Public Disclosure Copy. Implementation Status & Results Report Tamil Nadu and Puducherry Coastal Disaster Risk Reduction Project (P143382)

Similar documents
The World Bank Earthquake Housing Reconstruction Project (P155969)

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591)

Public Disclosure Copy

The World Bank Earthquake Housing Reconstruction Project (P155969)

Public Disclosure Copy

The World Bank BiH Floods Emergency Recovery Project (P151157)

Public Disclosure Copy

The World Bank Can Tho Urban Development and Resilience (P152851)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Zambia Water Resources Development Project (P114949)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Public Disclosure Copy

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272)

The World Bank Community Development Program Support Project-Phase III (P144637)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Community Development Program Support Project-Phase III (P144637)

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

The World Bank Mali Reconstruction and Economic Recovery (P144442)

Public Disclosure Copy

The World Bank Ecuador Risk Mitigation and Emergency Recovery Project (P157324)

Public Disclosure Copy

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180)

The World Bank Cusco Regional Development (P117318)

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings

Urban Water Supply Project (P156739)

Sri Lanka Strategic Cities Development Project (P130548)

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Second Tamil Nadu Road Sector Project (P143751)

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy

EC Ibarra Transport Infrastructure Improvement Project (P147280)

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank Dam Operational Improvement and Safety (P096532)

Public Disclosure Copy

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank Regional Infrastructure Development Fund (P154947)

The World Bank Indonesia National Slum Upgrading Project (P154782)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441)

Public Disclosure Copy

Kiribati Adaptation Phase III (LDCF) (P112615)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

The World Bank Indonesia National Slum Upgrading Project (P154782)

The World Bank Uganda Energy for Rural Transformation III (P133312)

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

Public Disclosure Copy

SUSTAINABLE CITIES (P128605)

The World Bank Third National Urban Water Sector Reform Project (P123513)

The World Bank Decentralized Community Driven Services Project (P117764)

Public Disclosure Copy. Implementation Status & Results Report Girls Education and Womens Empowerment and Livelihood Project (P151451)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Cities and Climate Change (P123201)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Second Rural Transport Improvement Project (P123828)

Public Disclosure Copy

The World Bank Senegal Tourism and Enterprise Development Project (P146469)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank Ho Chi Minh City Green Transport Development (P126507)

Public Disclosure Copy

The World Bank Education Infrastructure for Resilience (EU Facility for SuTP) (P162004)

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

The World Bank Guilin Integrated Environment Management (P133017)

The World Bank Livestock Sector Development Support Project (P159476)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Public Disclosure Copy

Public Disclosure Copy

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH ASIA India Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 7 ARCHIVED on 21-Oct-2016 ISR25154 Implementing Agencies: Commissioner Revenue Administration, RADMM, Government of Tamil Nadu, Project Implementation Agency, Department of Revenue and DM, Government of Puducherry Key Dates Key Project Dates Bank Approval Date:20-Jun-2013 Planned Mid Term Review Date:18-Mar-2016 Original Closing Date:31-Jul-2018 Project Development Objectives Effectiveness Date:29-Jan-2014 Actual Mid-Term Review Date:25-Jul-2016 Revised Closing Date:31-Jul-2018 Project Development Objective (from Project Appraisal Document) Increasing the resilience of coastal communities in Tamil Nadu and Puducherry, to a range of hydro-meteorological and geophysical hazards along with improving project implementing entities capacity to respond promptly and effectively to an eligible crisis or emergency. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Vulnerability Reduction:(Cost $224.60 M) Sustainable Fisheries:(Cost $82.00 M) Capacity Building in Disaster Risk Management:(Cost $12.40 M) Implementation Support:(Cost $18.20 M) Contingent Emergency Response (Both from Tamil Nadu and Puducherry) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Moderately Satisfactory 10/21/2016 Page 1 of 12

Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions Overall progress towards the achievement of the PDO is satisfactory. TAMIL NADU 1. Resilient Housing - 14,347 (100%) houses that were continuing from earlier ETRP Project are now complete and insured. Out of 121 Multi- Purpose Evacuation Shelters (MPES); 60 MPES are completed and handed over, 12 MPES are complete, 47 MPES are under progress, 2 MPES sites are being changed. All the Emergency Evacuation Routes are complete. Cyclone Resilient Electrical Network Design Consultant to submit DPR and bidding to begin by September 30, 2016. Early Warning System (EWS): Contract for the Early Warning Systems has been awarded. EWS installed on pilot basis in Kanchipuram District. UTL has been given a go ahead for installation. Out of 453 Disaster Warning Announcement systems planned, 121 have been installed. 2. Sustainable Fisheries: Modernization of Fishing Harbour at Mallipatnam: The RRAP is prepared and being implemented. Bar mouth opening of Both at Vellar and Upanar work has been completed. Setting up of Harbour Management Committees is underway. Fish Landing Centres have been completed at both Nagore and Portonovo- Annankoil. STP work orders have been issues, agreement to be concluded. While in FIMSUL: All components; Knowledge Management, Co-Management, and Seamless Communication have made reasonable progress. Additional 32 harbour and fish landing centre sites are now being supported by the project under the co-management model. Need to complete Monitoring and Evaluation system. For wireless communication, procurement has been intiated while licencing issue is being resolved. 3. Capacity Building in Disaster Risk Management Tamil Nadu has created the secretariat for the Disaster Management Authority as a society and recruitment of personnel is ongoing. The SPIU shared the concept note prepared by Regional Integrated Multi-Hazard Early Warning Systems for Africa and Asia (RIMES) for establishment of the Tamil Nadu Centre for Disaster Risk Management (TNCDRM). SPIU also to initiate discussion with RIMES, Institute for Remote sensing and others in establishing a Geographic Information System (GIS) CELL. The SIRD is implementing CBDRM component. Through Community Based Disaster Risk Management (CBDRM), 561 coastal habitations are participating in risk mapping and formation of Village Disaster Risk Management Teams 477 village disaster management plans are formed and total of 2500 task forces have been formed (5 in each habitation). Disaster Risk Management has been introduced in school curriculum from 7th to 10th standard classes while for 11th and 12th standard classes curriculum/ text books have been submitted to the State for approval. This will be included by next academic year. Coastal Zone mapping completed, HTL pillars in all 12 districts and trainings completed. PUDUCHERRY 4. Resilient Housing - of the total 1,447 multi-hazard resilient houses taken up in ETRP and carried over in CDRRP, 1,146 are In-situ (2 beneficiaries have returned their first installment) and 300 relocation. About 972 in-situ houses are complete in all respects and the remaining are at different stages of completion. The 300 relocation houses (Nellavadu) are completed and at the handing over stage. For the 1000 new houses, the list of beneficiaries will be finalized and disclosed by December 30, 2016. Rehabilitation of Public Buildings following the collapse of Mairie Building in December 2014; PIA and INTACT to finalise design and costing as well as hire a structural consultant for the reconstruction of Mairie Building. Bridges and culverts two culverts tendered and 3 bridges will be tendered by September 15, 2016. Underground cabling Tendering for 3 packaged while additional packages bids are in the process. 5. Sustainable Fisheries: 12 work shelters have been handed over to the Fisheries Department; they are being handed over to the respective Panchayat. 1 work shelter is under progress. 5 additional work shelters to be undertaken after seeing the management and maintenance of completed work shelters. For works at the harbor in Puducherry and Karaikal are in progress and construction is good. 6. Capacity Building in Disaster Risk Management Fire Department have procured most of the equipment. Demarcation of HTL The final report covering all four regions (Puducherry, Karaikal, Mahe, and Yanam) will be submitted by October 15, 2015. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- High High Macroeconomic -- Substantial Substantial Sector Strategies and Policies -- Substantial Substantial Technical Design of Project or Program -- Moderate Moderate 10/21/2016 Page 2 of 12

Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Substantial Substantial Environment and Social -- High Moderate Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Moderate Moderate Results Project Development Objective Indicators Increased institutional capacity for risk mitigation and response at State level (Percentage, Custom) Value 0.00 25.00 30.00 100.00 Enhanced performance of livelihood opportunities from fisheries with increased safety at sea (Percentage, Custom) Value 0.00 80.00 80.00 100.00 Percentage of fishers with wireless communication facilities (Percentage, Custom Supplement) Value 0.00 0.00 0.00 100.00 Percentage of local fisheries co-management platforms formed and involved in FMPs (Percentage, Custom Supplement) 10/21/2016 Page 3 of 12

Value 0.00 25.00 40.00 100.00 Percentage of villages having access to fishing related restored linkages/ infrastructure (Percentage, Custom Supplement) Value 0.00 80.00 80.00 100.00 Improved multi-hazard resilient coastal infrastructure (Percentage, Custom) Value 0.00 84.00 90.00 100.00 Date 02-Jul-2012 29-Feb-2016 29-Jul-2016 31-Jul-2018 Percentage of coastal area with electrical cabling transferred underground (Percentage, Custom Supplement) Value 0.00 0.00 0.00 100.00 Increased community resilience and preparedness in coastal areas (Percentage, Custom) 10/21/2016 Page 4 of 12

Value 0.00 50.00 60.00 100.00 Percentage of habitations with access to community managed emergency shelter (Percentage, Custom Supplement) Value 0.00 38.00 70.00 100.00 Percentage of households with Quality certified multi-hazard resilient houses (Percentage, Custom Supplement) Value 0.00 100.00 100.00 100.00 Percentage of coastal population covered by the early warning systems (Percentage, Custom Supplement) Value 0.00 2.00 30.00 100.00 Tamil Nadu (Percentage, Custom Breakdown) 10/21/2016 Page 5 of 12

Value 0.00 100.00 100.00 100.00 Puducherry (Percentage, Custom Breakdown) Value 0.00 71.00 71.00 100.00 Overall Comments Intermediate Results Indicators Roads rehabilitated, Rural (Kilometers, Core) Value 0.00 41.00 41.00 41.00 Sub-projects with post-project community engagement or O&M arrangements (%) (Percentage, Core) Value 0.00 40.00 50.00 100.00 10/21/2016 Page 6 of 12

Sub-projects that are expected to have a mechanism for post-completion operation (Number, Core Supplement) Value 0.00 30.00 40.00 100.00 Transmission lines constructed or rehabilitated under the project (Kilometers, Core) Value 0.00 0.00 0.00 1850.00 Transmission lines rehabilitated under the project (Kilometers, Core Breakdown) Value 0.00 0.00 0.00 1850.00 Evacuation Routes laid (Kilometers, Custom) Value 0.00 41.00 41.00 41.00 10/21/2016 Page 7 of 12

Integration of multiple Emergency Operation Centre (Number, Custom) Value 0.00 0.00 0.00 1.00 Establishment of a Centre for Disaster Management (Number, Custom) Value 0.00 1.00 0.00 1.00 Number of local fisheries co-management platforms formed and involved in FMPs (Number, Custom) Value 0.00 1.00 2.00 4.00 Number of culverts reconstructed (Number, Custom) Value 0.00 2.00 0.00 2.00 10/21/2016 Page 8 of 12

Number of old bridges rehabilitated and reconstructed (Number, Custom) Value 0.00 0.00 0.00 3.00 Number of Public buildings restored (Number, Custom) Value 0.00 0.00 0.00 3.00 Number of districts where HTL pillars are installed (Number, Custom) Value 0.00 11.00 11.00 11.00 Number of villages covered in CBDRM program (Number, Custom) Value 0.00 57.00 65.00 150.00 10/21/2016 Page 9 of 12

Number of fishermen provided with communication network/equipment (Number, Custom) Value 0.00 0.00 0.00 5000.00 No. of early warning systems installed (Number, Custom) Value 0.00 1.00 121.00 439.00 Number of evacuation shelters created (Number, Custom) Value 0.00 42.00 72.00 121.00 Multi-hazard resistant electrical network created (Kilometers, Custom) Value 0.00 0.00 0.00 1850.00 10/21/2016 Page 10 of 12

Number of resilient houses reconstructed (Number, Custom) Value 0.00 14649.00 14649.00 14649.00 Number of fishing related infrastructure works completed (Number, Custom) Value 0.00 15.00 15.00 19.00 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P143382 IDA-52790 Effective XDR 156.40 156.40 0.00 65.20 91.20 42% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P143382 IDA-52790 Effective 20-Jun-2013 11-Nov-2013 29-Jan-2014 31-Jul-2018 31-Jul-2018 Cumulative Disbursements 10/21/2016 Page 11 of 12