Geotechnical Report. 86 Burnett Street, Ashburton, Canterbury. For MWH Mainzeal. 16 July, 2012 Project Number: Claim:

Similar documents
Liquefaction induced ground damage in the Canterbury earthquakes: predictions vs. reality

GUIDANCE D. Part D: Guidelines for the geotechnical investigation and assessment of subdivisions in the Canterbury region.

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

Performance and Post Earthquake Assessment of CFA Pile Ground Improvement 22 February 2011 Christchurch, New Zealand Earthquake

14 Geotechnical Hazards

Hydraulic uplift forces on basements subject to liquefaction

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist?

Liquefaction and Foundations

EN Eurocode 7. Section 3 Geotechnical Data Section 6 Spread Foundations. Trevor L.L. Orr Trinity College Dublin Ireland.

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM

REPORT. Ngai Tahu Property Ltd. Wigram Skies Subdivision Geotechnical Assessment

Christchurch CBD: Lessons Learnt and Strategies for Foundation Remediation 22 February 2011 Christchurch, New Zealand, Earthquake

Case Study - Undisturbed Sampling, Cyclic Testing and Numerical Modelling of a Low Plasticity Silt

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

Area-wide geotechnical information summary for CERA zoning review panel

Guidelines for Geotechnical Site Investigation for Residential Building Consents in Hastings District. (Draft)

LSN a new methodology for characterising the effects of liquefaction in terms of relative land damage severity

Deep Foundations 2. Load Capacity of a Single Pile

GEOTECHNICAL REPORT AT 29 PETRIES ROAD, WOODEND. KIRK ROBERTS CONSULTING ENGINEERS LTD

(C) Global Journal of Engineering Science and Research Management

Rosemerryn Subdivision, Lincoln Stages 10 to 18 Geotechnical Investigation Report Fulton Hogan Land Development Limited

Effective stress analysis of pile foundations in liquefiable soil

GEOLOGY, SOILS, AND SEISMICITY

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton

Harmonized European standards for construction in Egypt

NZ Transport Agency s Detailed Design Guidance for Piled Bridges at Sites Prone to Liquefaction and Lateral Spreading

Area-wide geotechnical information summary for CERA zoning review panel

Area-wide geotechnical information summary for CERA zoning review panel

Comparison between predicted liquefaction induced settlement and ground damage observed from the Canterbury earthquake sequence

Impact : Changes to Existing Topography (Less than Significant)

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

SITE INVESTIGATION 1

Pierce County Department of Planning and Land Services Development Engineering Section

The development of design guidance for bridges in New Zealand for liquefaction and lateral spreading effects July 2014

Case History of Observed Liquefaction-Induced Settlement Versus Predicted Settlement

CPT: Geopractica Contracting (Pty) Ltd Total depth: m, Date:

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Mitigation of Liquefaction Potential Using Rammed Aggregate Piers

HKIE-GD Workshop on Foundation Engineering 7 May Shallow Foundations. Dr Limin Zhang Hong Kong University of Science and Technology

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.)

Improvement mechanisms of stone columns as a mitigation measure against liquefaction-induced lateral spreading

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

Foundations on Deep Alluvial Soils

Estimation of the static vertical subgrade reaction modulus ks from CPT for flexible shallow foundations on cohesionless soils

Area-wide geotechnical information summary for CERA zoning review panel

SOME OBSERVATIONS RELATED TO LIQUEFACTION SUSCEPTIBILITY OF SILTY SOILS

Micro Seismic Hazard Analysis

Table of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials

Geotechnical Completion Report Knights Stream Park Stage3A Development (Lots 107 to 148)

Soils. Technical English - I 10 th week

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

Forms of Flat Land Damage

KDOT Geotechnical Manual Edition. Table of Contents

INTRODUCTION TO STATIC ANALYSIS PDPI 2013

Consideration of Ground Variability Over an Area of Geological Similarity as Part of Liquefaction Assessment for Foundation Design

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

Geology, Soils, and Seismicity

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta

Cone Penetration Testing in Geotechnical Practice

NEW DOWN-HOLE PENETROMETER (DHP-CIGMAT) FOR CONSTRUCTION APPLICATIONS

CPT Applications - Liquefaction 2

STUDY OF THE BEHAVIOR OF PILE GROUPS IN LIQUEFIED SOILS

Evaluation of soil liquefaction using the CPT Part 2

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED

Engineeringmanuals. Part2

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Module 9 : Foundation on rocks. Content

Geotechnical Properties of Soil

Investigation of Liquefaction Behaviour for Cohesive Soils

Chapter (5) Allowable Bearing Capacity and Settlement

Liquefaction potential of Rotorua soils

Cyclic Behavior of Sand and Cyclic Triaxial Tests. Hsin-yu Shan Dept. of Civil Engineering National Chiao Tung University

The LSN Calculation and Interpolation Process

Chapter 7: Settlement of Shallow Foundations

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

BP Connect Development Turangi Preliminary Geotechnical Assessment Report

Liquefaction. Ajanta Sachan. Assistant Professor Civil Engineering IIT Gandhinagar. Why does the Liquefaction occur?

Evaluation of Geotechnical Hazards

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

Omaroro Lower Playing Field - Geotechnical Interpretive Report

An application of liquefaction hazard evaluation in urban planning

Appendix N. Engineering Design Consultants Limited Liquefaction Potential Assessment Interpretive Geotechnical Report

APPENDIX H SOIL SURVEY

Geotechnical Engineering and Resilience

Theory of Shear Strength

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

CPT Guide 5 th Edition. CPT Applications - Deep Foundations. Gregg Drilling & Testing, Inc. Dr. Peter K. Robertson Webinar # /2/2013

J. Paul Guyer, P.E., R.A.

Worked Examples Assessment of foundation solutions for residential technical category 3 properties

Reinforced Soil Structures Reinforced Soil Walls. Prof K. Rajagopal Department of Civil Engineering IIT Madras, Chennai

LIQUEFACTION ASSESSMENT OF INDUS SANDS USING SHEAR WAVE VELOCITY

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method

3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES

Transcription:

Geotechnical Report 6 Burnett Street, Ashburton, Canterbury For MWH Mainzeal Consulting Engineers 6 July, Project Number: 6- Claim: 77

6--Jw-Geotech-R-69 Consulting Engineers Table of Contents. INTRODUCTION..... RELEVANT DOCUMENTATION.... SITE DESCRIPTION.... GEOLOGY.... SITE INVESTIGATIONS..... CONE PENETRATION TESTING...... Subsoil.... REQUIREMENTS AND GUIDELINES... 6. ASSESSMENT OF LIQUEFACTION... 6.. ULTIMATE LIMIT STATE DESIGN (ULS)... 6... Design Parameters... 6... Results and Analysis... 6.. SERVICEABILITY LIMIT STATE DESIGN (SLS)... 6... Design Parameters... 6... Results and Analysis... 6.. SUMMARY... 7. LIQUEFACTION REMEDIATION MEASURES... 7.. SOIL REMEDIATION... 7.. STRUCTURAL MODIFICATION.... STATIC BEARING CAPACITY OF FOUNDATIONS... 9. FOUNDATIONS.... CONCLUSIONS AND RECOMMENDATIONS.... LIMITATIONS... 7. APPENDIX : SITE PLANS... 9. APPENDIX : CPT ANALYSIS.... APPENDIX : LIQUEFACTION ASSESSMENT...

6--Jw-Geotech-R-69 Consulting Engineers. INTRODUCTION The dwelling at 6 Burnett St has undergone structural damage and foundation settlement. It is proposed to develop a strategy for repair or replacement of this dwelling. Cook Costello Ltd has been engaged to prepare a geotechnical report to identify any significant issues with the land that may affect the proposed remedial works. This report considers the following aspects of site development: Geotechnical properties of the subsoil s Potential for settlement and liquefaction Liquefaction mitigation measures Investigation of ground bearing capacity and suitable building foundations/foundation remediation A site plan is attached as Appendix showing property boundaries, the approximate location of the existing building and associated field investigations... Relevant Documentation Department of Building and Housing: vember Guidelines for the Geotechnical Investigation and Assessment of Subdivisions in the Canterbury Region. New Zealand Geotechnical Society Inc: July Geotechnical Earthquake Engineering Practice Module : Guideline for the Identification, Assessment and Mitigation of Liquefaction Hazards. NZS 7.: Structural Design Actions. NZS 6: - Timber Framed Buildings. NZS :96 - Methods of Testing Soils for Civil Engineering Purposes. NZ Building Code: B/VM. Good Ground means any soil or rock capable of permanently withstanding an ultimate bearing pressure of kpa (i.e. an allowable bearing of kpa using a factor of safety of.) but excludes; a) Potentially compressible ground such as topsoil, soft soils such as clay which can be moulded easily in the fingers, and uncompacted loose gravel which contains obvious voids, b) Expansive soils being those that have a liquid limit of more than % when tested in accordance with NZS Test. and a linear shrinkage INTRODUCTION

6--Jw-Geotech-R-69 Consulting Engineers of more than % when tested from the liquid limit in accordance with NZS Test.6 and, c) Any ground which could forseeably experience movement of mm or greater for any reason including one or a combination of the following: land instability, ground creep, subsidence (liquefaction, lateral spread for the Canterbury earthquake region only), seasonal swelling and shrinking, frost heave, changing ground water level, erosion, dissolution of soil in water, and effects of tree roots.. SITE DESCRIPTION The site is located at 6 Burnett St, Ashburton. Access to the property is via a l driveway off the south side of Burnett St. The legal description of the site is Lot DP 699 with an area of m. Figure. Screen Capture from QuickMap showing property location highlighted in black. The property has a flat contour. The existing dwelling is located in the middle of the property and is surrounded by wooden decks and gardens. A separate garage is located at the south eastern corner of the property. The building is a storied timber framed structure with unreinforced brick veneer supported on a concrete ring foundation. The structure has lightweight suspended timber floors supported on shallow concrete piles. A level survey inside the dwelling indicates it has undergone settlement of more than mm toward the south west. SITE DESCRIPTION

6--Jw-Geotech-R-69 Consulting Engineers. GEOLOGY The Institute of Geological and Nuclear Sciences Geological Map, Geology of the Aoraki Area, defines the geology of the site as river deposits (Qa and Qa); grey river alluvium, comprising gravel, sand and silt, in active floodplains (Qa) with grey river alluvium beneath plains or low-level terraces (Qa). The geology of the site is consistent with the overall geology of the Canterbury/Christchurch region. Figure. Institute of Geological and Nuclear Sciences Geology of the Aoraki Area Geological Map, showing the subject area highlighted in red.. SITE INVESTIGATIONS Recommended minimum investigations are specified in the EC Guidelines and NZGS Geotechnical Earthquake Engineering Practice Module : Guideline for the identification, assessment and mitigation of liquefaction hazards. Based on these guidelines we recommend that the minimum site investigations to confirm building suitability are: Continuous profile of the subsoil to firm basement (usually by borehole and/or CPT) Measurement of depth to water table GEOLOGY

6--Jw-Geotech-R-69 Consulting Engineers In-situ testing of all susceptible strata (usually by CPT or SPT) Sampling of all susceptible strata Grading curves for susceptible soils Atterberg limit tests for all soils.. Cone Penetration Testing Geotechnical field investigations were carried out on the th of May,. These investigations consisted of: Visual inspections and walkover. Seven cone penetration tests (CPT) to varying depths ranging from.7m to 6.m below the existing ground level The locations of all cone penetration tests are shown on the site plan attached as Appendix.... Subsoil CPT results have been analysed with results attached in Appendix and. Results of the soil behaviour plots show alternating layers of Silty CLAY, SILT and Sandy SILT down to approximately.-6m below ground. Some CPT tests (CPTs 6 & 7) show sensitive fine grained material, interpreted as organics (peat), at a depth of between and.6m. All of the CPTs refused on a competent layer interpreted as SAND and/or GRAVEL. The groundwater table ranges from.7m to.m below ground level across the site.. REQUIREMENTS AND GUIDELINES The Department of Housing and Building has provided the following guidelines: Enhanced foundations can be used on sites with potential for liquefaction provided lateral spreading across the property is less than mm. A slope over the building platform of.% ( in ) is acceptable after a liquefiable event. 6. ASSESSMENT OF LIQUEFACTION REQUIREMENTS AND GUIDELINES

6--Jw-Geotech-R-69 Consulting Engineers CPT results have been analysed to assess the potential for soil liquefaction and settlement. Results are attached in Appendix. The assessment of liquefaction has been undertaken under ultimate limit state design (ULS) criteria and serviceability limit state design (SLS) criteria. The ultimate limit state is reached when the applied stresses actually exceed the strength of the structure or structural elements causing it to fail or collapse. The serviceability limit state is the point where a structure can no longer be used for its intended purpose but would still be structurally sound. The tolerances for serviceability depend on the intended use of the structure and can vary significantly. 6.. Ultimate Limit State Design (ULS) 6... Design Parameters Design parameters have been calculated for analysing the CPT results. Calculation of the peak horizontal ground acceleration (PGA) has been calculated in accordance with NZS7.: using the following formula: Ah = Z R C Where: Z =. (base PGA called hazard factor given by NZS 7.:) R = ( in yr return period factor given by NZS 7.:) C =. (Site response factor called spectral shape factor, based on class of soil and given by NZS 7.:) Ah =. x x. =.99 m/s The magnitude earthquake recommended for all common liquefaction assessment procedures in Christchurch is M7.. 6... Results and Analysis The results of the 7 CPT investigations under ULS design earthquake parameters show that there is generally a low risk of liquefaction across the site. Only one test location, CPT 6 near the south western corner of the house, indicated a high risk of liquefaction at a depth of some m. The site is not in close proximity to a river of free excavated bank and is not considered subject to lateral spreading based on observations from aerial photographs. ASSESSMENT OF LIQUEFACTION

6--Jw-Geotech-R-69 Consulting Engineers The CPT investigations were undertaken around the outside of the building due to equipment access limitations. It is assumed that the variability between CPT results in close proximity will equally apply inside the building footprint. Vertical Settlement The CPT locations have been plotted below, and a filled contour plan of vertical settlements across the site has been generated. A larger version of this plan is attached in Appendix. Figure. Filled contour plan showing vertical settlement across the site under ULS design earthquake parameters. Maximum settlement under the design earthquake parameters due to liquefaction was calculated to be approximately 6mm at the location of CPT6 at the southwestern side of the dwelling. Results also show that the western side of the site is more prone to liquefaction with higher liquefaction potential indexes. The rest of the site has vertical settlements ranging from to mm. Although liquefaction is a major cause of earthquake damage, little harm occurs unless liquefaction generates some form of ground surface disruption or ground failure. A study undertaken by K. Ishihara in 9 presented preliminary empirical criteria for assessing the potential for ground surface disruption at liquefaction sites. The criteria are based on relationships between the thickness of liquefiable sediment beneath a site and the corresponding thickness of overlying non-liquefiable soil. A summary of the settlement results, depths to liquefiable layers, thickness of liquefiable layers and liquefaction potential index across the site are tabulated below: ASSESSMENT OF LIQUEFACTION 6

6--Jw-Geotech-R-69 Consulting Engineers CPT Settlement (mm) Depth to liquefied layer (m) Thickness of liquefied layer (m) Liquefaction Potential Index (RISK).. LOW.. LOW 6.. LOW..9 LOW 9.. LOW 6 6.. HIGH 7. LOW Table. Settlement, depths to liquefiable layers, thickness of liquefiable layers and liquefaction potential index for 7 CPT tests undertaken across the site. Figure. Graph showing thickness of surface layer vs. thickness of liquefiable layer with boundary curve from Ishihara for a maximum ground acceleration of.g. All data points above the line signify occurrence of surface effects of liquefaction. The assessment against data from Ishihara 9 shows that the thickness of the surface layer is generally adequate to prevent sand boils and small fissures coming to the ground surface with the exception at the location of CPT6. It is likely that surface effects of liquefaction will occur along the southern portion of the house. ASSESSMENT OF LIQUEFACTION 7

6--Jw-Geotech-R-69 Consulting Engineers Differential Settlement Differential settlement causes the most damage to structures. It is the differential vertical and horizontal displacements which cause stresses on the structure and induce damage to foundations, flooring, structural connections, cladding and the roof. Differential settlement has been calculated between CPT6 and CPT, giving an angular rotation of % under ULS design parameters which is inside the regulations. This is taken as rotation from one side of the building platform to the other. Maximum differential settlement is between CPT6 and CPT with an angular rotation of.%. However, these CPT s are in close proximity and the stresses resulting from the differential settlement are expected to be spread across the entire structure reducing rotation. 6.. Serviceability Limit State Design (SLS) 6... Design Parameters Design parameters have been calculated for analysing the CPT results. Calculation of the peak horizontal ground acceleration (PGA) has been calculated using: Ah = Z R C Where: Z =. (base PGA called hazard factor given by NZS 7.:) R =. ( in yr return period factor given by NZS 7.:) C =. (Site response factor called spectral shape factor, based on class of soil and given by NZS 7.:) Ah =. x. x. =. m/s The magnitude earthquake recommended for all common liquefaction assessment procedures in Christchurch is M7.. 6... Results and Analysis The results of the 7 CPT investigations show that there is a low risk of liquefaction under the SLS design earthquake parameters. Vertical Settlement The CPT locations have been plotted below, and a filled contour plan of vertical settlements across the site has been generated. A larger version of this plan is attached in Appendix. ASSESSMENT OF LIQUEFACTION

6--Jw-Geotech-R-69 Consulting Engineers Figure. Filled contour plan showing vertical settlement across the site under SLS design earthquake parameters. Maximum settlement under the SLS design earthquake parameters due to liquefaction was calculated to be approximately mm at the location of CPT along the western side of the dwelling. Settlements of up to mm were calculated at the location of CPT 7, at the south western corner of the dwelling. Calculation of liquefaction induced settlement at the other CPT locations indicates settlement. A summary of the settlement results, depths to liquefiable layers, thickness of liquefiable layers and liquefaction potential index across the site are tabulated below: CPT Settlement (mm) Depth to liquefied layer (m) Thickness of liquefied layer (m) Liquefaction Potential Index (RISK).. LOW... LOW.. LOW..7 LOW..9 LOW 6.. LOW 7.. LOW ASSESSMENT OF LIQUEFACTION 9

6--Jw-Geotech-R-69 Consulting Engineers Table. Settlement, depth to liquefiable layers, thickness of liquefiable layers and liquefaction potential index for 7 CPT tests under SLS design earthquake parameters. Figure 6. Graph showing thickness of surface layer vs. thickness of liquefiable layer with boundary curve from Ishihara for a maximum ground acceleration of.g. All data points above the line signify occurrence of surface effects of liquefaction. The liquefaction assessment using SLS design earthquake parameters shows that surface effects of liquefaction are not likely to occur during the design earthquake across the site. Differential Settlement Differential settlement has been calculated between CPT6 and CPT, giving an angular rotation of.% under SLS design parameters which is inside the regulations. This is taken as rotation from one side of the building platform to the other. Maximum differential settlement is between CPT6 and CPT with an angular rotation of.9%. However, these CPT s are in close proximity and the stresses resulting from the differential settlement are expected to be spread across the entire structure reducing rotation. ASSESSMENT OF LIQUEFACTION

6--Jw-Geotech-R-69 Consulting Engineers 6.. Summary A summary of the results from the liquefaction assessment under ultimate limit state design (ULS) criteria and serviceability limit state design (SLS) criteria is tabulated below: Design Criteria Liquefaction Potential Index (RISK) Maximum Vertical Settlement (mm) Expected Differential Settlement (% rotation) Maximum Differential Settlement (% rotation) ULS LOW to HIGH 6 %.% SLS LOW.%.9% Table. Summary of LPI, vertical settlement and differential settlement for 7 CPT tests taken across the site. 7. LIQUEFACTION REMEDIATION MEASURES Two approaches are generally used to mitigate liquefaction and its consequences:. Soil Remediation. Structural Modification While these are discussed herein it is generally impracticable with a building in place due to the impracticality of large machines working and the cost of working in confined spaces. 7.. Soil Remediation Soil remediation measures effectively reduce ground deformation and effects of liquefaction by preventing/limiting/slowing-down the development of excess pore water pressure and/or by limiting the development of shear strains and vertical strains in the ground. Soil remediation is usually based on one or a combination of the following measures: Densification (compaction, vibro-flotation, compaction piles, preloading) to increase liquefaction resistance and reduce deformability of the soil through increased strength and stiffness. Solidification (deep mixing, permeation grouting) through cementation of soils. Containment of liquefied soils and limitation of ground deformation by reinforcement and soil mixing walls. Drainage (pre-fabricated drains, stone columns) for increased permeability and faster dissipation of excess pore water pressures. LIQUEFACTION REMEDIATION MEASURES

6--Jw-Geotech-R-69 Consulting Engineers Results of the 7 CPT tests show that there is generally a low risk of liquefaction across the site with the exception of the southern end of the dwelling where a high risk was identified. An option for soil remediation that may be suitable at the site is vibro-replacement stone columns or deep soil mixing. This would need to be undertaken with the building removed and may not be practical in this instance. During the vibro-replacement method a probe cavity is filled with imported materials such as crushed stone, gravel or sometimes concrete. Vibro-replacement can improve the liquefiable soil by densification, increasing the lateral stress, reinforcing the soil mass with the stiffer columns of fill material and providing increased drainage of earthquake induced excess pore water pressures. Deep soil mixing involves the mixing, and sometimes partial replacement, of in-situ soils with cementitious materials or grout. Deep soil mixing uses mixing augers that inject the cementitious material or grout into the surrounding soil through the auger stems as they continue to rotate and mix the injected matter with the existing soils. Testing is required prior to deep soil mixing; using different levels of cementitious material mixed with the existing soil to find the ideal unconfined compressive strength. 7.. Structural Modification Potential effects of liquefaction can be taken into account and accommodated in the design or strengthening of the structure in order to reduce differential settlement. This is commonly achieved by using stiff raft, rigid foundation beams/walls or pile foundations with sufficient lateral capacity to resist both inertial loads due to vibration of the structure and kinematic loads due to ground movement. If the building is to be rebuilt and a stiffened raft option is selected, there is still potential for the whole structure to rotate. CPT results show that differential settlement will likely be above the minimum allowable angular rotation of.%. If no soil remediation measures are undertaken prior to the repair or re-build, then structural modification of the building will be required to reduce differential settlement to below the tolerance of.% angular rotation. If a repair strategy is approached, then the recommended option is to underpin the perimeter concrete foundation with flexible pile foundations. The piles should be extended through the liquefiable layer and pinned into the dense material below. This will require a specific engineered design at the building consent stage of development. LIQUEFACTION REMEDIATION MEASURES

6--Jw-Geotech-R-69 Consulting Engineers. STATIC SETTLEMENT BELOW FOUNDATIONS CPT results have been analysed to assess the level of static vertical settlement beneath foundations of future dwellings at the subdivision. Due to the identification of a fine grained sensitive soil in CPTs 6 and 7, we anticipate further static settlements along the south western portion of the structure. A foundation system consisting of a.m wide x.m deep strip footing (i.e. for a concrete slab floor) has been used for design purposes with a conservative kpa footing pressure. A length to breadth footing dimension ratio of has been used for the calculations. A summary of the static vertical settlement results are summarised below. CPT Static Vertical Settlement (mm) < < < < < 6 < 7 < Table. Summary of static vertical settlement at each CPT location. The results show ongoing static settlement across the site will be negligible. It is likely that the organic soils identified have already undergone settlement and some of the settlement observed in the level survey is a result of this. 9. STATIC BEARING CAPACITY OF FOUNDATIONS The ultimate bearing capacities for a.m wide x.m deep strip footing have been calculated with varying results between CPT test locations at the site. Allowable bearing capacity has been determined using a Factor of Safety of. Bearing capacity calculations are included in Appendix. Results shown in Table below show allowable bearing capacities vary significantly across the site. CPT Ultimate Bearing Capacity (kpa) Allowable Bearing Capacity (kpa) Dependable Bearing Capacity (kpa) 7 7 STATIC SETTLEMENT BELOW FOUNDATIONS

6--Jw-Geotech-R-69 Consulting Engineers 7 9 6. 6 7 9. 7 66 Table. Summary of bearing capacity at each CPT location. Care is required as the density of the upper layers varies and heavy compaction below the foundations is recommended prior to construction. Generally the allowable bearing capacity should be in excess of kpa.. FOUNDATIONS Maximum vertical settlement at the site under SLS and ULS design earthquake parameters was found to be mm and 6mm, respectively. In accordance with the liquefaction deformation limits and house foundation implications (Table below, taken from DBH Guidelines), the vertical settlements are within the limits recommended for a TC site and therefore enhanced foundation solutions will be suitable (DBH Guidelines Section.). Table. DBH Guidelines for the Geotechnical Investigation and Assessment of Subdivisions in the Canterbury Region Liquefaction Deformation Limits and House Foundation Implications. The liquefaction analysis indicates that the building will be subject to ongoing settlement from SLS Serviceability Limit Loads and ULS Ultimate Limit Loads during the ongoing earthquake sequence that is being experienced in the Christchurch area. The CPTs identified a hard founding layer (gravel) at depths of between and 6m. The future foundations and building interaction will need to control horizontal and vertical differential settlement to ensure the induced concentrated stresses do not FOUNDATIONS

6--Jw-Geotech-R-69 Consulting Engineers damage the building. The resulting damage from an earthquake event should be able to be repairable through an earthquake sequence by re-levelling the building. Considering the thickness to the liquefying layer and geotechnical conclusions identifying the damage that has occurred to the building foundations treatment of the ground and/or repairing the foundations are required. This will require. Ground improvement. Reconstructing the building on a raft foundation. Completing these options with the building in place will be economically challenging. If soil remediation measures are undertaken, then a concrete slab floor of stiffened raft or rib raft design may be constructed directly on the ground surface. Options for soil remediation are:. Cement stabilisation with -6% cement re-worked into the existing ground up to m thick with building foundations constructed on this layer. This will act as a bridging layer and prevent liquefaction from reaching the surface. The stabilised pad should be extended at least.m past the building envelope.. Vibro replacement stone columns consisting 6mm diameter columns extended a minimum of -6m below ground level to be pinned into the un-liquefiable subsoil beneath. If no soil remediation is undertaken at the site, the following foundation option is recommended:. Construct an enhanced reinforced foundation wall. This would require underpinning the ring foundation by driving or boring flexible timber piles to below the un-liquefiable soils at a depth of some -6m. A replacement foundation wall could be constructed on top of these piles and tied into the existing foundation. This would require specific engineering design.. Re-level and repack the concrete piles supporting the timber floors and internal walls. It may be that some settlement occurs in future events and provision should be made to re-level the internal footings if this occurs. Alternatively, strengthening of the structure could restrict this settlement.. CONCLUSIONS AND RECOMMENDATIONS Geotechnical investigations indicate that the subsoil properties do not have strength parameters necessary for ongoing support of the existing building without ground improvement and/or repairing the foundation system. Allowable bearing capacity is CONCLUSIONS AND RECOMMENDATIONS

6--Jw-Geotech-R-69 Consulting Engineers variable across the building platform. A fine grained sensitive soil (peat) was identified along the south western portion of the dwelling. Design Criteria Liquefaction Potential Index (RISK) Maximum Vertical Settlement (mm) Expected Differential Settlement (% rotation) Maximum Differential Settlement (% rotation) ULS LOW to HIGH 6 %.% SLS LOW.%.9% Table. Summary of LPI, vertical settlement and differential settlement for 7 CPT tests taken across the site. Calculations to date using the design earthquake parameters from NZS7. show the following: SLS maximum dynamic settlement is approximately mm with an expected differential settlement across the building platform north-south of mm causing angular rotation of.%. ULS dynamic settlement is 6mm with an expected differential settlement across the building platform north-south of mm causing angular rotation of %. The un-liquefiable surface layer thickness is generally thick enough to prevent surface effects of liquefaction including sand boils and small fissures except along the south western portion of the house where surface effects of liquefaction may occur. It is advised that the building under ULS loading is flexible enough to allow these movements without collapse. The following recommendations are to be incorporated into the building construction:. It is recommended that soil remediation or a new foundation system at the site be constructed.. Soil remediation is recommended to prevent sand boils penetrating the ground surface, reduce differential settlement and maintain the integrity of the building. This is unlikely to be economically practicable with the building in place. a. One option for soil remediation is cement stabilisation of the top m subsoil with -6% cement re-worked into the existing ground. The stabilised pad should be extended at least.m past the building envelope. a. Option two for soil remediation is vibro replacement stone columns consisting of 6mm diameter columns extended a minimum of -6m below ground level to be pinned into the un-liquefiable subsoil beneath. CONCLUSIONS AND RECOMMENDATIONS 6

6--Jw-Geotech-R-69 Consulting Engineers. If soil remediation measures are undertaken then the foundations of the new building may be constructed directly on the re-worked ground. A concrete slab flooring system of rib raft or stiffened raft design is recommended. 6. If no soil remediation is undertaken at the site, the concrete ring foundation will need to be replaced with an enhanced reinforced foundation wall and underpinned with pile foundations to reduce differential settlement. Pile foundations will likely consist of -mm diameter driven timber piles pinned into the un-liquefiable subsoil beneath. The internal piles supporting the floor should be repacked and re-levelled with a provision for furthering re-levelling in the event of further events. 7. The ground is suitable for the construction of services and these should allow for being subjected to earthquake dynamic loads and liquefaction zones.. All re-build works should be carried out under the guidance of a Chartered Professional Engineer with relevant experience.. LIMITATIONS This report has been prepared for the benefit of MWH Mainzeal as our client with respect to geotechnical investigation for repair/reconstruction methodology as defined in the brief. It shall not be relied upon for any other purpose. The reliance by other parties on the information or opinions contained in this report shall, without our prior review and agreement in writing, be at such parties sole risk. Opinions and judgments expressed herein are based on our understanding and interpretation of current regulatory standards, and should not be construed as legal opinions. Where opinions or judgments are to be relied on they should be independently verified with appropriate legal advice. Any recommendations, opinions, or guidance provided by Cook Costello Ltd in this report are limited to technical engineering requirements and are not made under the Financial Advisers Act. Recommendations and opinions in this report are based on data from cone penetration testing undertaken on site. The nature and continuity of subsoil conditions away from the cone penetration tests are inferred and it must be appreciated that actual conditions could vary considerably from the assumed model. During excavation and construction the site should be examined by an Engineer or Engineering Geologist competent to judge whether the exposed subsoil s are compatible with the inferred conditions on which the report has been based. It is possible that the nature of the exposed subsoil s may require further investigation and the modification of the design based on this report. In any event it is essential that the LIMITATIONS 7

6--Jw-Geotech-R-69 Consulting Engineers firm is notified if there is any variation in subsoil conditions from those described in the report as it may affect the design parameters recommended in the report. Cook Costello Ltd. have performed the services for this project in accordance with the standard agreement for consulting services and current professional standards for environmental site assessment. guarantees are either expressed or implied. There is no investigation which is thorough enough to preclude the presence of materials at the site which presently, or in the future, may be considered hazardous. Because regulatory evaluation criteria are constantly changing, concentrations of contaminants present and considered to be acceptable now may in the future become subject to different regulatory standards which cause them to become unacceptable and require further remediation for this site to be suitable for the existing or proposed land use activities. J T Walker Engineering Geologist BScGE, MIPENZ, P J Cook Chartered Professional Engineer BE(hons),Dip Ag, CPEng, MIPENZ, IntPE(NZ), MACENZ, MIOD LIMITATIONS

6--Jw-Geotech-R-69 Consulting Engineers. APPENDIX : SITE PLANS APPENDIX : SITE PLANS 9

6--Jw-Geotech-R-69 Consulting Engineers. APPENDIX : CPT ANALYSIS APPENDIX : CPT ANALYSIS

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.7 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Settlements calculation according to theory of elasticity * Cone Cone resistance qt qt Constrained Modulus Cumulative settlement.......6. End of Primary Ov erall.... 6.6....6.6....6.7.7.7.76.7....6....6 6.9.9...9.96...6...6.9.. 6 Tip resistance (MPa) 9 9 9 9 9 9 69 79 9 M(C PT) (MPa).. Settlement (cm). Caclulation properties Footing type: Rectangular Footing width:. (m) L/B: Footing pressure:. (kpa) Embedment depth:. (m) Footing is rigid: Remove excavation load: Apply % rule: Calculate secondary settlements: Time period for second. settlements: * Primary settlements calculation is performed according to the following formula: S * Secondary (creep) settlements calculation is performed according to the following formula: S C a CPT v z z log( t) CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT- :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm).............. 9.9.6........ 9.9......... 9.7 6..99....... 9.6 6..9... 6..6..6 9.6 6.9.97... 7.6.7..6. 7..9....7...7 7.9..9... 9..9..9 7...9....9.. 6..6.......79...... 9....... 9..7........7........7... 6 6....6... 7 6 7..7 9..9... 7..7.6 6.6... 9 9. 7.7 9.6.9... 9.7.. 6..7.6....7.7.. 6.6......7.7...7 7.9.....7.7... 9.....7.7....7....7.7........ 6.7.76...67.... 7.76.77..7.9 6......77.7.. 7.6... 9.7.79. 6.....79..9. 6.7...... 9. 66....... 9. 66.9.......99 67.7.......9 6..9...... 6.67.7... 6 6.. 7.7 6.... 7 6 7. 7. 6..... 7. 7. 67.6.... 9 9..9 6.9 66..... 9.9.. 6.6 66......9.9.. 6.9 6......9.9.. 6. 6.99.....9.9...9 6.6.....9.9...6 6.6.9....9.9...7 6.67... CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT- :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm) 6.9.96..7 6.69... 7.96.97..7. 6..7....97.9..7.9 6.... 9.9.99..7 6.9....99...9.6 6.9......... 6.6.........6 6.99......... 6.9.........9 6.......... 6..... Total primary settlement:. Total secondary settlement:. Total calculated settlement:. Abbreviations Start depth: End depth: Thickness: Relative depth: Iz: Delta P: Eff. stress: M (CPT): Settlement: Second. settlement: Start depth of soil layer (penetration depth measured from ground free surface) End depth of soil layer (penetration depth measured from ground free surface) Thickness of soil layer Depth of calculation relative to footing Stress influence factor Footing impossed stress: Effective stress Constrained modulus from CPT Primary settlement Secondary settlemends due to creep CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.7 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Bearing Bearing Capacity Capacity Plot Plot,, 9 96 Bearing Capacity calculation is perfromed based on the formula: Q ult R k q t q soil Ultimate Bearing Capacity (kpa) 9 9 9 6 7 76 7 7 7 6 where: R k: Bearing capacity factor q t: Average corrected cone resistance over calculation depth q soil: Pressure applied by soil above footing 66 6 6 Footing Width (m) :: Tabular results :: B (m) Start Depth (m) End Depth (m) Ave. q t (MPa) R k Soil Press. (kpa) Ult. bearing cap. (kpa)...9.7. 9. 7.....6. 9. 9..7...9. 9. 99..9.... 9....... 9.. 6..... 9. 96.99 7...7.6. 9. 96.7.7...9. 9. 66.79 9.9...9. 9....6.69. 9. 77....9.. 9. 697...... 9. 6.6.7.... 9. 6..9.... 9. 66..... 9. 66 6..... 9. 66 7...7.. 9. 66.7. 6... 9. 66 9.9. 6... 9. 66 CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.67 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Settlements calculation according to theory of elasticity * Cone Cone resistance qt qt Constrained Modulus Cumulative settlement.... End of Primary Ov erall.....6.6.......6...6......6.6.......6.6.......6.6 6 Tip resistance (MPa) 6 6 6 66 6 M(C PT) (MPa) 6 Settlement (cm) Caclulation properties Footing type: Rectangular Footing width:. (m) L/B: Footing pressure:. (kpa) Embedment depth:. (m) Footing is rigid: Remove excavation load: Apply % rule: Calculate secondary settlements: Time period for second. settlements: * Primary settlements calculation is performed according to the following formula: S * Secondary (creep) settlements calculation is performed according to the following formula: S C a CPT v z z log( t) CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT- :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm).......... Total primary settlement:. Total secondary settlement:. Total calculated settlement:. Abbreviations Start depth: End depth: Thickness: Relative depth: Iz: Delta P: Eff. stress: M (CPT): Settlement: Second. settlement: Start depth of soil layer (penetration depth measured from ground free surface) End depth of soil layer (penetration depth measured from ground free surface) Thickness of soil layer Depth of calculation relative to footing Stress influence factor Footing impossed stress: Effective stress Constrained modulus from CPT Primary settlement Secondary settlemends due to creep CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.67 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Bearing Bearing Capacity Plot Plot Bearing Capacity calculation is perfromed based on the formula: Q ult R k q t q soil Ultimate Bearing Capacity (kpa) 9 7 6 where: R k: Bearing capacity factor q t: Average corrected cone resistance over calculation depth q soil: Pressure applied by soil above footing 9 Footing Width (m) :: Tabular results :: B (m) Start Depth (m) End Depth (m) Ave. q t (MPa) R k Soil Press. (kpa) Ult. bearing cap. (kpa)...9... 6....... 9..7......6.9..... 6.6.......7 6...... 99. 7...7.9.. 7.7.7..... 6.77 9.9...7...9...6.66...7...9.9.. 7.6.......7.7...6.. 9.96.9..... 9........ 6...... 7...7.7.. 9..7. 6..7.. 9. 9.9. 6..7.. 9. CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. 7 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.97 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Settlements calculation according to theory of elasticity * Cone Cone resistance qt qt Constrained Modulus Cumulative settlement.... End of Primary Ov erall.....6.6.......6.6........6.6.......6.6.......6.6.. Tip resistance (MPa) 9 M(C PT) (MPa) 9 Settlement (cm) Caclulation properties Footing type: Rectangular Footing width:. (m) L/B: Footing pressure:. (kpa) Embedment depth:. (m) Footing is rigid: Remove excavation load: Apply % rule: Calculate secondary settlements: Time period for second. settlements: * Primary settlements calculation is performed according to the following formula: S * Secondary (creep) settlements calculation is performed according to the following formula: S C a CPT v z z log( t) CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT- :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm)......9.... Total primary settlement:. Total secondary settlement:. Total calculated settlement:. Abbreviations Start depth: End depth: Thickness: Relative depth: Iz: Delta P: Eff. stress: M (CPT): Settlement: Second. settlement: Start depth of soil layer (penetration depth measured from ground free surface) End depth of soil layer (penetration depth measured from ground free surface) Thickness of soil layer Depth of calculation relative to footing Stress influence factor Footing impossed stress: Effective stress Constrained modulus from CPT Primary settlement Secondary settlemends due to creep CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. 9 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.97 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown 6 Bearing Bearing Capacity Plot Plot Bearing Capacity calculation is perfromed based on the formula: Q ult R k q t q soil Ultimate Bearing Capacity (kpa) 6 6 where: R k: Bearing capacity factor q t: Average corrected cone resistance over calculation depth q soil: Pressure applied by soil above footing Footing Width (m) :: Tabular results :: B (m) Start Depth (m) End Depth (m) Ave. q t (MPa) R k Soil Press. (kpa) Ult. bearing cap. (kpa)...9.6.. 9....... 6..7...9.. 9.7.9..........9... 6...... 6.9 7...7.7...7...66...76 9.9...6...7...6.9.. 97.69...9....79....9.. 7.67.7..... 6..9...6.. 7....... 7 6...... 66. 7...7....7.7. 6.... 66.7 9.9. 6.... 66.7 CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.9 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Settlements calculation according to theory of elasticity * Cone Cone resistance qt qt Constrained Modulus Cumulative settlement.... End of Primary Ov erall.....6.6.......6...6......6.6.......6.6.......6.6.. Tip resistance (MPa) M(C PT) (MPa) Settlement (cm) Caclulation properties Footing type: Rectangular Footing width:. (m) L/B: Footing pressure:. (kpa) Embedment depth:. (m) Footing is rigid: Remove excavation load: Apply % rule: Calculate secondary settlements: Time period for second. settlements: * Primary settlements calculation is performed according to the following formula: S * Secondary (creep) settlements calculation is performed according to the following formula: S C a CPT v z z log( t) CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT- :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm).......... Total primary settlement:. Total secondary settlement:. Total calculated settlement:. Abbreviations Start depth: End depth: Thickness: Relative depth: Iz: Delta P: Eff. stress: M (CPT): Settlement: Second. settlement: Start depth of soil layer (penetration depth measured from ground free surface) End depth of soil layer (penetration depth measured from ground free surface) Thickness of soil layer Depth of calculation relative to footing Stress influence factor Footing impossed stress: Effective stress Constrained modulus from CPT Primary settlement Secondary settlemends due to creep CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.9 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Bearing Bearing Capacity Plot Plot 9 7 Bearing Capacity calculation is perfromed based on the formula: Q ult R k q t q soil where: R k: Bearing capacity factor q t: Average corrected cone resistance over calculation depth q soil: Pressure applied by soil above footing Ultimate Bearing Capacity (kpa) 6 9 7 6 9 Footing Width (m) :: Tabular results :: B (m) Start Depth (m) End Depth (m) Ave. q t (MPa) R k Soil Press. (kpa) Ult. bearing cap. (kpa)...9.96.. 9.9...... 9.7.7..... 6..9..... 9.....7...6 6...... 6. 7...7.97.. 9.76.7...6.. 7. 9.9...7...97...6.6......9....6........7......77.9..... 7.9...... 9. 6.......7 7...7.9.. 6.7.7. 6.... 9. 9.9. 6.... 9. CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.6 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Settlements calculation according to theory of elasticity * Cone Cone resistance qt qt Constrained Modulus Cumulative settlement.....6......6. End of Primary Ov erall...6....6.....6....6....6....6. 6 Tip resistance (MPa) 7 9 M(C PT) (MPa) Settlement (cm) Caclulation properties Footing type: Rectangular Footing width:. (m) L/B: Footing pressure:. (kpa) Embedment depth:. (m) Footing is rigid: Remove excavation load: Apply % rule: Calculate secondary settlements: Time period for second. settlements: * Primary settlements calculation is performed according to the following formula: S * Secondary (creep) settlements calculation is performed according to the following formula: S C a CPT v z z log( t) CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT- :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm)......9.... Total primary settlement:. Total secondary settlement:. Total calculated settlement:. Abbreviations Start depth: End depth: Thickness: Relative depth: Iz: Delta P: Eff. stress: M (CPT): Settlement: Second. settlement: Start depth of soil layer (penetration depth measured from ground free surface) End depth of soil layer (penetration depth measured from ground free surface) Thickness of soil layer Depth of calculation relative to footing Stress influence factor Footing impossed stress: Effective stress Constrained modulus from CPT Primary settlement Secondary settlemends due to creep CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT- Total depth:.6 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown 9 Bearing Bearing Capacity Plot Plot Bearing Capacity calculation is perfromed based on the formula: Q ult R k q t q soil where: R k: Bearing capacity factor q t: Average corrected cone resistance over calculation depth q soil: Pressure applied by soil above footing Ultimate Bearing Capacity (kpa) 7 6 9 7 6 Footing Width (m) :: Tabular results :: B (m) Start Depth (m) End Depth (m) Ave. q t (MPa) R k Soil Press. (kpa) Ult. bearing cap. (kpa)...9... 6.7...... 96..7..... 7.7.9...7.. 9.6....... 6...... 66. 7...7.7...7.7...99.. 9. 9.9...9...9...6... 67....9... 6.....7.. 9..7...7...6.9...69.. 7.....9.. 7. 6....9.. 7. 7...7.9.. 7..7. 6..9.. 7. 9.9. 6..9.. 7. CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT-6 Total depth:.7 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Settlements calculation according to theory of elasticity * Cone Cone resistance qt qt Constrained Modulus Cumulative settlement.......6. End of Primary Ov erall.... 6.6....6.6....6.7.7.7.76.7.....6....6. 6.9.9.9.96...9..6..6.. Tip resistance (MPa) 9 79 9 M(C PT) (MPa) 79... Settlement (cm). Caclulation properties Footing type: Rectangular Footing width:. (m) L/B: Footing pressure:. (kpa) Embedment depth:. (m) Footing is rigid: Remove excavation load: Apply % rule: Calculate secondary settlements: Time period for second. settlements: * Primary settlements calculation is performed according to the following formula: S * Secondary (creep) settlements calculation is performed according to the following formula: S C a CPT v z z log( t) CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. 7 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT-6 :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm).............. 9.9......... 9.9.66........ 9.7.9.99....... 9.6 6..9... 6..6..6 9.6 6.9.97... 7.6.7..6. 6.6.9....7...7 7.9 6..9... 9..9..9 7..9.9....9.. 6........................7.......9.7........7... 6 6....... 7 6 7..7 9..... 7..7.6.7... 9 9. 7.7..9... 9.7.. 6. 9.6....7.7.. 6.6 9.6.....7.7...7 9......7.7....6....7.7... 7.....7.7... 6.7.... 6.7.76....... 7.76.77..7.9......77.7...... 9.7.79..7....79..9..7...... 9........ 9..76.......99.6.......9..9.......6.7... 6 6.. 7.7.7... 7 6 7. 7...... 7. 7...... 9 9..9 6.9..... 9.9.. 6.6.7.....9.9.. 6.9.6.....9.9.. 6..9.....9.9...9.79.....9.9...6..9....9.9...7 9.9... CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT-6 :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm) 6.9.96..7.6... 7.96.97..7...7....97.9..7.9.... 9.9.99..7 7.....99...9.6 7.......... 6..........6....................9...........6.... Total primary settlement:. Total secondary settlement:. Total calculated settlement:. Abbreviations Start depth: End depth: Thickness: Relative depth: Iz: Delta P: Eff. stress: M (CPT): Settlement: Second. settlement: Start depth of soil layer (penetration depth measured from ground free surface) End depth of soil layer (penetration depth measured from ground free surface) Thickness of soil layer Depth of calculation relative to footing Stress influence factor Footing impossed stress: Effective stress Constrained modulus from CPT Primary settlement Secondary settlemends due to creep CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, :: p.m. 9 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT-6 Total depth:.7 m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown 6 Bearing Bearing Capacity Plot Plot 7 Bearing Capacity calculation is perfromed based on the formula: Q ult R k q t q soil where: R k: Bearing capacity factor q t: Average corrected cone resistance over calculation depth q soil: Pressure applied by soil above footing Ultimate Bearing Capacity (kpa) 76 7 7 7 6 66 6 6 6 6 6 Footing Width (m) :: Tabular results :: B (m) Start Depth (m) End Depth (m) Ave. q t (MPa) R k Soil Press. (kpa) Ult. bearing cap. (kpa)...9... 6.6.......9.7..... 77.9.9...79.. 7.7...... 7.9 6...... 66. 7...7... 6.9.7...9.. 79. 9.9...76...9...6.9...9...9... 7.....9.. 7.7.7...7...67.9........... 6...... 7...7....7. 6.... 9.9. 6.... CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT-7 Total depth:. m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown Settlements calculation according to theory of elasticity * Cone Cone resistance qt qt Constrained Modulus Cumulative settlement.........6. End of Primary Ov erall.. 6.6.6....6.....6..7.7.7.76.7.. 6..6.....6....9.9.9.96.9.6.6.... 6 7 Tip resistance (MPa) 6 7 M(C PT) (MPa).. Settlement (cm). Caclulation properties Footing type: Rectangular Footing width:. (m) L/B: Footing pressure:. (kpa) Embedment depth:. (m) Footing is rigid: Remove excavation load: Apply % rule: Calculate secondary settlements: Time period for second. settlements: * Primary settlements calculation is performed according to the following formula: S * Secondary (creep) settlements calculation is performed according to the following formula: S C a CPT v z z log( t) CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT-7 :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm)............. 9.9......... 9.9......... 9.7 7.6.99....... 9.6 9.7.9... 6..6..6 9.6 6.9.97... 7.6.7..6. 6..9....7...7 7.9 66..9... 9..9..9 7. 6.7.9....9.. 6. 7....... 7.7...... 7....... 7.7.7...... 7..7...... 7..7... 6 6... 7.6... 7 6 7..7 9. 76.9... 7..7.6 76.7... 9 9. 7.7 77..9... 9.7.. 6. 77..6....7.7.. 6.6 77......7.7...7 76......7.7... 76.6....7.7... 76.....7.7... 76..... 6.7.76.. 7.9.... 7.76.77..7.9 7.9.....77.7.. 7.... 9.7.79. 7.....79..9. 7....... 9. 7....... 9. 7.6.......99 7.7.......9 7..9...... 7..7... 6 6.. 7.7 7.7... 7 6 7. 7. 76..... 7. 7. 76..... 9 9..9 6.9 76.9.... 9.9.. 6.6 76.9.....9.9.. 6.9 77......9.9.. 6. 77......9.9...9 7......9.9...6 79.7.9....9.9...7 79.9... CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

CPT name: CPT-7 :: Tabular results :: Point Start depth (m) End depth (m) Thickness (m) Relative depth (m) Delta P (kpa) M (CPT) (MPa) Iz Settlement (cm) Second. settlement (cm) Overall settlement (cm) 6.9.96..7.9... 7.96.97..7..6.7....97.9..7.9.9... 9.9.99..7.....99...9.6....................6.......... 7..........9 77.......... 76.9.... Total primary settlement:. Total secondary settlement:. Total calculated settlement:. Abbreviations Start depth: End depth: Thickness: Relative depth: Iz: Delta P: Eff. stress: M (CPT): Settlement: Second. settlement: Start depth of soil layer (penetration depth measured from ground free surface) End depth of soil layer (penetration depth measured from ground free surface) Thickness of soil layer Depth of calculation relative to footing Stress influence factor Footing impossed stress: Effective stress Constrained modulus from CPT Primary settlement Secondary settlemends due to creep CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

Project: Location: Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Liquefaction Assessment 6-: 6 Burnett St, Ashburton CPT: CPT-7 Total depth:. m, Date: 7/6/ Surface Elevation:. m Coords: X:., Y:. Cone Type: Uknown Cone Operator: Uknown,6,6,, Bearing Bearing Capacity Capacity Plot Plot Bearing Capacity calculation is perfromed based on the formula: Q ult R k q t q soil Ultimate Bearing Capacity (kpa),,,,,,,,,, 9 9 where: R k: Bearing capacity factor q t: Average corrected cone resistance over calculation depth q soil: Pressure applied by soil above footing 7 Footing Width (m) :: Tabular results :: B (m) Start Depth (m) End Depth (m) Ave. q t (MPa) R k Soil Press. (kpa) Ult. bearing cap. (kpa)...9.6. 9. 66.... 7.7. 9. 9.76.7.. 7.. 9...9.. 7.. 9..7... 6.67. 9..9 6... 6.. 9..6 7...7.9. 9. 9.9.7.... 9. 96.6 9.9.... 9. 9.6...6.7. 9. 9....9.. 9. 9..... 9..7...7. 9. 7.6.9...7. 9. 7.....7. 9. 7. 6....7. 9. 7. 7...7.7. 9. 7..7. 6..7. 9. 7. 9.9. 6..7. 9. 7. CPeT-IT v..7.. - CPTU data presentation & interpretation software - Report created on: 6/7/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CPe-IT.cpt

6--Jw-Geotech-R-69 Consulting Engineers. APPENDIX : LIQUEFACTION ASSESSMENT APPENDIX : LIQUEFACTION ASSESSMENT

Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Project title : Liquefaction Assessment - ULS Location : 6-: 6 Burnett St, Ashburton Overall Liquefaction Potential Index report 7. 6... LPI color scheme Very high risk High risk Low risk LPI value.... 9.. Basic statistics Total CPT number: 7.7% low risk.9% high risk.% very high risk 7. 6...6.. CPT- CPT- CPT- CPT- CPT- CPT-6 CPT-7......7.7. CPTU name CLiq v...6 - CPT Liquefaction Assessment Software Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Project title : Liquefaction Assessment - ULS Location : 6-: 6 Burnett St, Ashburton Overall vertical settlements report...6.7.....6. Vertical settlement (cm)....6.....96.6....7.99 CPT- CPT- CPT- CPT- CPT- CPT-6 CPT-7 7.... CPTU name CLiq v...6 - CPT Liquefaction Assessment Software Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Project title : Liquefaction Assessment - ULS CPT file : CPT- Cone Cone resistance NCEER (99) NCEER (99) 7.. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio Location : 6-: 6 Burnett St, Ashburton. m.6 m.6 SBTn Plot Plot Trans. detect. applied: CRR CRR plot plot like behavior applied: FS FS Plot Plot.....6......6......6......6......6....6...6...6...6...6........6....6...6....6...6....6...6....6 During earthq....6....6 During earthq. 6 qt (MPa) 6 Rf (%) Ic (Robertson 99).. CRR & CSR.. Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- CPT basic interpretation plots.. Cone Cone resistance.. Friction Friction Ratio Ratio.. Pore Pore pressure.. SBT SBT Plot Plot.. Soil Soil Behaviour Type Type Sensitive fine grained...........6.6.6.6.6........6....6....6....6....6............6.6.6.6.6........ Insitu....6..6..6..6..6 6 qt (MPa) 6 Rf (%) -. -. u (kpa) Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- CPT basic interpretation plots (normalized) rm. rm. cone cone resistance rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio SBTn SBTn Plot Plot rm. rm. Soil Soil Behaviour Type Type.............6....6....6....6....6. Sand & silty sand Sand & silty sand Sand & silty sand Sand & silty sand Sand & silty sand...6....6....6....6....6............6.6.6.6.6............6..6..6..6..6 Qtn 6 Fr (%) -... Bq Ic (Robertson 99) 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6........6...6...6...6...6................6.6.6.6.6................6.6.6.6.6 6 qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- Liquefaction analysis overall plots CRR CRR plot plot FS Plot FS Plot Liquefaction potential Vertical settlements Lateral Lateral displacements.....................6.6.6.6.6........6...6...6...6...6................6. During earthq..6. During earthq..6..6..6............6.6.6.6.6.. CRR & CSR.. Factor of safety LPI...6. Settlement (cm). Displacement (cm) NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6.......6...6...6...6.............6.6.6.6..........6..6..6..6 Peak Su ratio Liq. Su ratio 6 6 Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Project title : Liquefaction Assessment - ULS CPT file : CPT- Cone Cone resistance.....6....6....6....6....6 6 qt (MPa) NCEER (99) NCEER (99) 7.......6....6....6....6....6 Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio 6 Rf (%).....6....6....6....6....6 Location : 6-: 6 Burnett St, Ashburton. m. m.6 SBTn Plot Plot Ic (Robertson 99) Trans. detect. applied:.....6....6....6....6....6 CRR CRR plot plot During earthq... CRR & CSR like behavior applied:.....6....6....6....6....6 FS FS Plot Plot During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq 7

CPT name: CPT- CPT basic interpretation plots Cone Cone resistance Friction Friction Ratio Ratio Pore Pore pressure SBT SBT Plot Plot Soil Soil Behaviour Type Type.................6....6....6....6....6....6....6....6....6....6....6..6..6..6..6........... Insitu.....6...6...6...6...6....6 6 qt (MPa)..6 6 Rf (%)..6 -. -. -. u (kpa) -...6 Ic(SBT)..6 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- CPT basic interpretation plots (normalized) rm. rm. cone cone resistance.. rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio.. SBTn SBTn Plot Plot. rm. rm. Soil Soil Behaviour Type Type................6.6.6.6.6........6.....6.....6.....6.....6....6..6..6..6..6................6...6...6...6...6....6 Qtn..6 6 Fr (%)..6 -... Bq..6 Ic (Robertson 99)..6 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. 9 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6................6..6..6..6..6............6.6.6.6.6................6.6.6.6.6................6.6.6.6.6 6 qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- Liquefaction analysis overall plots... CRR CRR plot plot... FS Plot FS Plot... Liquefaction potential... Vertical settlements... Lateral Lateral displacements......6.6.6.6.6................6...6...6...6...6........6. During earthq..6. During earthq..6..6..6....6....6...6....6...6....6...6....6...6....6.. CRR & CSR.. Factor of safety LPI.. Settlement (cm) Displacement (cm) NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6.............6..6..6..6..........6.6.6.6.............6.6.6.6..........6..6..6..6 Peak Su ratio Liq. Su ratio 6 6 Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Project title : Liquefaction Assessment - ULS CPT file : CPT- Cone Cone resistance.....6....6....6....6....6. qt (MPa) NCEER (99) NCEER (99) 7.......6....6....6....6....6. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio 6 Rf (%).....6....6....6....6....6. Location : 6-: 6 Burnett St, Ashburton.7 m. m.6 SBTn Plot Plot Ic (Robertson 99) Trans. detect. applied:.....6....6....6....6....6. CRR CRR plot plot During earthq... CRR & CSR like behavior applied:.....6....6....6....6....6. 6 FS FS Plot Plot During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- CPT basic interpretation plots Cone Cone resistance Friction Friction Ratio Ratio Pore Pore pressure SBT SBT Plot Plot Soil Soil Behaviour Type Type.....................6..6..6..6..6............6...6...6...6...6........6..6..6..6..6............6....6..6....6..6....6. Insitu.6....6..6....6. Sand & silty sand qt (MPa) 6 Rf (%) -.. u (kpa). Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- CPT basic interpretation plots (normalized) rm. rm. cone cone resistance.. rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio.. SBTn SBTn Plot Plot. rm. rm. Soil Soil Behaviour Type Type................6.6.6.6.6................6...6...6...6...6....6..6..6..6..6................6....6..6....6..6....6..6....6..6....6. Sand & silty sand Qtn 6 Fr (%) -... Bq Ic (Robertson 99) 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6................6.6.6.6.6................6.6.6.6.6................6.6.6.6.6................6.6.6.6.6..... qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- Liquefaction analysis overall plots.....6. CRR CRR plot plot.....6. FS Plot FS Plot.....6. Liquefaction potential.....6. Vertical settlements.....6. Lateral Lateral displacements...........6.6.6.6.6................6.6.6.6.6........6....6. During earthq... CRR & CSR...6....6. During earthq... Factor of safety...6....6. LPI...6....6. 6.... Settlement (cm)....6....6. Displacement (cm) NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. 7 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6.............6.6.6.6.............6.6.6.6.............6.6.6.6.............6..6..6..6. Peak Su ratio Liq. Su ratio Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Project title : Liquefaction Assessment - ULS CPT file : CPT- Cone Cone resistance.....6....6....6....6....6. qt (MPa) NCEER (99) NCEER (99) 7.......6....6....6....6....6. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio 6 Rf (%).....6....6....6....6....6. Location : 6-: 6 Burnett St, Ashburton. m. m.6 SBTn Plot Plot Ic (Robertson 99) Trans. detect. applied:.....6....6....6....6....6. CRR CRR plot plot During earthq... CRR & CSR like behavior applied:.....6....6....6....6....6. FS FS Plot Plot During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq 9

CPT name: CPT- CPT basic interpretation plots Cone Cone resistance Friction Friction Ratio Ratio Pore Pore pressure SBT SBT Plot Plot Soil Soil Behaviour Type Type.........6.....6.....6.....6.....6....6.....6.....6.....6.....6........6..6..6..6..6............6....6..6....6..6....6. Insitu.6....6..6....6. Sand & silty sand qt (MPa) 6 Rf (%) -.6 -. -. u (kpa). Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance CPT basic interpretation plots (normalized) rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio SBTn SBTn Plot Plot CPT name: CPT- rm. rm. Soil Soil Behaviour Type Type.....................6.6.6.6.6........6.....6.....6.....6.....6........6..6..6..6..6............6....6. Qtn.6....6. 6 Fr (%).6....6. -... Bq.6....6. Ic (Robertson 99).6....6. Sand & silty sand Sand 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6................6...6...6...6...6........6.6.6.6.6................6.6.6.6.6................6.6.6.6.6..... qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- Liquefaction analysis overall plots.....6. CRR CRR plot plot.....6. FS Plot FS Plot.....6. Liquefaction potential.....6. Vertical settlements.....6. Lateral Lateral displacements...........6...6...6...6...6........6.6.6.6.6............6....6. During earthq...6....6. During earthq...6....6...6....6...6....6... CRR & CSR.. Factor of safety LPI.. Settlement (cm) Displacement (cm) NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6.............6...6...6...6.......6.6.6.6.............6.6.6.6.............6..6..6..6. Peak Su ratio Liq. Su ratio Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::6 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Project title : Liquefaction Assessment - ULS CPT file : CPT- Cone Cone resistance NCEER (99) NCEER (99) 7.. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio Location : 6-: 6 Burnett St, Ashburton.7 m. m.6 SBTn Plot Plot Trans. detect. applied: CRR CRR plot plot like behavior applied: FS FS Plot Plot.....6....6....6....6. 6 qt (MPa).....6....6....6....6. 6 Rf (%).....6....6....6....6. Ic (Robertson 99).....6....6....6....6. During earthq... CRR & CSR.....6....6....6....6. During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::7 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- CPT basic interpretation plots. Cone Cone resistance. Friction Friction Ratio Ratio. Pore Pore pressure. SBT SBT Plot Plot. Soil Soil Behaviour Type Type........6....6....6....6....6........6...6...6...6...6............6.6.6.6.6................6..6..6. Insitu.6..6. 6 qt (MPa) 6 Rf (%) -. -. u (kpa).. Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::7 p.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- CPT basic interpretation plots (normalized) rm. rm. cone cone resistance.... rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio.... SBTn SBTn Plot Plot.. rm. rm. Soil Soil Behaviour Type Type...6....6....6....6....6. Sand & silty sand Sand & silty sand...6....6....6....6....6............6..6..6..6..6............6..6..6..6..6. Qtn 6 Fr (%) -... Bq Ic (Robertson 99) 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::7 p.m. 7 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6............6...6...6...6...6............6.6.6.6.6................6.6.6.6.6..... 6 qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::7 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT- Liquefaction analysis overall plots CRR CRR plot plot FS Plot FS Plot Liquefaction potential Vertical settlements Lateral Lateral displacements.....................6.6.6.6.6............6...6...6...6...6............6.6.6.6.6....... During earthq... During earthq........6.6.6.6.6....... CRR & CSR.. Factor of safety LPI.. Settlement (cm) Displacement (cm) NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::7 p.m. 9 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6..........6...6...6...6..........6.6.6.6.............6.6.6.6.... Peak Su ratio Liq. Su ratio 6 Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::7 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Project title : Liquefaction Assessment - ULS CPT file : CPT-6 Cone Cone resistance NCEER (99) NCEER (99) 7.. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio Location : 6-: 6 Burnett St, Ashburton.7 m. m.6 SBTn Plot Plot Trans. detect. applied: CRR CRR plot plot like behavior applied: FS FS Plot Plot.....6......6......6......6......6....6....6....6...6....6....6...6....6....6...6....6....6 During earthq....6....6....6 During earthq. qt (MPa) 6 Rf (%) Ic (Robertson 99).. CRR & CSR.. Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::9 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT-6 CPT basic interpretation plots.. Cone Cone resistance.. Friction Friction Ratio Ratio.. Pore Pore pressure.. SBT SBT Plot Plot.. Soil Soil Behaviour Type Type Sensitive fine grained..... Sand & silty sand......6..6..6..6..6. Sand & silty sand Sand & silty sand...6...6...6...6...6............6..6..6..6..6... Insitu............ Sensitive fine grained.6.6.6.6.6 qt (MPa) 6 Rf (%) -. u (kpa). Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::9 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance CPT basic interpretation plots (normalized) rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio SBTn SBTn Plot Plot CPT name: CPT-6 rm. rm. Soil Soil Behaviour Type Type.......... Sand & silty sand...........6..6..6..6..6. Sand & silty sand Sand & silty sand...6...6...6...6...6................6.6.6.6.6................6.6.6.6.6 Qtn 6 Fr (%) -... Bq Ic (Robertson 99) 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::9 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT-6 Corrected norm. norm. cone cone resistance.....................6.6.6.6.6........6...6...6...6...6................6.6.6.6.6................6.6.6.6.6 qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::9 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT-6 Liquefaction analysis overall plots CRR CRR plot plot FS Plot FS Plot Liquefaction potential Vertical settlements Lateral Lateral displacements.....................6.6.6.6.6........6...6...6...6...6....... During earthq... During earthq........6.6.6.6.6................6.6.6.6.6.. CRR & CSR.. Factor of safety LPI Settlement (cm) Displacement (cm) NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::9 p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT-6 Liquefied Su/Sig'v.................6.6.6.6.......6...6...6...6.............6.6.6.6..........6..6..6..6 Peak Su ratio Liq. Su ratio Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, ::9 p.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Project title : Liquefaction Assessment - ULS CPT file : CPT-7 Cone Cone resistance NCEER (99) NCEER (99) 7.. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio Location : 6-: 6 Burnett St, Ashburton. m.6 m.6 SBTn Plot Plot Trans. detect. applied: CRR CRR plot plot like behavior applied: FS FS Plot Plot.....6....6....6....6. 6 qt (MPa).....6....6....6....6. 6 Rf (%).....6....6....6....6. Ic (Robertson 99).....6....6....6....6. During earthq... CRR & CSR.....6....6....6....6. During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq 7

CPT name: CPT-7 CPT basic interpretation plots. Cone Cone resistance. Friction Friction Ratio Ratio. Pore Pore pressure. SBT SBT Plot Plot. Soil Soil Behaviour Type Type Sensitive fine grained Sand & silty sand..... Sand & silty sand...........6.6.6.6.6........6...6...6...6...6................6.6.6.6.6........6. 6 qt (MPa) 7...6. 6 Rf (%)...6. Insitu,, u (kpa),,...6. Ic(SBT)...6. Sensitive fine grained 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT-7 CPT basic interpretation plots (normalized) rm. rm. cone cone resistance.. rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio.. SBTn SBTn Plot Plot. rm. rm. Soil Soil Behaviour Type Type..... Sand & silty sand.......... Sand & silty sand Sand & silty sand.6..6..6..6..6. Sand & silty sand...6...6...6...6...6................6.6.6.6.6.......... Sensitive fine grained..6. Qtn..6. 6 Fr (%)..6. -... Bq..6. Ic (Robertson 99)..6. 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. 9 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT-7 Corrected norm. norm. cone cone resistance.....................6.6.6.6.6........6...6...6...6...6................6.6.6.6.6................6.6.6.6.6. 6 qt (MPa) 7. Ic (Robertson 99). Qtn. Kc 6 7 9. Qtn,cs NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

CPT name: CPT-7 Liquefaction analysis overall plots CRR CRR plot plot FS Plot FS Plot Liquefaction potential Vertical settlements Lateral Lateral displacements.....................6.6.6.6.6........6...6...6...6...6................6. During earthq..6. During earthq..6..6..6............6.6.6.6.6... CRR & CSR... Factor of safety. LPI... Settlement (cm). Displacement (cm) NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT-7 Liquefied Su/Sig'v.................6.6.6.6.......6...6...6...6.............6.6.6.6.............6. 6 Qtn.6. Kc 6 7 9 Qtn,cs.6. Ic (Robertson 99).6.. Peak Su ratio Liq. Su ratio.. Su/Sig'v.. NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 7/6/, :: p.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq ULS.clq

Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Project title : Liquefaction Assessment - SLS Location : 6-: 6 Burnett St, Ashburton Overall Liquefaction Potential Index report 7. 6... LPI color scheme Very high risk High risk Low risk LPI value.... 9.. Basic statistics Total CPT number: 7.% low risk.% high risk.% very high risk 7. 6... CPT- CPT- CPT- CPT- CPT- CPT-6 CPT-7.....97 CPTU name CLiq v...6 - CPT Liquefaction Assessment Software Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz Project title : Liquefaction Assessment - SLS Location : 6-: 6 Burnett St, Ashburton Overall vertical settlements report.6......6. Vertical settlement (cm)....6....776... CPT- CPT- CPT- CPT- CPT- CPT-6 CPT-7.6 CPTU name CLiq v...6 - CPT Liquefaction Assessment Software Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Project title : Liquefaction Assessment - SLS CPT file : CPT- Cone Cone resistance NCEER (99) NCEER (99) 7.. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio Location : 6-: 6 Burnett St, Ashburton. m.6 m.6 SBTn Plot Plot Trans. detect. applied: CRR CRR plot plot like behavior applied: FS FS Plot Plot.....6......6......6......6......6....6...6...6...6...6........6....6...6....6...6....6...6....6 During earthq....6....6 During earthq. 6 qt (MPa) 6 Rf (%) Ic (Robertson 99).. CRR & CSR.. Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- CPT basic interpretation plots.. Cone Cone resistance.. Friction Friction Ratio Ratio.. Pore Pore pressure.. SBT SBT Plot Plot.. Soil Soil Behaviour Type Type Sensitive fine grained...........6.6.6.6.6........6....6....6....6....6............6.6.6.6.6........ Insitu....6..6..6..6..6 6 qt (MPa) 6 Rf (%) -. -. u (kpa) Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- CPT basic interpretation plots (normalized) rm. rm. cone cone resistance rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio SBTn SBTn Plot Plot rm. rm. Soil Soil Behaviour Type Type.............6....6....6....6....6. Sand & silty sand Sand & silty sand Sand & silty sand Sand & silty sand Sand & silty sand...6....6....6....6....6............6.6.6.6.6............6..6..6..6..6 Qtn 6 Fr (%) -... Bq Ic (Robertson 99) 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6........6...6...6...6...6................6.6.6.6.6................6.6.6.6.6 6 qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- Liquefaction analysis overall plots CRR CRR plot plot FS Plot FS Plot Liquefaction potential Vertical settlements Lateral Lateral displacements.....................6.6.6.6.6........6...6...6...6...6................6. During earthq..6. During earthq..6..6..6............6.6.6.6.6.. CRR & CSR.. Factor of safety LPI Settlement (cm) Displacement (cm) NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6.......6...6...6...6.............6.6.6.6..........6..6..6..6 Peak Su ratio Liq. Su ratio 6 6 Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7... m.6 m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Project title : Liquefaction Assessment - SLS CPT file : CPT- Cone Cone resistance.....6....6....6....6....6 6 qt (MPa) NCEER (99) NCEER (99) 7.......6....6....6....6....6 Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio 6 Rf (%).....6....6....6....6....6 Location : 6-: 6 Burnett St, Ashburton. m. m.6 SBTn Plot Plot Ic (Robertson 99) Trans. detect. applied:.....6....6....6....6....6 CRR CRR plot plot During earthq... CRR & CSR like behavior applied:.....6....6....6....6....6 FS FS Plot Plot During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq 7

CPT name: CPT- CPT basic interpretation plots Cone Cone resistance Friction Friction Ratio Ratio Pore Pore pressure SBT SBT Plot Plot Soil Soil Behaviour Type Type.................6....6....6....6....6....6....6....6....6....6....6..6..6..6..6........... Insitu.....6...6...6...6...6....6 6 qt (MPa)..6 6 Rf (%)..6 -. -. -. u (kpa) -...6 Ic(SBT)..6 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- CPT basic interpretation plots (normalized) rm. rm. cone cone resistance.. rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio.. SBTn SBTn Plot Plot. rm. rm. Soil Soil Behaviour Type Type................6.6.6.6.6........6.....6.....6.....6.....6....6..6..6..6..6................6...6...6...6...6....6 Qtn..6 6 Fr (%)..6 -... Bq..6 Ic (Robertson 99)..6 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. 9 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6................6..6..6..6..6............6.6.6.6.6................6.6.6.6.6................6.6.6.6.6 6 qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- Liquefaction analysis overall plots... CRR CRR plot plot... FS Plot FS Plot... Liquefaction potential... Vertical settlements... Lateral Lateral displacements......6.6.6.6.6................6...6...6...6...6........6. During earthq..6. During earthq..6..6..6....6....6...6....6...6....6...6....6...6....6.. CRR & CSR.. Factor of safety LPI.. Settlement (cm). Displacement (cm) NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6.............6..6..6..6..........6.6.6.6.............6.6.6.6..........6..6..6..6 Peak Su ratio Liq. Su ratio 6 6 Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Project title : Liquefaction Assessment - SLS CPT file : CPT- Cone Cone resistance.....6....6....6....6....6. qt (MPa) NCEER (99) NCEER (99) 7.......6....6....6....6....6. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio 6 Rf (%).....6....6....6....6....6. Location : 6-: 6 Burnett St, Ashburton.7 m. m.6 SBTn Plot Plot Ic (Robertson 99) Trans. detect. applied:.....6....6....6....6....6. CRR CRR plot plot During earthq... CRR & CSR like behavior applied:.....6....6....6....6....6. 6 FS FS Plot Plot During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- CPT basic interpretation plots Cone Cone resistance Friction Friction Ratio Ratio Pore Pore pressure SBT SBT Plot Plot Soil Soil Behaviour Type Type.....................6..6..6..6..6............6...6...6...6...6........6..6..6..6..6............6....6..6....6..6....6. Insitu.6....6..6....6. Sand & silty sand qt (MPa) 6 Rf (%) -.. u (kpa). Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- CPT basic interpretation plots (normalized) rm. rm. cone cone resistance.. rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio.. SBTn SBTn Plot Plot. rm. rm. Soil Soil Behaviour Type Type................6.6.6.6.6................6...6...6...6...6....6..6..6..6..6................6....6..6....6..6....6..6....6..6....6. Sand & silty sand Qtn 6 Fr (%) -... Bq Ic (Robertson 99) 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6................6.6.6.6.6................6.6.6.6.6................6.6.6.6.6................6.6.6.6.6..... qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- Liquefaction analysis overall plots.....6. CRR CRR plot plot.....6. FS Plot FS Plot.....6. Liquefaction potential.....6. Vertical settlements.....6. Lateral Lateral displacements...........6.6.6.6.6................6.6.6.6.6........6....6. During earthq... CRR & CSR...6....6. During earthq... Factor of safety...6....6. LPI...6....6. 6 Settlement (cm)...6....6. Displacement (cm) NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. 7 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6.............6.6.6.6.............6.6.6.6.............6.6.6.6.............6..6..6..6. Peak Su ratio Liq. Su ratio Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Project title : Liquefaction Assessment - SLS CPT file : CPT- Cone Cone resistance.....6....6....6....6....6. qt (MPa) NCEER (99) NCEER (99) 7.......6....6....6....6....6. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio 6 Rf (%).....6....6....6....6....6. Location : 6-: 6 Burnett St, Ashburton. m. m.6 SBTn Plot Plot Ic (Robertson 99) Trans. detect. applied:.....6....6....6....6....6. CRR CRR plot plot During earthq... CRR & CSR like behavior applied:.....6....6....6....6....6. FS FS Plot Plot During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::6 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq 9

CPT name: CPT- CPT basic interpretation plots Cone Cone resistance Friction Friction Ratio Ratio Pore Pore pressure SBT SBT Plot Plot Soil Soil Behaviour Type Type.........6.....6.....6.....6.....6....6.....6.....6.....6.....6........6..6..6..6..6............6....6..6....6..6....6. Insitu.6....6..6....6. Sand & silty sand qt (MPa) 6 Rf (%) -.6 -. -. u (kpa). Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::6 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

rm. rm. cone cone resistance CPT basic interpretation plots (normalized) rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio SBTn SBTn Plot Plot CPT name: CPT- rm. rm. Soil Soil Behaviour Type Type.....................6.6.6.6.6........6.....6.....6.....6.....6........6..6..6..6..6............6....6. Qtn.6....6. 6 Fr (%).6....6. -... Bq.6....6. Ic (Robertson 99).6....6. Sand & silty sand Sand 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::6 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6................6...6...6...6...6........6.6.6.6.6................6.6.6.6.6................6.6.6.6.6..... qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::6 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- Liquefaction analysis overall plots.....6. CRR CRR plot plot.....6. FS Plot FS Plot.....6. Liquefaction potential.....6. Vertical settlements.....6. Lateral Lateral displacements...........6...6...6...6...6........6.6.6.6.6............6....6. During earthq...6....6. During earthq...6....6...6....6...6....6... CRR & CSR.. Factor of safety LPI Settlement (cm) Displacement (cm) NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::6 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6.............6...6...6...6.......6.6.6.6.............6.6.6.6.............6..6..6..6. Peak Su ratio Liq. Su ratio Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7... m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::6 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Project title : Liquefaction Assessment - SLS CPT file : CPT- Cone Cone resistance NCEER (99) NCEER (99) 7.. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio Location : 6-: 6 Burnett St, Ashburton.7 m. m.6 SBTn Plot Plot Trans. detect. applied: CRR CRR plot plot like behavior applied: FS FS Plot Plot.....6....6....6....6. 6 qt (MPa).....6....6....6....6. 6 Rf (%).....6....6....6....6. Ic (Robertson 99).....6....6....6....6. During earthq... CRR & CSR.....6....6....6....6. During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::7 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- CPT basic interpretation plots. Cone Cone resistance. Friction Friction Ratio Ratio. Pore Pore pressure. SBT SBT Plot Plot. Soil Soil Behaviour Type Type........6....6....6....6....6........6...6...6...6...6............6.6.6.6.6................6..6..6. Insitu.6..6. 6 qt (MPa) 6 Rf (%) -. -. u (kpa).. Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::7 a.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- CPT basic interpretation plots (normalized) rm. rm. cone cone resistance.... rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio.... SBTn SBTn Plot Plot.. rm. rm. Soil Soil Behaviour Type Type...6....6....6....6....6. Sand & silty sand Sand & silty sand...6....6....6....6....6............6..6..6..6..6............6..6..6..6..6. Qtn 6 Fr (%) -... Bq Ic (Robertson 99) 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::7 a.m. 7 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT- Corrected norm. norm. cone cone resistance.....................6.6.6.6.6............6...6...6...6...6............6.6.6.6.6................6.6.6.6.6..... 6 qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::7 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT- Liquefaction analysis overall plots CRR CRR plot plot FS Plot FS Plot Liquefaction potential Vertical settlements Lateral Lateral displacements.....................6.6.6.6.6............6...6...6...6...6............6.6.6.6.6....... During earthq... During earthq........6.6.6.6.6....... CRR & CSR.. Factor of safety LPI Settlement (cm) Displacement (cm) NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::7 a.m. 9 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT- Liquefied Su/Sig'v.................6.6.6.6..........6...6...6...6..........6.6.6.6.............6.6.6.6.... Peak Su ratio Liq. Su ratio 6 Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, ::7 a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Project title : Liquefaction Assessment - SLS CPT file : CPT-6 Cone Cone resistance NCEER (99) NCEER (99) 7.. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio Location : 6-: 6 Burnett St, Ashburton.7 m. m.6 SBTn Plot Plot Trans. detect. applied: CRR CRR plot plot like behavior applied: FS FS Plot Plot.....6......6......6......6......6....6....6....6...6....6....6...6....6....6...6....6....6 During earthq....6....6....6 During earthq. qt (MPa) 6 Rf (%) Ic (Robertson 99).. CRR & CSR.. Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT-6 CPT basic interpretation plots.. Cone Cone resistance.. Friction Friction Ratio Ratio.. Pore Pore pressure.. SBT SBT Plot Plot.. Soil Soil Behaviour Type Type Sensitive fine grained..... Sand & silty sand......6..6..6..6..6. Sand & silty sand Sand & silty sand...6...6...6...6...6............6..6..6..6..6... Insitu............ Sensitive fine grained.6.6.6.6.6 qt (MPa) 6 Rf (%) -. u (kpa). Ic(SBT) 6 SBT (Robertson et al. 96) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBT legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

rm. rm. cone cone resistance CPT basic interpretation plots (normalized) rm. rm. friction friction ratio ratio m. m. pore pore pressure ratio ratio SBTn SBTn Plot Plot CPT name: CPT-6 rm. rm. Soil Soil Behaviour Type Type.......... Sand & silty sand...........6..6..6..6..6. Sand & silty sand Sand & silty sand...6...6...6...6...6................6.6.6.6.6................6.6.6.6.6 Qtn 6 Fr (%) -... Bq Ic (Robertson 99) 6 SBTn (Robertson 99) 6 NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: SBTn legend. Sensitive fine grained. Organic material. to silty clay. ey silt to silty. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand. Very stiff sand to 9. Very stiff fine grained CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Total Total cone cone resistance Liquefaction analysis overall plots (intermediate results) SBTn SBTn Index Index rm. rm. cone cone resistance Grain Grain char. char. factor factor CPT name: CPT-6 Corrected norm. norm. cone cone resistance.....................6.6.6.6.6........6...6...6...6...6................6.6.6.6.6................6.6.6.6.6 qt (MPa) Ic (Robertson 99) Qtn Kc 6 7 9 Qtn,cs NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

CPT name: CPT-6 Liquefaction analysis overall plots CRR CRR plot plot FS Plot FS Plot Liquefaction potential Vertical settlements Lateral Lateral displacements.....................6.6.6.6.6........6...6...6...6...6....... During earthq... During earthq........6.6.6.6.6................6.6.6.6.6.. CRR & CSR.. Factor of safety LPI Settlement (cm) Displacement (cm) NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liquefaction are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

rm. rm. cone cone resistance Check for strength loss plots (Olsen & Stark ()) Grain Grain char. char. factor factor Corrected norm. cone cone resistance SBTn SBTn Index Index CPT name: CPT-6 Liquefied Su/Sig'v.................6.6.6.6.......6...6...6...6.............6.6.6.6..........6..6..6..6 Peak Su ratio Liq. Su ratio Qtn Kc 6 7 9 Qtn,cs Ic (Robertson 99)... Su/Sig'v.. NCEER (99) NCEER (99) 7...7 m. m.6 like behavior applied: CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. 6 Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq

Project title : Liquefaction Assessment - SLS CPT file : CPT-7 Cone Cone resistance NCEER (99) NCEER (99) 7.. Cook Costello Consulting Engineers Christchurch http://www.coco.co.nz LIQ UEFACTION ANALYSIS REPORT G.W.T. (in-situ): G.W.T. (earthq.): Friction Ratio Location : 6-: 6 Burnett St, Ashburton. m.6 m.6 SBTn Plot Plot Trans. detect. applied: CRR CRR plot plot like behavior applied: FS FS Plot Plot.....6....6....6....6. 6 qt (MPa).....6....6....6....6. 6 Rf (%).....6....6....6....6. Ic (Robertson 99).....6....6....6....6. During earthq... CRR & CSR.....6....6....6....6. During earthq... Factor of safety Liquefaction M w=7 /, sigma ' = atm base curve, Summary of liquefaction potential Cyclic Stress Ratio* (CSR*).... rmalized CPT penetration resistance. 6 Qtn,cs Liquefaction 6. rmalized friction ratio (%) Zone A : Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A : Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v...6 - CPT Liquefaction Assessment Software - Report created on: 9/6/, :: a.m. Project file: C:\Users\Jordan\Documents\Cook Costello\6\6--77-6 Burnett Street\Calculations\6- CLiq SLS.clq 7