Galileo IOV Results. Navigation solutions powered by Europe

Similar documents
GGSP: Realisation of the Galileo Terrestrial Reference Frame

Update on the In-orbit Performances of GIOVE Clocks

EUROPEAN GNSS (GALILEO) INITIAL SERVICES NAVIGATION SOLUTIONS POWERED BY E U R O P E OPEN SERVICE QUARTERLY PERFORMANCE REPORT

EUROPEAN GNSS (GALILEO) INITIAL SERVICES NAVIGATION SOLUTIONS POWERED BY E U R O P E OPEN SERVICE QUARTERLY PERFORMANCE REPORT

EUROPEAN GNSS (GALILEO) INITIAL SERVICES NAVIGATION SOLUTIONS POWERED BY E U R O P E OPEN SERVICE QUARTERLY PERFORMANCE REPORT

Galileo Extended Slots Characterisation and Relation with the Nominal Constellation

Status of the Gravitational Redshift Test with Eccentric Galileo Satellites

IN-ORBIT PERFORMANCE ASSESSMENT OF GIOVE CLOCKS

the experience of INRIM in the Galileo project

Galileo System Simulation Facility

Figure 1. View of ALSAT-2A spacecraft

BeiDou and Galileo, Two Global Satellite Navigation Systems in Final Phase of the Construction, Visibility and Geometry

End of Life Re-orbiting The Meteosat-5 Experience

The In-Orbit Commissioning of MSG-1

Evaluation on the Multi-GNSS Precise Orbit and Clock Products

GALILEO CONSTELLATION: EVALUATION OF STATION KEEPING STRATEGIES.

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010

Sentinel-1B Flight Dynamics Operations during LEOP and Acquisition of its Reference Orbit: Achieving the Sentinel-1 Constellation

PROBA 1. F. Teston ESA/ESTEC D/TEC-EL

ESTIMATION AND PREDICTION OF THE GIOVE CLOCKS

Ionosphere Prediction Service for GNSS Users

USE OF GALILEO NEQUICK IONOSPHERIC ESTIMATION FOR SATELLITE OPERATIONAL ORBIT DETERMINATION

Operational Support by ESOC s GRAS Ground Support Network - Status and Outlook

Manoeuvre Optimization in the Galileo L7 Orbit Acquisition

ASE 379L Space Systems Engineering Fb February 4, Group 1: Johnny Sangree. Nimisha Mittal Zach Aitken

Vicky Chu, Jer Ling, Tom Lin, Joe Fong, Feng-Tai Huang, Guey-Shin Chang. April 15, 2011

FLIGHT DYNAMICS MISSION ANALYSIS AND OPERATIONS FOR GALILEO SATELLITES: ORBITAL MANEUVERS STRATEGY DESIGN AND PERFORMANCES

SENTINEL-1A FLIGHT DYNAMICS LEOP OPERATIONAL EXPERIENCE

Multi-GNSS Working Group Technical Report 2016

Integral in Orbit* The Integral satellite was launched on 17 October 2002, at

Preparing MetOp for Work

IADC Re-Entry Prediction Campaigns

ESSE Payload Design. 1.2 Introduction to Space Missions

THIRD VEGA LAUNCH FROM THE GUIANA SPACE CENTER

Usage of IGS TEC Maps to explain RF Link Degradations by Spread-F, observed on Cluster and other ESA Spacecraft

Status report on current and future satellite systems by EUMETSAT Presented to CGMS-44, Plenary session, agenda item D.1

A BATCH LAUNCH FOR THE O3b CONSTELLATION

Orekit in NEOSAT FDS. Alexandre Janer& Pol Sola Romeu(TAS) Maxime Journot(CS) Orekit Day 2017 PROPRIETARY INFORMATION 27/11/2017

MISSION ENGINEERING SPACECRAFT DESIGN

Euclid Mission Overview

The AEOLUS Mission - In Orbit Commissioning and Verification

Status of EUMETSAT Operational Services & EUMETCast Africa Dissemination Baseline Updates

sentinel-3 A BIGGER PICTURE FOR COPERNICUS

The ACES Mission. Fundamental Physics Tests with Cold Atom Clocks in Space. L. Cacciapuoti European Space Agency

METEOSAT THIRD GENERATION

RECENT SPACE DEBRIS MITIGATION ACTIVITIES IN FRANCE F.ALBY

No End of Push-broom Operations

SECOND VEGA LAUNCH FROM THE GUIANA SPACE CENTER

An Update on EUMETSAT Programmes and Plans. Dieter Klaes on behalf of EUMETSAT teams

Impact of GPS box-wing models on LEO orbit determination

Time and Frequency Activities at the JHU Applied Physics Laboratory

Latest & future Evolutions. Atomic Clocks for. Global Navigation Satellites. Workshop H2020 Space' September 2016 Satellites Navigation

MULTI PURPOSE MISSION ANALYSIS DEVELOPMENT FRAMEWORK MUPUMA

sentinel-2 COLOUR VISION FOR COPERNICUS

August VS 09 GALILEO SAT 5-6

Sentinel-5 Precursor: Preparing the first Copernicus Atmospheric Mission

TIMING ACTIVITIES AT INRIM IN THE FRAME OF THE GALILEO PROJECT

IN ORBIT VERIFICATION RESULTS FROM GRAS RECEIVER ON METOP-A SATELLITE

Meteorological Missions

Week 02. Assist. Prof. Dr. Himmet KARAMAN

OTSUKIMI Moon-sighting Satellite Kyushu Institute of Technology. 3 rd Mission Idea Contest UNISEC Global

GIOVE-A APPARENT CLOCK ASSESSMENT AND RESULTS

Clocks (Time) and Navigation: from Harrison to GPS

FUTURE PLAN AND RECENT ACTIVITIES FOR THE JAPANESE FOLLOW-ON GEOSTATIONARY METEOROLOGICAL SATELLITE HIMAWARI-8/9

Space Environment & Technology Space Policy and Law Course 2018

Availability and Reliability Advantages of GPS/Galileo Integration

The Potential of Galileo Inter-Satellite Ranging for Tropospheric Monitoring

INTEGRATED OPERATIONAL PRECISE ORBIT DETERMINATION FOR LEO

JUpiter Icy Moons Explorer (JUICE) Status report for OPAG. N. Altobelli (on behalf of O. Witasse) JUICE artist impression (Credits ESA, AOES)

Modernization of National Geodetic Datum in China *

REPORT ON EUMETCAST INCLUDING GEONETCAST

SECOND ANNOUNCEMENT International Technical Laser Workshop 2012 (ITLW-12)

BRINGING YOUR EXPERIMENT INTO SPACE

STATUS OF THE JUICE MISSION

Systems Engineering in Venus Satellite

Life Cycle of Convective Systems over Western Colombia

ROCSAT-3 Constellation Mission

arxiv:gr-qc/ v1 15 Nov 2004

Calculations Equation of Time. EQUATION OF TIME = apparent solar time - mean solar time

OVERVIEW ON 2012 SPACE DEBRIS ACTIVITIES IN FRANCE

CNESOC FLIGHT DYNAMICS MONITORING AND COMMAND OPERATIONS DURING GALILEO FOC1 LEOP AND RECOVERY.

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

Galileo gravitational Redshift test with Eccentric satellites (GREAT)

The Orbit Control of ERS-1 and ERS-2 for a Very Accurate Tandem Configuration

The E-SAIL programme. 10th IAA Symposium on Small Satellites for Earth Observation April 20-24, 2015 Berlin LuxSpace s.à.r.

Status of the European Student Moon Orbiter (ESMO) Project:

KARI Activation for the International Disasters

ESA ITT AO/1-5209/07/NL/HE Contract No /07/NL/HE. NOVEL TIME SYNCHRONISATION TECHNIQUES FOR DEEP SPACE PROBES Executive Summary

Herschel Mission Overview and Key Programmes

Orbit Evolution of the Swarm Mission Detlef Sieg

Sentinel-1 Long Duration Mutual Interference

LAUNCH KIT MARCH 2017 VV09. Sentinel-2B

Radio occultation mission to Mars using cubesats

ERS-2 and ENVISAT orbit control Current and future strategy The impact on the interferometric baseline

SENTINEL-1A LAUNCH CONTENTS. CONTACT & LINKS Press Contact Mario de Lepine

Geodesy Part of the ACES Mission: GALILEO on Board the International Space Station

IGS-MGEX: QZSS Orbit and Clock Determination

An Eye in the Sky EUMETSAT. Monitoring Weather, Climate and the Environment

JUpiter Icy Moons Explorer (JUICE) Status report for OPAG. O. Witasse and N. Altobelli. JUICE artist impression (Credits ESA, AOES)

SPACE PASSIVE HYDROGEN MASER PERFORMANCES, LIFETIME DATA, AND GIOVE-B-RELATED TELEMETRIES

Transcription:

Galileo IOV Results Navigation solutions powered by Europe

Galileo IOV results 1. Galileo IOV System Configuration and IOV Test Campaign Objectives - E. Breeuwer (ESA) 2. Quality of the broadcast Galileo navigation message a) Orbit and clock prediction, ionospheric and group delay parameters - A. Ballereau (ESA) b) UTC-Galileo System Time offset and GPS-Galileo Time Offset - F. Gonzalez (ESA) 3. Galileo UERE and Position accuracy results - G. Lopez-Risueno (ESA) 4. Performance extrapolation to FOC & Outlook towards Galileo Early Services - D. Blonski (ESA)

Galileo IOV System Configuration And Test Campaign Edward Breeuwer ESA Galileo Project Navigation solutions powered by Europe

Deployment / Exploitation Plan Full Operational Capability 30 operational satellites and complete ground infrastructure Early Galileo Services OS, SAR, PRS and CS demonstrator Hand-over Exploitation Phase FOC1 System End 2016 2020 In-Orbit Validation 4 satellites initial ground infrastructure 2014/15 Development System Testbed GIOVE A/B 2005 2013

Galileo System 5

Galileo IOV Configuration Test User Receivers L-band 4 Galileo IOV Satellites S-band C-band GSS GPS COTS Rx Galileo Rx 11 Monitoring Stations + GSS PTF GCC-I (GMS) 2 (+1) TTC 3 ULS External Entities (TVF, OVF, RLSP, GALSEE) GCC-D (GCS)

IOV GSAT0102 GSAT0103 GSAT0101 GSAT0104 7

IOV FM3/FM4 Satellites EADS Astrium GmbH EADS Astrium Ltd Thales Alenia Space Italy Uplink antenna (C band) FM1/2 + FM3/4 differences SAR Transponder (not on FM 1/2) NSGU SPACECRAFT Properties Mass at Launch (incl. Propellant) Power Consumption Dimensions: Lifetime Orbit Injection Attitude Profile 7 May, 2014 ~700 kg 1420 W 2.74 x 14.5 x 1.59 m 12 years Direct into MEO orbit Yaw Steered Navigation antenna (L band, array) SAR Tx antenna (L band) SAR Rx antenna (406 MHz, array) Document Title 8

IOV-1 Launch: Soyuz from CSG «Maiden Flight» 21 October 2011 First two IOV Satellites (PFM/FM2) launched from Guiana Space Center on 21 October 2011

IOV-2 Launch 12th of October 2012

Ground Stations Network (2013) Svalbard GSS Jan Mayen GSS Kiruna TTC Redu GSS/IOT/TTC St Pierre et Miquelon GSS Fucino GSS Maspalomas MEOLUT Kourou TTC/ULS/GSS Reunion ULS/GSS Noumea ULS/GSS 11 GSS 3 ULS 3 TT&C 1 IOT 1 MEOLUT Falkland GSS Troll GSS Kerguelen GSS

Galileo Sites in Europe Navigation solutions powered by Europe Swanwick Security Monitoring Centre ESTEC - Time and Geodesy (IOV) - Performance Monitoring Redu In Orbit Testing NL Galileo Reference Centre CORE INFRASTRUCTURE - Launch and Early Orbit Phase (2x) - In Orbit Testing (1x) - Control Centre (2x) - Time and Geodesy (1x IOV) St Germain en Laye Security Monitoring Centre Darmstadt LEOP Centre Oberpfaffenhoffen - Control Centre SERVICE INFRASTRUCTURE - Galileo Security Monitoring Centre (2x) - SaR Data Service Manager (1x) - OS, CS Service Centre (1x ) - Performance Monitoring (1x) Toulouse - LEOP Centre - SAR Data Service Manager Fucino - Control Centre Madrid Galileo Service Centre (OS, CS)

Galileo Control Centre (D)

Galileo Control Centre (I)

IOV Main Objectives 1. Validation in fight of all space, ground and user components, including their interfaces, prior to full system deployment 2. Analysis of system performance with the view to refine the FOC system prior to full system deployment 3. Verification of the adequacy of the site requirements 4. Verification of Navigation Processing 5. User Equivalent Range Error budget characterization 6. Characterization of feared events 7. Verification of operational procedures 8. Deployment risk reduction

12 March 2013 Galileo 1 st Position Fix 8 95th Percentile:5.9[m] 50th Percentile:3.1[m] 6 12 03 2013 10:00 11:00 UTC 4 2 0-2 -4-6 Dual Frequency E1-E5a F/NAV -8-8 -6-4 -2 0 2 4 6 8 12/03/2013 10:00-11:00 UTC

Positive Feedbacks Around the World Galileo fixes Europe's position in history 12 Mar 2013 - Galileo. This first position fix of longitude, latitude and altitude took place at the Navigation Laboratory at ESA's technical heart ESTEC,... NavSAS, Septentrio Report Galileo IOV Positioning Results, Turin 13 Mar 2013 - Two European organizations announced successful positioning results yesterday (March 12, 2013) using signals from the four Galileo in-orbit... PLAN Group Tracks Galileo Satellites for Positioning in Canada Four Galileo Birds Sighted over Asia 15 Mar 2013 - Within a day of their initial activation over central Europe on March 12, Galileo satellites were visible over North America. The PLAN Group of... 27 Mar 2013 - Scientists in Hanoi, Vietnam, send word that on March 27 the four Galileo in-orbit validation satellites were visible at the same time in the sky over that Southeast Asian country. Real-time PPP with Galileo is now a reality! 25 Mar 2013 Press Release indicates that the noise level of the position is better with Galileo alone than when GPS and GLONASS satellites are also used. This suggests a strong future for Fugro s Galileo PPP solution. GALILEO-only Position Fix from India 9 Sep 2013 - First successful Galileo-only 3- dimensional position solution obtained from Burdwan, India on 03 July, 2013.

IOV test campaign Facts and Figures IOV Test Campaign started on 14 th May up to 31 st Oct 2013 More than 5 months of continuous navigation validation campaign conducted in Rome, Fucino and at ESTEC 2 months of Search and Rescue validation campaign conducted in Toulouse, Maspalomas and ESTEC 2 months of PRS access control campaign in Fucino, Rome and ESTEC Test Activity conducted in Galileo GCCs, ESA, CNES and TASI Laboratories and facilities ( both fixed and mobile ) Teams of up to 35 people for Industry and 25 for ESA continuously deployed Tens of Terabites of data accumulated and processed during the campaign Mobile Vans Open Service 8500Km and 250 hrs PRS 2000Km and 100 hrs

IOV Test campaign achievements Date Event 12 March First Position Fix 16 April First GST-UTC offset dissemination 22 April First GGTO dissemination 27 May First implementation of GTRF aligned to ITRF2008 25 June First dissemination of Commercial Service data 9 July First SAR localisations using Maspalomas MEOLUT July First PRS position fix by Member States (PPTI) October First dissemination of SAR Return Link 12 November First aeronautical test (incl. PRS) 22 November First Mobile PRS Access Control

Time and Geodetic Validation Facility (TGVF) Independent reference for GMS orbit and clocks Off-line PVT computation at each GESS location GPC ESTEC Network of 16 Galileo Experimental Sensor Stations (GESS)

GALSEE Generates orbit&clock reference based on IOCE tool processing GSS data Collects and compares orbit and clock data directly retrieved from GMS through dedicated interface

Test User Receivers OS and PRS versions Collect data for UERE analysis and run PRS access control tests Fixed and Mobile set-ups (ESTEC and TAS-I/Rome). ESTEC

First Road and Maritime and Trials 25

First Galileo Aeronautical Trials 3 flights in November 2013 co-organized by ESA and NLR Done in Gilze-Rijen Air Force Base using the NLR Metro-2 aircraft. 26

Galileo Positioning works well GUSN 23rd August - 3rd September 2013, GDOP<10 [mean GDOP = 4.5] 20 95th Percentile:7.8[m] drms:4[m] <- South - North (m) -> 15 10 5 0-5 -10-15 Dual Frequency Positioning Accuracy (PDOP <=5): Horizontal (95%) 8 m in average Vertical (95%) 9 m in average -20-15 -10-5 0 5 10 15 20 <- West - East (m) ->

Galileo Timing works well 10 8 6 UTC(SIS) - UTCrapid [ns] 4 2 0-2 -4-6 -8-10 1 Dec 15 Dec 31 Dec Timing Accuracy: 10 nsec in avg 67% availability with 4 IOV S/C 96% availability after 1 st FOC launch (6 S/C)

Search And Rescue/Galileo Acknowledgment GALILEO Up-Link Alarm GALILEO Control Center SAR MEOLUT Search and Rescue Mission Control Center Rescue Coordination Center

Galileo Search and Rescue works well SAR Beacons Localisation Accuracy: Within 2 km (77% localisations) Within 5 km (95% localisations) Grey = 3 s/c Black = 4 s/c

IOV Industry Team WP1 SETA Industrial Team: TASI as Prime Contractor Astrium-D (now Airbus!) for Signal, Performance and External Interfaces TCS for Security WP6 Operations Industrial Team: SpaceOpal as Prime Contractor DLR Lead for Spacecraft Operations and GCS Ground Operations Telespazio Lead for GMS Ground Operations and PLSU M&C

Galileo works very well!! Positioning Timing Search And Rescue GUSN 23rd August - 3rd September 2013, GDOP<10 [mean GDOP = 4.5] 20 95th Percentile:7.8[m] drms:4[m] 15 10 8 <- South - North (m) -> 10 5 0-5 -10 UTC(SIS) - UTCrapid [ns] 6 4 2 0-2 -4-6 -8-10 1 Dec 15 Dec 31 Dec -15-20 -15-10 -5 0 5 10 15 20 <- West - East (m) -> Dual Frequency Positioning Accuracy (PDOP <=5): Horizontal (95%) 8 m in average Vertical (95%) 9 m in average Timing Accuracy: < 10 nsec in avg 67% availability with 4 IOV S/C 96% availability after 1 st FOC launch (6 S/C) Grey = 3 s/c Black = 4 s/c SAR Beacons Localisation Accuracy: Within 2 km (77% localisations) Within 5 km (95% localisations)

Thank You http://www.esa.int/our_activities/galileo http://www.gsc-europa.eu