Agenda for Long Term Access NVVNL Solar Power Projects

Similar documents
Jawaharlal Nehru National Solar Mission

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

CHAPTER 5 ELECTRIC POWER SUPPLY AND SYSTEM LOSSES

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

Charges for Deviation (Paise/kWh) applicable for: 19 December 2018

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

'+fl"«phcfli «Government of India ~JOj?tI~4 Ministry of Power. ~~~~ Northern Regional Power Committee

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. January 2018

Agenda for the meeting to discuss Revision of LTA quantum in respect of Kudgi STPS

'l:l1w m:q;n: government of India. ~~gtf'~ Central Electricity Authority. ~m~~

SUMMARY REPORT FOR COUNCIL OF MINISTERS ON IMPORTANT DEVELOPMENTS IN POWER SECTOR DURING THE MONTH OF OCTOBER, 2018

NPCIL ISGS. Units Units Capacity in MW Stage-I&II Stage-III Stage- II Stage- II 1&2 3&4 Unit-1. Stage -II

Sub: Regional Transmission Deviation Account for the month of February, Reg

Phone : ; FAX : ; ; web site:

Phone : ; FAX : ; ; web site:

ANSWER THE MINISTER OF STATE (INDEPENDENT CHARGE) FOR POWER, COAL, NEW & RENEWABLE ENERGY AND MINES (SHRI PIYUSH GOYAL)

O.I.H GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE

Sub: Regional Transmission Deviation Account for the month of December, Reg

GOVERNMENT OF INDIA MINISTRY OF HEALTH AND FAMILY WELFARE DEPARTMENT OF HEALTH AND FAMILY WELFARE

DRAFT GOVERNMENT OF PUNJAB FOREST, WILDLIFE & FISHERIES DEPARTMENT Dated: Kathar Game Reserve

व षय: स श ध त क ष त र य प र शण ऱ ख

National Project on Organic Farming

ORIGINAL IN HINDI GOVERNMENT OF INDIA MINISTRY OF CONSUMER AFFAIRS, FOOD & PUBLIC DISTRIBUTION DEPARTMENT OF FOOD AND PUBLIC DISTRIBUTION

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA

THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

ALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN

APPENDIX A 5 BUSSYSTEM DATA

W E E K L Y MONSOON INSIGHT

ALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN

CURRENT STATUS OF MONSOON Main Meteorological conditions of the last week (27August to 2 September)

O.I.H. GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE

Performance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements

URTDSM Initiative in India and Controlled Islanding using PMU Measurements

MINISTRY OF POWER

ALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

11.1. IRRIGATION, FLOOD CONTROL AND COMMAND AREA DEVELOPMENT

व षय: स श ध त क ष त र य प र शण ल ख

CASE No. 33 of In the matter of Determination of Generic Tariff for Renewable Energy for FY

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Economic Growth and Human Development: An Empirical Analysis of Major States of India During the Period to

Economic Operation of Power Systems

GOVERNMENT OF INDIA MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION LOK SABHA UNSTARRED QUESTION NO ANSWERED ON

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

Key Finding: Long Term Trend During 2014: Rain in Indian Tradition Measuring Rain

Section 2: Installed Capacity and Capacity Utilisation

3. HYDROMETEROLOGY. 3.1 Introduction. 3.2 Hydro-meteorological Aspect. 3.3 Rain Gauge Stations

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015

Water Resource & Management Strategies

Automatic Dam Control System with Vidyut Cable Saver DI-731 for Automation of Barrage Gates

Suppressed Surface Heating over northwestern parts of the Country and the ensuing Monsoon Rainfall

Is India s manufacturing sector moving out of cities? Ejaz Ghani ICRIER-HUDCO Seminar on Urbanization and the Competitiveness of Cities May 17, 2012

Laterite. Quartzite Rs./t 315 Silica Sand Rs./t 127 Sand (others) Rs./t 43. Shale Rs./t 21 Steatite

PROMOTIONAL AND DETAILED EXPLORATION

Pool Campus Drive for BE/Diploma Pass Out 2013 batch

Analysis & Prediction of Road Accident Data for Indian States

Natural Vegetation and Wildlife

Long Range Forecast Update for 2014 Southwest Monsoon Rainfall

CHAPTER 4 CIRCULATION OF PUBLICATIONS

Determination of Generic Levellised Generation Tariff for Solar PV for FY and FY

Government of India India Meteorological Department (Ministry of Earth Sciences) Subject: Current weather conditions and forecast for next two weeks

Impact of climate change on extreme rainfall events and flood risk in India

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA

POWER SYSTEM OPERATION CORPORATION LIMITED.

Optimal PMU Placement

ORIGINAL IN HINDI GOVERNMENT OF INDIA MINISTRY OF CONSUMER AFFAIRS, FOOD & PUBLIC DISTRIBUTION DEPARTMENT OF FOOD AND PUBLIC DISTRIBUTION

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

SN Region/State/Centre Discipline Resi. Non-Resi. SOUTHERN B G T B G T Karnataka 1 Dharwad Athletic Basketball

AGRO METEOROLOGY. Greek word Meteoro means above the earth s surface (atmosphere) logy means

1. Which of the places have been recently added to the list of Swacch Iconic Places under Swacch Bharat Mission?

Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited, Generation Business For the period FY to FY

CLIMATE CHANGE ASSESSMENT. A. Climate Change Risk Assessment and Adaptation Measures

Principal Secretary to Government Haryana, Town & Country Planning Department, Haryana, Chandigarh.

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. Date of order:

Date of. Issued by (AICRPAM), & Earth System

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) BUSINESS PLAN ORDER FOR THE CONTROL PERIOD FROM FY TO FY

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

Written as per the latest syllabus prescribed by the Maharashtra State Bureau of Textbook Production and Curriculum Research, Pune.

Power Engineering II. Fundamental terms and definitions

Development from Representation? A Study of Quotas for the Scheduled Castes in India. Online Appendix

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

Occurrence of heavy rainfall around the confluence line in monsoon disturbances and its importance in causing floods

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

GOVERNMENT OF INDIA DEPARTMENT OF ATOMIC ENERGY RAJYA SABHA UNSTARRED QUESTION NO TO BE ANSWERED ON 05/08/2010 URANIUM DEPOSITS IN STATES

BIHAR ELECTRICITY REGULATORY COMMISSION Vidyut Bhawan-II, Bailey Road, Patna Suo-motu Proceedings No. 09/2013

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Module 2: Mapping Topic 2 Content: Determining Latitude and Longitude Notes

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

Key Finding: During 2013: Rain in Indian Tradition: Measuring Rain

Figure 2.1: Constituent Area

N. K. Manglik Director

AFP Surveillance Bulletin - India Report for week 1, ending 5 January 2019

Central Ground Water Board. Government of India. Faridabad

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

STATE POWER SECTOR PERFORMANCE RATINGS

UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET

COAL EXPLORATION & RESOURCES

Transcription:

Agenda for Long Term Access NVVNL Solar Power Projects NTPC Vidyut Vyapar Nigam Ltd. (NVVNL) vide letter dated 04/11/2014 had applied for Long term Access (LTA) for transfer of 150MW power i.e. 100MW from Solar Power Plant of M/s Rajasthan Sun Technique Energy Pvt. Ltd. & 50MW Solar Power Plant of M/s Godawari Green Energy Limited being set up under JNNSM Phase-1 Batch-1. As per the application power from the generations was to be allocated to various states in NR, ER, WR and SR. Injection of power was through RVPN-STU interconnection with PGCIL network in Rajasthan. Copy of the applications are enclosed at Annexure-I. As the injection of power was through RRVPNL system, No objection Certificate (NOC) of the Rajasthan was required. The applicant forwarded the No objection Certificate (NOC) dated 10/1/2014 from RVPNL. The NOC given by RRVPNL is only for 100MW from Solar Power Plant of M/s Rajasthan Sun Technique Energy Pvt. Ltd., located at Dhursar, Jaisalmer in Rajasthan, as against LTA application of 150MW. The NOC is valid from 10/1/2014 upto 30/11/2038. Copy of the NOC is enclosed at Annexure-II. For five states the quantum mentioned in the NOC issued by RVPNL was different from LTA application quantum. M/s NVVNL revised the quantum vide communication dated 22/1/14 for five states in line with the Rajasthan NOC (Uttar Pradesh and Karnataka quantum in LTA application and NOC were same). Copy enclosed at Annexure-III. Accordingly, the details of LTA being sought by the applicant are as below: Generation Project 100MW Solar Power Plant of M/s Rajasthan Sun Technique Energy Pvt. Ltd., Dhursar, Jaisalmer, Rajasthan being set up under JNNSM Phase-1 Batch-1. LTA sought from From 01/12/2013 for a period of 25 years. As NoC is valid from 10/1/2014 upto 30/11/2038, same is being considered.

Beneficiaries State UP Punjab GRIDCO, Orissa West Bengal DVC Chhattisgarh Karnataka Total Revised LTA Quantum 25MW 15MW 5MW 15MW 5MW 15MW 20MW 100MW 100MW Solar Power Plant of M/s Rajasthan Sun Technique Energy Pvt. Ltd is located at Jaisalmer in Rajasthan would be connected to 220/132kV GSS, Dechu of RVPN as per NOC. Dechu S/s is in turn connected to Jodhpur 400 kv substation of RRVPNL through Dechu-Tinwari-Jodhpur 220kV line. Jodhpur 400kV substation is connected to ISTS through Kankroli (POWERGRID) Jodhpur (RRVPNL) 400kV of POWERGRID. Power transfer to various States shall take place through principle of displacement through ISTS. Accordingly Power transfer to various beneficiaries would be as follows: To NR Beneficiaries: In NR, Punjab and Uttar Pradesh have been allocated 25MW and 15MW respectively. Under ISTS many 400/220kV substations with strong inter-connection have been established in both states and can access their allocated share of 25MW and 15MW through the touch points already provided. To ER Beneficiaries: In ER, GRIDCO, West Bengal and DVC have been allocated 5MW, 15MW and 5 MW respectively. It has been observed that generally, the direction of power transfer is from ER to NR. As the LTA is for NR to ER, considering the quantum of power 25MW, no constraints are envisaged in transferring from Northern grid to Eastern grid. The states can access the power through interconnection with ISTS. To WR Beneficiaries: As per the application, in WR, Chattisgarh has been allocated 15MW from the generation. Further 20MW to SR would also be mostly via WR It has been observed that generally, the direction of power transfer is from WR to NR. As the LTA is for NR to WR, considering the quantum of power

35MW, no constraints are envisaged in transferring from Northern grid to Western grid. Chattisgarh can access the power through interconnection with ISTS. To SR Beneficiaries: Regarding LTA of 20MW to Karnataka in SR it may be mentioned that presently the entire ATC for transfer of power to SR region from NEW grid is allocated for LTA/MTOA. Transfer capacity is expected to be available only beyond June 2016. Accordingly, the applicant can avail long term access from 16 th June 2016. Accordingly, it is proposed that LTA to NVVNL may be granted till 30/11/2038 as per the beneficiaries indicated below Northern Region : UP-25MW and Punjab- 15MW Eastern Region : GRIDCO-5MW, West Bengal -15MW & Damodar Valley Corporation-5MW Western Region- Chattisgarh-15MW Southern Region- Karnataka-20MW from 16 th June 2016 The LTA would be subject to: Signing of required agreements within specified time frame The applicant/beneficiary shall abide by all provisions of the Electricity Act, 2003, CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state transmission and related matters) Regulations, 2009, Approved Detailed procedure of CTU, CEA (Technical Standards for connectivity to the Grid), Indian Electricity Grid Code as amended from time to time and any other regulation/policy/act as applicable.