Roundabout Construction. SP LA 8 / US 171 Roundabout Leesville, LA Vernon Parish

Similar documents
Katrina. Katrina... 2/27/2009 4

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road

Roundabout Level of Service

Critchfield Rd / SR-129

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

Annual Collision Report

Neighborhood Locations and Amenities

Parking Analysis. Introduction. School Information. Parking Analysis. September 26, To:

Construction complete on all HSDRRS projects across storm evacuation routes

TAKE ROLL CALL TO DETERMINE IF THERE IS A QUORUM OF MEMBERS PRESENT

West Tennessee Construction June 14-21, 2017

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance

Linear Referencing Systems (LRS) Support for Municipal Asset Management Systems

City of Laramie, Wyoming SNOW AND ICE POLICY

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

A Study of Red Light Cameras in Kansas City, MO

GEOGRAPHIC INFORMATION SYSTEMS

Coefficient of Thermal Expansion of Concrete Pavements

RECORD OF MEETING. Region Five Development Commission

General Decision Number: FL /20/2013 FL286. State: Florida. Construction Type: Highway. County: Pinellas County in Florida.

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Monitoring Survey in the Vicinity of St. Marys Cement: Interim Report

Organized Chain-Up and VSL

National Rural ITS Conference 2006

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report

The Use of Expanded Shale, Clay and Slate Lightweight Aggregates in Granular Geotechnical Fills

RESOLUTION NO INTRODUCTION

HSIP FUNDING APPLICATION

CVS Derwood. Local Area Transportation Review

2267 N o r t h 1500 W C l i n t o n U T 84015

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

The Trade Area Analysis Model

Tsukuba, Japan International Institute of Seismology and Earthquake Engineering Building Research Institute STUDY TRIP TO ITAKO CITY

Counties: Pulaski and Radford* Counties in Virginia. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

DRY LAND APPROVED JURISDICTIONAL DETERMINATION FORM 1 U.S.

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution


For personal use only

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS

Significant Events: A Multi-Level Approach to Significant Event Response

I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT

Information for File MVP RMM

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

STAFF REPORT ACTION REQUIRED

Counties: Fairfax, Fairfax* and Falls Church* Counties in. *including the independent cities of Falls Church and Fairfax

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox

The Joplin Tornado: Lessons Learned from the NIST Investigation

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

Taft Stormwater Quest

Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director

New Mapping, Recent Events What do we know? June 9, 2011

Minimum Standards for Wetland Delineations

The Joplin Tornado: Lessons Learned from the NIST Investigation

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Monroe County: Key West and Lower Keys

Traffic Impact Study

Shenandoah University. (PowerPoint) LESSON PLAN *

Copyright 2017 Edmentum - All rights reserved.

Recognition Of Harpooning Danger Is A Very Long And Slow Learning Curve

CLEARING THE WAY CAUTION. brampton.ca/snow

GCSE LINKED PAIR PILOT 4361/02 APPLICATIONS OF MATHEMATICS UNIT 1: APPLICATIONS 1 HIGHER TIER

The Urbana Free Library Parking and Transportation Study

Perth County Road Fatal Head-on Collision - A Common and Dangerous Issue

Expanding the GSATS Model Area into

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

1. Departmental Presentation - Away Goes Trouble Down the Drain - Highway Division. 3. Continued Discussion an Ordinance for Disorderly Residences

SNOW AND ICE REMOVAL PROCEDURES

Effectiveness of Experimental Transverse- Bar Pavement Marking as Speed-Reduction Treatment on Freeway Curves

LOGISTICS CLUSTER SOUTH SUDAN ASSESSMENT

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Revised Test Plan for Seasonal Monitoring Program using HWD Testing

Any student who registers as a new attendee of Teaneck High School after August 15 th will have an extra week to complete the summer assignment.

Traffic and Road Monitoring and Management System for Smart City Environment

Good Spirit School Division Parents/Guardians

Construction Exits Vibration grids

7. New Business 7.1 New items that the Committee or District Staff would like to discuss.

State Highway Log. Planning Report Olympic Region. Washington State Department of Transportation. Strategic Planning Division

Coarse Sediment Traps

Vol. II-F: Paleontological Identification Report (PIR)/ Paleontological Evaluation Report (PER)

METRO Blue Line LRT Extension (BLRT) 5514 West Broadway Avenue, Suite 200, Crystal, MN

Wilson Area School District Planned Course Guide

225 Bush Street Suite 1700 San Francisco, CA phone fax

How GIS Can Help With Tribal Safety Planning

Quiz 1. Department of Mathematical Sciences Instructor: Markus Schmidmeier Calculus II August 26, 2016

FDOT Level 2 Roundabout b/c Evaluation

STATISTICAL ANALYSIS OF LAW ENFORCEMENT SURVEILLANCE IMPACT ON SAMPLE CONSTRUCTION ZONES IN MISSISSIPPI (Part 1: DESCRIPTIVE)

6 th Line Municipal Class Environmental Assessment

Rock & Aggregate Drop Inlet Protection

APPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1)

What is 511? Need for 511 Services. Development & Deployment of Regional Road and Weather Information Supporting 511 Traveler Services

Transcription:

Roundabout Construction SP 373-01-0020 LA 8 / US 171 Roundabout Leesville, LA Vernon Parish

What this presentation covers Recognition for District 08 Design and Traffic Sections Difference between a circle and a roundabout Why did DOTD elect to construct the Roundabout? Public Meeting and Public Perceptions Barrier Curb and Gutter Modifications Challenges for Sequences of Construction Time Constraints General Public Comments and End Results

Recognition for District 08 Design and Traffic Sections Dale Craig District 08 Traffic Section Recommended roundabout design and spearheaded the project to the design phase Jason Rachal District 08 Design Section The overall success for this project is greatly attributed to the project plans developed by Jason Rachal David Backstedt - District 08 Traffic Engineer David meet with me on the project site on numerous occasions in order to monitor the traffic flow after each construction sequence change.

Circle or Roundabout? Circle Area = π r 2 Roundabout

Why did DOTD elect to construct the Roundabout? Proposed Market Basket location Permit request for access to a proposed Market Basket grocery store Traffic Study and Evaluation Buy-in from DOTD, Market Basket and City of Leesville

Public Meeting and Public Perceptions

Public Meeting and Public Perceptions

Public Meeting Public Perceptions

Barrier Curb and Gutter Modifications Installed continuous steel reinforcement in the barrier curb section Class M Concrete Mix Design Modifications Recommend not using Grade A (Size 57) coarse aggregate (100% passing the 1 ½ US Sieve) Recommend changing mix design to max size Grade P (Size 67) coarse aggregate (100% passing the ¾ US Sieve)

Barrier Curb and Gutter Modifications Installed Bolster Blocks behind sharp angled corners of curb section

Time Constraints Project Letting Date: July 21, 2010 Work Order Date: September 24, 2010 Roundabout Opening Date: August 1, 2011 Market Basket Grand Opening Date: August 4, 2011 Governor s Ribbon Cutting Date: August 5, 2011

Sequence of Construction - Phase I

Sequence of Construction - Phase I Traffic congestion along US 171 South Bound Lane Temporary Traffic Signals installed at intersection of LA 8 and US 171 Temporary Traffic Signals

Sequence of Construction - Phase I

Sequence of Construction - Phase I

Sequence of Construction - Phase I

Sequence of Construction - Phase I

Sequence of Construction - Phase I

Sequence of Construction - Phase I

Sequence of Construction - Phase I

Sequence of Construction - Phase I

Sequence of Construction - Phase I Temporary Traffic Signals installed at intersection of LA 8 and US 171

Sequence of Construction - Phase II

Sequence of Construction - Phase II

Sequence of Construction - Phase II

Sequence of Construction - Phase II

Sequence of Construction - Phase III

Sequence of Construction - Phase III

Sequence of Construction - Phase III Removed temporary traffic signals Staged flagmen at each access point into the roundabout Utilized dynamic message signs cautioning traveling public that roundabout is open and there is a yield condition ahead Installed do not enter signs on temporary stands at each connection point to the roundabout

Sequence of Construction - Phase III

General Public Comments and End Results All of the Politicians and most of the general public have very favorable comments in regards to the functionality of the Roundabout From 2007 to 2010 there was an average of 10 injuries per year with only 1 fatality during that time period. Since 2010 there has only been one injury, which occurred in January 2013.

End Results

Size Comparison between the Alexandria South Traffic Circle and the Leesville Roundabout

Photo of the intersection of LA 8 and US 171, prior to construction Proposed Market Basket location

Completed Roundabout Aerial Photo of the intersection of LA 8 and US 171 Photo taken by SURDEX Corporation

Questions?