecast Informed Reservoir Operations (FIRO)

Estimating of Manning s Roughness Coefficient for Hilla River through Calibration Using HEC-RAS Model

WEST CATARACT CREEK DAM FINAL DESIGN REPORT

A STUDY ON DEBRIS FLOW DEPOSITION BY THE ARRANGEMENT OF SABO DAM

Transcription:

MATEC Web of Conferences 147, 03009 (018) SIBE 017 https://doi.org/10.1051/matecconf/01814703009 D Modeling of Flood Propagation due to the Failure of Way Ela Natural Dam Bagus Pramono Yakti 1,*, Mohammad Bagus Adityawan, Mohammad Farid, Yadi Suryadi, Joko Nugroho and Iwan Kridasantausa Hadihardaja 1 1 Graduate School of Civil Engineering, Institut Teknologi Bandung, Jalan Ganesha 10, Bandung 4013, Indonesia Water Resources Engineering Research Group, Institut Teknologi Bandung, Jalan Ganesha 10, Bandung 4013, Indonesia 3 Water Resources Development Center, Institut Teknologi Bandung, Jalan Ganesha 10, Bandung 4013, Indonesia Abstract. A dam break induced-flood propagation modeling is needed to reduce the losses of any potential dam failure. On the 5 July 013, there was a dam break generated flood due to the failure of Way Ela Natural Dam that severely damaged houses and various public facilities. This study simulated the flooding induced by the failure of Way Ela Natural Dam. A two-dimensional (D) numerical model, HEC-RAS v.5, is used to simulate the overland flow. The dam failure itself is simulated using HECHMSv.4. The results of this study, the flood inundation, flood depth, and flood arrival time are verified by using available secondary data. These informations are very important to propose mitigation plans with respect to possible dam break in the future. 1 Introduction Way Ela Dam was a dam located in Negeri Lima Village, Leihitu District, Ambon Island. This dam was formed naturally by landslide due to high rainfall on 13 July 01 [1]. Avalanche material was carried in the form of soil and rocks with a very large volume, thus closing the flow of the Way Ela River. The avalanche caused the formation of a dam on Way Ela River. A year after it was formed, on 5 July 013 flooding occurred due to an extreme rainfall that caused the failure of the natural dam. According to Badan Nasional Penanggulangan Bencana (BNPB), the generated flood depth was about 6-7 m and took the lives of 1 person while the number of refugees reached to 3,000 people. The flood caused by the failure of the natural dam at least destroyed more than 350 housing units and other public facilities. The climate change that causes extreme rainfall, has increased the frequency of floods, landslides, and increasing disaster risks caused by a dam failure []. Modeling the dam failure and the impact of the flood is necessary to reduce losses from the potential for dam failure [3]. A numerical model is often used to predict the flood propagation due to a dam failure, but the model used is generally still 1-D, so the distribution of inundation can not be predicted accurately. However the 1-D model approach can be used for certain cases, mostly used in channel planning, but it has limitations on runoff analysis [4]. At the time the water starts to overflow to surface, - D phenomenon occurs. Therefore, it is necessary to have the calculation of the area of inundation, water level inundation, and rapid flood flooding (flood travel time). By conducting such analysis, the disaster risk of the affected area can be known [5]. Way Ela dam failure was studied and modeled using Zhong Xing HY1 [6]. The study was based on the assumption that the dam failure was caused by middle piping due to a PMF (Probable Maximum Flood) discharge, although it was mentioned that the inflow during the incident was not due to a PMF discharge. Additionally, based on investigation report [7], the cause of the dam failure was overtopping. Therefore it is necessary to conduct research based on the latest data from investigation report [7] HEC-RAS v.5 is a numerical software model with a free license that has been widely used to simulate flood. Starting from v.5, the model is capable of simulating D flow, which gives it an advantage for estimating flood inundation. The model was developed based on the full D St. Venant equations, solved using a finite difference scheme. The model is robust and accurate. The model was applied for simulating Monticello Dam Breach with good results [8]. In this study, -D modeling of flood propagation caused by the failure of the Way Ela natural dam is conducted in order to predict the flood inundation, flood depth and flood arrival time so that it can anticipate and reduce the human-economic losses. The modeling is based on the failure information that has occurred and the DEM (Digital Elevation Model) data. A two-dimensional (D) numerical model, HEC-RAS v.5, is used to simulate the overland flow. The dam failure itself is simulated by using HECHMSv.4. Methodology of study The flow chart of this study is given in Figure 1. * Corresponding author: bagusyakti@gmail.com The Authors, published by EDP Sciences. This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/).

MATEC Web of Conferences 147, 03009 (018) SIBE 017 https://doi.org/10.1051/matecconf/01814703009 Fig. 1. Flow chart. Land Cover was analyzed to obtain the runoff coefficient and manning s n value for the inflow discharge hydrograph. Hydrological parameter was analyzed to obtain the inflow discharge hydrograph as the input for reservoir routing the dam failure outflow. Reservoir bathymetry was analyzed for reservoir routing as the parameter of reservoir storage characteristic. Dam parameter was analyzed with the reservoir routing as the parameter for dam characteristic and dam failure scenario..1. Study Area Way Ela Natural Dam is located in Negeri Lima Village, Leihitu District, Ambon Island. The village had a mean elevation between 0-700 m above sea level. The main River are the Way Ela River which in 01 dammed to form a natural dam due to avalanches. (b) After dam failure. Fig. 3. Orthophoto inunduation image. The images before and after dam failure are shown in Figure 3. The urban areas affected by flood due to the dam failure is approximately 147,749.8 m.. Land Cover In this study the land cover is used to define the Runoff coefficient (C). The Way Ela Watershed Land is covered by forest with Runoff coefficient is 0.5 [9]. Fig. 4. Land cover map of the study area Fig.. Study area. BNPB [1].3 Reservoir Routing The reservoir routing was calculated using HEC-HMS to estimate the amount of discharge when the dam failed. There are three main parameters used as the input for reservoir routing in HEC-HMS, inflow, reservoir bathymetry and the dam failure scenarios. The output from this reservoir routing is the outflow discharge due the failure of Way Ela Natural Dam. Table 1. HEC-HMS data used. (a) Before dam failure. Watershed Area (m ) 1.56 River Length (m) 6.85 Land Cover (Runoff 0.5 Coefficient) Inflow Hydrograph Figure 4 Dam Top Elevation (m) + 15.66

MATEC Web of Conferences 147, 03009 (018) SIBE 017 https://doi.org/10.1051/matecconf/01814703009.3.1 Inflow Dam Top Length (m) 300 Normal Water Level (m) + 197 The inflow of the reservoir was calculated using rainfall at the time of the dam failure. The condition of this inflow at the time of dam failure was estimated with Synder- Alexeyev Synthetic Unit Hydrograph based on the characteristic of the catchment area as given in table 1. The rainfall detected at the dam failure by Ambon Meteorological Agency (BMKG) was 43 mm. The results are shown in the Figure 5 along with the capacity of the spillway of the natural dam. It shows that inflow exceeds the spillway capacity..3.3 Dam Failure Scenario In this study a simulation was conducted for the dam failure with the assumption that the failure was caused by overtopping based on previous studies [7]. Table. HEC-HMS data used. Overtopping Top Elevation (m) 15.66 Bottom Elevation (m) 115 Bottom Width 01.3 Left Slope (xh : 1V) 1 Right Slope (xh : 1V) 1 Development Time (HR) 10 Trigger Elevation (m) 00 The scenarios parameter is given in table. The trigger elevation is set to + 00 m, is 3 m above spillway = 197 m, because based on chronology when the dam failure sliding occurs on the dam body because the spillway only finishes 70% and then collapses. The dam failure development time is 5 hours but lengthened to 10 hours due to emergency spillway [7]. The Bottom Width parameter is dam height [10]..4 Flood Propagation Model Fig. 5. Inflow hydrograph.3. Reservoir Bathymetry Reservoir Bathymetry of the Way Ela natural dam was analyzed based on previous studies [7], the result is given in figure 5 along with the dam elevation (table 1). The D flood propagation was modeled using HEC-RAS v5. The HEC-RAS v5 solves the full D Saint Venant equations [11] : Continuity Equation p q 0 x y Momentum Equation : p p pq x h x h n pg p h pf px q h h xx gh py xy (1) () Fig. 6. Storage-Elevation curve Figure 6 shows the maximum storage capacity of the reservoir is 19.807,000 m 3 and after the dam failure the volume of water becomes,500,000 m 3. where h is the water depth (m), p and q are the specific flow in the x and y directions (m /s), is the surface elevation (m), g is the acceleration due to gravity (m/s), n is the Manning resistance, is the water density (kg/m 3 ), xx, yy and xy are the components of the effective shear stress and f is the Coriolis (s -1 ). The manning roughness is estimated for each type of land cover as given in the table and figure bellow. 3

MATEC Web of Conferences 147, 03009 (018) SIBE 017 https://doi.org/10.1051/matecconf/01814703009 3 Result and Discussion 3.1 Reservoir Routing Outflow from dam failure is simulated uses HEC-HMS. The overtopping failure scenario is selected refers to previous study [8]. Inflow Hydrograph was analyzed using the Synder-Alexeyev Synthetic Unit Hydrograph. The result of this routing process will be shown by Figure 7. Fig. 7. Manning distribution map of study area Table 3. Manning s Roughness Land Cover Manning s n Forest 0.03 Channel 0.05 Coastal 0.05 Urban 0.17 Source : Kotani, et. al. [1], chow [13], Gibson [14] In order to ensure the stability of the model, the time step was estimated according to the Courant-Friedrichs- Lewy condition : ct x ght 1 x Cr (3) Based on the dam failure the overtopping failure will be modeled. The model results will be compared with the past inundation from the image (orthophoto). The inundation orthophoto is given in Figure 3. Table 4. HEC-RAS Parameters Outflow Hydrograph (Upstream Boundary) Stage Hydrograph (Downstream Boundary) Digital Elevation Model (Terrain) Land Cover (manning s n) From Reservoir Routing 0 30 m 30 m Table 1 t [s] 0.5 x [m] 10 Simulation Period (day) 1 Fig. 8. Outflow hydrograph due the dam failure Figure 8 shows the outflow peak discharge due the dam failure by the overtopping failure is 1,68.4 m 3 /s. 3. Flood Depth The relative error of overtopping failure shown in Table 5. Table 5 shows the result that this overtopping failure has a small relative error compared with the inunduation of the orthphoto image. It can be concluded that the previous dam failure was caused by overtopping. Time requirement to execute this model is 30 minutes. Table 5. Flood Area Way Ela Inunduation Village HEC-RAS v5 Urban Orthophoto Area Overtopping Area (m) 404,945.33 147,749.38 147,13.91 Area (%) - 36.49 36.33 Relative Error (%) - - 0.4 4

MATEC Web of Conferences 147, 03009 (018) SIBE 017 https://doi.org/10.1051/matecconf/01814703009 References Fig. 9. Flood depth map Figure 9 shows the maximum depth of flood inundation. In general, the depth agrees well with report provided by BNPB [1]. The maximum depth in the village area are between 3-6 m, the depth of flood in the upstream near the dam is 3-8 m, and in the middle of the channel, the depth flood inundation is quite high 3-7 m due to its topographic condition which is a cliff. 3. Flood Arrival Fig. 10. Flood arrival time map Figure 10 shows that the arrival time of the flood caused by the dam failure when it reaches the village is between hours and in the downstream is between 5-5.5 hours. 4 Conclusions A two-dimensional (D) numerical model, HEC-RAS v.5, is used to simulate the over land flow generated by a dam failure. The dam failure itself is simulated using HECHMSv.4. The model was applied to the dam break case of the Way Ela natural dam. The results from the study are the inundation area, depth, and arrival time. The inundation area was verified using the data from orthophoto. It was found that both areas corresponds well with a very small relative error (0.4%). The inundation depth in the village there are up to 6 m, which agrees well with the reported depth. The arrival time of the flood is hours. These informations are very important to propose a mitigation plans with respect to possible dam break in the future. 1. S.P. Nugroho, Sebagian Bendungan Way Ela di Maluku Jebol, http://www.bnpb.go.id/ (5 July 013). C. S. Chen, T. W. Lin, C. Y. Chen, Eng. Geol. 188, pp. 148-158, (015). 3. Y. Xiong, J. Water Resource Prot. 3, pp. 370-379, (011). 4. K.Srinivas, M. Werner, N. Wright, Comparing forecast skill of inundation models of differing complexity-the case of Upton upon Severn, Flood risk management : research and practice, Issue ISBN 978-0-415-48507-4, (009) 5. D. Wirustyastuko, J. Nugroho, Jurnal Teknik Sipil ITB 0, pp 19-140, (013) 6. Rachmadan, C.R., Juwono, P.T., Asmaranto, R., Analisa Keruntuhan Bendungan Alam Way Ela dengan Menggunakan Program Zhong Xing HY1, http://pengairan.ub.ac.id/, (1 March 014) 7. Balai Wilayah Sungai Maluku Kementrian Pekerjaan Umum Republik Indonesia, Final Report Investigasi Pekerjaan Bencana Alam Natural Dam Way Ela Negeri Lima, Kab. Maluku Tengah, PT. LAPI ITB, (014) 8. G.W. Brunner, D Modeling and Mapping with HEC-RAS v.5 Monticello Dam Breach. US Army Corps of Engineers, (015) 9. R.K. Sivanappan, Soil and water conservation and water harvesting, nd ed, Madras : Tamil Nadu Social Forestry Project, Indo-Swedish Forestry Coordination Programme, (199) 10. F.A. Johnson, P. Illes, A Classification of Dam Failures. Water Power and Dam Construction, pages 43-45, (1976) 11. V. M. Quiroga, S. Kure, A. Mano, IAHR 36 th, pp. 5-33, (015) 1. M. Kotani, F. Imamura, and N. Shuto, JSCE 45, pp. 356 360, (1998) 13. V.T. Chow, Open-Channel Hydraulics. (McGraw- Hill Book Company, New York. p.113. 1959) 14. S. Gibson, Unsteady HEC-RAS Model of the Downtown Reach of the Truckee River, HEC, PR-58, 39 p., (005) 5