Customer Track Maintenance Guide

Similar documents
WINTER SAFETY CHECKLIST for those with rail tracks

2010 Winter Weather Advisory

Winter switching safety: weather and extended darkness bring risks!

John A. Carlson Snow and Ice Removal

Snow Cover. Snow Plowing and Removal Services Best Practices Guide. l

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

Protecting Your Business This Winter Weather Season

Town of Oconomowoc Snow & Ice Control Policy

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Snow Plow Safety Quick Reference Guide

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

TOWN OF GRAND FALLS WINDSOR

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

EXCEPTIONAL CLOSURES - CHECKLIST FOR GOOSTREY COMMUNITY PRIMARY SCHOOL

Auburn Lewiston Airport. Snow and Ice Removal Plan

SNOW CREW CALL IN SHEET

Traffic Control Weather Policy

City of Camrose Winter Road Maintenance Policy

Cold Weather Preparation

Dunn County Snow Removal Policy

Risk Assessment and Management System (RAMS)

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

Snow / Inclement Weather Closure Policy

WHITE PAPER. Winter Tires

Severe Weather Policy (Snow & Ice) Seek Ye First the Kingdom of God...

CITY OF LANSING SNOW AND ICE REMOVAL OPERATION PLAN, VERSION 2008

Winter Precautions to reduce the risk of property damage

Zero Switching Fatality Goal. SOFA s mission is the elimination of Fatalities in switching operations

Motorists are urged to drive wisely and cautiously in all winter weather situations:

Policy Title: Snow Removal & Ice Control Policy #: PW

Snow and Ice Removal

PLEASE POST IMMEDIATELY Work Safely this Winter Implement SOFA Advisories and Lifesavers

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

COUNCIL POLICY BACKGROUND

CUSTER COUNTY SNOW REMOVAL PROCEDURES

RAILWAY INVESTIGATION REPORT R12W0165 MAIN-TRACK DERAILMENT

Town of Windsor. Department of Public Works

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

STATIC GAS MONITOR Type SGM/DEW Revision A of 20 aprile 2016

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

Facilities Operations Procedure for the Management of Snow and Ice

Snow Melting Design Guide: Accessibility Ramps (Concrete and Pavers)

SNOW REMOVAL & ICE CONTROL POLICY

Installation instructions, accessories. Snow chains

SNOWabout...

CITY OF EAGLE LAKE SNOW PLOWING POLICY

FOR CAN-AM ATV s P/N ASSEMBLY / OWNERS MANUAL

NEW YORK CENTRAL SYSTEM HOT BOX DETECTORS JUNE 1, 1959

Municipality of Grey Highlands Policy

S N O W P L A N / Keflavík International Airport

AOP 16 Winter Operations (Aerodrome Operating Procedure)

FOREMAN ASSEMBLY / OWNER S MANUAL

WINTER MAINTENANCE TRAINING VINCE LOMBARDI

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

CLEARING THE WAY CAUTION. brampton.ca/snow

Snow, Ice and Leaves Clearance Policy

SNOW CONTROL OPERATIONS

The following emergency snow routes are generally cleared first:

GETTING BRITAIN MOVING THIS WINTER Forecast, Gritting and Snow Clearing Services from Paxman Landscapes UK Ltd

Risk. Management. Bulletin. Created by. Insurance Fully Managed Claims Service Financial Advice paveygroup.co.uk

ER2 Short-head Electric Chain Hoist

Crisis Coordinator Communique. Follow us on: facebook.com/ kennesawstateoem K Social Media

PUSH TUBE STANDARD DUTY

ASSEMBLY / OWNER S MANUAL

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

Ionizing Radiation Awareness (Non-User)

IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

Municipal Act, 2001 Loi de 2001 sur les municipalités

City of Brainerd, Minnesota Snowplowing Policy

CLEA# Approved Date: Feb Revision Date: Aug 02, May06, Mar08, Jan 09 New ( ) Amends ( ) Rescinds ( ) Pages:

WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas)

MONTGOMERY COUNTY SNOW PLAN

INSTALLATION INSTRUCTIONS ATV Plow Blade Part Number: (50 ), (54 ), or (60 ) Application: All Terrain Vehicles

COUNCIL POLICY MANUAL

Edmonton International Airport

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

City of Lee s Summit Public Works Operations

City of Rhinelander Snow and Ice Policy

ATV WP2 FRONT MOUNT PUSH TUBE

Hazard Vulnerability Analysis (HVA)

Edmonton International Airport

PLOW MOUNT KIT FOR POLARIS RANGER P/N ASSEMBLY / OWNERS MANUAL

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3


New Pig Corporation newpig.com HOT-HOGS Page 1 of 10

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION:

FOR POLARIS ATV s P/N ASSEMBLY / OWNERS MANUAL

GHS/ CHEMICAL RIGHT TO KNOW

University of Oklahoma Emergency Response Plan for INSERT EVENT NAME HERE.

TORNADO/high winds *

Winter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works

FACILITIES PLANNING AND MANAGEMENT (FP&M) SNOW REMOVAL PLAN (Revision)

Winter Weather Snow and Ice Hazard Mitigation Guidelines. November 30, 2018

Safety Issue: Types of weather emergencies and natural. Weather Emergencies

History of Natural and Man-Made Disaster within the Region. There have been two aircraft accident resulting in casualties within the past 50 years.

Transcription:

Customer Track Maintenance Guide

Winter Safety Safety is of the utmost importance at CN, not only for our employees but also for you, our customers. We ve developed this Customer Track Maintenance Guide in order to help bring attention to the additional hazards that are present during the winter months, especially for our crews performing switching activities. Our goal is to move your products as quickly and safely as possible. Please contact your service delivery representative or account manager if you have any questions. Additional information on our seasonal safety guidelines can be found at: www.cn.ca/seasonalsafety Winter is a challenging time for a railroad; many of the service disruptions are caused by accumulations of snow and ice. On the track, problems with switches and crossings are mainly caused by snow so clearing the snow solves the problem. 3

Flangeways Be particularly vigilant where flangeways can be become contaminated with snow, ice, or other material, or where any trackage is covered by excessive amounts of snow or ice, or other material. Ensure equipment can be carefully operated through flangeway over such track. wheel flange Be especially aware at crossings, as these are prone to these types of conditions. rail flangeway minimum of 1.5 clear of ice, snow, mud, etc. At a minimum, flangeways must be cleared to a depth of 1.5. Acceptable: Not acceptable: 4

Switches Be aware that switches can become very difficult to line due to cold weather and snow/ice build-up in the switch points. Attempting to line a stiff switch can and does lead to back, leg and arm injuries. Proper switch maintenance prior to the winter season can reduce this risk. Although CN is responsible for the maintenance of switches on the main line, crews cannot properly service a customer if they cannot line the switches within their facility. Acceptable: Not acceptable: 5

Derails Derails can be buried under snow and must be cleared so train crews can find them. All derails must be properly identified by a sign (as pictured). Keep in mind that these derails need space to open. A derail, unable to completely open, will sit high and this situation will cause damage and, in some cases, even a derailment. Acceptable: Not acceptable: 6

Walking Conditions Everyone is more at risk of injury due to icy conditions. Please ensure icy walkways, particularly trackside, are sanded and/or salted to help crews operating on your property. Also be aware of debris and material that can pose tripping hazards, especially when obscured by fresh snow. It is imperative that windrows be cleared trackside by 4-5 ft to allow for safe walking and proper inspection of the cars by train crews prior to movement. Acceptable: Not acceptable: 7

Contacts CN Network Operations Centre 1-800-661-3963 Derailment of any railcar. Leak or suspected leak of any tank car or other dangerous commodity on CN property. Equipment or materials within the main track or siding clearance envelope (8 m/25 ft from nearest rail). Damage to any switch, derail, sign, rail or track structure. Any other condition or situation which might cause injury, damage or derailment. CN Police 1-800-465-9239 Trespassers, vandalism, damage to CN property. Railroad crossing concerns, violations, accidents. CN Service Delivery Centre 1-866-926-7245 Changes to any structures, ramps, loading docks, ground conditions, temporary piles, parked vehicles, etc., within the track clearance envelope for industrial track: Height 6.71 m (22 ft) above the rail. Side clearances: Top of rail to 1.22 m above rail requires side clearance of 1.83 m/6 ft* Over 1.22 m above the rail requires side clearance of 2.44 m/8 ft* Damage to any railcar, including ladders, doors, couplers, etc. Unless explicitly permitted by CN, no work shall take place within 8 m/25 ft of the nearest rail except in the presence of a CN representative. Derails left unlocked or in a non derailing position. *From the centre of the track.

www.cn.ca