CURRENT STATUS OF THE MAPPING OF FLOOD RISK AND ITS APPLICATION IN THE LAND. THE CASE OF THE REGION OF MURCIA

Similar documents
Landslide Hazard Assessment Methodologies in Romania

The Governance of Land Use

APPROACH TO THE SPANISH WATER ORGANISATION IMPROVING FLOOD HAZARD MAPPING, LAWS AND AUTHORITIES COORDINATION

Land Administration and Cadastre

4.17 Spain. Catalonia

APPLICATIONS OF EARTHQUAKE HAZARD MAPS TO LAND-USE AND EMERGENCY PLANNING EXAMPLES FROM THE PORTLAND AREA

Progress Report. Flood Hazard Mapping in Thailand

They include earthquakes, volcanic eruptions, floods, landslides, and other processes and occurrences. They are included in the broader concept of.

Plan4all (econtentplus project)

SEISMIC RISK ASSESSMENT IN ARMENIA

The UN-GGIM: Europe core data initiative to encourage Geographic information supporting Sustainable Development Goals Dominique Laurent, France

1. 1 What hazard maps have been developed in your country?

Spanish national plan for land observation: new collaborative production system in Europe

Contents: LEVANTE DE ALMERÍA A INFORMATION SYSTEM OBJECTIVES AND ACTIONS GEOGRAPHIC INFORMATION SYSTEM RESULTS

INSPIRE Basics. Vlado Cetl European Commission Joint Research Centre.

FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS

TERRITORIAL COHESION MEASUREMENT AT THE REGIONAL SCALE. A METHODOLOGICAL PROPOSAL AND APPLICATION IN ANDALUSIA

Summary. Recommendations on the Fifth Policy Document on Spatial Planning September 2001

DRR-related mandates and relevant activities and projects of RA III

CARTOGRAPHY OF TERRITORIAL VULNERABILITY TO FLOODING RISK. ADAPTED PROPOSAL TO THE EUROPEAN FLOODS DIRECTIVE AND DERIVED LEGISLATION

Evolution and development of National Spatial Data Infrastructure in Republic of Moldova

Appropriation Directions for 2007

Towards a fully integrated urban weather environment climate service in Mexico City

Update on INSPIRE; interoperable framework for natural hazards

Policy framework The Netherlands and the Polar Regions, Summary and priorities

Overview and purposes of the meeting

EO Information Services. Assessing Vulnerability in the metropolitan area of Rio de Janeiro (Floods & Landslides) Project

Copernicus Overview. Major Emergency Management Conference Athlone 2017

GIS FOR MAZOWSZE REGION - GENERAL OUTLINE

Disaster Management in Mongolia

USING 3D GIS TO ASSESS ENVIRONMENTAL FLOOD HAZARDS IN MINA

Questionnaire on Hazard Mapping

Public Disclosure Copy

RETA 6422: Mainstreaming Environment for Poverty Reduction Category 2 Subproject

Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts. Ben Binder (303)

Norwegian spatial data infrastructure supporting disaster risk management Norwegian Mapping Authority

The Governance of Land Use

Investigation, assessment and warning zonation for landslides in the mountainous regions of Vietnam

Chapter 2 Land Use Management and Risk Communication

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Urban Climate Resilience

Geographic Information Systems

GENERAL. CHAPTER 1 BACKGROUND AND PURPOSE OF THE GUIDELINES Background of the Guidelines Purpose of the Guidelines...

Assessing Hazards and Risk

Summary Description Municipality of Anchorage. Anchorage Coastal Resource Atlas Project

Mediteranean sea issues in the view of ESPON ESaTDOR project and Marine Spatial Planning in Slovenia

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey.

Baldwin County, Alabama

Vulnerability of Bangladesh to Cyclones in a Changing Climate

World Meteorological Organization

12/05/2016. The First step in Adaptation to future climate change Reduce Vulnerability and Exposure to present Climate Variability (IPCC 2014)

HELSINKI COMMISSION Baltic Marine Environment Protection Commission

The Global Fundamental Geospatial Data Themes Journey. April Clare Hadley WG Chair

SDI Development in Georgia. Mari Khardziani Head of International Relations Unit National Agency of Public Registry

What is Spatial Planning?

Regional and Local Scale Flood Hazard Assesment in Tekirdağ and Samsun

Hawke s Bay Liquefaction Hazard Report - Frequently Asked Questions

Advancing Geoscientific Capability. Geological Survey of Finland

A Simple Procedure for Estimating Loss of Life from Dam Failure. Wayne J. Graham, P.E. 1

GMES Service for Geospatial Reference Data Access (RDA) Covering Areas Outside Europe

GEOMATICS. Shaping our world. A company of

KENTUCKY HAZARD MITIGATION PLAN RISK ASSESSMENT

Borah Peak Earthquake HAZUS Scenario Project Executive Summary Idaho Bureau of Homeland Security Idaho Geological Survey Western States Seismic

Republic of Mozambique

FLOOD HAZARD AND RISK ASSESSMENT IN MID- EASTERN PART OF DHAKA, BANGLADESH

The Governance of Land Use

I. INTRODUCTION. 1 Regulation EU No 1303/2013 on the Common Provisions on the ESI Funds.

International Guidelines on Access to Basic Services for All

Innovative Ways to Monitor Land Displacement

Opportunities to Improve Ecological Functions of Floodplains and Reduce Flood Risk along Major Rivers in the Puget Sound Basin

The Governance of Land Use

Need of Proper Development in Hilly Urban Areas to Avoid

Maritime Spatial Planning in the Baltic Sea Region

THE FLOOD OF THE RIVER TURIA AT TERUEL IN JUNE 1933: AN ASSESSMENT

Emerging Needs, Challenges and Response Strategy

Environmental Management Information System (EMIS)

16540/14 EE/cm 1 DG E 1A

EARTH OBSERVATION SERVICES IN REPUBLIC OF MOLDOVA

Center for Spatial Data Infrastructures and Land Administration Department of Geomatics, University of Melbourne. Content

Geospatial Technologies for Resources Planning & Management

The Governance of Land Use

Copernicus Overview and Emergency Management Service

Getting Biodiversity Data

Disaster Risk Assessment: Opportunities for GIS and data management with Open DRI

3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e

National Perspectives - Portugal. Margarida Almodovar

The Swedish National Geodata Strategy and the Geodata Project

MODELS AND TOOLS FOR GOVERNANCE OF

Margarita Stancheva Hristo Stanchev & Robert Young 2. MEDCOAST JUBILEE WORKSHOP May 2015, Iberotel Sarigerme Park, Dalaman, Turkey

GIS as a tool in flood management

Gis for Land Management: An Overview on Italy

Geodiversity, Geoheritage & Geoconservation

Grant 0299-NEP: Water Resources Project Preparatory Facility

THE SEVILLE STRATEGY ON BIOSPHERE RESERVES

Impacts of Climate Change and Water-Related Disaster Reduction Management in the Asia-Pacific Region

Assumption Parish Hazard Mitigation Plan Update Public Meeting. September 1, 2015 Napoleonville, LA

Emergency Management Service (EMS) mapping

WP4: COASTAL PROCESSES

West Carroll Parish Hazard Mitigation Plan Update Public Meeting. August 25, 2015 Oak Grove, LA

Transcription:

Boletín Current de la Asociación status of the de mapping Geógrafos of Españoles flood risk and N.º its 58 application - 2012, págs. in the 443-448 land. The case of the Region of Murcia I.S.S.N.: 0212-9426 CURRENT STATUS OF THE MAPPING OF FLOOD RISK AND ITS APPLICATION IN THE LAND. THE CASE OF THE REGION OF MURCIA Alfredo Pérez Morales Departamento de Geografía. Universidad de Murcia I. INTRODUCTION The natural risk analysis required in most of its development, the spatial expression of the areas associated with a hazard (both at different severities as probabilities of occurrence) and the geographic location of the elements at risk and vulnerabilities. Therefore, the mapping has become an indispensable tool in the analysis and evaluation of natural hazards from the initial stages as a source of information, through analysis and modeling support, and ending with the publication of results as the basis of representation. The risk map represents the delineation of areas where there is a possibility that a number of sectors or segments of society are affected by a natural occurrence of extreme type. Therefore, risk zoning involves a process of integration of two types of mapping, hazard, aimed at zoning according to the frequency and intensity of occurrence of a particular natural phenomenon, and the vulnerability and exposure, which is to express the situation and temporary stay of the elements at risk, mainly people, goods and services, as well as to the dangers inherent fragility. Finally there is also the mapping of emergency management, applied a strong character because they are designed to be used in the operational processes of intervention before the occurrence of natural disasters. The role of cartography is really important in the case of flood risk analysis, since there are different parameters and variables of the agent that can be represented by the space component (depth, velocity, sediment load, etc.).. Furthermore, this expression mapping of risk levels for easy integration with territorial preventive measures, such as planning and management of uses and stays in risk areas (Elízaga, 1983). The article discusses each of the forms of expression of such maps. Boletín de la Asociación de Geógrafos Españoles N.º 58-2012 443

Alfredo Pérez Morales II. FLOOD HAZARD MAPS IN SPAIN Spanish cartographic production in flood risk is increasingly important, however, progress in its coverage of the territory is quite slow because most cases are limited to specific studies or pilot areas. One of the main explanations for this situation is the lack of specific guidelines for processing, which makes a homogeneity in the work and, more seriously, raises serious difficulties in the selection of an appropriate scale with regard to each place. Among the organizations that have developed flood risk mapping highlights the Geological and Mining Institute of Spain (IGME-ITGE). This institution has developed over its long history many anecdotal reports and general studies focused on the characterization and analysis of natural hazards. The peak in the scientific-technical-itge IGME in the field of flood risk analysis occurs in the decade of 1980-1990 and the beginning of the next decade (Díez and Lain, 1998). Among the works with each cartographic expression to highlight two types of studies: Maps sighted risk of flooding in urban areas. Three groups of methods in an integrated way (historical-statistical, hydrologic-hydraulic and geological-geomorphological), by which floodplain obtained for different return periods (5 to 500 years) and large scales (1:2500, 1 : 5,000, 1:8000 or 1:10.000). In the Region of Murcia are conducted to the municipalities of Puerto Lumbreras, Lorca, Totana and Archena (Pernia, et al, 1987). The results obtained in the two nuclei included in the study area reveal important areas flooded on both banks of the river courses and Nogalte Guadalentín. Unfortunately all these works have been in vain, since, as discussed below, consideration of these planning policy has been nil. There is no link between these works and town planning legislation and occupation that is being done in these areas is growing flood. Establishment of geological criteria for flood forecasting in areas of local, provincial or regional governments. This is preventive studies on geological (geomorphological, sedimentological, hydrological, hydrogeological risks...), and anthropogenic climate which allow a certain degree of predictability of the flood. The results are maps in the mid-scale (1:25,000 to 1:500,000) which reflects the flooded spots, exposed elements, and foreseeable risks. On the other hand, Centre for Hydrographic Studies, part of the Experiment Station of Public Works (CEDEX, Ministry of Development), has been at the forefront methodological hydrological-hydraulic analysis of floods. However, cartographic production in the field of risk maps is limited to specific studies or pilot areas in which models have been tested. Finally, as noted above, the Directorate General of Water Resources, initially from the Ministry of Public Works, Transport and Environment (MOPTMA) and, currently, the Ministry of Environment, Linde has embarked on the program, focusing to develop the boundary of the Public Water (DHP) of rivers as envisaged in the existing Water Act 1985. The documentation produced in the framework of Linde, DPH mainly maps and floodprone areas is essential as hazard mapping at the risk of flooding in its probabilistic aspect. Moreover, because this definition closely linked to a legal effect, facilitates their integration into spatial planning, in particular their necessary inclusion in municipal planning. 444 Boletín de la Asociación de Geógrafos Españoles N.º 58-2012

Current status of the mapping of flood risk and its application in the land. The case of the Region of Murcia III. THE FLOOD RISK MAPPING OF THE BASIS FOR PLANNING IN THE REGION OF MURCIA The flood risk maps for use in regional planning in the Region of Murcia come primarily from two sources: 1. The Atlas Inventory of Natural Hazards in the Region of Murcia The Atlas Inventory of Natural Hazards in the Region of Murcia has been until recent years, the reference document for any work on the territory since its completion in 1995. Unfortunately, what should be a thorough study on these aspects, is nothing more than a generalist approach of the main risks affecting the territory (landslides, earthquakes, extreme weather events and floods) accompanied by a mapping small-scale applicability in management issues near zero. The chapter devoted to the Atlas of flood risks, includes a description of the hydrography and hydrology of the basin of the Segura, a simple explanation of the mechanisms of floods and a catalog of historic avenues. Risk analysis itself, in theory, the most important point of the study, is shipped in four short paragraphs. The first (5.5.1 Areas of potential danger), is a mere regional level classification of spaces according to the degree (high, medium and moderate) of its potential danger of flooding, which would be necessary a series of actions to prevent or reduce as far as possible flood damage (5.5.1 Areas of potential danger). For the location of these areas used two sources of information: Areas that have suffered at some point the effects of floods Areas with a probability of being damaged because there are causes that can cause flooding. The results are presented in a flood zone map (vid. Fig X). As can be seen, scale, 1:500,000 is so extremely small that prevents their use for specific sectoral actions on the territory of reference. In fact, it is a simple mapping that offers only a very superficial impression of the risk of flooding in the area of Murcia. Despite the general of that document, it is understood that only has been considered a risk area outside the drainage basin of the Segura and its tributaries (Rambla de Benipila in Cartagena) when it was less than five years since the publication of this work the floods had hit hard the towns of Mazarron and Aguilas, causing even the loss of human lives. Even in the second section of that risk analysis titled, urban areas and hot spots (5.5.2), the latter two populations contained in the list of places where the authors believe that the flood could affect significantly. Including whether they are Puerto Lumbreras and Lorca, with 10% and 15% respectively, of the inner city streets affected by plants of 50-100 year return period. To determine the proportion in each of the populations studied, used as a base map drawings National Topographic Map 1:50,000 scale maps and flood hazard work Geology and flood damage prevention (Ayala. et al., 1985). Unfortunately, the work does not attach any of these detailed maps, which, surely, if that could have been used in work planning and land use boundaries later. Finally, there are two section (5.6 defense measures against floods and preventive operations) closely linked to each other, about defense measures against floods in the basin of the Segura and preventive actions should be to bring out. In this sense, the study builds on work done in the year 1982 by the Directorate General of Water Resources for the Civil Boletín de la Asociación de Geógrafos Españoles N.º 58-2012 445

Alfredo Pérez Morales Protection National Commission on the actions needed to prevent and reduce flood damage in the Segura Basin. It recommends a series of actions fall into two groups: structural methods and management activities. The former are well known: mill dam, correction and regulation of channels, channeling, diversion channels, etc. The latter include activities such as soil conservation and reforestation, establishment of an insurance system, installation of alarm systems and forecasting, integrated hydraulic system, a type of action that qualify as zoning and legal regulations, which could be interpreted as measures of planning. Unfortunately, among the most important findings of this study, raw technocratic approach to the problem, and planning, which is not dedicated or a paragraph, is completely neglected by structural measures. It should be noted that much of the works and projects that are listed as necessary, and were collected previously by the General Defense Plan Avenues by the Hydrographic Confederation in 1977 and adopted in 1986 by the Directorate General of Hydraulic Works. 2. The Civil Protection Special Plan for Flood in the Region of Murcia INUNMUR Plan (Plan Civil Protection Special Flood Region of Murcia), replaces the outdated maps of IGME and stands as the document to be consulted on any land demarcation process under Article 12 of the Act ground state of 2007 provided that the competent basin organization dictates otherwise not have a definition or replacement. The assessment of flood risk mapping is done by the INUNMUR Plan demonstrates the shortcomings identified so far. Below is a detailed analysis of what are the weaknesses and foibles of each of the maps developed for some of the towns of Murcia Region most affected by the floods. IV. THE NATIONAL FLOOD ZONE MAPS On November 26, 2007 came into force a new European Directive on the assessment and management of floods (Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management flood risk) whose transposition into Spanish law should be made before November 26, 2009. With the launch of the National Flood Zone Mapping by the MARM (Ministry of Environment and Rural and Marine Affairs), Spain became one of the first European countries to apply the principles of the directive. With the development of the National Flood Zone Mapping will be made available to citizens through the Internet, all flood hazard maps made by the Ministry of Environment and Rural and Marine Affairs and those who provide the Autonomous Communities within their competence. This system will generate and facilitate consultation of the entire floodplain mapping available in the country. It will be a basic tool: Protection of Public Water Basin Organizations and the defense of the flood hazard areas, serving as a basic tool for the issuance of reports on authorizations in the Public Water and their associated zones and flood management in connection with the Automatic Hydrological Information Systems. 446 Boletín de la Asociación de Geógrafos Españoles N.º 58-2012

Current status of the mapping of flood risk and its application in the land. The case of the Region of Murcia Proper planning of the actions of defense against floods, identifying vulnerabilities on which they must act as a priority. Planning and management of flood areas in the scope of its powers, the Civil Protection authorities. Provide this information to other governments (especially the planning authorities and planning) and promoters on the existing floodplain and the risk that exists to build on them. To inform citizens about the dangers existing in each area so that it will provide sufficient information to improve transparency in the management of all administrations. Regarding the development of the National Flood Zone Mapping is being conducted in two phases: The first is the identification and collection of all floodplain studies already carried out, whether prepared by the Marmara or the Autonomous Communities. The second phase will make the generation of new floodplain mapping from the sections at risk. This phase will start running in the watersheds of the Bay of Biscay and Júcar and, increasingly, in other watersheds that manages MARM through the Hydrographic Confederations. For the Segura basin, the Ministry of Environment and Rural and Marine has tendered for more than three million such work and it is estimated that 1,250 kilometers have to define channels, which will result in a total of 100,000 acres mapped. To perform this last step identified the following areas: 1. Determination of DPH by criteria hydrological, geomorphological and environmental issues. 2. Preferential flow path, which may, if necessary to establish themselves as police zone 3. Avenue associated with different return periods, under natural and altered. It thus appears that the method chosen to complete the gaps now definitely been mentioned. If you follow the steps outlined in this new project seems to have an efficient mapping and reliable enough to establish for the first time a definition of sensitive areas of flooding in line with what happens in nature. Therefore, trust is only the future municipal management plans, implement wisely directed to be made for each case, with the main objective of integrating all the security guarantees to the flood risk management process territorial. V. FINAL REVIEWS The flood risk maps are an irreplaceable tool for identifying areas and elements and thus subject to the same efforts to distribute proportionally to the levels of involvement. That is, knowing the potential level of impact of flooding on the various elements distributed in the territory helps to analyze, make decisions and develop measures for management and planning. Spanish cartographic production in this area has experienced a breakthrough in the last two decades due to advances in techniques used to model natural watersheds. In this sense, the number of software dedicated to this task has been growing in number, and now there is a diverse group of private profit-driven tools such as MIKE-SHE, MIKE 11 and SOBEK or free of charge as: AVSWAT-2000, ArcHydro, TauDEM, MODFLOW-2000, HidroSIG Boletín de la Asociación de Geógrafos Españoles N.º 58-2012 447

Alfredo Pérez Morales and, above all, the family of programs developed by the Hydrologic Engineering Center (Hydrologic Engineering Center) from the body of engineers from the U.S. Navy (U.S. Army Corps of Engineers). 448 Boletín de la Asociación de Geógrafos Españoles N.º 58-2012