Application of particle swarm optimization technique for optimal location of FACTS devices considering cost of installation and system loadability

Similar documents
Reactive Power Contribution of Multiple STATCOM using Particle Swarm Optimization

Analyzing the Effect of Loadability in the

A. Esmaeili Dahej, S. Esmaeili, A. Goroohi. Canadian Journal on Electrical and Electronics Engineering Vol. 3, No. 3, March 2012

Analyzing the Optimal Reactive Power Dispatch in the Presence of Series and Shunt Facts Controllers

Real Time Voltage Control using Genetic Algorithm

OPTIMAL DISPATCH OF REAL POWER GENERATION USING PARTICLE SWARM OPTIMIZATION: A CASE STUDY OF EGBIN THERMAL STATION

B-Positive Particle Swarm Optimization (B.P.S.O)

Modelling and Simulation of TCPAR for Power System Flow Studies

Single objective optimization using PSO with Interline Power Flow Controller

Reactive Power and Voltage Control of Power Systems Using Modified PSO

Regular paper. Particle Swarm Optimization Applied to the Economic Dispatch Problem

Optimal Locating and Sizing of TCPST for Congestion Management in Deregulated Electricity Markets

Improving Transient Stability of a Multi-Machine Power Network Using FACTS Devices and Nonlinear Controller Tuned by PSO

OPTIMAL POWER FLOW BASED ON PARTICLE SWARM OPTIMIZATION

Vedant V. Sonar 1, H. D. Mehta 2. Abstract

On Optimal Power Flow

Comparison of Loss Sensitivity Factor & Index Vector methods in Determining Optimal Capacitor Locations in Agricultural Distribution

Multi-objective Emission constrained Economic Power Dispatch Using Differential Evolution Algorithm

RBFNN based GSA for optimizing TCSC parameters and location- A secured optimal power flow approach

Optimal Placement of Capacitor Banks in order to Improvement of Voltage Profile and Loss Reduction based on PSO

Distributed vs Bulk Power in Distribution Systems Considering Distributed Generation

PowerApps Optimal Power Flow Formulation

Assessment of Total Transfer Capability Enhancement Using Optimization Technique

Hybrid Big Bang - Big Crunch Algorithm for Optimal Reactive Power Dispatch by Loss and Voltage Deviation Minimization

Optimal Capacitor Placement in Radial Distribution System to minimize the loss using Fuzzy Logic Control and Hybrid Particle Swarm Optimization

International Research Journal of Engineering and Technology (IRJET) e-issn: Volume: 03 Issue: 03 Mar p-issn:

Assessment and enhancement of voltage stability based on reactive power management using UPFC

A Particle Swarm Optimization for Reactive Power Optimization

PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS

CONTROL of power flow in the interconnected power system

Optimal capacitor placement and sizing using combined fuzzy-hpso method

Congestion Alleviation using Reactive Power Compensation in Radial Distribution Systems

Optimal Placement and Sizing of Distributed Generation for Power Loss Reduction using Particle Swarm Optimization

J. Electrical Systems 10-1 (2014): Regular paper. Optimal Power Flow and Reactive Compensation Using a Particle Swarm Optimization Algorithm

Application of the Three-Phase STATCOM in Voltage Stability

QFT Based Controller Design of Thyristor-Controlled Phase Shifter for Power System Stability Enhancement

A PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS

Simultaneous placement of Distributed Generation and D-Statcom in a radial distribution system using Loss Sensitivity Factor

Co-ordinated control of FACTS Devices using Optimal Power Flow Technique

Fuzzy based Stochastic Algorithms for Multi-Objective Reactive Power Optimization including FACTS Devices

Optimal Capacitor Placement in Distribution System with Random Variations in Load

Optimal Placement & sizing of Distributed Generator (DG)

An Adaptive Approach to Posistioning And Optimize Size of DG Source to Minimise Power Loss in Distribution Network

Turkish Journal of Electrical Engineering & Computer Sciences

Minimization of Reactive Power Using Particle Swarm Optimization

CHAPTER 3 FUZZIFIED PARTICLE SWARM OPTIMIZATION BASED DC- OPF OF INTERCONNECTED POWER SYSTEMS

Total Transfer Capability Enhancement Using Hybrid Evolutionary Algorithm

Proceedings of the 13th WSEAS International Conference on CIRCUITS

Performance Improvement of the Radial Distribution System by using Switched Capacitor Banks

Application of Teaching Learning Based Optimization for Size and Location Determination of Distributed Generation in Radial Distribution System.

Energy Conversion and Management

Power Electronic Circuits Design: A Particle Swarm Optimization Approach *

Branch Outage Simulation for Contingency Studies

Assessment of Available Transfer Capability Incorporating Probabilistic Distribution of Load Using Interval Arithmetic Method

Genetic Algorithm Based Fuzzy Multi-Objective Approach to FACTS Devices Allocation in FARS Regional Electric Network

Optimal Compensation of Reactive Power in Transmission Networks using PSO, Cultural and Firefly Algorithms

Unified Power Flow Controller (UPFC) Based Damping Controllers for Damping Low Frequency Oscillations in a Power System

Effects of STATCOM, TCSC, SSSC and UPFC on static voltage stability

Implementation of GCPSO for Multi-objective VAr Planning with SVC and Its Comparison with GA and PSO

OPTIMAL ALLOCATION OF TCSC DEVICES FOR THE ENHANCEMENT OF ATC IN DEREGULATED POWER SYSTEM USING FLOWER POLLINATION ALGORITHM

Improved representation of control adjustments into the Newton Raphson power flow

Distribution System s Loss Reduction by Optimal Allocation and Sizing of Distributed Generation via Artificial Bee Colony Algorithm

OPTIMAL CAPACITOR PLACEMENT USING FUZZY LOGIC

Static and Transient Voltage Stability Assessment of Power System by Proper Placement of UPFC with POD Controller

Unit Commitment Using Soft Computing Techniques

APPLICATION OF AN INTERLINE POWER FLOW CONTROLLER AS AGC

Capacitor Placement for Economical Electrical Systems using Ant Colony Search Algorithm

THE loss minimization in distribution systems has assumed

Modern Power Systems Analysis

Optimal Allocation of FACTS Devices in Distribution Networks Using Imperialist Competitive Algorithm

Optimal capacitor placement and sizing via artificial bee colony

A Benders Decomposition Approach to Corrective Security Constrained OPF with Power Flow Control Devices

Power System Security Analysis. B. Rajanarayan Prusty, Bhagabati Prasad Pattnaik, Prakash Kumar Pandey, A. Sai Santosh

CAPACITOR PLACEMENT USING FUZZY AND PARTICLE SWARM OPTIMIZATION METHOD FOR MAXIMUM ANNUAL SAVINGS

Farzaneh Ostovar, Mahdi Mozaffari Legha

Meta Heuristic Harmony Search Algorithm for Network Reconfiguration and Distributed Generation Allocation

CAPACITOR PLACEMENT IN UNBALANCED POWER SYSTEMS

Particle swarm optimization approach to portfolio optimization

K. Valipour 1 E. Dehghan 2 M.H. Shariatkhah 3

Hierarchical VBA based TCSC Robust damping control system design

J. Electrical Systems x-x (2010): x-xx. Regular paper

OPTIMAL LOCATION AND SIZING OF DISTRIBUTED GENERATOR IN RADIAL DISTRIBUTION SYSTEM USING OPTIMIZATION TECHNIQUE FOR MINIMIZATION OF LOSSES

Contents Economic dispatch of thermal units

Application of Gravitational Search Algorithm for Real Power Loss and Voltage Deviation Optimization

Software Tools: Congestion Management

A Study of the Factors Influencing the Optimal Size and Site of Distributed Generations

GA BASED OPTIMAL POWER FLOW SOLUTIONS

OPTIMAL CAPACITORS PLACEMENT IN DISTRIBUTION NETWORKS USING GENETIC ALGORITHM: A DIMENSION REDUCING APPROACH

SSSC Modeling and Damping Controller Design for Damping Low Frequency Oscillations

Multi Objective Economic Load Dispatch problem using A-Loss Coefficients

Optimal Capacitor Placement and Sizing on Radial Distribution System by using Fuzzy Expert System

CHAPTER 6 STEADY-STATE ANALYSIS OF SINGLE-PHASE SELF-EXCITED INDUCTION GENERATORS

Swarm intelligence approach to the solution of optimal power flow

Transient Stability Assessment of Synchronous Generator in Power System with High-Penetration Photovoltaics (Part 2)

A Novel Analytical Technique for Optimal Allocation of Capacitors in Radial Distribution Systems

Transmission Line Compensation using Neuro-Fuzzy Approach for Reactive Power

STUDY OF PARTICLE SWARM FOR OPTIMAL POWER FLOW IN IEEE BENCHMARK SYSTEMS INCLUDING WIND POWER GENERATORS

arxiv: v1 [math.oc] 9 Jan 2018

Optimal Capacitor placement in Distribution Systems with Distributed Generators for Voltage Profile improvement by Particle Swarm Optimization

Analytical Study Based Optimal Placement of Energy Storage Devices in Distribution Systems to Support Voltage and Angle Stability

Transcription:

Electric Power Systems Research 77 (2007) 276 283 Application of particle swarm optimization technique for optimal location of FACTS devices considering cost of installation and system loadability M. Saravanan, S. Mary Raja Slochanal, P. Venkatesh, J. Prince Stephen Abraham Electrical and Electronics Engineering Department, Thiagarajar College of Engineering, Madurai 625015, India Received 13 April 2005; received in revised form 5 November 2005; accepted 8 March 2006 Available online 18 April 2006 Abstract This paper presents the application of particle swarm optimization (PSO) technique to find the optimal location of flexible AC transmission system (FACTS) devices with minimum cost of installation of FACTS devices and to improve system loadability (SL). While finding the optimal location, thermal limit for the lines and voltage limit for the buses are taken as constraints. Three types of FACTS devices, thyristor controlled series compensator (TCSC), static VAR compensator (SVC) and unified power flow controller (UPFC) are considered. The optimizations are performed on the parameters namely the location of FACTS devices, their setting, their type, and installation cost of FACTS devices. Two cases namely, single-type devices (same type of FACTS devices) and multi-type devices (combination of TCSC, SVC and UPFC) are considered. Simulations are performed on IEEE 6, 30 and 118 bus systems and Tamil Nadu Electricity Board (TNEB) 69 bus system, a practical system in India for optimal location of FACTS devices. The results obtained are quite encouraging and will be useful in electrical restructuring. 2006 Elsevier B.V. All rights reserved. Keywords: FACTS; TCSC; SVC; UPFC; Particle swarm optimization; Maximum system loadability 1. Introduction The electric supply industry is undergoing a profound transformation worldwide. Market forces, scare natural resources and an ever increasing demand for electricity are some of the drivers responsible for such an unprecedented change. Particularly in the case of transmission systems, it requires non-discriminatory open access to transmission resources. Therefore, sufficient transmission capacity for supporting transmission services is of great demand to transmission network s requirement. Flexible AC transmission system (FACTS) can provide benefits in increasing system transmission capacity and power flow control flexibility and rapidity [1 3]. FACTS devices are solid-state converters that have the capability of control of various electrical parameters in transmission circuits. FACTS devices include thyristor controlled series compensator (TCSC), static VAR compensator (SVC), unified power flow controller (UPFC), static compensator (STATCOM), etc. Modeling of FACTS devices for power flow studies and the inte- Corresponding author. Fax: +91 452 2483427. E-mail address: saravanan maran@yahoo.com (M. Saravanan). gration of those devices into power flow studies were reported [4,5]. TCSC is connected in series with the line conductor to compensate for the inductive reactance of the line. The SVC can be made to generate or absorb reactive power by means of thyristor controlled elements [6,7]. The UPFC is capable of providing active and reactive power control and voltage magnitude control and it regulates all the three variables simultaneously or any combination of them, provided no operating limits are violated [8]. Population based, cooperative and competitive stochastic search algorithms are very popular in the recent years in the research arena of computational intelligence. Some well established search algorithms such as GA [9] and Evolutionary Programming (EP) [10,11] are successfully implemented to solve complex problems efficiently and effectively. The PSO algorithm was introduced by Kennedy and Eberhart [12,13] and further modifications in PSO algorithm were carried out [14]. PSO is applied for solving various optimization problems in electrical engineering [15 18]. Optimal location of different types of FACTS devices in the power system has been attempted using different techniques such as Genetic Algorithm (GA), hybrid tabu approach and simulated annealing (SA). The best location for a set of phase 0378-7796/$ see front matter 2006 Elsevier B.V. All rights reserved. doi:10.1016/j.epsr.2006.03.006

M. Saravanan et al. / Electric Power Systems Research 77 (2007) 276 283 277 shifters was found by genetic algorithm to reduce the flows in heavily loaded lines resulting in an increased loadability of the network and reduced cost of production [19]. The best optimal location of FACTS devices in order to reduce the production cost along with the device s cost using real power flow performance index was reported [20]. A hybrid tabu search and simulated annealing was proposed to minimize the generator fuel cost in optimal power flow control with multi-type FACTS devices [21]. The best location of UPFC to minimize the generation cost function and the investment cost on the UPFC device was found using steady state injection model of UPFC, continuation power flow technique and OPF technique [22]. Power flow algorithm with the presence of TCSC and UPFC has been formulated and solved [23]. A hybrid GA approach to solve optimal power flow in a power system incorporating FACTS devices has been reported [24]. In this paper, applying PSO technique, the optimal location of FACTS devices to achieve minimum cost of installation of FACTS devices and to improve system loadability (SL), while satisfying the power system constraints, for single- and multitype FACTS devices were found. The variables for the optimization for each device are its location in the network, its setting and the installation cost, in the case of single-type devices. In the case of multi-type devices, the type of device used is taken as additional variable for optimization. TCSC has been modeled as a variable reactance inserted in the line and SVC is modeled as a reactive source added at both ends of the line. UPFC is modeled as combination of a SVC at a bus and a TCSC in the line connected to the same bus. Computer simulations were done for IEEE 6, 30, 118 bus systems and Tamil Nadu Electricity Board (TNEB) 69 bus test system. In both single- and multitype FACTS devices, it is observed that SL cannot be increased beyond a limit after placing certain number of FACTS devices and the maximum value of SL that can be achieved without violating the constraints is known as maximum system loadability (MSL). The MSL, minimum number of FACTS devices required to attain the MSL and the optimal installation cost of FACTS devices are obtained for single- and multi-type FACTS devices. 2. Problem formulation 2.1. Objective Optimal placement of FACTS devices to minimize the cost of installation of FACTS devices has been mathematically formulated and is given by (1). Minimize IC = C S 1000 (1) where IC is the optimal installation cost of FACTS devices in US$ and C is the cost of installation of FACTS devices in US$/KVAR. The cost of installation of UPFC, TCSC and SVC are taken from Siemens database and reported in [25,26]. The costs of installation of various FACTS devices are given by (2). C UPFC = 0.0003S 2 0.2691S + 188.22 C TCSC = 0.0015S 2 0.7130S + 153.75 C SVC = 0.0003S 2 0.3051S + 127.38 where S is the operating range of the FACTS devices in MVAR S = Q 2 Q 1 (3) where Q 2 is the reactive power flow in the line after installing FACTS device in MVAR and Q 1 is the reactive power flow in the line before installing FACTS device in MVAR. The cost is optimized with the following constraints. 2.2. Line flow and bus voltage constraints J = OVL LINE BUS (4) LINE BUSVS J is the factor indicating violation of line flow limits and bus voltage limits, where OVL denotes line overload factor for a line and VS denotes voltage stability index for a bus 1; if P pq Ppq max ( ) OVL = exp λ 1 P pq ; ifp pq >Ppq max (5) VS = Ppq max { 1; if 0.9 Vb 1.1 exp(μ 1 V b ); otherwise where P pq is the real power flow between buses p and q, Ppq max the thermal limit for the line between buses p and q, V b the voltage at bus b, and λ and μ are the small positive constants both equal to 0.1 2.3. FACTS device s constraints (i) 0.8X L X TCSC 0.2X L p.u. (7) (ii) 100 MVAR Q SVC 100 MVAR (8) (iii) (7) and (8) for UPFC where X TCSC is the reactance added to the line by placing TCSC, X L the reactance of the line where TCSC is located and Q SVC is the reactive power injected at the bus by placing SVC. 2.4. Power flow constraints g(v, θ) = 0 (9) where } P t (V, θ) Pt net Q t (V, θ) Q net t g(v, θ) = P m (V, θ) P net } m for each PQ bus t for each PV bus m, not including reference (2) (6)

278 M. Saravanan et al. / Electric Power Systems Research 77 (2007) 276 283 P t is the calculated real power for PQ bus, P m the calculated real power for PV bus, Q t the calculated reactive power for PQ bus, Pt net the specified real power for PQ bus, Q net t the specified reactive power for PQ bus, V the voltage magnitude at different buses and θ is the voltage phase angle at different buses. 3. Overview of PSO and its implementation for optimal location of FACTS devices PSO is developed through simulation of bird flocking in two-dimensional space. The position of each agent is represented in x y plane with position (S x, S y ), V x (velocity along x-axis) and V y (velocity along y-axis). Modification of the agent position is realized by the position and velocity information. Bird flocking optimizes a certain objective function. Each agent knows its best value so far, called P best, which contains the information on position and velocities. This information is the analogy of personal experience of each agent. Moreover, each agent knows the best value so far in the group, G best among all P best. This information is the analogy of knowledge, how the other neighboring agents have performed. Each agent tries to modify its position by considering current positions (S x, S y ), current velocities (V x, V y ), the individual intelligence (P best ) and the group intelligence (G best ). The following equations are utilized, in computing the position and velocities, in the x y plane: V k+1 i = W Vi k + C 1 rand 1 (P besti Si k ) + C 2 rand 2 (G best Si k ) (11) Si k+1 = Si k + V i k+1 (12) where V k+1 is the velocity of ith individual at (k + 1)th iteration, Vi k i the velocity of ith individual at kth iteration, W the inertia weight, C 1 and C 2 the positive constants having values (0, 2.5) [13,14], rand 1 and rand 2 the random numbers selected between 0 and 1, P besti the best position of the ith individual, G best the best position among the individuals (group best) and Si k is the position of ith individual at kth iteration. The velocity of each particle is modified according to (11) and the minimum and maximum velocity of each variable in each particle is set within the limits of V min and V max, respectively. The position is modified according to (12). The inertia weight factor W is modified using (13) to enable quick convergence [13,14]. W = W max W max W min iter (13) iter max where W max is the initial value of inertia weight equal to 0.9, W min the final value of inertia weight equal to 0.4, iter the current iteration number and iter max is the maximum iteration number. The implementation of PSO algorithm for optimal location of FACTS devices is given below. 3.1. Initialization Initially the type of FACTS device and number of FACTS devices to be used are declared. SL is set to 101% (i.e. load factor = 1.01) which means that the load bus real power is increased by 1% from the base case value. The initial population of particles (S k ) is generated randomly such that the variables of each particle are in normalized form (i.e. between 0 and 1). The variables of each particle in the population correspond to the FACTS devices setting and their location, when single-type FACTS devices are used. If N number of FACTS devices (either TCSC or SVC) is to be installed then each particle has 2 N variables (N-FACTS device settings and N-locations). When N number of UPFCs are to be installed, each particle has 3 N variables (N-TCSC settings, N-SVC settings and N-locations), since the UPFC is modeled as combination of TCSC and SVC in this work. When multi-type FACTS devices are used, each particle has one more additional variable for each FACTS device, indicating the type. Here for indicating the type of FACTS device, the value 1 is used for TCSC, value 2 is used for SVC and value 3 is used for UPFC. 3.2. Calculation of fitness function The constrained optimization problem of optimal location of FACTS devices is converted into unconstrained optimization problem using penalty factor (PF) as given in (14). This becomes the fitness function in PSO technique. Fitness function = IC + PF J 1 (14) It consists of two terms. The first term corresponds to installation cost of FACTS devices given by (1). The second term corresponds to constraint violation and it is multiplied by penalty factor. To calculate the fitness function given by (14) for each particle, the normalized value of each variable (X norm )inthe particle are first denormalized to actual value (X actual ) according to (15). X actual = X min + (X max X min ) X norm (15) where X min is the minimum value of the variable and X max is the maximum value of the variable. Since the variables such as location (line number) and type of FACTS device are integer, their denormalized value is rounded to nearest integer to get the actual value. When more than one FACTS devices are to be installed, after generating the initial population or new population, it is verified that only one device is placed in a line. If two FACTS devices are placed in the same line, one of the FACTS devices is removed from that line and it is placed in some other line where FACTS device is not present. For each particle, the line data is updated according to its FACTS device s (TCSC) setting and location and the bus data is updated according to its FACTS device s (SVC) setting and location and the current SL. Load flow is performed using Newton Raphson method and line flows and voltage at buses are obtained. Using these values, the value of J for each particle is found out using (4) and the fitness function of each particle is calculated using (14). The particle that gives minimum value for the fitness function in the population, is considered as G best particle.

M. Saravanan et al. / Electric Power Systems Research 77 (2007) 276 283 279 3.3. Generation of new population The new velocity is calculated using Eq. (11) and the new position of each particle is found using (12). The procedures said in 3.2 and 3.3 are repeated until maximum number of iterations is reached. 3.4. Finding MSL After the maximum number of are iterations are reached, the value of J for the G best particle is checked. If it is equal to 1 then using that G best particle, the current value of SL can be met out without violating line flow and bus voltage limit constraints and the G best particle is saved along with its cost of installation and SL. SL is then increased by 1% and again the PSO algorithm is run. If the value of J for the G best particle is not equal to 1 then the G best particle is unable to meet out the current SL and the G best particle with J = 1, obtained in the previous run is considered as the best optimal settings and the SL corresponding to that G best particle is considered as the MSL. The step by step procedure to find optimal installation cost of FACTS devices and the MSL is shown in the flowchart (Fig. 1). Fig. 1. Flowchart showing PSO algorithm implementation for optimal location of FACTS devices.

280 M. Saravanan et al. / Electric Power Systems Research 77 (2007) 276 283 Table 1 Line flows before and after installing single- and multi-type FACTS devices, optimal setting and optimal cost of installation of FACTS devices (IC) and MSL in IEEE 6 bus system Case Type of device used From line To line P pqb (MW) Q pqb (MVAR) P pqa (MW) Q pqa (MVAR) Device setting (p.u. for TCSC, MVAR for SVC) IC ( 10 6 US$) Single type TCSC 1 2 28.6897 15.4187 39.7681 21.1384 0.009306 0.368 (MSL = 115%) 1 4 43.5849 20.1201 59.9769 19.3805 0.029088 1 5 35.6009 11.2547 39.9259 10.8897 0.021361 2 4 33.0909 46.0541 28.9459 48.8949 0.002585 2 6 26.2489 12.3995 39.9239 13.2763 0.073963 SVC 1 2 28.6897 15.4187 33.5555 17.4429 79.50954 9.73 (MSL = 110%) 1 4 43.5849 20.1201 54.331 3.8646 96.571101 2 4 33.0909 46.0541 29.967 2.3951 53.015082 UPFC 1 2 28.6897 15.4187 39.7034 17.9088 32.3 (MSL = 122%) 1 4 43.5849 20.1201 59.5295 1.4559 2 3 2.9303 12.2687 10.0356 8.5234 2 4 33.0909 46.0541 36.5896 42.9759 2 6 26.2489 12.3995 61.5946 36.6098 Multi-type SVC 1 2 28.6897 15.4187 39.5855 21.0394 0.448685 9.42 (MSL = 116%) 1 4 43.5849 20.1201 58.6958 10.0134 28.936442 TCSC 2 3 2.9303 12.2687 4 14.4129 0.043657 UPFC 2 5 15.5145 15.3532 28.9139 24.107 SVC 3 6 43.7732 60.7242 48.1295 59.0285 5.993867 4. Results and discussions The solutions for optimal location of FACTS devices to minimize the cost of installation of FACTS devices and to find the MSL for IEEE 6, 30, 118 and TNEB utility systems were obtained and discussed below. The simulation studies were carried out on Pentium-IV, 2.4 GHz system in MATLAB 6.5 environment. 4.1. IEEE 6 bus system The bus data and line data of the six bus sample system are taken from [27] and it contains 11 lines. The location, settings of FACTS devices and optimal installation cost are obtained using the PSO technique for single- and multi-type devices and it is given in Table 1. P pqb and Q pqb are the real and reactive power flow in the line p q before placing FACTS device, respectively. P pqa and Q pqa are the real and reactive power flow in the line p q after placing FACTS device, respectively. The effect of number of FACTS devices on SL and the installation cost are also observed and are shown in Figs. 2 and 3, respectively. In the case of TCSC, it is observed that placing TCSC in lines (1 2, 1 4, 1 5, 2 4 and 2 6) gives MSL of 115% and the cost of installation is US$ 0.368 10 6. This is indicated as point A in Figs. 2 and 3. Among the five lines, it is observed that the improvement in power flow is maximum in the line 1 4 which is represented in bold case in Table 1 and the corresponding X TCSC setting is 0.029088 p.u. Similarly for the other cases, bold case in Table 1 represents the line in which maximum improvement in power flow occurs after placing FACTS device. Fig. 2. System loadability curve for TCSC, SVC, UPFC and multi-type device in IEEE 6 bus system. In the case of SVC, the MSL obtained is 110% and the minimum installation cost for SVC is US$ 9.73 10 6 and this is represented as point B in Figs. 2 and 3. The SVC has to be placed in lines (1 2, 1 4 and 2 4). Placing SVC with Q SVC setting of 96.571101 MVAR in line (1 4) gives large improvement in power flow among the lines, where SVC is placed. In the case of UPFC, to achieve MSL of 122%, UPFC have to be placed in lines (1 2, 1 4, 2 3, 2 4 and 2 6) and the installation cost is US$ 32.3 10 6 and it is shown as point C in Figs. 2 and 3. Fig. 3. Installation cost (US$) curve for placing various FACTS devices in IEEE 6 bus system.

M. Saravanan et al. / Electric Power Systems Research 77 (2007) 276 283 281 In the case of single-type of devices, UPFC shows best performance with MSL of 122%. Next to UPFC, TCSC gives MSL of 115%. SVC gives lowest MSL. In the case of multi-type devices, the values tabulated in Table 1 are the best combination with minimum cost, minimum number of devices required for attaining MSL and their type. In this case, MSL of 116% is reached and placing UPFC in line 2 5, it is observed that there is a large improvement in power flow from the base case. The installation cost for placing SVC in three lines, TCSC in one line, and UPFC in one line is US$ 9.42 10 6 and it is shown as point D in Figs. 2 and 3. Placing UPFC in line 2 5 improves the power flow by about 100% of base case value compared to other lines where FACTS devices are placed. In all the cases, it is observed that FACTS devices improve the line flows of the lines even to their thermal limit. It is concluded that for six bus system, TCSC is cost wise cheaper with better improvement in SL, but UPFC gives largest MSL. In all the cases (single- and multi-type), one of the device is placed in lines 1 2 and 1 4 and hence it is inferred that placing any type of FACTS device in these lines will be beneficial in increasing SL. The optimal location of FACTS devices for IEEE 6 bus system is also carried out by PSO algorithm reported in [14], by linearly decreasing the acceleration coefficient C 1 from 2.5 to 0.5 and linearly increasing the acceleration coefficient C 2 from 0.5 to 2.5 as the iteration proceeds, which gives good results for most of the benchmark functions [14]. The comparison of the results for IEEE 6 bus system obtained by PSO [13] in which C 1 and C 2 are kept constant at 2 and PSO [14] is shown in Table 2. From the results, it is observed that the cost obtained by PSO [13] is less than the cost obtained by PSO [14]. But the SL is improved while using PSO [14]. Hence, PSO algorithm [13] is used for the simulation studies of remaining systems. 4.2. IEEE 30 bus system The bus data and line data of 30 bus system are taken from [11] and it contains 41 lines. Table 3 shows the MSL, optimal cost of installation and minimum number of devices needed for 30 bus system, obtained by PSO technique. Both in single- and multitype of FACTS devices, after placing 8 numbers of devices, the SL is saturated and it does not increase further. Using single type of device, UPFC improves the SL to 139% and TCSC gives MSL of 138%. SVC improves the SL to 128%. Comparing the cost and SL, TCSC is the best option. Table 3 Optimal installation cost (IC), MSL and minimum number of FACTS devices (N) needed in IEEE 30 bus system Type of device used MSL (%) N IC ( 10 6 US$) TCSC 138 8 3.57 SVC 128 8 0.52 UPFC 139 8 276.7 Multi-type 138 8 12.61 Table 4 Optimal installation cost (IC), MSL and minimum number of FACTS devices (N) needed in IEEE 118 bus system Type of device used Results obtained in this work MSL (%) N IC ( 10 6 US$) Results reported in [9] MSL (%) TCSC 135 32 15.1 135 30 SVC 118 32 3.26 119 40 UPFC 140 32 197 Multi-type 136 32 21.1 140 30 4.3. IEEE 118 bus system N IC ( 10 6 US$) The bus data and line data values are taken from [11]. Simulations are carried out for optimal location of single- and multitype FACTS devices. In all the cases, after using 32 devices, the SL saturates. Table 4 shows the MSL in using single- and multi-type devices and the optimal cost of installation. Fig. 4 shows the variation of system loadability with respect to number of FACTS devices used. The MSL obtained for TCSC, SVC, UPFC and multi-type of devices are indicated as points A, B, C and D, respectively, in Fig. 4. After placing 32 devices, there is no considerable improvement in the SL. In this system, UPFC gives largest MSL but cost-wise it is too costlier. Multitype device gives next higher MSL followed by TCSC. TCSC is cost wise cheaper. SVC gives least MSL. The results obtained in IEEE 118 bus system are compared with the results reported in [9] and it is given in Table 4. The MSL and the minimum number of FACTS devices obtained in this work are nearly equal to the results reported in [9] for TCSC and multi-type of device. But in the case of SVC, the minimum number of SVC required for achieving nearly same value of MSL, obtained in this work is less, when compared with that of the result reported in [9]. Also the cost of installation of FACTS Table 2 MSL and the optimal installation cost (IC) of FACTS devices obtained by PSO [13] and PSO [14] algorithm in IEEE 6 bus system Type of device used PSO [13] PSO [14] MSL (%) IC ( 10 6 US$) MSL (%) IC ( 10 6 US$) TCSC 115 0.368 160 0.3616 SVC 110 9.73 150 9.796 UPFC 122 32.3 160 33.184 Multi-type 116 9.42 165 10.745 Fig. 4. System loadability curve for TCSC, SVC, UPFC and multi-type devices in IEEE 118 bus system.

282 M. Saravanan et al. / Electric Power Systems Research 77 (2007) 276 283 Table 5 Optimal installation cost (IC), MSL and minimum number of FACTS devices (N) needed in TNEB utility system Type of device used MSL (%) N IC ( 10 6 US$) TCSC 131 33 21.1 SVC 116 33 32.2 UPFC 124 8 35.4 Multi-type 130 35 55.0 Fig. 7. Functional evaluation graph in IEEE 30 bus system for TCSC, when system loadability is 138%. Fig. 5. System loadability curve for TCSC, SVC, UPFC and multi-type devices in TNEB system. devices is not considered while finding MSL and for UPFC, the results are not reported in [9], which are considered in this work. 4.4. TNEB 69 bus system The bus data and line data are taken from [28] and it has 99 lines. The MSL, minimum number of FACTS devices needed to attain MSL and installation costs are shown in Table 5. Fig. 5 shows the results obtained for TNEB 69 bus system. From the figure, it is observed that TCSC gives highest MSL when com- pared with all the cases and the installation cost is also lowest. In the case of UPFC, minimum numbers of devices are required to attain MSL of 124% when compared with all other cases. MSL obtained using SVC is lowest, the value being 116%. In case of multi-type of device, the MSL obtained was 130% but the cost of installation is highest. The MSL obtained for TCSC, SVC, UPFC and multi-type of devices are indicated as points A, B, C and D, respectively, in Fig. 5. Fig. 6 shows the single line diagram of TNEB 69 bus system. 4.5. PSO parameters The population size (N p ) for IEEE 6, 30 and 118 and TNEB system are taken as 20, 30, 50 and 30, respectively, and maximum Fig. 6. Single line diagram of TNEB 69 bus system.

M. Saravanan et al. / Electric Power Systems Research 77 (2007) 276 283 283 number of iterations (N i ) for the above systems are taken as 50, 75, 100 and 100, respectively. The graphs showing the functional evaluation for different values of population size and maximum number of iterations for 30 bus system using only TCSCs for MSL of 138% are shown in Fig. 7. 5. Conclusion In this work, the optimal location of FACTS devices are found to minimize the cost of installation of FACTS devices and to improve system loadability, for single- and multi-type FACTS devices using PSO technique. Simulations were performed on IEEE 6, 30 and 118 bus systems and TNEB practical system. Optimizations were performed on the parameters namely location of the FACTS devices, their settings in the line, and the cost of installation of FACTS devices for single-type FACTS devices. In the case of multi-type FACTS devices, the type of device to be placed is also considered as a variable in the optimization. In both single- and multi-type devices, it is observed that system loadability cannot be improved further after placing certain number of FACTS devices. In IEEE test systems, UPFC gives maximum system loadability but the cost of installation is high when compared with all other cases and TCSC requires minimum cost of installation with better improvement in system loadability. SVC gives lowest cost of installation in IEEE 30 and 118 bus systems but with minimum improvement in system loadability. In TNEB system, TCSC gives maximum system loadability and cost of installation is also minimum when compared with all other devices. Acknowledgements The authors express their sincere thanks to the Management of Thiagarajar College of Engineering and All India Council for Technical Education for providing necessary facilities and project grant to carry out this research work. References [1] N.G. Hingorani, L. Gyugyi, Understanding FACTS Concepts and Technology of Flexible AC Transmission Systems, IEEE Press, 2000, ISBN 0-7803-3455-8. [2] R.M. Mathur, R.K. Varma, Thyristor Based FACTS Controllers for Electrical Transmission Systems, John Wiley & Sons Inc., 2002. [3] Y.H. Song, X.F. Wang, Operation of Market Oriented Power System, Springer-Verlag Ltd., 2003, ISBN 1-85233-670-6. [4] J.G. Douglas, G.T. Heydt, Power flow control and power flow studies for systems with FACTS devices, IEEE Trans. Power Syst. 13 (1) (1998) 60 65. [5] D. Povh, Modeling of FACTS in power system studies, in: IEEE Power Engineering Society Winter Meeting, vol. 2, January 2000, pp. 1435 1439. [6] A. Kazemi, B. Badrzadeh, Modeling and simulation of SVC and TCSC to study their limits on maximum loadability point, Electr. Power Energy Syst. 26 (2004) 619 626. [7] S.N. Singh, Role of FACTS devices in competitive power market, in: Proceeding of Short Term Course on Electric Power System Operation and Management in Restructured Environment, 2003, pp. a71 a80. [8] C.R. Fuerte-Esquivel, E. Acha, Unified power flow controller: a critical comparison of Newton Raphson UPFC algorithms in power flow studies, IEE Proc. Gen. Transm. Distrib. 144 (5) (1997) 437 444. [9] S. Gerbex, R. Cherkaoui, A.J. Germond, Optimal location of multi-type FACTS devices by means of genetic algorithm, IEEE Trans. Power Syst. 16 (3) (2001) 537 544. [10] T.T. Ma, Enhancement of power transmission systems by using multiple UPFC on evolutionary programming, in: IEEE Bologna Power Tech Conference, vol. 4, June 2003. [11] P. Venkatesh, R. Gnanadass, N.P. Padhy, Comparison and application of evolutionary programming techniques to combined economic emission dispatch with line flow constraints, IEEE Trans. Power Syst. 18 (2) (2003) 688 697. [12] J. Kennedy, R. Eberhart, Particle swarm optimization, in: Proceedings of the IEEE International Conference on Neural Networks, 1995, pp. 1942 1948. [13] Y. Shi, R.C. Eberhart, Empirical study of particle swarm optimization, in: Proceedings of the International Congress on Evolutionary Computation, vol. 3, 1999, pp. 101 106. [14] A. Ratnaweera, S.K. Halgamuge, H.C. Watson, Self-organizing hierarchical particle swarm optimizer with time varying acceleration coefficients, IEEE Trans. Evol. Comput. 8 (June (3)) (2004) 240 255. [15] H. Yoshida, K. Kawata, Y. Fukuyama, S. Takayama, Y. Nakanishi, A particle swarm optimization for reactive power and voltage control considering voltage security assessment, IEEE Trans. Power Syst. 15 (2000) 1232 1239. [16] Xin-mei Yu, Xin-yin Xiong, Yao-wi Wu, A PSO based approach to optimal capacitor placement with harmonic distortion consideration, Electr. Power Syst. Res. 71 (1) (2004) 27 33. [17] S. Kannan, S. Mary Raja Slochanal, P. Subbaraj, N.P. Pandhay, Application of particle swarm optimization technique and its variants to generation expansion planning problem, Electr. Power Syst. Res. 70 (2004) 203 210. [18] Jong-Bae Park, Ki-Song Lee, Joong-Rin Shin, K.-Y. Lee, A particle swarm optimization for economic dispatch with non smooth cost functions, IEEE Trans. Power Syst. 20 (February (1)) (2005). [19] P. Paterni, S. Vitet, M. Bena, A. Yokoyama, Optimal location of phase shifters in the french network by genetic algorithm, IEEE Trans. Power Syst. 14 (1) (1999) 37 42. [20] S.N. Singh, A.K. David, A new approach for placement of FACTS devices in open power markets, IEEE Power Eng. Rev. 21 (9) (2001) 58 60. [21] P. Bhasaputra, W. Ongsakul, Optimal power flow with multi-type of FACTS devices by hybrid TS/SA approach, in: IEEE Proceedings on International Conference on Industrial Technology, vol. 1, December 2002, pp. 285 290. [22] H.A. Abdelsalam, G.E.M. Aly, M. Abdelkrim, K.M. Shebl, Optimal location of the unified power flow controller in electrical power system, in: IEEE Proceedings on Large Engineering Systems Conference on Power Engineering, July 2004, pp. 41 46. [23] N.P. Padhy, M.A. Abdel Moamen, Power flow control and solutions with multiple and multi-type FACTS devices, Electr. Power Syst. Res. (October) (2004). [24] T.S. Chung, Y.Z. Li, A hybrid GA approach for OPF with consideration of FACTS devices, IEEE Power Eng. Rev. 21 (2) (2001) 47 50. [25] L.J. Cai, I. Erlich, Optimal choice and allocation of FACTS devices using genetic algorithms, in: Proceedings on Twelfth Intelligent Systems Application to Power Systems Conference, 2003, pp. 1 6. [26] L.J. Cai, I. Erlich, Optimal choice and allocation of FACTS devices in deregulated electricity market using genetic algorithms, in: IEEE Conference (0-7803-8718-X/04), 2004. [27] A.J. Wood, B.F. Woolenberg, Power Generation, Operation and Control, Wiley, 1996, ISBN 0-471-58699-4. [28] Tamil Nadu Electricity Board Statistics at a Glance 2003 2004, Planning Wing of Tamil Nadu Electricity Board, Chennai, India.