Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 2010 to 2050

Similar documents
Study Overview. the nassau hub study. The Nassau Hub

GIS Analysis of Crenshaw/LAX Line

Regional Transit Development Plan Strategic Corridors Analysis. Employment Access and Commuting Patterns Analysis. (Draft)

III. FORECASTED GROWTH

California Urban Infill Trip Generation Study. Jim Daisa, P.E.

River North Multi-Modal Transit Analysis

2040 MTP and CTP Socioeconomic Data

East Bay BRT. Planning for Bus Rapid Transit

Guidelines on Using California Land Use/Transportation Planning Tools

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

Alternatives Analysis

The 3V Approach. Transforming the Urban Space through Transit Oriented Development. Gerald Ollivier Transport Cluster Leader World Bank Hub Singapore

Foreword. Vision and Strategy

HORIZON 2030: Land Use & Transportation November 2005

Frequently Asked Questions

Technical Memorandum #2 Future Conditions

Kitsap County 2016 Comprehensive Plan Update. Appendix A: Growth Estimates

APPENDIX I: Traffic Forecasting Model and Assumptions

BROOKINGS May

Metro SafeTrack Impact on Individual Travel Behavior & Regional Traffic Conditions. 1. Introduction. 2. Focus of this Volume & Issue

Trip Generation Model Development for Albany

ACCESSIBILITY OF INTERMODAL CENTERS STUDY

Regional Performance Measures

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT

Regional Performance Measures

Land Use Advisory Committee. Updating the Transit Market Areas

CHAPTER 2. Strategic Context

Urban White Paper on Tokyo Metropolis 2002

Figure 8.2a Variation of suburban character, transit access and pedestrian accessibility by TAZ label in the study area

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Lee County, Alabama 2015 Forecast Report Population, Housing and Commercial Demand

Volume Title: Empirical Models of Urban Land Use: Suggestions on Research Objectives and Organization. Volume URL:

Transportation Statistical Data Development Report OKALOOSA-WALTON OUTLOOK 2035 LONG RANGE TRANSPORTATION PLAN

Jobs-Housing Fit: Linking Housing Affordability and Local Wages

Simplified Trips-on-Project Software (STOPS): Strategies for Successful Application

Local Economic Activity Around Rapid Transit Stations

Forecasts from the Strategy Planning Model

Crow River Plaza - Retail Development South Diamond Lake Rd. Rogers, MN FOR LEASE 2,066 SF Retail Space. Lease Rate: $16.

King Fahd University of Petroleum & Minerals College of Engineering Sciences Civil Engineering Department. Geographical Information Systems(GIS)

THE LEGACY OF DUBLIN S HOUSING BOOM AND THE IMPACT ON COMMUTING

APPENDIX I - AREA PLANS

National Planning Framework Louth County Council Submission

Economic Geography of the Long Island Region

Expanding the GSATS Model Area into

Public Transit Accessibility vs. Employment: A Comparative Assessment of Counties/Cities in Northern Virginia

FOR SALE +/- 419 ACRES ¼ Mile South of Alliance Airport

Transit Market Index. Validating Local Potential for Transit Ridership

5.0 POPULATION, HOUSEHOLD AND EMPLOYMENT FORECASTS

A Comprehensive Method for Identifying Optimal Areas for Supermarket Development. TRF Policy Solutions April 28, 2011

Impressive Growth & Relaxed Elegance.

Analyzing the Market Share of Commuter Rail Stations using LEHD Data

Economic Activity Economic A ctivity

Growth Management: Analysis of Comments Received and Responses Comments received as of October 16, 2017

Crow River Plaza - Retail Development South Diamond Lake Rd. Rogers, MN FOR LEASE 1,024 SF Retail Space. Lease Rate: $16.

Population and Employment Forecast

Changes in the Spatial Distribution of Mobile Source Emissions due to the Interactions between Land-use and Regional Transportation Systems

Land Use Modeling at ABAG. Mike Reilly October 3, 2011

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

Regional Growth Strategy Regional TOD Advisory Committee

Appendix: Development Patterns and Design

TRAVEL DEMAND MODEL. Chapter 6

Lee County, Florida 2015 Forecast Report Population, Housing and Commercial Demand

Employment Capacity in Transit Station Areas in Maryland

The effects of impact fees on urban form and congestion in Florida

Mapping Accessibility Over Time

King City URA 6D Concept Plan

Note on Transportation and Urban Spatial Structure

Developing the Transit Demand Index (TDI) Gregory Newmark, Regional Transportation Authority Transport Chicago Presentation July 25, 2012

Date: June 19, 2013 Meeting Date: July 5, Consideration of the City of Vancouver s Regional Context Statement

Density and Walkable Communities

for sale HOLLYWOOD HILLS CENTURY CITY BEVERLY HILLS WEST HOLLYWOOD MELROSE AVE ROMAINE ST 843 NORTH LA BREA AVE WARING AVE WILLOUGHBY AVE

Hillsborough County MPO Transit Study. Technical Team August 23, 2007

Measuring connectivity in London

Neighborhood Locations and Amenities

Monmouth County Adam Nassr (Partner: Brian Berkowitz, Ocean County)

Traffic Impact Study

Employment Decentralization and Commuting in U.S. Metropolitan Areas. Symposium on the Work of Leon Moses

The Role of Transitways in Our Region s Economic Competitiveness. The 23rd CTS Annual Research Conference St. Paul, MN May 23, 2012

I-1. The slope of the bid-price function, P{u}, is - t / H. Use Equation (35) to derive general

VALIDATING THE RELATIONSHIP BETWEEN URBAN FORM AND TRAVEL BEHAVIOR WITH VEHICLE MILES TRAVELLED. A Thesis RAJANESH KAKUMANI

The paper is based on commuting flows between rural and urban areas. Why is this of

MODULE 1 INTRODUCING THE TOWNSHIP RENEWAL CHALLENGE

Social Studies Grade 2 - Building a Society

Population Profiles

Transit Service Gap Technical Documentation

São Paulo Metropolis and Macrometropolis - territories and dynamics of a recent urban transition

Towards a Co-ordinated Planning of Infrastructure and Urbanization

The Attractive Side of Corpus Christi: A Study of the City s Downtown Economic Growth

Data driven approaches to Urban Planning Experience from Derry/Londonderry

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

Port Cities Conference: How Regional Planning can Help Support a Competitive Port. Christina DeMarco Metro Vancouver

Traffic Demand Forecast

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Prepared for: San Diego Association Of Governments 401 B Street, Suite 800 San Diego, California 92101

Policy Note 6. Measuring Unemployment by Location and Transport: StepSA s Access Envelope Technologies

Managing Growth: Integrating Land Use & Transportation Planning

Typical information required from the data collection can be grouped into four categories, enumerated as below.

Leveraging Urban Mobility Strategies to Improve Accessibility and Productivity of Cities

The Governance of Land Use

Long Term Plan What is planned for Murchison?

Transcription:

George Mason University Center for Regional Analysis Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 21 to 25 Prepared for the Fairfax County Department of Planning and Zoning Lisa Sturtevant, PhD, Research Assistant Professor John McClain, AICP, Senior Fellow and Deputy Director 7/26/21

Introduction George Mason University s Center for Regional Analysis has developed forecasts for the Reston-Dulles Rail Corridor and the Route 28 Corridor as part of Fairfax County s work to update the Comprehensive Plan. The Center for Regional Analysis was established in 1992 with the principal mission of providing research and analytical services to local governments and businesses in the Washington region, focusing on economic, demographic, housing and fiscal trends and forecasts. The Center frequently conducts special studies and research for area governments, businesses and institutions. Objectives and Purpose of Forecasting Project This work was undertaken for Fairfax County as part of its process to update the County s Comprehensive Plan for the rail corridor from Wiehle Avenue to the Route 28/CIT station area and for the Route 28 corridor south of the rail corridor. The process to update the County s plan for these areas was undertaken to incorporate the extension of Metrorail through Tysons Corner out to Washington Dulles International Airport. The purpose of the forecasting project was to develop forecasts of development activity for 22, 23, 24 and 25 that represent likely market feasibility in the context of overall future development in the Washington metropolitan area, Northern Virginia, and Fairfax County. The forecasts are intended to provide reasonable market expectations of development, timesequenced to assist the County in developing a final comprehensive plan for development and for infrastructure requirements. Overview of Methodology and Assumptions Forecasts of population, households, jobs, residential development and non-residential (i.e. office, retail, hotel and other) development were generated for the two rail corridors and for the four Metro station areas that make up the Reston-Dulles corridor (Wiehle Avenue, Reston Parkway, Herndon-Monroe and Route 28/CIT.) These corridor and station area forecasts were developed through a combination top-down, bottom-up approach. The following describes the methodology and assumptions used in the forecasting process: 1. Develop household and job forecasts for the Washington metropolitan area and for Fairfax County to 25. The Center for Regional Analysis used NPA, Inc. econometric forecasts of households and jobs for the Washington metropolitan area and the region s counties for the period 21 23. The NPA, Inc., forecasts were extended GMU Center for Regional Analysis 1

to 25 and growth rates from these forecasts were applied to COG Round 7.1 household and job totals for 21 to develop 1-year forecasts out to 25 at the metropolitan and County levels. The growth rates implied by the NPA, Inc. forecasts were compared with other forecasts done by Global Insight to ensure they were reasonable. These County forecasts form the basis for the corridor and station area forecasts. 2. Develop household and job forecasts for the Reston-Dulles rail corridor and the Route 28 corridor. Over the next 4 years, the two corridors will capture some share of County household and job growth. It was assumed that the share of County development in these two corridors would increase over time. These assumptions were based on an assessment of the relative attractiveness of the two corridors and the timing of the completion of the Metrorail project. Also considered was the planned growth in other employment and household centers in the County and in other parts of the metropolitan area that would compete with these corridors for future growth. 3. Generate population forecasts and office, retail, hotel and other job forecasts for the two corridors. Population forecasts were generated based on assumptions about trends in average household sizes for the County and the two corridors over the next 4 years. It was assumed that average household sizes in the two corridors would decline slightly over the forecast period. The vast majority of jobs in the two corridors are forecasted to be office jobs, as those are the types of jobs generally attracted to areas around Metro stations. Forecasts of other types of jobs were based on assumptions about the relationships among office, retail and hotel employment, as well as the existing job mix in the corridors. The overall mix of jobs forecasted for the two corridors was compared to the mixes in other regional activity centers, as well as to the employment mix implied by current County plans and COG forecasts. 4. Generate residential and non-residential (i.e. office, retail, hotel and other) development forecasts. Residential development in the two corridors was forecasted by assuming an average of 1,5 square feet of residential space per household. While multi-family residential projects will have somewhat smaller units sizes (e.g. between 1, to 1,2 square feet), these large buildings will also have common space that needs to be included in the residential square footage totals. In addition, there will be demand for townhouses within the corridor boundaries, and these townhouses will have somewhat larger unit sizes. GMU Center for Regional Analysis 2

Office development forecasts were based on 3 square feet of office space per office job, while retail development assumed 45 square feet per retail employee. Hotel space was forecasted based on roughly 75 square feet per hotel employee, with additional space for conference facilities. These assumptions are fairly standard in the Washington metropolitan area and most urban and suburban environments. 5. Given the corridor forecasts, generate forecasts for each Metro station area. Each of the four Metro station areas will experience development differently over the next 4 years. There will be a different mix of residential and non-residential development, and the timing of development will be different. Based on an analysis of the existing development in the four Metro station areas and the timing of the completion of Phases I and II of the Metrorail project, the corridor forecasts were divided up among the station areas. In the initial phases of preparing the forecasts, an even mix of residential and non-residential development was considered an ideal for some areas. However, given the current mix of development, the study area boundaries, and the market demand for housing and commercial space, a 5/5 split between residential and non-residential development did not come to fruition for any one station area in the final forecasts. The following highlights some of the assumptions used in generating forecasts for each station area: Wiehle Avenue: Given how the Wiehle Avenue Metro station area boundary is drawn, there is currently no residential development at Wiehle Avenue. (Obviously, there are homes near the proposed Wiehle Avenue Metro station but they do not fall within the boundary defined for this study.) Wiehle Avenue is part of Phase I of the Metrorail project and, as a result, will attract development sooner than will some other Metro station areas. Given its proximity to the office and retail hub of Tysons Corner and the regional demand for housing the Wiehle Avenue Metro station area will attract residential development first, followed by office and retail development. It is forecasted that development in the Wiehle Avenue Metro station area will be split rough 4/6 (residential/nonresidential) by 25. Reston Parkway: The Reston Parkway station will be completed as part of Phase II of the Metrorail extension. Reston is already a regional destination and will attract both residential and non-residential development. Given the regional demand for housing, residential development will occur somewhat sooner than non-residential development. It is anticipated that in the Reston Parkway Metro GMU Center for Regional Analysis 3

station area, development will be split about 4/6 (residential/non-residential) by 25. Herndon-Monroe: Herndon-Monroe will also attract residential and commercial development, but later than either Wiehle Avenue or Reston Parkway. Due to the location of the park and ride facility and the existing neighborhoods, the Herndon-Monroe station will attract more residential than non-residential development and will have a split of about 6/4 (residential/non-residential) development by 25. Route 28/CIT: Route 28/CIT is the westernmost station in Fairfax County along the new Metrorail line. Its location with good access to both the airport and the Route 28 corridor make it an attractive location for office and other commercial development. This station will attract development somewhat later than either Wiehle Avenue or Reston Parkway. In 25, it is anticipated that development will be split about 4/6 (residential/non-residential) in the Route 28/CIT Metro station area. 6. Develop High and Low forecasts. A range of forecasts for the two corridors was developed using a confidence interval approach, with Low and High forecasts for each 1-year period at 75% and 125% of the growth increment of the Intermediate forecasts. In addition, for the High forecast of households in the Reston-Dulles rail corridor, the 125% growth increment was adjusted to reflect even more residential growth potential, with the ratio of jobs to households reaching a level of 4.5 in 25. This High forecast of households for the Reston-Dulles corridor approaches the jobs-household ratio in the Rosslyn-Ballston rail corridor in Arlington County. Jobs-Housing Balance Contemporary master plans often have a goal of improving in the jobs-housing balance as a means of reducing travel demand and creating more livable communities. Public policy cannot dictate where individuals live and work; however, if there is a balance of housing and jobs in a growth center there will be a greater share of residents commuting to close-by jobs. The means to achieve a better jobs-housing balance are not exact science and public policies aimed at this objective have often had to address significant political challenges. Job-household ratios vary significantly depending on what geography is used. At the Washington metropolitan scale, there are approximately 1.6 workers (jobs) per household. Employment centers by their historical nature have fairly high job-household ratios, and there are efforts in many metropolitan areas to try to get more housing near or in these employment centers to reduce the amount of commuting, and, therefore, traffic congestion. There is no GMU Center for Regional Analysis 4

magic number since the true balance would not only match overall supply of housing with jobs, but would also match housing by price level to wage levels of the jobs. In 21, the Reston- Dulles rail corridor has a job-household ratio of 11.5 (i.e. there are currently 11.5 jobs for every one household in the corridor.) This ratio would decline to 5.6 under the intermediate forecasts. It is important to remember that these job-household ratios are highly dependent on the way the study area boundaries are defined. Because there is a significant quantity of housing just outside the study area boundary, the job-household ratio would be lower if the study boundary was expanded to include more of these residential neighborhoods. Forecasts for the Region and Fairfax County Population and job forecasts for the Washington metropolitan area, Northern Virginia and Fairfax County are shown in Figures 1 and 2, respectively. The metropolitan area is expected to grow from an estimated level of 5.4 million people in 21 to a forecast level of 8.3 million people in 25. Northern Virginia would grow from 2.4 million to 3.9 million, and Fairfax County s population would increase from 1.3 million to 1.56 million. The number of jobs is forecasted to increase from 3.3 million in 21 to 5.7 million in 25 for the metropolitan area, with Northern Virginia increasing from 1.4 million to 2.6 million jobs, and Fairfax County growing from 68, to 1,28, jobs by 25. Over the 4-year period of 197 to 21, Fairfax County has grown by 6, people and 53, jobs. It has transformed from a suburban residential county to a major urban county with significant job centers and increasing residential development in higher densities to accompany its job centers. We believe that for the next forty years that its job growth will exceed its population growth, and this is reflected in the forecasts for the County to 25. The growth for the past 4 years compared to the forecasts for the next 4 years are shown in Figure 3. GMU Center for Regional Analysis 5

Millionss 9 8 7 6 5 4 3 2 1 Figure 1 Population, 2-25 2 21 22 23 24 25 Millions 6 Figure 2 Jobs, 2-25 5 4 3 2 1 2 21 22 23 24 25 GMU Center for Regional Analysis 6

s 7 6 5 4 3 2 1 Figure 3 Fairfax County Growth 8 Years, 197-25 6 197 21 53 21 25 Population 57 197 21 Jobs 65 21 25 21 to 25 Forecasts for Reston-Dulles Rail Corridor and Route 28 Corridor Reston-Dulles Corridor Reston is already a major center for population and jobs within the region and with the extension of Metrorail to Dulles Airport and the construction of four stations, the Reston- Dulles rail corridor will be an even larger growth complex for the next few decades. The presence and growth of Tysons Corner to the East, the continuing expansion and growth of air travel service at Dulles, the identity of Reston as a center all combine with the extension of rail to create the potential for one of the most dynamic growth corridors in America. In 21, there are approximately 97,6 jobs and 8,5 households in the Reston- Dulles corridor. By 23, the planning horizon for the County s two on-going corridor studies, the Reston-Dulles Corridor is forecasted to have 137, jobs and 18,2 GMU Center for Regional Analysis 7

households. These forecasts translate into 27.3 million square feet of residential development and 46.2 million square feet of non-residential development by 23. By 25, the end of the forecast period for this study, it is forecasted that the corridor will have over 183,2 jobs and 32,7 households. These job and population forecasts translate into 5.6 million square feet of residential development and 67. million square feet of non-residential development in the Reston-Dulles Corridor by 25. About two-thirds of the non-residential development (47.2 million square feet) is forecasted to be office development. With the exception of some future institutional/government/other space in the Reston Parkway and Wiehle Avenue station areas, the remainder of the non-residential development is retail and hotel space. Retail along the corridor will serve both office workers and residents. However, the amount of retail space was forecasted based on standard relationships between office and retail jobs in employment centers. Hotel space was also forecasted in relation to the amount of office space, as well as with consideration of the need for additional hotel/conference space near Dulles Airport. Route 28 Corridor In 21, the Route 28 corridor contains about 79,8 jobs and 4,4 households. In 23, the Route 28 corridor will have about 11,7 jobs and 5,4 households. As a result, these forecasts suggest there will be about 8.1 million square feet of residential development and 41.2 million square feet of non-residential development in the Route 28 Corridor by 23. By 25, there will be approximately 15,1 jobs and 6,4 households in the Route 28 corridor. These forecasts translate into 9.6 million square feet of residential development and 55.6 million square feet of non-residential development, including 38. million square feet of office space. The remainder of the non-residential space includes some institutional/government/other space, but is mostly comprised by retail and hotel space. The forecasted retail development would largely serve future office workers in the corridor. Given the forecasted employment growth and the proximity to Dulles Airport, the demand for hotel space in the later years of the forecast period was expected to be fairly substantial. Detailed forecasts for the Reston-Dulles Rail Corridor, the four Metro station areas, and the Route 28 Corridor are provided in the Appendix and an overview of the forecasts for each major forecast item are shown in the figures below. GMU Center for Regional Analysis 8

s 5 45 4 35 3 25 2 15 1 5 Figure 4 Reston-Dulles Rail Corridor Households Forecast Range, 21-25 21 22 23 24 25 45.5 32.7 26.7 s 25 Figure 5 Reston-Dulles Rail Corridor Employment Forecast Range, 21-25 2 15 24.7 183.2 161.8 1 5 21 22 23 24 25 GMU Center for Regional Analysis 9

s (s) 6 5 Figure 6 Reston-Dulles Rail Corridor Household Forecasts 45.5 4 3 2 26.7 32.7 21 25 1 8.5 8.5 8.5 Low Intermediate High s 25 Figure 7 Reston-Dulles Rail Corridor Employment Forecasts 2 15 161.8 183.2 24.7 1 97.6 97.6 97.6 21 25 5 Low Intermediate High GMU Center for Regional Analysis 1

s Figure 8 Reston-Dulles Rail Corridor 21-25 Growth 12 17.1 1 8 6 4 2 18.2 64.2 24.2 85.6 37. Households Jobs Low Intermediate High GMU Center for Regional Analysis 11

s 14 Figure 9 Wiehle Avenue Metro Station Area Households Forecast Range, 21-25 12 11.5 1 8 6 8.1 6.8 4 2 21 22 23 24 25 Figure 1 Wiehle Avenue Metro Station Area Employment Forecast Range, 21-25 s 6 5 4 56.3 5.4 44.5 3 2 1 21 22 23 24 25 GMU Center for Regional Analysis 12

Figure 11 Reston Parkway Metro Station Area Households Forecast Range, 21-25 s 16 14 14.5 12 1 8 1.1 8.5 6 4 2 21 22 23 24 25 Figure 12 Reston Parkway Metro Station Area Employment Forecast Range, 21-25 s 8 7 6 5 73.4 65.7 58. 4 3 2 1 21 22 23 24 25 GMU Center for Regional Analysis 13

s 9 8 7 6 5 4 3 2 1 Figure 13 Herndon-Monroe Metro Station Area Households Forecast Range, 21-25 21 22 23 24 25 8.4 5.9 5. s 25 Figure 14 Herndon-Monroe Metro Station Area Employment Forecast Range, 21-25 2 15 2.5 18.3 16.2 1 5 21 22 23 24 25 GMU Center for Regional Analysis 14

Figure 15 Route 28/CIT Metro Station Area Households Forecast Range, 21-25 s 14 12 1 8 6 12.4 8.7 7.3 4 2 21 22 23 24 25 Figure 16 Route 28/CIT Metro Station Area Employment Forecast Range, 21-25 s 6 5 4 54.5 48.8 43.1 3 2 1 21 22 23 24 25 GMU Center for Regional Analysis 15

s 8 7 6 5 4 3 2 1 Figure 17 Route 28 Corridor Households Forecast Range, 21-25 21 22 23 24 25 6.9 6.4 5.9 s 18 16 14 12 1 Figure 18 Route 28 Corridor Employment Forecast Range, 21-25 8 6 4 2 21 22 23 24 25 167.7 15.1 132.5 GMU Center for Regional Analysis 16

1% 9% 8% 7% 6% 5% 4% 3% 2% 1% % Figure 19 Station Area Share of Jobs 21-23-25 2.8 21.5 11.1 1.7 41.1 39.7 26.6 1. 35.9 27. 28. 27.5 21 23 25 Rt 28 / CIT Herndon-Monroe Reston Wiehle Figure 2 Station Area Share of Households 21-23-25 1% 9% 8% 7% 6% 5% 4% 3% 2% 1% % 27.5 26.5 38.8 18. 24.2 3.6 3.8 29.1 3.6 24.7 19.2 21 23 25 Rt 28 / CIT Herndon-Monroe Reston Wiehle GMU Center for Regional Analysis 17

% 18 16 14 12 1 8 6 4 2 NA 11. Figure 21 Ratio of Jobs to Households Intermediate Forecasts 21-23-25 15.4 1.3 6.2 6.5 4.2 3.3 3.1 11.5 7.5 6.2 5.9 5.6 5.6 21 23 25 GMU Center for Regional Analysis 18

Appendix

FORECASTS OF POPULATION, HOUSEHOLDS, JOBS AND DEVELOPMENT: 21-25 RESTON-DULLES METRORAIL CORRIDOR 21 22 23 24 25 Population Low 18,7 25, 34, 44,9 56,1 Intermediate 18,7 27, 39,1 53,9 68,7 High 18,7 32,2 5,1 73,1 95,6 Jobs Low 97,6 11,4 127,3 145,5 161,8 Intermediate 97,6 114,4 137, 161,4 183,2 High 97,6 118,9 147, 177,4 24,7 Households Low 8,5 11,4 15,8 21,4 26,7 Intermediate 8,5 12,3 18,2 25,7 32,7 High 8,5 14,7 23,3 34,8 45,5 Residential Development (SF) Low 12,759, 17,1, 23,7, 32,1, 4,5, Intermediate 12,759, 18,467, 27,38, 38,498, 5,55, High 12,759, 22,5, 34,95, 52,2, 68,25, Non-Residential Development (SF) Low 31,558, 35,76, 42,985, 5,289, 59,192, Intermediate 31,558, 37,57, 46,27, 55,814, 67,36, High 31,558, 38,447, 49,574, 61,396, 74,879, Office Development (SF) Low 25,879, 28,839, 33,265, 37,289, 41,64, Intermediate 25,879, 29,885, 35,87, 41,387, 47,157, High 25,879, 31,5, 38,364, 45,525, 52,675, Retail Development (SF) Low 1,275, 1,535, 2,122, 2,86, 3,776, Intermediate 1,275, 1,59, 2,284, 3,114, 4,276, High 1,275, 1,65, 2,447, 3,425, 4,777, Other Non-Residential Development (SF) Low 4,44, 5,387, 7,598, 1,193, 13,776, Intermediate 4,44, 5,583, 8,179, 11,313, 15,62, High 4,44, 5,791, 8,763, 12,445, 17,428, Source: GMU Center for Regional Analysis GMU Center for Regional Analysis 2

FORECASTS OF POPULATION, HOUSEHOLDS, JOBS AND DEVELOPMENT: 21-25 WIEHLE AVENUE METRO STATION AREA 21 22 23 24 25 Population Low 2,9 6,4 9,9 14,2 Intermediate 3,2 7,4 11,9 16,9 High 3,8 9,5 16,1 24,3 Jobs Low 26,4 3,6 35,7 4,8 44,5 Intermediate 26,4 31,7 38,4 45,2 5,4 High 26,4 33, 41,2 49,7 56,3 Households Low 1,3 3, 4,7 6,8 Intermediate 1,5 3,5 5,7 8,1 High 1,7 4,4 7,7 11,5 Residential Development (SF) Low 2, 2,14, 4,491, 7,79, 1,166, Intermediate 2, 2,175, 5,175, 8,49, 12,75, High 2, 2,597, 6,623, 11,512, 17,323, Non-Residential Development (SF) Low 8,14, 9,393, 12,18, 14,21, 16,813, Intermediate 8,14, 9,734, 12,937, 15,562, 19,4, High 8,14, 1,99, 13,861, 17,118, 21,268, Office Development (SF) Low 7,672, 8,268, 9,386, 1,26, 1,541, Intermediate 7,672, 8,568, 1,14, 11,127, 11,938, High 7,672, 8,889, 1,825, 12,24, 13,335, Retail Development (SF) Low 13, 91, 259, 41, 662, Intermediate 13, 94, 278, 455, 75, High 13, 98, 298, 51, 838, Other Non-Residential Development (SF) Low 419, 1,34, 2,373, 3,585, 5,69, Intermediate 419, 1,72, 2,555, 3,979, 6,353, High 419, 1,112, 2,737, 4,377, 7,96, Source: GMU Center for Regional Analysis GMU Center for Regional Analysis 21

FORECASTS OF POPULATION, HOUSEHOLDS, JOBS AND DEVELOPMENT: 21-25 RESTON PARKWAY METRO STATION AREA 21 22 23 24 25 Population Low 5,8 7,6 9,9 13,1 17,8 Intermediate 5,8 8,2 11,4 15,7 21,2 High 5,8 9,8 14,6 21,2 3,4 Jobs Low 4,1 45,7 5,6 55, 58, Intermediate 4,1 47,3 54,4 6,9 65,7 High 4,1 49,2 58,4 67, 73,4 Households Low 2,6 3,5 4,6 6,2 8,5 Intermediate 2,6 3,7 5,3 7,5 1,1 High 2,6 4,5 6,8 1,1 14,5 Residential Development (SF) Low 3,951, 5,195, 6,914, 9,332, 12,738, Intermediate 3,951, 5,61, 7,967, 11,192, 15,135, High 3,951, 6,699, 1,196, 15,175, 21,77, Non-Residential Development (SF) Low 13,4, 15,36, 17,449, 19,251, 21,792, Intermediate 13,4, 15,918, 18,782, 21,366, 24,68, High 13,4, 16,515, 2,123, 23,53, 27,568, Office Development (SF) Low 1,345, 11,893, 13,11, 13,87, 14,772, Intermediate 1,345, 12,324, 14,112, 15,324, 16,729, High 1,345, 12,786, 15,119, 16,857, 18,686, Retail Development (SF) Low 688, 782, 981, 1,232, 1,591, Intermediate 688, 81, 1,55, 1,367, 1,82, High 688, 841, 1,131, 1,54, 2,13, Other Non-Residential Development (SF) Low 2,367, 2,686, 3,358, 4,211, 5,43, Intermediate 2,367, 2,783, 3,615, 4,675, 6,149, High 2,367, 2,887, 3,874, 5,142, 6,869, Source: GMU Center for Regional Analysis GMU Center for Regional Analysis 22

FORECASTS OF POPULATION, HOUSEHOLDS, JOBS AND DEVELOPMENT: 21-25 HERNDON-MONROE METRO STATION AREA 21 22 23 24 25 Population Low 5,6 6,9 8,2 9,4 1,4 Intermediate 5,6 7,4 9,5 11,3 12,4 High 5,6 8,8 12,1 15,3 17,7 Jobs Low 1,8 12, 13,6 14,9 16,2 Intermediate 1,8 12,5 14,6 16,5 18,3 High 1,8 13, 15,7 18,1 2,5 Households Low 2,6 3,1 3,8 4,5 5, Intermediate 2,6 3,4 4,4 5,4 5,9 High 2,6 4, 5,6 7,3 8,4 Residential Development (SF) Low 3,843, 4,697, 5,723, 6,724, 7,43, Intermediate 3,843, 5,73, 6,595, 8,65, 8,83, High 3,843, 6,57, 8,44, 1,935, 12,662, Non-Residential Development (SF) Low 3,355, 3,614, 4,118, 4,82, 5,238, Intermediate 3,355, 3,745, 4,433, 5,349, 5,932, High 3,355, 3,886, 4,749, 5,884, 6,625, Office Development (SF) Low 3,17, 3,334, 3,766, 4,158, 4,45, Intermediate 3,17, 3,455, 4,54, 4,615, 5,4, High 3,17, 3,584, 4,343, 5,76, 5,63, Retail Development (SF) Low 121, 158, 234, 313, 445, Intermediate 121, 163, 251, 347, 54, High 121, 17, 269, 382, 563, Other Non-Residential Development (SF) Low 127, 123, 118, 349, 342, Intermediate 127, 127, 127, 388, 388, High 127, 132, 136, 426, 433, Source: GMU Center for Regional Analysis GMU Center for Regional Analysis 23

FORECASTS OF POPULATION, HOUSEHOLDS, JOBS AND DEVELOPMENT: 21-25 ROUTE 28 / CIT METRO STATION AREA 21 22 23 24 25 Population Low 7,3 7,6 9,4 12,6 15,3 Intermediate 7,3 8,2 1,9 15,1 18,2 High 7,3 9,8 13,9 2,4 26,1 Jobs Low 2,3 22,1 27,5 34,9 43,1 Intermediate 2,3 22,9 29,5 38,7 48,8 High 2,3 23,8 31,7 42,5 54,5 Households Low 3,3 3,5 4,4 6, 7,3 Intermediate 3,3 3,7 5, 7,2 8,7 High 3,3 4,5 6,5 9,7 12,4 Residential Development (SF) Low 4,964, 5,194, 6,571, 8,965, 1,941, Intermediate 4,964, 5,69, 7,572, 1,752, 12,995, High 4,964, 6,697, 9,691, 14,579, 18,645, Non-Residential Development (SF) Low 6,699, 7,393, 9,4, 12,197, 15,35, Intermediate 6,699, 7,661, 1,118, 13,537, 17,384, High 6,699, 7,948, 1,841, 14,891, 19,418, Office Development (SF) Low 4,755, 5,344, 7,3, 9,299, 11,877, Intermediate 4,755, 5,538, 7,538, 1,32, 13,451, High 4,755, 5,746, 8,76, 11,352, 15,24, Retail Development (SF) Low 453, 54, 649, 851, 1,78, Intermediate 453, 522, 699, 944, 1,221, High 453, 542, 748, 1,39, 1,363, Other Non-Residential Development (SF) Low 1,491, 1,545, 1,748, 2,48, 2,395, Intermediate 1,491, 1,61, 1,882, 2,273, 2,713, High 1,491, 1,661, 2,16, 2,5, 3,3, Source: GMU Center for Regional Analysis GMU Center for Regional Analysis 24

FORECASTS OF POPULATION, HOUSEHOLDS, JOBS AND DEVELOPMENT: 21-25 ROUTE 28 CORRIDOR 21 22 23 24 25 Population Low 1,6 11,2 12,2 12,7 13,6 Intermediate 1,6 11,4 12,7 13,6 14,7 High 1,6 11,7 13,4 14,5 15,9 Jobs Low 79,8 89,5 13, 117,1 132,5 Intermediate 79,8 92,8 11,7 129,5 15,1 High 79,8 96, 118,4 141,9 167,7 Households Low 4,4 4,7 5,2 5,5 5,9 Intermediate 4,4 4,8 5,4 5,9 6,4 High 4,4 4,9 5,7 6,3 6,9 Residential Development (SF) Low 6,6, 7,5, 7,8, 8,25, 8,85, Intermediate 6,6, 7,184, 8,1, 8,85, 9,6, High 6,6, 7,35, 8,55, 9,45, 1,35, Non-Residential Development (SF) Low 27,51, 32,118, 38,598, 44,211, 49,52, Intermediate 27,51, 33,62, 41,27, 48,51, 55,597, High 27,51, 34,29, 43,821, 52,959, 61,744, Office Development (SF) Low 14,89, 18,258, 24,21, 28,98, 33,596, Intermediate 14,89, 18,881, 25,829, 32,58, 38,48, High 14,89, 19,523, 27,637, 35,264, 42,537, Retail Development (SF) Low 3,17, 3,171, 3,282, 3,393, 3,55, Intermediate 3,17, 3,279, 3,529, 3,754, 3,969, High 3,17, 3,391, 3,776, 4,129, 4,437, Other Non-Residential Development (SF) Low 1,313, 1,689, 11,295, 11,837, 12,41, Intermediate 1,313, 1,91, 11,849, 12,698, 13,58, High 1,313, 11,115, 12,47, 13,566, 14,769, Source: GMU Center for Regional Analysis GMU Center for Regional Analysis 25

GMU Analysis of Reston-Dulles Corridor: Station Areas ROUTE 28/CIT AREA RESTON TOWN CENTER NORTH AREA BARON CAMERON AVENUE HERNDON-MONROE AREA WIEHLE AVENUE AREA SULLY ROAD (ROUTE 28) Legend CENTRE VILLE RD Station Areas (Data to be organized/analyzed by station area) Reston-Dulles GMU Analysis Area Parcels within Analysis Area General Location of Planned Metro Stations Note: Circles denote 1/4 and 1/2 mile radius from station FAIRFAX COUNTY PARKWAY RESTON PARKWAY SUNRISE VALLE Y DRIVE RESTON PARKWAY AREA.5 1 Miles G:\projects\ocp\pd\avprojects\29\Reston_Special_Study\GMU_Forecast\Projects\Existing_Zoned_Planned_Station_Area_Map.mxd