WELCOME BIG BEND SUBSTATION OPEN HOUSE 11 A.M. 2 P.M.

Similar documents
Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015

Appendix B Impact Table - Proposed Routes

Resiliency of Power Grids After Earthquakes

URD Cable Fault Prediction Model

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects

Reven ue Req u i remen t Ap pl icat ion 2004/05 and 2005/06. BC hydro m W. Volume 2. Appendix L. System Performance Indicators

Welcome to NetMap Portal Tutorial

Ocmulgee River Watershed Project Fact Sheet

NEW WATERFRONT METROPARK. P u b l i c O p e n H o u s e, J u n e 2 1,

SxD STUDIO MAPPING THE SPIKES TEAM VANAGAIN.

OPALCO Outage Analysis. December 2017 Board Meeting

Fluvial Erosion Impacts on Infrastructure Along Indiana Rivers and Streams

Ch 8. Three-phase systems

Problems In Large Cities

Measuring connectivity in London

Esri s Living Atlas of the World Community Maps

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician

Vancouver Island and Coast

Spatial units (Levels 0 and 1)

06/04/2015. Overview: Spatial units. Advancing the SEEA Experimental Ecosystem Accounting Spatial units (Level 1)

BVES Annual Reliability Public Presentation 2016 Performance

Norm Hann Performance Manager, Performance Management Department Hydro One Networks Inc.

PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 CHIEF SYSTEM OPERATOR

Folsom Dam Water Control Manual Update

APPENDIX E. Photographs of Hazard Events in Broome County. DMA 2000 Hazard Mitigation Plan Broome County, New York E-1

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

FIRST CONTACT. Astronomy 101, Section 4 at the Domed Theater Professor Neil McFadden Professor John McGraw

Stone Cottage, Farnham Lane, Haslemere Guide Price 750,000

Superstorm Sandy What Risk Managers and Underwriters Learned

Alamito Creek Preserve Ranches for Sale Marfa, Presidio County, Texas

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

NASA, partners track rain, snow in soggy Washington 10 November 2015, byphuong Le

What is a map? Understanding your map needs

JUNIOR CERTIFICATE 2008 MARKING SCHEME GEOGRAPHY ORDINARY LEVEL

Village of Glenview: Community-wide Flood Risk Reduction Program (FRRP)

Attachment 3. Updating UBC s Regional Context Statement. University of British Columbia CONSIDERATION MEMORANDUM OF CONSULTATION INPUT

THUNDERSTORM/STORM PROCEDURE

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Storm Surge Analysis Update Meeting Cross City, Florida June 17, 2014

A Utility s Response and Recovery. Marc Butts Southern Company 03/19/2014

BCeMap A Multi Agency Situational Awareness System for the Province of BC

OTTER POINT ADVISORY PLANNING COMMISSION. Notice of Meeting on Tuesday, June 5, 2018 at 7 p.m.

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.

Welcome Jeff Orrock Warning Coordination Meteorologist National Weather Service Raleigh

Lake Lure Community Meeting with Duke Energy

132 Imperial Road North Bay, Ontario P1A 4M5. Subject: Tower Site Proposed for Trout Lake, 1427 Owl s Nest Road, Township of Hoskin

Major Event Response Reporting Guelph Hydro Electric Systems Inc. (Guelph Hydro) May 4, 2018 Wind Storm

MINISTRY OF FORESTS, LANDS AND NATURAL RESOURCE OPERATIONS, POST-WILDFIRE RISK ANALYSIS PRELIMINARY REPORT

City of Manitou Springs

1) NetMap Overview. 2) Habitat modeling HIP & Beyond. 3) What do you do with habitat models? 4) NetMap a platform for regional analysis & interactions

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.

A WEST COAST UTILITY'S APPROACH TO MITIGATING EARTHQUAKE HAZARDS

EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS

How to shape future met-services: a seamless perspective

Port Cities Conference: How Regional Planning can Help Support a Competitive Port. Christina DeMarco Metro Vancouver

CoCoRaHS. Community Collaborative Rain, Hail, & Snow Network. Ashley Wolf Meteorologist NWS Green Bay Northeast Wisconsin CoCoRaHS Coordinator

Motion. Sep 8 10:22 AM. Unit One Kinematics (Part 1 Motion in a Straight Line, Part 2 Motion in Two Dimensions) (kinematics: the study of motion

INVESTOR GUIDE. A development by

NYY-J/-o 34 NYCWY 36 NYCY 37 NAYY 38

Multi Hazard Evaluation of a High Voltage Transmission Network. John Eidinger 1 and Leon Kempner 2

1 INTRODUCTION AND MAJOR FINDINGS... 1

Into Avista s Electricity Forecasts. Presented by Randy Barcus Avista Chief Economist Itron s Energy Forecaster s Group Meeting

f<~~ ~ Gulf Power April16, 2018

National Wetlands Inventory Update for New England 2009

Winter Ready DC District of Columbia Public Service Commission

Wesley Chapel Area Roadway Needs Study Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 1

This Powerpoint presentation summarizes the use of NetMap for a Fire Decision Support System. Created on Sept 25, 2015 by Dr. Lee Benda and Kevin

[Leveraging & Improving Neighborhood Connections] Area E Cedar Creek

Director, Operations Services, Met-Ed

Power Engineering II. Fundamental terms and definitions

FINAL AESTHETICS RESOURCES STUDY PLAN. Takatz Lake Hydroelectric Project, FERC No Prepared by: City and Borough of Sitka Electric Department

Natural hazards in Glenorchy Summary Report May 2010

Applications Using SuperPower 2G HTS Conductor

Mitsuhiko Kawakami and Zhenjiang Shen Department of Civil Engineering Faculty of Engineering Kanazawa University Japan ABSTRACT

APPENDIX I - AREA PLANS

Transmission Planning: Cluster Analysis

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017

2018 FORECAST ACCURACY BENCHMARKING SURVEY AND ENERGY TRENDS. Mark Quan

Alectra Utilities List of Station Capacity

Learning Objectives: I can identify and interpret river flows and directions.

City of Roswell, GA GIS VIEWER USER GUIDE

Creating Basemaps to Manage Buildings and Facilities

Mapping on the Edge: shoreline mapping for regulation and voluntary stewardship

Analysis of catastrophic floods affecting Croatia in May 2014 Meteorological and Hydrological Service Zagreb, Croatia

Subject Area: Geography

REQUEST FOR PROPOSALS CLOSING DATE:

The Blacktown Fishing Bat

RPUPlugged In. at the end of April. Larry Koshire retiring. Thanks for your dedication and service to the city of Rochester!

Protocols for cyclones and Heavy rain/torrential rain. A. Cyclones. A.1 Preliminary preparations under normal (no cyclone) conditions

Pesticide Use Data in Water Quality Modeling

South Bay Coastal Ocean Observing System California Clean Beaches Initiative

Flood and emergency preparedness CARNATION DUVALL CITIZEN CORPS DUVALL KING COUNTY FIRE DISTRICT 45 SEPTEMBER 11, 2018

Regional Snapshot Series: Transportation and Transit. Commuting and Places of Work in the Fraser Valley Regional District

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Topographic Strategy National Topographic Office March 2015

Restoring the Napa River:

STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

Transcription:

WELCOME BIG BEND SUBSTATION OPEN HOUSE 11 A.M. 2 P.M.

WELCOME! Take a look at the storyboards and maps to learn more about the future Big Bend Substation Why it is needed How its design and landscaping will fit into the Glenlyon Business Park Project team members are here to answer your questions, so please have a chat with us.

WHAT IS A SUBSTATION? Substations link BC Hydro s transmission and distribution systems. Generation: Generation: Electricity is is generated byby Electricity generated BCBC Hydro and independent Hydro and independent power producers power producers Transmission: Transmission: Electricity Electricityisismoved movedfrom from where whereititisisproduced producedto to where whereititisisused used Substations: Substations: Voltage is is reduced reducedat at substations Voltage to provide power suitable for use substations to provide in homes and businesses power suitable for use in homes and businesses Distribution: Distribution: Lowvoltage voltageelectricity electricityisis Low providedtotoneighbourhoods neighbourhoods provided andbusinesses businesses and

Byrne Rd Edmonds St 10 Ave 8 Ave 6 Ave Marine Dr Marine Dr ELECTRICAL TRANSMISSION SYSTEM IN SOUTH BURNABY McMillan Bloedel Substation (Private) Imperial Street Rumble St Big Bend Substation Crown Paper Substation (Private) Queensborough Connector E 49th Ave Newell Substation Tree Island Substation (Private) Ewen Ave FUTURE BIG BEND SUBSTATION SUBSTATIONS 230 KV TRANSMISSION LINE 69 KV TRANSMISSION LINE 0 0.5 1 km Big Bend Area Boyd St Glenlyon Pkwy River Rd Gilley Ave Royal Oak Ave Nelson Ave Patterson Ave Tyne St Boundary Rd Kerr St No 7 Rd N Fraser Way Marine Way Riverway Golf Course Griffiths Dr Canada Way 20 St Southridge Dr Kingsway GDS11-365

WHY IS BIG BEND SUBSTATION NEEDED? Burnaby s Big Bend area is home to scores of small businesses and it s still growing. BC Hydro forecasts show that the demand for electricity in Big Bend will increase by more than 20 per cent over the next 10 years. The Big Bend area gets its electricity from Newell Substation (Kingsway and Griffiths). But soon, Newell will no longer be able to meet load growth in Big Bend. The new Big Bend Substation will ensure continued, reliable power to this important business area.

SITE ««Image provided by Google Earth Pro Blue arrow points to the existing transmission lines Green arrow points to the future site of Big Bend Substation

THE RIGHT LOCATION IS KEY BC Hydro has purchased 8.5 acres off North Fraser Way, just south of Riverway Golf Course. We will use about 2.3 acres to build Big Bend Substation. If we need to expand Big Bend Substation someday, there will be enough property to do this, and to provide room for viewscape screening. The location is ideal because it s: In the heart of Big Bend, where load growth is taking place, and away from any residential development Located right by the 69 kv transmission lines that will feed it so no need to build additional transmission lines Located close to the distribution system that will carry electricity to Big Bend businesses Level, above the flood plain, and has been preloaded Already disturbed, so environmental impacts minimal

BUILDINGS CONTROL BUILDING The control building will house the substation s telecommunication system. This allows the substation to be operated remotely from the BC Hydro control centre in the Fraser Valley. FEEDER BUILDING The feeder building will house the equipment that distributes electricity from the substation to the underground distribution cables connected to customers.

SCHEDULE Currently completing project planning phase, including: Final technical substation design Architectural and landscape designs Construction start: Fall 2014 In-service date: Fall 2016

ENVIRONMENT The Big Bend Substation property is bordered by Byrne Creek to the east and Gray Creek to the north. Appropriate setbacks from these fish-bearing streams will be followed in siting the substation and during all construction activities. Further protection to the creeks will be provided by the environmental management and protection plans that will be followed during construction. Environmental monitors will ensure that workers abide by these plans. The substation will be equipped with state of the art containment to prevent any risk of fluid spills into the watershed.

THANK YOU FOR COMING! FOR MORE INFORMATION: bchydro.com/bigbendsub Lesley Wood Stakeholder Engagement, BC Hydro 604 623 4472 stakeholderengagement@bchydro.com