PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC

Similar documents
Operational Experience with J-PARC Injection and Extraction Systems

Performance Studies of the Vibration Wire Monitor on the Test Stand with Low Energy Electron Beam

Design Status of the PEFP RCS

STATUS REPORT ON SURVEY AND ALIGNMENT OF J-PARC AFTER THE EARTHQUAKE

Technological Challenges for High-Intensity Proton Rings

INJECTION PAINTING AND ASSOCIATED HW FOR 160 MeV PSB H

HIGH POWER BEAM OPERATION OF THE J-PARC RCS AND MR. Yoichi Sato for J-PARC Accelerator Group May 3 rd, 2018 THYGBF1, IPAC2018

Lattice Design of 2-loop Compact ERL. High Energy Accelerator Research Organization, KEK Miho Shimada and Yukinori Kobayashi

Front end, linac upgrade, and commissioning of J-PARC. Y. Liu KEK/J-PARC, Japan

Beam Extraction by the Laser Charge Exchange Method Using the 3-MeV LINAC in J-PARC )

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

SIMULATION STUDY FOR MEIC ELECTRON COOLING*

STATUS OF THE J-PARC FACILITY

arxiv: v1 [physics.acc-ph] 21 Oct 2014

Longitudinal Top-up Injection for Small Aperture Storage Rings

Proposal to convert TLS Booster for hadron accelerator

FURTHER UNDERSTANDING THE LCLS INJECTOR EMITTANCE*

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

How J-PARC recovered from the big earthquake

WG2 on ERL light sources CHESS & LEPP

A Project to convert TLS Booster to hadron accelerator 1. Basic design. 2. The injection systems:

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

FACET-II Design Update

RF BARRIER CAVITY OPTION FOR THE SNS RING BEAM POWER UPGRADE

China high-intensity accelerator technology developments for Neutron Sources & ADS

Estimation of Radioactivity and Residual Gamma-ray Dose around a Collimator at 3-GeV Proton Synchrotron Ring of J-PARC Facility

BEAM LOSS DUE TO FOIL SCATTERING IN THE SNS ACCUMULATOR RING*

LONGITUDINAL PARTICLE TRACKING CODE FOR A HIGH INTENSITY PROTON SYNCHROTRON

NEW ARRANGEMENT OF COLLIMATORS OF J-PARC MAIN RING

PoS(KAON09)023. Beam Hole Photon Veto For J-PARC K O TO experiment. Yosuke Maeda Kyoto University

The optimization for the conceptual design of a 300 MeV proton synchrotron *

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER

Operational Experience with HERA

On-axis injection into small dynamic aperture

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007

Multiparameter optimization of an ERL. injector

6 Bunch Compressor and Transfer to Main Linac

OPTIMIZATION OF COMPENSATION CHICANES IN THE LCLS-II BEAM DELIVERY SYSTEM

Advanced Storage Photon Ring Source Upgrade Project:

DEVELOPMENT OF FFAG AT KYUSYU UNIVERSITY

Application of Carbon Nanotube Wire for Beam Profile Measurement of Negative Hydrogen Ion Beam

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

S. Guiducci. Table 1 PADME beam from Linac. Energy (MeV) 550. Number of positrons per pulse Pulse length (ns)

ELECTRON COOLING EXPERIMENTS IN CSR*

LHC Status and CERN s future plans. Lyn Evans

Update on Optics Modeling for the ATF Damping Ring at KEK Studies for low vertical emittance

The TESLA Dogbone Damping Ring

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

Space Charge Studies on the ISIS Ring

Tools of Particle Physics I Accelerators

CEPC Linac Injector. HEP Jan, Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi

Reactor & Spallation Neutron Sources

ILC Beam Dynamics Studies Using PLACET

Beam loss background and collimator design in CEPC double ring scheme

FACET-II Design, Parameters and Capabilities

LOLA: Past, present and future operation

University of Huddersfield Repository

SSA Measurements with Primary Beam at J-PARC

Accelerator Physics. Accelerator Development

Status of the AGS Experiment for Mercury Spallation

JAPAN PROTON ACCELERATOR RESEARCH COMPLEX

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

Conceptual design of an accumulator ring for the Diamond II upgrade

Compressor Ring. Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions. Valeri Lebedev.

Non-Scaling Fixed Field Gradient Accelerator (FFAG) Design for the Proton and Carbon Therapy *

Accelerators. Lecture V. Oliver Brüning. school/lecture5

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

A Proposal of Harmonictron

Calibrating the FNAL Booster Ionization Profile Monitor

Beam Profile Monitor at the 1MW Spallation Neutron Source

COMET muon conversion experiment in J-PARC

Hadron cancer therapy complex using nonscaling fixed field alternating gradient accelerator and gantry design

Investigation of the Effect of Space Charge in the compact-energy Recovery Linac

Low energy electron storage ring with tunable compaction factor

Survey and Alignment of the J-PARC

The MAX IV Thermionic preinjector


Physics 736. Experimental Methods in Nuclear-, Particle-, and Astrophysics. - Accelerator Techniques: Introduction and History -

Lorentz Laser-Assisted Stripping (Lolas) for H - /H 0 Injection into Proton Drivers

Beam Dynamics for CSNS Linac. Jun Peng September. 18, 2012

THRESHOLDS OF THE HEAD-TAIL INSTABILITY IN BUNCHES WITH SPACE CHARGE

Introduction to Collider Physics

Beam monitors in J-PARC

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH THE CLIC POSITRON CAPTURE AND ACCELERATION IN THE INJECTOR LINAC

BEAM DYNAMICS ISSUES IN THE SNS LINAC

Review of ISOL-type Radioactive Beam Facilities

Low alpha mode for SPEAR3 and a potential THz beamline

Flexible control of femtosecond pulse duration and separation using an emittance-spoiling foil in x-ray free-electron lasers

Accelerator R&D Opportunities: Sources and Linac. Developing expertise. D. Rubin, Cornell University

Lattice Design and Performance for PEP-X Light Source

PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

The 2015 erhic Ring-Ring Design. Christoph Montag Collider-Accelerator Department Brookhaven National Laboratory

$)ODW%HDP(OHFWURQ6RXUFHIRU/LQHDU&ROOLGHUV

Low slice emittance preservation during bunch compression

A beam line for schools

PoS(NuFact2017)088. EMuS in CSNS. Guang Zhao 1. Institute of High Energy Physics Beijing, China

Polarized Proton Acceleration at the J-PARC Accelerator Complex

Transcription:

THO3AB3 Proceedings of HB, East-Lansing, MI, USA PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC P.K. Saha, H. Harada, H. Hotchi and T. Takayanagi J-PARC Center, KEK & JAEA, Tokai-mura, Naka-gun, Ibaraki-ken, Japan Copyright CC-BY-3. and by the respective authors Abstract The 3-GeV RCS (Rapid Cycling Synchrotron) of J-PARC (Japan Proton Accelerator Research Complex) is a MWclass proton beam source for the muon and neutron production targets in the MLF (Material and Life Science Experimental Facility) as well as an injector for the -GeV MR (Main Ring). The RCS has to meet not only the beam power but also to ensure two different transverse sizes of the extracted beam for the MLF and MR, especially at high intensity operation. Namely, a wider one for the MLF in order to reduce damage on the neutron production target, while a narrower one for the MR in order to ensure a permissible beam loss in the beam transport line of 3-GeV to the MR and also in the MR. We proposed a pulse-to-pulse direct control of the transverse injection painting area so as to ensure a desired extracted beam emittance. For that purpose, RCS injection system was carefully designed for changing painting area between MLF and MR very accurately. The extracted beam profiles for the MR are measured to be sufficiently narrower than those for the MLF and also shown to be consistent with numericalbeam simulation results. The system is already in service and plays an important role even at the present 3 kw beam operation. It is thus one remarkable progress on the RCS design goal to confirm that the beam parameters can be dynamically controlled and delivered as requested by the users even in simultaneous operation. A detail of the design strategy, painting process as well as experimental results are presented. INTRODUCTION The 3-GeV Rapid Cycling Synchrotron (RCS) of Japan Proton Accelerator Research Complex (J-PARC) is designed for a beam power of 1 MW [1]. A total of.33 1 13 protons in two bunches is accelerated to 3 GeV at a repetition rate of Hz and simultaneously delivered to the neutron and muon production targets in the MLF (Material and Life Science Experimental Facility) as well as to the MR (-GeV Main Ring synchrotron). Figure 1 shows a schematic view of the RCS, which is a three-fold symmetric lattice having a circumference of 3.333 m. The injected beam energy is recently upgraded to the designed MeV from the 11 MeV so far. The RCS beam power at present for the operation is 3 KW, while a beam power of nearly kw with sufficiently low loss has already been demonstrated in a recent beam study []. A pattern dipole magnet named Pulse Bending magnet (PB) located downstream of the RCS extraction beam transport (BT) line is used to switch the beam destination to the MR E-mail address: saha.pranab@j-parc.jp ISBN 97-3-9-173-1 39 Figure 1: Schematic view of the 3-GeV RCS of J-PARC. Extracted beam is simultaneously delivered to the MLF and MR at a repetition rate of Hz. A pattern dipole magnet named Pulse Bending magnet (PB) located downstream of the RCS extraction line acts as a switching magnet for changing beam destination MLF to MR. according to the operation strategy. At present for the MR with fast extraction operation, RCS beam delivery ratio to the MLF and MR is typically 9:1. However, RCS design goal is not only to achieve the beam power but also to ensure specific requirements of each downstream facility. One such an issue, especially at high intensity operation is to control transverse emittance of the extracted beam pulse-to-pulse between MLF and MR even in simultaneous operation. Namely, a wider transverse beam distribution for the MLF in order to reduce damage on the neutron production target, while a narrower one for the MR in order to ensure a permissible beam loss in the BT of 3-GeV RCS to the MR (3-BT) as well as in the MR. The BT of RCS to the MLF targets named 3-NBT has the aperture of 3π mm mrad, same as the RCS primary collimator but 3-BT and MR designed apertures are much smaller, π mm mrad and 1π mm mrad, respectively. In order to realize such a requirement, we proposed pulse-to-pulse direct control of the transverse painting area during multi-turn H charge-exchange injection process in the RCS so as to ensure a desired transverse beam profile or in other words, a desired transverse emittance of the extracted beam. The designed injection painting area in the RCS for the MLF and MR are and π mm mrad, respectively. The RCS injection system was carefully designed for varying both hor-

Proceedings of HB, East-Lansing, MI, USA THO3AB3 izontal and vertical painting areas pulse-to-pulse between MLF and MR and has also been experimentally verified through beam studies. At the present 3 kw operation of the RCS, the transverse painting areas for the MLF and MR are chosen to be 1 and π mm mrad, respectively. Unnormalized rms emittance (π mm mrad) 3 3 1 1 Injection painting for π mm mrad 1 π mm mrad 1 π mm mrad 1 1 Time (ms) Figure : Estimated damping of the transverse rms horizontal emittance and dependence on the injection painting area for a beam power of 3 kw. A smaller painting area gives comparatively a smaller emittance of the extracted beam. Figure shows numerical results for expected transverse rms emittance damping and dependence on the injection painting areas of, 1 and 1π mm mrads as shown by blue, black and red lines, respectively. The painting emittance values are 99.7% emittance values for all cases. In this simulation injected beam energy was 11 MeV and a beam power of 3 kw at the extraction energy of 3 GeV was considered, where a full 3-D space charge effect was taken into account. It can be easily seen that a smaller initial painting area guaranties comparatively a smaller emittance of the extracted beam. One can expect nearly % reduction of an rms emittance for an injection painting area of 1π mm mrad as compared to that of π mm mrad. RCS INJECTION SCHEME AND TRANSVERSE PAINTING PROCESS Figure 3 shows a layout of the RCS injection area. The H beam from the LINAC is stripped to H + by the 1st stripped foil placed in the middle of injection chicane magnets, also called shift bump magnets (SB), and is injected into the RCS. The transverse injection painting in the horizontal direction are performed by painting bump magnets named PBH. The first two of them (PBH1 ) are place in the upstream of the SB, while the rest two (PBH3 ) are place at the downstream of the SB. The two vertical painting bump magnets (PBV1,) are placed at the LINAC to the RCS injection beam transport (L-3BT) line. In the original design, two pulse steering magnets named PSTR1 and PSTR are used for changing painting area MLF to MR in the horizontal direction but recently with upgraded power supplies of the PBHs, it has also been successfully done by using only PBHs. Figure shows a schematic view of the RCS transverse injection painting process for horizontaland vertical planes in the upper and lower plots, respectively. The painting area is considered to be the design maximum of π mm mrad for both planes as shown by the bigger ellipses (black), where a typical injected beam emittance is considered to be π mm mrad (blue). In the horizontal direction, the position and angle (x and x ) of the injected beam center is matched to a closed orbit offset made by the SBs together with PBHs. The horizontal phase space painting is performed by varying the closed orbit by the PBHs during. ms injection period as shown by the arrow [3, ]. The SBs are then linearly ramped down to zero so as to move the closed orbit to the ring center. In the vertical direction, however, injected beam angle (y ) at the foil is directly sweeped by the PBVs. As shown in the figure the vertical angle of the injected beam can be sweeped either center-to-outside or outside-tocenter in the circulating phase space for so-called correlated or anti-correlated painting. METHODS FOR SWITCHING PAINTING AREA BETWEEN MLF AND MR In this section, two methods for changing injection painting area pulse-to-pulse between MLF and MR, especially for the horizontal direction are described. A change of the painting area between MLF and MR in the horizontal direction is originally performed by using PSTR magnets but recently it has also been realized by using only PBHs because of their upgraded power supplies. Switching Painting Area by PSTRs Figure shows a schematic view of changing transverse painting area between MLF and MR. The design painting areas for the MLF and MR are considered to be π mm mrad and π mmmradasshownbytheblackandredellipses, respectively. In order to change painting area from MLF to MR in the horizontal direction, PSTR magnets are used to change only angle of the injected beam to a smaller value by keeping its position same as that for the MLF. This is because a change of the both position and angle for a smaller painting area needs to move the foil further inside in the horizontal direction. That will significantly increase the foil hits of the circulating beam for the MLF. It is therefore a big issue for the corresponding foil scattering beam loss as well as foil lifetime as 9% of the beam is delivered to the MLF. The injected beam orbit, painting for the MLF is fixed by two DC septa, while two PSTRs are additionally used to control the injected beam orbit in such a way to realize a smaller painting area for the MR. The black and red arrows shows the amplitude and direction of closed orbit variation for the corresponding painting area performed by the PBHs. It has also to be mentioned that the chicane bump offset for the MLF and MR should be changed and it is about 11% higher for the later case. A further detail of the designed strategy as well as experimental results can be found in our separate article []. ISBN 97-3-9-173-1 39 Copyright CC-BY-3. and by the respective authors

THO3AB3 Proceedings of HB, East-Lansing, MI, USA Figure 3: Layout of RCS injection area. The SB1 are the injection chicane magnets. The PBH1 andpbv1 (injection line) are used for transverse injection painting in the horizontal and vertical directions, respectively. The two pulse steering magnets named PSTR1 and PSTR (injection line) are used to control horizontal phase space coordinates of the injected beam at the 1st stripper foil in order to change horizontal painting area between MLF and MR. The PBVs are used for controlling vertical angle of the injected beam for changing vertical painting area between MLF and MR. 1 1 Circulating beam (π mm mrad) Injected beam (π mm mrad) Closed orbit variation by PBHs 1 1 Painting for MLF (π mm mrad) Painting for MR (π mm mrad) Injected beam (π mm mrad) - - Copyright CC-BY-3. and by the respective authors y (mrad) -1-1 1 - -1 SB height - 1 1 - - - Variation of injected beam angle by PBVs Center to outside: Correlated painting Outside to center: Anti-correlated painting Figure : Schematic view of the transverse painting process in the horizontal (top) and vertical direction (bottom). A controlled closed orbit is variation is done by using PBHs for horizontal painting, while injected beam angle itself is sweeped in the vertical phase space for vertical painting. As for the vertical direction, a painting area pulse-topulse between MLF and MR, however, is changed by controlling the size of the injected beam angle at the foil by using two vertical painting magnets, PBV1,. A typical case for correlated painting is shown. ISBN 97-3-9-173-1 39 y (mrad) -1-1 1 - -1 SB height for MLF SB height for MR - 1 1 - - - Figure : Schematic view of switching painting area between MLF and MR. The PSTRs are used to change angle of the injected beam by keeping its position unchanged at foil in the horizontal direction, while PBVs are used to control size of the injected beam angle in the vertical direction. Switching Painting Area by PBHs In stead of PSTRs, horizontal painting magnets PBHs are only used in this method for switching horizontal painting area MLF to MR. Figure shows a demonstration such a process which has also been successfully introduce in the recent beam studies. In this case, injected beam position and angle are both kept same for both MLF and MR but PBHs

Proceedings of HB, East-Lansing, MI, USA THO3AB3 patterns are carefully controlled for a particular closed orbit variation so as to realize a desired painting area. As the closed orbit variation at the end of injection determines the painting area, its amplitude for the MR painting is controlled as shown by the red arrow. Figure 7 shows typical current patterns for the first painting magnets (PBH1). The solid black and red curves are typical patterns for and π mm mrad painting area, where initial closed orbit offsets at the foil are different. However, in this method initial closed orbit offset is kept same and thus the current at the starting of π mm mrad is matched to that of π mm mrad by adding an offset between these two currents at start as shown by the red dotted curve. In stead of current being zero at the end, there has thus an offset at the end of injection, which determines the painting area for the MR. At present PBHs patterns are kept flat further. ms after injection is finished and then linearly ramped down to zero by another.3 ms. One big advantage with this method is that the painting area is changed by using only PBHs and injected beam orbit for both MLF and MR can be kept same. The chicane bump height is also same for both MLF and MR painting. The partially stripped and un-stripped waste beam orbits are can be thus kept same. However, an extra foil hits after the injection due to remaining offset of the PBHs can be considered as one small issue. In the vertical direction the procedure is same as done in the previous method. 1 1 - -1-1 Painting for MLF (π mm mrad) Painting for MR (π mm mrad) Injected beam (π mm mrad) SB height same for both MLF and MR - 1 1 Figure : Schematic view of switching horizontal painting area by using only PBHs. EXPERIMENTAL RESULTS In order to verify a dependence of the extracted beam profiles on the RCS injection painting area, experimental studies were carried out for both 11 MeV and recently upgraded MeV injection energies. Measurement of Extracted Beam Profiles by Changing Painting Area by PSTRs The experimental study by using PSTRs were carried out at 11 MeV injection. For simplicity, transverse injection PBH1 current (ka) 1 1 For π mm mrad painting For π mm mrad painting (usual) For changing π to π mm mrad painting Injection ends.... 1 Time (ms) Figure 7: Typical PBH current patterns for different painting areas. The dotted line is a typical patterns for changing horizontal painting area MLF to MR by using only PBHs. painting applied only for the horizontal direction and was 1 and 1π mm mrad for the MLF and MR, respectively. The extracted beam profiles were measured by a Multi-wire Profile Monitor (MWPM) placed in the 3-NBT. Figure shows the measured (solid red circles) and simulated (lines) horizontal extracted beam profiles for MLF (top) and MR (bottom) for an equivalent beam power of 3 kw. As expected, the width of the extracted beam profile for the MR painting is measured to be narrower as compared to that of MLF painting and is also quite consistent with corresponding simulation results. The simulation was performed by using ORBIT code [, 7]. 1 1 1 1 = 7. mm - - = 7. mm - - Figure : Comparison of horizontal extracted beam profiles forthe MLF 1 and MR 1π mm mrad injection painting applied for only in the horizontal direction. The equivalent beam power was 3 kw, where red solid circles are the measured data by MWPM and lines are the corresponding simulation results. The profile width for a smaller injection painting area for the MR is confirmed to be narrower as compared to that for a larger one for the MLF. ISBN 97-3-9-173-1 397 Copyright CC-BY-3. and by the respective authors

THO3AB3 Proceedings of HB, East-Lansing, MI, USA Copyright CC-BY-3. and by the respective authors Measurement of Extracted Beam Profiles by Changing Painting Area by PBHs Figure 9 shows comparisons of both horizontal and vertical extracted beam profiles between MLF and MR. The painting area between MLF and MR was changed by using PBHs and PBVs for the horizontal and vertical directions, respectively. In this experiment, the injected beam energy was MeV and the extracted beam intensity was. 1 13 ppp ( kw equivalent). The painting area for the MLF and MR was chosen to be 1 and π mm mrad, respectively. The top two figures are for comparison in the horizontal direction, while bottom two figures are those for the vertical direction. The measured profiles are plotted with red solid circles, where lines are corresponding beam simulations. Here also extracted beam profiles for the MR painting is measured to be significantly narrower as compared to those for the MLF painting even for an equivalent beam power of kw. The simulation results are also found to be almost consistent with measured ones. 1 1 1 1 1 1 1 1 = 7. mm - - =.1 mm - - σ y = 1 mm - - σ y = 9 mm - - Figure 9: Comparison of the horizontal (top two) and vertical (bottom two) extracted beam profiles for the MLF 1 and MR π mm mrad injection painting applied for both horizontal and vertical directions. In this case painting area between MLF to MR was changed by the PBHs and PBVs for the horizontal and vertical directions, respectively. The beam profile widths for the MR are obtained to be narrower than those for the MLF. ISBN 97-3-9-173-1 39 SUMMARY In order to control extracted beam emittance pulse-topulse in simultaneous operation, a direct control of the transverse injection painting is proposed and has also been successfully demonstrated through experimental studies. The extracted beam profiles for a smaller injection painting area for the MR are measured to be significantly narrower as compared to those for a larger painting area for the MLF. Two independent methods, especially for changing painting area in the horizontal direction are considered and also successfully applied in the experimental studies. The corresponding numerical simulation results are also found to be consistent with measurements. The system is already in service even at the present RCS operation with 3 kw beam, where transverse painting area for the MLF and MR are fixed to be 1 and π mm mrad, respectively. It is thus confirmed that in a multi user machine beam parameters can be dynamically controlled and delivered as requested by the users even in simultaneous operation. The present principle can be applicable to any similar multi user machine for controlling beam emittances in a pulse-to-pulse mode. ACKNOWLEDGMENT The authors would like to acknowledge all members of the RCS for many supports and cooperation throughout the present study. It is also our opportunity to acknowledge Dr. S. Meigo and Dr. M. Ooi of J-PARC MLF for measuring and providing the extracted beam profiles. REFERENCES [1] High-intensity Proton Accelerator Project Team, Accelerator Technical Design Report for J-PARC, JAERI-Tech 3- and KEK Report -13. [] H. Hotchi et al., Lessons from 1-MW Proton RCS Beam Tuning, in this proceeding, MOXLR, HB, East Lansing, MI, USA (). [3] P.K. Saha et al., Direct observation of the phase space footprint of a painting injection in the Rapid Cycling Synchrotron at the Japan Proton Accelerator Research Complex Phys. Rev. ST Accel. Beams, 3 (9). [] H. Hotchi et al., Beam loss reduction by injection painting in the 3-GeV rapid cycling synchrotron of the Japan Proton Accelerator Research Complex Phys. Rev. ST Accel. Beams 1, (). [] P.K. Saha et al., Beam emittance control by changing injection painting area in a pulse-to-pulse mode in the 3-GeV Rapid Cycling Synchrotron of Japan Proton Accelerator Research Complex, Phys. Rev. ST Accel. Beams, (13). [] J.A. Holmes, Recent Enhancements to the ORBIT Code, in the Proceedings of IPAC1, Kyoto, Japan, 191 (1). [7] P.K. Saha et al., ORBIT Beam Progress in the 3-GeV Rapid Cycling Synchrotron of J-PARC, in the Proceedings of IPAC13, Shanghai, China, 1 (13).