Herschel Space Observatory and The NASA Herschel Science Center at IPAC. April, u George Helou. u Implementing Portals to the Universe Report

Similar documents
Lessons Learned! from Past & Current ESA-NASA Collaborations

Announcement of Opportunity AKARI (ASTRO-F)

SOFIA Science Metrics Update

The Stratospheric Observatory for Infrared Astronomy (SOFIA)

Next Generation SOFIA Science Instrument Call for Proposals

Newsletter Newsletter Published on Division for Planetary Sciences ( Issue12-10, May 14th 2012

SOFIA Stratospheric Observatory For Infrared Astronomy

New Worlds, New Horizons in Astronomy and Astrophysics

Time Allocation at ESO

Tracking Accuracy: An Essential Step to Improve Your Forecasting Process

FIR/submm astronomy: science, observatories, and perspectives for lunar observatory

Data Management Plan Extended Baryon Oscillation Spectroscopic Survey

Hertz & the 2020 Decadal Survey: a PAG Panel Discussion!

The Herschel Mission

STScI at the AAS 231: January 2018, Washington, D.C.

Spitzer Space Telescope Current Status and Future Plans

NASA s Solar System Exploration Research Virtual Institute (SSERVI)

ALMA/ASTE/Mopra Report

The James Webb Space Telescope Overview

Service vs Visitor mode observing at ESO. Should I stay or should I go?

Opportunities with the James Webb Space Telescope

4.2 Herschel. Introduction. Scientific objectives

Table of Contents and Executive Summary Final Report, ReSTAR Committee Renewing Small Telescopes for Astronomical Research (ReSTAR)

SOFIA Science Highlights Cycle 4 Progress Cycle 5 Call for Proposals

ESASky, ESA s new open-science portal for ESA space astronomy missions

The Development of the Herschel Mission

The elements that make up our bodies formed from the violent explosions of massive

James Webb Space Telescope Cycle 1 Call for Proposals

A. Project Description

REPORT FROM THE WORKSHOP ON LABORATORY SPECTROSCOPY IN SUPPORT OF HERSCHEL, SOFIA, AND ALMA

Newsletter Newsletter Published on Division for Planetary Sciences ( Issue 16-31, August 24, 2016

Princeton Astrophysics Community Meeting

Four Basic Steps for Creating an Effective Demand Forecasting Process

The European Southern Observatory - the Irish Perspective. Paul Callanan, on behalf of the Irish astronomical community

Stefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017

Herschel Overview Status

Credit: ESO/B. Tafreshi (twanight.org) Operating the Very Large Telescope

Welcome and Introduction

Department of Astrophysical Sciences Peyton Hall Princeton, New Jersey Telephone: (609)

Instrumentation and Remote Sensing

Science Operations with the Square Kilometre Array

Gender Systematics in Telescope Time Allocation at ESO. F. Patat, The Messenger, September 2016, No. 165, p. 2

The next-generation Infrared astronomy mission SPICA (1)Oxford presentation (2)Status and Schedule (3)Operation and Observation Program

The next-generation Infrared astronomy mission SPICA Space Infrared Telescope for Cosmology & Astrophysics

James Webb Space Telescope Early Release Science

The SPICA infrared space observatory project status

PlanetQuest The Planet-Wide Observatory

Rick Ebert & Joseph Mazzarella For the NED Team. Big Data Task Force NASA, Ames Research Center 2016 September 28-30

LOFAR OBSERVING: INTERACTION USER RADIO OBSERVATORY. R. F. Pizzo

Working Group on Geospatial Information

A REVIEW OF RADIO ASTRONOMY IN THE USA I. INTRODUCTION

Ardusat Space Program

Decadal Survey: Summary of the ExoPAG s Response to Paul Hertz s Charge Regarding Large Missions"

ASI - Italian Space Agency The Space Science Data Center is a Research Infrastructure of the Italian Space Agency

Planning for the 2020 Decadal Survey An Astrophysics Division White Paper

Spatial Data Availability Energizes Florida s Citizens

UN COPUOS 52 nd session of the Scientific and Technical Subcommittee. COPERNICUS - an European Achievement. S. Jutz Head, ESA Copernicus Space Office

Himawari-8 BUFR Development for Winds Processing and Radiances Cloud Mask, Cloud Phase, Cloud Height

Applying for Time at the Very Large Telescope Interferometer (VLTI) Christian Hummel (ESO, User Support Department)

MATISSE. Multi-purpose Advanced Tool for Instruments for the Solar System Exploration. Angelo Zinzi 1,2, Maria Teresa Capria 3,1, Angelo Antonelli 1,2

Non Member State Summer Student Program at ISOLDE

Climate and Cryosphere Contributions for the Year of Polar Prediction (YOPP)

The Vaisala AUTOSONDE AS41 OPERATIONAL EFFICIENCY AND RELIABILITY TO A TOTALLY NEW LEVEL.

SP-1291 June Mars Express. The Scientific Investigations

SPIRE/PACS Parallel Mode

*** IAU Division D Bulletin N. 2: July 1st, 2014 ***

The Promise of Herschel

SpyMeSat Mobile App. Imaging Satellite Awareness & Access

Euro-VO. F. Genova, Interoperability meeting, 9 November 2009

REPORT ON INVESTMENTS

A review of (sub)mm band science and instruments in the ALMA era

The JWST mission: status and overview

MeteoGroup FleetGuard. The world s most comprehensive SaaS fleet management system

Continental Divide National Scenic Trail GIS Program

the IRIS Consortium Collaborative, Multi-user Facilities for Research and Education Briefing NSF Business Systems Review September 9, 2008

NIRSpec Multi-Object Spectroscopy of Distant Galaxies

Novice s Guide to Using the LBA

Czech ARC Node Bartosz Dąbrowski. ALMA Regional Centre, Czech Republic

Spitzer Warm Mission Workshop Introduction

Europe to the Moon. BHF 10 Feb 2005 SPC

Access to massive catalogues in the Gaia archive: a new paradigm

DEPARTMENT OF PHYSICS AND ASTRONOMY. BSc/MSci Programme Structures (Full-time Undergraduate Degrees)

Proposal for a US strategy towards physics & detectors at future lepton colliders

CIMA Dates and Prices Online Classroom Live September August 2016

Light and Optics. Light and Optics. Author: Sarah Roberts

EU collaborations with NASA LCLUC Program & Current Priorities

APPLICATIONS FOR PHYSICAL SCIENCE

Herschel Mission Overview and Key Programmes

Skyalert: Real-time Astronomy for You and Your Robots

Astrophysics Advisory Committee

UNESCO Thematic Initiative. Astronomy and World Heritage

Himawari-8 BUFR Development for Winds Processing and Radiances - Packaging for Algorithm Integration Team (AIT)

arxiv:astro-ph/ v1 28 Jun 2002

Quantum Information Science

Stellar Astronomy 1401 Spring 2009

an NSF Facility Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

The Precursor Services of ESA s Space Situational Awareness NEO programme (SSA-NEO)

Land Board, NW Services and SDI Tambet Tiits, FRICS

Presentation of the Cooperation Project goals. Nicola Ferrè

WordPress and CRM. Match Made In Heaven... or Hell?

Transcription:

Herschel Space Observatory and The NASA Herschel Science Center at IPAC u George Helou u Implementing Portals to the Universe Report April, 2012 Implementing Portals to the Universe, April 2012 Herschel/NHSC 1

[OIII] 88 µm z = 3.04 Herschel: Cornerstone FIR/Submm Observatory u u Three instruments: imaging at {70, 100, 160}, {250, 350 and 500} µm; spectroscopy: grating [55-210]µm, FTS [194-672]µm, Heterodyne [157-625]µm; bolometers, Ge photoconductors, SIS mixers; 3.5m primary at ambient T ESA mission with significant NASA contributions, May 2009 February 2013 [+/-months] cold Implementing Portals to the Universe, April 2012 Herschel/NHSC 2

Herschel Mission Parameters u Userbase v International; most investigator teams are international u Program Model v Observatory with Guaranteed Time and competed Open Time v ESA Corner Stone Mission (>$1B) with significant NASA contributions v NASA Herschel Science Center (NHSC) supports US community u Proposals/cycle (2 Regular Open Time cycles) v Submissions run 500 to 600 total, with >200 with US-based PI (~x3.5 oversubscription) u Users/cycle v US-based co-investigators >500/cycle on >100 proposals u Funding Model v NASA funds US data analysis based on ESA time allocation u Default Proprietary Data Period v 6 months now, 1 year at start of mission Implementing Portals to the Universe, April 2012 Herschel/NHSC 3

Best Practices: International Collaboration u Approach to projects led elsewhere needs to be designed carefully v NHSC Charter remains firstly to support US community v But ultimately success of THE mission helps everyone v Need to express dual allegiance well and early to lead/other centers u NHSC became integral part of the larger team, worked for Herschel success, though focused on US community participation v Working closely with US community reveals needs and gaps for all users v Anything developed by NHSC is available to all users of Herschel v Trust follows from good teaming: E.g. NHSC scientists contributed half the technical reviews of proposals u Mantra of learn by helping was seen by all as win-win v NHSC helps with tasks that generate insight into instruments, software, workings of system; NHSC staff spent time with Instrument Teams and ESA Science Center as members of the team v That insight proved essential to effective user support Implementing Portals to the Universe, April 2012 Herschel/NHSC 4

Best Practices: User Support Targeting u User Support has different emphases at different mission phases u Need to target messages, medium, mode of support to each phase v Start early to make sure potential users understand how to use it v Provide same tools for the whole spectrum of users, GTO - GO Archival v Talk to non-gto early: they will have different takes and needs v Aim support at non-specialists: the whole community is potentially interested, if properly engaged, and will enrich the science u Herschel payoff was high access for US community (48.5% of time) v NHSC User Support model was ahead of EU effort, especially pre- Launch, because more resources were available for it v NHSC worked with HSC to deploy model in EU, e.g. Data Analysis Workshops u User surveys using mail-in questionnaires, informal data gathering Implementing Portals to the Universe, April 2012 Herschel/NHSC 5

Best Practices: User Support Evolution u Example #1: As US-based Herschel users grew in number, the model of hosting teams to support their data analysis became unworkable v Success rate of US PI and co-i teams was 2-3x anticipated rates for Key Projects, OT1, OT2 u NHSC response: v Organize hands-on data reduction workshops, 20-40 participants each v Take those sessions onto the web with webinar technology v Schedule remote help sessions, and provide self-paced web-tutorials u Example #2: Hardware requirements for reducing large data sets exceeded by far anticipated sizing, to well beyond what most investigator teams could afford to buy u NHSC Response: v Set up dedicated well-sized hardware to be reserved & used remotely v A virtual machine (private, secure, tailored environment) is deployed for each team for days to weeks, then destroyed Implementing Portals to the Universe, April 2012 Herschel/NHSC 6

Best Practices: Build on Other Missions u From Spitzer: v Observation Planning Tool Spot became H-Spot (now also SOFIA-Spot) v Team structure within NHSC: Combined scientists + engineers v User interactions: Start Panel early, diversify it, listen hard in other forums! v Data Analysis Funding scheme and policies: RSA, formulas, priority levels for uncertain cryo-mission duration u ISO v Collaboration model: learn by helping v Resident US Astronomer at Herschel Science Center v Background estimator, other tools adapted for Spitzer, then for Herschel u IPAC environment, team member progression to new projects help v New missions still need to work hard at not re-inventing the wheel Implementing Portals to the Universe, April 2012 Herschel/NHSC 7

From Portals to the Universe: The NASA Astronomy Science Centers (NRC Report, 2007) Successful research using archival data sets is dependent on the resident expertise and corporate memory that resides at the science centers.