UNFC COAL MINES CASE STUDIES

Similar documents
Guidelines for preparation of Mining Plans for Coal/Lignite Blocks

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

PRE-FEASIBILITY REPORT FOR PROPOSED 1.0 MTPA COAL MINING AT CHOTIA-II COAL MINE AT SALAIGOT VILLAGE, TEHSIL PODIUPRODHA, KORBA DISTRICT, CHHATTISGARH

Taming the Soutpansberg SACMA Presentation - Exxaro Tshikondeni Coal November 2011

PRE-FEASIBILITY REPORT FOR PRODUCTION CAPACITY EXPANSION FROM 0.25 MTPA TO 1.0 MTPA CHOTIA-II SUB BLOCK OF CHOTIA COAL MINE

PROMOTIONAL AND DETAILED EXPLORATION

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

Resource Classification Systems by Dan Alexander

COAL EXPLORATION & RESOURCES

NZQA unit standard New US6 to replace and version 1 Page 1 of 5

DEPARTMENT OF MINING ENGINEERING

Borehole Problems. Horizontal Level Ground. Boreholes Sunk on Horizontal Ground. Depth Diagram (Not to Scale)

North Goonyella Outburst Incident Learnings

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Oil Shale Mining Developments in Estonia as the bases for sustainable power industry

University of Saskatchewan

Geophysical Surveying, Drilling Methods in Kothagudem Region Coal Mines

METROPOLITAN. Longwall 27 Outburst Events. Presenter Title

INVESTOR SITE VISIT MAGARENG MINE - 10 NOVEMBER

Blast design parameters and their impact on rock fragmentation

JV PROJECT UPDATE JORC COAL RESOURCE

Coal Mining Methods. Underground Mining. Longwall & Room and Pillar Mining. Fig. 1: Longwall Mining

CARTER METALLURGICAL COAL PROJECT. Endurance Gold Corporation (EDG)

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

Characterization of Geologic Anomalies Through Horizontal Directional Drilling

(3) The consent letter/declaration/undertaking may have uniform signature of the lessee.

For personal use only

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

Overview of Underground mining business

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

Underground Drilling and Packer Test in Fault F16 of Wugou Coal Mine

A BOOKLET ON. T Rangasamy, A R Leach and A P Cook. Facilitating safety and health research in the South African mining industry

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

EAS 233 Geologic Structures and Maps Winter Miscellaneous practice map exercises. 1. Fault and separation:

Sample Header for slide

Geotechnical roof classification for an underground coal mine from borehole data

Wongai Project Presentation

Surface auger mining at Rietspruit Mine Services (Pty) Ltd

Oil Shale Resource in Mae Sot Basin, Thailand

Colombia s Non-Traditional Coal Areas

Strata control monitoring in a contiguous seam depillaring working

Geotechnical Issues on Application of Highwall Mining System inindonesia

Review of mechanization within Lonmin

For personal use only

Monday 2 June 2014 Morning

Strong Weighting Events in Shallow Multi-seam Longwall Mining

Victoria Advance Exploration Project Past, Present and What s Next

Longwalls 201 to 204 Coal Resource Recovery Plan. November 2016

For personal use only

Redesigning the geometry of the Makala Coal Mine to improve safety and productivity

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

DIRECTORY OF COAL MINES IN ILLINOIS 7.5-MINUTE QUADRANGLE SERIES KINSMAN QUADRANGLE GRUNDY & LASALLE COUNTIES. Jennifer M. Obrad

Geotechnical & Mining Engineering Services

Practical long-term planning in narrow vein mines a case study

LWB4 to LWB7 Coal Resource Recovery Plan. September 2017

Demonstration of the Advanced Radio Imaging Method (RIM): Ground Truth Results for Three-Dimensional Imaging of Coal Seams

DIRECTORY OF COAL MINES IN ILLINOIS 7.5-MINUTE QUADRANGLE SERIES HILLSBORO QUADRANGLE MONTGOMERY COUNTY

Research Article Rock Load Estimation in Development Galleries and Junctions for Underground Coal Mines: A CMRI-ISM Rock Mass Rating Approach

Expert paper GIS CONTENT PROPOSAL FOR UNDERGROUND MINING ROOMS

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

DIRECTORY OF COAL MINES IN ILLINOIS 7.5-MINUTE QUADRANGLE SERIES MAZON QUADRANGLE GRUNDY COUNTY. Jennifer M. Obrad

Successful Use of a Stress Relief Roadway at Appin Colliery

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

Critical Borehole Orientations Rock Mechanics Aspects

PROGRESS GALLERY Advancing our projects

Oposura Scoping Study Nearing Completion

Kolloquium: Schacht, Strecke und Tunnel TU Bergakademie Freiberg, April, Freiberg / Sachsen

Hard Coal Reserves and Resources in Poland and Relationship to UNFC-2009

The Mine Geostress Testing Methods and Design

DIRECTORY OF COAL MINES IN ILLINOIS 7.5-MINUTE QUADRANGLE SERIES WOOD RIVER QUADRANGLE MADISON COUNTY Cheri Chenoweth & Melony E.

World Journal of Engineering Research and Technology WJERT

GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION

BORE CORE SAMPLING DESIGN & OBJECTIVES. John Bamberry Principal Geologist Palaris Australia

Milenko Ljubojev *#, Mirko Ivković **, Jovo Miljanović ** and Lidija Đurđevac Ignjatović *

MIC- 401 MINE SURVEYING II

Engineering Geophysical Application to Mine Subsidence Risk Assessment

Case study 2: Using seismic reflection to design a mine

Oil Shale, 2009, Vol. 26, No. 4, pp ISSN X OIL SHALE MINING-RELATED RESEARCH IN ESTONIA

AN EVALUATION OF THE QUALITY OF METALLURGICAL COKING COAL SEAMS WITHIN THE NORTH BLOCK OF EASTERN PARVADEH COAL DEPOSIT, TABAS, CENTRAL IRAN

Initial Investigations for In-situ Gasification of Lignite Seams A Case Study of a Romanian Deposit

RISK ASSESSMENT OF FEASIBILITY OF ROADHEADERS IN ESTONIAN UNDERGOUND MINING

ANALYSIS OF FIELD TEST RESULTS FOR THE OIL SHALE MINE VENTILATION SIMULATION

DESTRESS BLASTING AS A PROACTIVE MEASURE AGAINST ROCKBURSTS. PETR KONICEK Czech Academy of Sciences, Institute of Geonics

Numerical Study on an Applicable Underground Mining Method for Soft Extra-Thick Coal Seams in Thailand

ROCKMA Digital Strata Mapping Based on Drill Monitoring. Presentation by Warwick Smyth GeoConsult BBUGS & BOHUGS 2014

Evaluation of induced vertical stress during depillaring in blasting gallery panel workings

DIRECTORY OF COAL MINES IN ILLINOIS 7.5-MINUTE QUADRANGLE SERIES CHRISTOPHER QUADRANGLE FRANKLIN COUNTY. Alan R. Myers

DIRECTORY OF COAL MINES IN ILLINOIS 7.5-MINUTE QUADRANGLE SERIES BROADWELL QUADRANGLE LOGAN COUNTY. Margaret H. Bargh

End-wall Slope Stability Analysis of Surface Coal Mine under the Combined Open-pit Mining with Underground Mining

DIRECTORY OF COAL MINES IN ILLINOIS 7.5-MINUTE QUADRANGLE SERIES SORENTO SOUTH QUADRANGLE BOND & MONTGOMERY COUNTIES

DIRECTORY OF COAL MINES IN ILLINOIS 7.5-MINUTE QUADRANGLE SERIES MT. PULASKI QUADRANGLE LOGAN COUNTY. G. K. Coats M. H. Bargh C. G.

SHALE GAS/ OIL: OPPORTUNITIES CMPDI S ENDEAVOURS

Stability of roadways in coalmines alias rock mechanics in practice

KLGOLD.COM TSX: KL OTCQX: KLGDF MACASSA MINE TECHNICAL OVERVIEW

THE EFFECT OF GEOLOGICAL STRUCTURES IN THE EXPLORATION FOR PRIME COKING COAL

Coal Mines in Illinois WOODHULL QUADRANGLE HENRY & KNOX COUNTIES Colchester & Rock Island Coals

Transcription:

UNFC COAL MINES CASE STUDIES

Format for Collecting Information Block Geological Reserve in the block Geological Reserve Considered Extractable Reserve Balance Extractable Reserve Econ /Not Econ F1 F2 G1 G2 G3 Total G1 G2 G3 Total G1 G2 G3 Total G1 G2 G1 G2

Project Report contains: Introduction Project Site Information Mine Boundary, Reserves & Mine Life Mining Strategy Mining Schedule Ventilation CHP & Surface Dispatch Arrangement Power Supply, Illumination & Communication Manpower, Productivity & Training Mine Closure Planning Financial Evaluation Marketability & Justification Geology and Deposit Appraisal Mine Entries Method of Mining / Mining System & Equipment Horizontal & Vertical Transport Water Management, Pumping & Drainage Workshop, Stores & Magazine Civil Construction Safety and Conservation Environment Management Land Requirement, R&R Package and Project Implementation Schedule

Case-1: Jagannath Underground (UG) (Mahanadi Coalfields Ltd)

Salient Features Name of the Project Jagannath UG Project Geological Block Jagannath UG Block Area (Sq. km) 4.5 Borehole Density (per sq. km) Seams occurring in the block 20 (Index Seam) 12 (Seam I Top) 9 (seam I Bottom) Index (local occurrence), Seam I (split into top, middle & bottom) Total Geological Reserve 80.62 Mt (Index + Seam I)

Sl. No FAULTS Fault Trend Direction of throw 1 F1-F1 NW-SE to E-W Amount of throw (m) Northerly 40-85 2 F2-F2 NE-SW Northwesterly 10-35 3 F3-F3 NW-SE to E-W 4 F4-F4 E-W to NW-SE 5 F5-F5 E-W to NW-SE Southerly 5-35 Southerly 10-75 Southerly 90-125 6 F6-F6 E-W Southerly 7-15

COAL SEAMS CONSIDERED Sl. No. Particulars Thickness range (m) From 1 Index Seam 0.50 3.33 Parting 3.05 17.68 2 Seam I (Top) 1.20 6.34 Parting 0.46 6.81 3.A Seam I (Middle + Bottom) To 6.79 13.99 3.B Seam I (Middle) 2.98 6.65 Parting 1.00 5.02 4 Seam I (Bottom) 3.53 7.78

NET GEOLOGICAL RESERVE (PROVED) Coal Seam Total (Mt) Index 4.91 Seam-I (Top) 20.17 Seam-I (Middle + Bottom) 55.54 Total 80.62

SECTOR-WISE NET GEOLOGICAL RESERVE Sector Reserve Workable / Not Workable A 1.66 Not Workable B 36.34 Workable C 14.30 Workable D 8.93 Workable E 11.18 Workable F 5.60 Workable G 2.61 Not Workable Total 80.62

Seam-wise Mining Area Seam Area (sq.km) Index 1.3 Seam I (Top) 4.5 Seam I (Bot) 4.5

GEO-MINING CHARACTERISTICS Items Seam Index I (Top) I (Mid+Bott) Thickness range (m) 0.50-3.33 1.2-6.34 6.79-13.99 Workable thickness range (m) 1.5-2.0 1.5-4.6 1.7-4.6 Avg. thickness (m) 1.83 3.10 3.59 Avg. grade of coal D C B Immediate roof Sandstone and Shale Avg. seam gradient 1 in 9

Plans / Drawings Jagannath UG Index Seam Seam I (Top) Seam I (M+B)

MINE ENTRY Incline Name Gradient Length / Depth (m) Crosssectional Area (m 2 ) Incline 1 1 in 4.5 560 5.0 x 3.0 Haulage, intake Purpose Upto seam Seam-I (Mid+Bot) Incline 2 1 in 4.5 560 5.0 x 3.0 Belt, intake Seam-I (Mid+Bot) Airshaft Vertical 180 5.0m dia Return Seam-I (Mid+Bot) Airshaft Vertical 140 5m dia Intake Seam-I (Mid+Bot)

UG PANEL PARAMETERS No. of Headings in each Panel 5 Width of Galleries 5.0m Pillar Size 35m x 35m

PRODUCTION CM Set Cutting Thickness Range Production Rate (Tonnes Per Day) CM 1 2.4m 4.6m 1600 CM 2 2.4m 4.6m 1600 CM 3 1.5m 3.8m 1200

EXTRACTABLE RESERVE Seam Extractable Reserve (Mt) Index 1.75 Seam I Top 8.99 Seam I M/B 10.81 Total 21.55 Mine Life : 22 Yrs

Reserves Total Proved Geological Reserve 80.62 Mt Geological Reserve Considered for Mining 76.35 Mt Extractable Reserve 21.55 Mt

UNFC Classification G1 G2 G3 Total g. reserve G. Reserve considered Ex. Reserve Balance Ex. Reserve Eco. Status 80.62 0.00 0.00 80.62 76.35 21.55 21.55 Eco RESOURCE RESERVE 3,3,3 3,3,2 3,3,1 2,2,2 2,2,1 2,1,1 1,2,2 1,2,1 1,1,2 1,1,1 0.00 0.00 4.27 0.00 54.80 0.00 0.00 0.00 0.00 21.55

Case-2 MAHATADIH RAIDIH BLOCK Raniganj Coalfield

SALIENT FEATURES SEAM - Begunia TOTAL AREA - 2.36 Sq. km MINING AREA - 1.17 Sq. km DEPTH - 330 TO 550m MINING THICKNESS - 2.50 TO 3.05m GRADIENT - 1 in 6 (small part) to 1 in 8/9 (major part) GASSINESS - Degree III GRADE - S-I to W-II (Avg. S-II) Medium Coking

RESERVE (ISP) PARTICULARS RESERVE (MT) Proved Reserve 4.17 Indicated Reserve 2.79 Total Geological Reserve 6.96 Reserve within mining area 4.95 Extractable Reserve 2.51

Project Plan of Begunia Seam

UNFC Classification G1 G2 G3 Total g. reserve G. Reserve considered Ex. Reserve Balance Ex. Reserve Eco. Status 4.17 2.79 0.00 6.96 G1-4.17 G2 0.78 Total 4.95 G1 2.23 G2 0.28 Total 2.51 G1 2.23 G2 0.28 Total 2.51 Eco RESOURCE RESERVE 3,3,3 3,3,2 3,3,1 2,2,2 2,2,1 2,1,1 0.00 2.01 0.00 0.50 1.94 0.00 1,2, 2 0.00 1,2,1 1,1,2 1,1,1 0.00 0.28 2.23

Method of Mining and Rate of Production METHOD OF MINING BORD AND PILLAR, COAL LOADING WITH LHD / SDL UDM FOR FACE DRILLING AND ROOF BOLTING PILLAR EXTRACTION WITH HYDRAULIC SAND STOWING (Gassiness - Degree III) PRODUCTION RATE 2 LHD DIST : 800 TPD (3 LHD per panel) 1 SDL DIST : 200 TPD (2 SDL main dip) TOTAL : 1000 TPD

PRODUCTION PHASING Year 1 st 3 rd 4th 5th 6th 7th 8-13 th Prod (Mty) -- 0.03 0.06 0.18 0.30 0.30 PRODUCTION CAPACITY : 0.3 MTY MINE LIFE : 13 YEARS (including gestation period)

Case-3 Deoghar Block Rajmahal Coalfield

SALIENT FEATURES Geological Block - Deoghar Block Total Area - 10.63 Sq. km Borehole Density - 15 per Sq. km Seam Occurrence - Seam XII to Seam I Mining Area - 4.01 Sq. km Seams Proposed to be Worked - Seam X to Seam II Bottom Extent of the Mining Area - (730-4000m) / (800-4400m) Production Capacity - 3.0 Mty

RESERVE (ISP) PARTICULARS RESERVE (MT) Proved Reserve 432.88 Indicated Reserve 0.00 Total Geological Reserve 0.00 Reserve within mining area 100.00 Extractable Reserve 90.04

Open cast Mine Limit Plan showing Coal Reserve/Resource

Block: Deoghar (Hura C ) G1 G2 G3 Total g. reserve G. Reserve considered Ex. Reserve Balance Ex. Reserve Eco. Status 432.88 0.00 0.00 432.88 100.00 90.04 90.04 Eco RESOURCE RESERVE 3,3,3 3,3,2 3,3,1 2,2,2 2,2,1 2,1,1 1,2,2 1,2,1 1,1,2 1,1,1 0.00 0.00 332.88 0.00 9.96 0.00 0.00 0.00 0.00 90.04

Mine Parameters Total Extractable Reserve - 90.73 Mt Total Overburden - 228.79 Mm 3 Avg. Stripping Ratio - 2.52 m 3 / Tonne Surface Constraints - 2 nallas flowing north to south Overall Grade - F G HEMM - Diesel Hydraulic Shovel / Backhoe Electric Shovel, Surface Miner, Front End Loader, Dumper (100Te, 60Te), Dozer with Ripper, Drills IRR (85% Utilization) - 12.14% (Departmental Operations) 17.48% (Outsourced Operations)

Thank You