SHADE/SHADOW REPORT. For the Proposed 8777 Washington Project. Culver City, CA. Prepared for:

Similar documents
IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS SHADE/SHADOW

4.A.3 SHADE/SHADOW 1. INTRODUCTION. 2. ENVIRONMENTAL SETTING a. Existing Conditions. (1) Project Vicinity 4.A.3 1

IV.B. VISUAL RESOURCES SHADE SHADOW

October 16, Dear Mr. Hawkins:

APPENDIX B SHADOW STUDY

225 Bush Street Suite 1700 San Francisco, CA phone fax

SHADOW STUDY REPORT REGARDING

Attachment E: CADP Design Shadow Analysis

Project No India Basin Shadow Study San Francisco, California, USA

SHADOW IMPACT STUDY REPORT

SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP 6 Storey Condominium Louis Saint Laurent Ave & Leger Way Milton, Ontario

Attachment A: Existing Conditions Illustrated by Context

APPENDIX N View Impact & Shadow Analysis

SUBJECT: 363 6th Street Shadow Analysis with Cumulative Analysis of 345 6th Street

5.6.2 SHADOW / DAYLIGHT ASSESSMENT

Project 2. Introduction: 10/23/2016. Josh Rodriguez and Becca Behrens

L.O: EARTH'S 23.5 DEGREE TILT ON ITS AXIS GIVES EARTH ITS SEASONS March 21 (SPRING), June 21(SUMMER), Sept 22 (AUTUMN) & Dec 21(WINTER)

For most observers on Earth, the sun rises in the eastern

1.4j interpret simple shadow stick data to determine local noon and observer s longitude

SHADOW FLICKER MODELING ANALYSIS

Proposition K Technical Memo

Practice Questions: Seasons #1

March 21. Observer located at 42 N. Horizon

Solutions Manual to Exercises for Weather & Climate, 8th ed. Appendix A Dimensions and Units 60 Appendix B Earth Measures 62 Appendix C GeoClock 63

Jordan Harrison, Planner III, San Francisco Recreation and Park Department

1. Executive Summary Introduction Project Description Project Location Project Characteristics...

LAB: What Events Mark the Beginning of Each Season?

TILT, DAYLIGHT AND SEASONS WORKSHEET

PRELIMINARY WORKING DRAFT Work in Progress

EXECUTIVE SUMMARY. April 17, Thor Kaslofsky Common Ground Urban Development

PLAZA MEXICO RESIDENCES

C) the seasonal changes in constellations viewed in the night sky D) The duration of insolation will increase and the temperature will increase.

Which Earth latitude receives the greatest intensity of insolation when Earth is at the position shown in the diagram? A) 0 B) 23 N C) 55 N D) 90 N

November 20, NOTES ES Rotation, Rev, Tilt.notebook. vertically. night. night. counterclockwise. counterclockwise. East. Foucault.

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

R.L. Kellogg, Ph.D. North American Sundial Society June 2013

Appendix J: Transportation and Circulation

King City URA 6D Concept Plan

Memorandum. Air Sampling

What causes the seasons? 2/11/09

Which table correctly shows the dates on which the apparent paths of the Sun were observed? A) B) C) D)

5. In which diagram is the observer experiencing the greatest intensity of insolation? A) B)

DATE: September 4, Recreation and Park Commission. Yomi Agunbiade, General Manager Dawn Kamalanathan, Planning Director

Earth Motions Packet 14

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

Grade 6 Nature Walk: Volunteer Guide

Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles

NAME; LAB # SEASONAL PATH OF THE SUN AND LATITUDE Hemisphere Model #3 at the Arctic Circle

IMPROVING LIGHT PENETRATION FOR GOLF GREENS Scott Robinson ArborCom Technologies Halifax, Nova Scotia

LAB 2: Earth Sun Relations

California 120 Day Precipitation Outlook Issued Tom Dunklee Global Climate Center

Seasons Page 520. A. What Causes Seasons?

Time Zones. Doug Fischer Geog 106 LRS

MOTIONS OF THE EARTH. Figure 3.1 : Inclination of the Earth s axis and the orbital plane. Figure 3.2 : Day and Night on the Earth due to rotation

Student Exploration: Seasons: Earth, Moon, and Sun

TIME. Astronomical time Time is defined by astronomical cycles. The day is the average time from noon to noon (the solar day).

CHAPTER 3. The sun and the seasons. Locating the position of the sun

ME 476 Solar Energy UNIT THREE SOLAR RADIATION

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

SEASONAL AND DAILY TEMPERATURES

Using Temperature and Dew Point to Aid Forecasting Springtime Radiational Frost and/or Freezing Temperatures in the NWS La Crosse Service Area

Case Study Las Vegas, Nevada By: Susan Farkas Chika Nakazawa Simona Tamutyte Zhi-ya Wu AAE/AAL 330 Design with Climate

13 SHADOW FLICKER Introduction Methodology

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

Why the Earth has seasons. Why the Earth has seasons 1/20/11

RE: Existing and Future Parking Demand Analysis St. Joseph Center Expansion

PASSIVE SOLAR HEATING

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Student Exploration: Seasons in 3D

Section 1: Overhang. Sizing an Overhang

JOEL PAULSON, COMMUNITY DEVELOPMENT DIRECTOR

APPENDIX I - AREA PLANS

1 What Is Climate? TAKE A LOOK 2. Explain Why do areas near the equator tend to have high temperatures?

Seasons, Global Wind and Climate Study Guide

L. SHADOW. Comments and Responses PROJECT COMPLIANCE WITH SHADOW REGULATIONS. Comments

Before you Sit. Please Pick-up: Blue Information Sheet for Evening Observing. 1 Red and 1 Blue ticket for Observing/ Planetarium

2.2 The Reason for Seasons

What Is the Relationship Between Earth s Tilt and the Seasons?

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

b. So at 12:00 p.m., are the shadows pointing in the direction you predicted? If they are not, you must explain this observation.

The following information is provided for your use in describing climate and water supply conditions in the West as of April 1, 2003.

Earth & Space Science, Interpreting Data DURATION Preparation: 5 minutes Activity: 40 minutes (total over one day)

Daylight Data: Days and Nights Around the World

CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session June 26th, 2017

FINAL UTILITY REPORT Creekside Thornton, CO

PREDICTING OVERHEATING RISK IN HOMES

Here s what a weak El Nino usually brings to the nation with temperatures:

Average Weather For Coeur d'alene, Idaho, USA

Weather Atmospheric condition in one place during a limited period of time Climate Weather patterns that an area typically experiences over a long

The Pennsylvania Observer

MEMORANDUM. Trip Generation Analysis

Earth Science Seasons Test Name Per Date

Six (6) Unit Apartment Building Along Garfield Boulevard - Bank Owned WEST GARFIELD BOULEVARD CHICAGO, IL DETAILS PROPERTY OVERVIEW

Which graph best shows the relationship between intensity of insolation and position on the Earth's surface? A) B) C) D)

Unit Three Worksheet Meteorology/Oceanography 2 WS GE U3 2

Seasons & Time.

Sunlight and its Properties Part I. EE 446/646 Y. Baghzouz

Sundials and the Celestial Sphere. Katie Hausknecht

Transcription:

SHADE/SHADOW REPORT For the Proposed 8777 Washington Project Culver City, CA Prepared for: VITRUVIAN CULVER CITY LLC (THE APPLICANT) 5822 WEST WASHINGTON BOULEVARD CULVER CITY, CALIFORNIA 90232 Prepared by: 233 Wilshire Blvd, Ste 150 Santa Monica, CA 90401 TEL 310.451.4488 FAX 310.451.5279 February 2017

SHADE AND SHADOW IMPACT ANALYSIS A. INTRODUCTION Vitruvian Culver City LLC (the Applicant) proposes to redevelop a 0.98-acre property located at 8777 Washington Boulevard north of the intersection at Washington Boulevard and National Boulevard in Culver City. The project is proposing a mix of office, commercial and pedestrian serving retail uses within a 4-story building (up to 56 feet). This report analyzes the project s potential to result in shade/shadow impacts on adjacent shade sensitive uses based on the criteria set forth in the City of Los Angeles CEQA Thresholds Guide (2006). As analyzed herein, the project would not result in significant shadow impacts. B. METHODOLOGY The consequences of shadows on land uses can be positive, including cooling effects during warm weather; or negative, such as loss of warmth during cooler weather and loss of natural light for landscaping and human activity. Sensitive uses include routinely usable outdoor spaces associated with residential, recreational or institutional uses (e.g., schools, convalescent homes), commercial uses such as pedestrianoriented outdoor spaces or restaurants with outdoor eating areas, nurseries, and existing solar collectors. These uses are considered sensitive because sunlight is important to function, physical comfort, or commerce. In order to determine the extent of shading impacts, a shading diagram of the worst case scenario (longest shadows) has been prepared that shows the adjacent off-site shade-sensitive uses on an aerial photograph. The shading diagram illustrates the shadows cast by the project on nearby surrounding uses in 2-hour increments from 10:00 A.M. to 4:00 P.M. during the winter solstice, the worst case scenario, as well as the summer solstice, spring equinox, and fall equinox. The duration of shading that would occur is compared to threshold standards below to determine if a significant shadow impact would occur as a result of project implementation. C. SIGNIFICANCE CRITERIA Appendix G of the CEQA Guidelines does not provide screening questions that address impacts with regard to shading. However, according to the L.A. CEQA Thresholds Guide, a project would have a potentially significant impact if: Threshold - Shade-sensitive uses would be shaded more than three hours between the hours of 9:00 A.M. and 3:00 P.M. Pacific Standard Time (PST), between early November and mid-march or more than four hours between the hours of 9:00 A.M. and 5:00 P.M. Pacific Daylight Time (PDT) between early mid-march and early November. 1 1 The durations originally cited in the L.A. CEQA Threshold Guide, were originally geared to change in early April and Late October, consistent with the change to daylight savings time that was in effect at that time. The durations used here have been modified to match the current starting and ending dates for daylight savings time. 8777 Washington Project Shade/Shadow Report 3

Shade and Shadow Impact Analysis February 2017 D. PROJECT LOCATION AND SURROUNDING SHADOW SENSITIVE USES The project site is bounded by the intersection at Washington Boulevard and National Boulevard followed by vacant land and the Metro Expo Platform/Line to the south; the Access Culver City Mixed-Use Development and commercial uses to the east; a surface parking lot for the Metro Expo Line and Metro Station to the west (future site of the Ivy Station Mixed-Use Project); and commercial uses to the north. Figure 1, Aerial Photograph with Surrounding Land Uses, illustrates the surrounding uses. Potential shading impacts could result when shadow-sensitive uses are located to the north, northwest, or northeast of new structures. Shade sensitive uses in the project vicinity are limited to the routinely usable outdoor spaces within the future Ivy Station mixed-use project (to the west) and the Access Culver City project (to the south and southeast). E. PROJECT CHARACTERISTICS The proposed project would include a mix of office, commercial and pedestrian serving retail uses. The project site is currently developed with a main single-story commercial (retail/warehouse) building occupied by the Surfas Restaurant Supply for restaurant supply sales and a detached storage garage building, with an associated asphalt-paved surface parking lot. Also, the east portion of the main building includes a café addition. All of the existing on-site uses would be demolished and removed to support development of the project. The site s current uses do not cast shadows onto shade sensitive uses. The project would include a rectangular shaped 4-story building (up to 56 feet). Parking for all of the proposed uses would be provided on-site within the ground-level and subterranean parking structure. F. IMPACT ANALYSIS Potential shading impacts could result when shadow-sensitive uses are located to the north, northwest, or northeast of new structures as the sun position and location is in the south. Figure 2, Project Shadows, illustrates the project s shadows during the winter solstice, summer solstice, spring equinox, and fall equinox. The longest shadows cast at 10:00 A.M. to the northwest and 4:00 P.M. to the northeast in Los Angeles occur during winter solstice (December 21 st ) at a bearing of 45 degrees and extend for a distance of roughly 3 times the height of the source. At this time of year, the proposed buildings would cast shadows approximately around 170 feet in length to the northwest/east, respectively. Thus, the project building s shadow would not reach the residences to the west or south as they don t cross National and Washington Boulevards. The multi-family residential uses as part of the Ivy Station project to the west would be located over 100 feet from the project site and thus well beyond any potential shadows that could be cast by the project. Summer Solstice, Spring Equinox and Fall Equinox morning shadows would be cast directly to the west, but their reach would only be 75 feet in maximum length, so they would not reach the future Ivy Station site and its 8777 Washington Project Shade/Shadow Report 4

February 2017 Shade and Shadow Impact Analysis residential uses. 2 The only other shadow sensitive uses near the site that could be subject to project shadows are the residential uses and associated routinely usable outdoor spaces within the Access Culver City project to the east and southeast of the project site. The Access Culver City project is a mixed-use development that includes multi-family uses to the east and southeast of the project site (over 100 feet away) across the intersection of National Boulevard and Washington Boulevard. However, only Summer Solstice, Spring and Fall Equinox s afternoon shadows prior to 5:00 P.M. PDT would be cast toward the east of the proposed project site. Those shadows would have a maximum length of 75 feet and therefore not cross Washington Boulevard and impact the Access Culver City Access residential uses. G. CONCLUSION No shadow-sensitive uses would be shaded by project-related structures for more than three hours between the hours of 9:00 AM and 3:00 PM between late October and early April, or for more than four hours between the hours of 9:00 AM and 5:00 PM between early April and late October. As a result, the addition of the Project would not significantly increase the shading of adjacent shadow-sensitive uses based on the significance thresholds stated above, and a less than significant impact would occur. 2 Maximum morning shadow lengths to the west of the project site at Los Angeles s geo-location occur during the summer solstice (June 21st) at a bearing of 85 degrees at this time of the year. The project would cast shadows approximately 75 feet in length to the west. Thus, the proposed building s shadow would not reach the off-site residences to the west. 8777 Washington Project Shade/Shadow Report 5

10 Project Boundary Commercial Light Industrial Vera Avenue Light Industrial/Commercial Residential Mixed-Use/Residential Ivy Street Commercial/Manufacturing School Curts Avenue Helms Avenue e Venice Boulevard National Boulevard PROJECT SITE Washington Boulevard Helms Avenue Ivy Station Site Access Culver City Site Wesley Street Metro Platform Expo Line Culver City Metro Station Washington Boulevard Platform Landmark Street Wesley Street 0 275 Feet SOURCE: Google Map, 2015 (Aerial). 8777 Washington Figure 1 Aerial Photograph with Surrounding Land Uses

SOURCE: Gensler, 2017 8777 Washington Figure 2 Project Shadows