THE GSI FUTURE PROJECT: AN INTERNATIONAL ACCELERATOR FACILITY FOR BEAMS OF IONS AND ANTIPROTONS

Similar documents
FAIR AT GSI. P. Spiller, GSI, Darmstadt, Germany

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

A NEW STANDARD METHOD FOR THE SURVEYING AND ALIGNMENT OF BEAMLINE FACILITIES AT GSI

Development and application of the RFQs for FAIR and GSI Projects

Gesellschaft für Schwerionenforschung mbh (GSI), Planckstrasse 1, D Darmstadt, Germany

Advanced Storage Photon Ring Source Upgrade Project:

From FRS to Super-FRS. Martin Winkler

Status Report on CSR Survey and Alignment at IMP

Linear and circular accelerators

Description of the FAIR facility to be constructed and the stages of construction (Part A) and

THE SPEAR3 UPGRADE PROJECT AT SLAC *

SURVEY AND ALIGNMENT FOR THE SYNCHROTRON LIGHT SOURCE ELETTRA

MAGNET INSTALLATION AND ALIGNMENT FOR THE FUJI TEST BEAM LINE AT KEKB

Heavy ion fusion energy program in Russia

The Alignment of BEPCII RING

The FAIR Accelerator Facility

In-Kind FAIR. David Urner. FAIR, Darmstadt , D. Urner 1

THE SUPER-FRS PROJECT AT GSI

Superconducting Magnets for Future Electron-Ion Collider. Yuhong Zhang Thomas Jefferson National Accelerator Facility, USA

Atomic Physics with Stored and Cooled Ions

The Alignment Concept For The Fermilab Recycler Ring Using Permanent Magnets

Advanced Design of the FAIR Storage Ring Complex

OVERVIEW OF THE LHEC DESIGN STUDY AT CERN

Status Report on the Survey and Alignment Activities at Fermilab

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU

Bulk shielding design for the MAX IV facility

David Martin High Precision Beamline Alignment at the ESRF IWAA, Grenoble 3-7 October 2016

Schroeder, C., Walter, F., Marzouki, F., Stafiniac, A., Floch, E., Schnizer, P., Moritz, G., Xiang, Y., Kauschke, M., Meier, J., Hess, G.

Preface. Executive Summary

Analysis of Coupled Electromagnetic-Thermal Effects in Superconducting Accelerator Magnets

Accelerator Design and Construction Progress of TPS Project

THE SPEAR3 UPGRADE PROJECT AT SLAC * Abstract

Thomas Nilsson. Status of FAIR-NuSTAR and R 3 B. MAGISOL-meeting, IEM-CSIC, Madrid, January

Challenges of the FAIR Vacuum System

STATUS REPORT ON STORAGE RING REALIGNMENT AT SLRI

Survey and Alignment of the Fermilab Electron Cooling System

ERHIC - A PRECISION ELECTRON-PROTON/ION COLLIDER FACILITY AT BROOKHAVEN NATIONAL LABORATORY

Status Report on the Survey and Alignment efforts at DESY

FAIR. International Facility for Antiproton and Ion. Research

ELECTRON COOLING EXPERIMENTS IN CSR*

Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)

THE LASER TRACKER : A MAJOR TOOL FOR THE METROLOGY OF THE LHC

The Super-FRS Project at GSI

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

ALIGNMENT RESULT FOR MAGNET UNITS OF THE SPRING-8 STORAGE RING

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

Proposal to convert TLS Booster for hadron accelerator

Approaches to High Intensities for FAIR

Development of the UNILAC towards a Megawatt Beam Injector

(a) (b) Fig. 1 - The LEP/LHC tunnel map and (b) the CERN accelerator system.

Radiation Shielding of Extraction Absorbers for a Fermilab Photoinjector

BEAM PARAMETERS FROM SIS18 AND SIS100 ON TARGETS

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

Milano Fisica conantiprotoni al progetto FAIR del GSI

TECHNIQUES USED IN THE ALIGNMENT OF TJNAF S ACCELERATORS AND EXPERIMENTAL HALLS*

NUSTAR and the status of the R3B project at FAIR

Shielding calculations for the design of new Beamlines at ALBA Synchrotron

Survey & Alignment of Pohang Light Source

FAIR. Reiner Krücken for the NUSTAR collaboration

Review of ISOL-type Radioactive Beam Facilities

Geodetic Survey and Component Alignment of the Combined Heavy Ion Synchrotron SIS and the Experimental Storage Cooler Ring ESR

SC magnets for Future HEHIHB Colliders

A Project to convert TLS Booster to hadron accelerator 1. Basic design. 2. The injection systems:

Status Report on Survey and Alignment Efforts at DESY

1 BROOKHAVEN SCIENCE ASSOCIATES

The Electron-Ion Collider

SOFIA Fission studies at GSI

Large Hadron Collider at CERN

High Resolution Electron Spectrometry at the NESR. Ajay Kumar

The FAIR/GSI Accelerator Facility

CESR CREATING NEW FORMS OF MATTER. Meet CESR in Action. To Increase Luminosity

Appendices 193 APPENDIX B SCATTERING EXPERIMENTS

Radiation Protection Issues at SOLARIS - Safety Assumptions and Project Status.

Fast-Neutron Production via Break-Up of Deuterons and Fast-Neutron Dosimetry

STORAGE RINGS FOR RADIO-ISOTOPE BEAMS

Longitudinal stacking and electron cooling of ion beams in the ESR as a proof of principle for FAIR. C. Dimopoulou

Facility for Antiproton and Ion Research - FAIR

Status of the ESR And Future Options

Spin-physics with Polarized Antiprotons at GSI

BEPCII Pre-alignment and Hold Level Adjustment. Accelerator Center of IHEP Xiaolong Wang

The Superconducting SIS100 Synchrotron for High Intensity Proton and Heavy Ion Beams

PREPARING THE SPS COMPLEX ALIGNMENT FOR FUTURE LHC RUNS

DEVELOPMENT OF FFAG AT KYUSYU UNIVERSITY

UPGRADE OF THE HIT INJECTOR LINAC-FRONTEND

The Booster has three magnet systems for extraction: Kicker Ke, comprising two identical magnets and power supplies Septum Se

Accelerators. Lecture V. Oliver Brüning. school/lecture5

3.2.2 Magnets. The properties of the quadrupoles, sextupoles and correctors are listed in tables t322_b,_c and _d.

MESON AREA 1000 GeV STUDY. C. N. Brown, A. L. Read, A. A. Wehmann Fermi National Accelerator Laboratory

UPGRADE OF THE HIT INJECTOR LINAC-FRONTEND

Overview and Status of the Austrian Particle Therapy Facility MedAustron. Peter Urschütz

FAIR Project in Progress. Boris Sharkov. Scientific managing director. Moscow

JAPAN PROTON ACCELERATOR RESEARCH COMPLEX

Survey and Alignment of the J-PARC

STATUS REPORT ON SURVEY AND ALIGNMENT OF J-PARC AFTER THE EARTHQUAKE

PULSE-TO-PULSE TRANSVERSE BEAM EMITTANCE CONTROLLING FOR MLF AND MR IN THE 3-GeV RCS OF J-PARC

Design of a Sector Magnet for High Temperature Superconducting Injector Cyclotron

Feasibility Studies for the EXL Project at FAIR *

Physics with Exotic Nuclei

The FLUKA study of the secondary particles fluence in the AD-Antiproton Decelerator target area.

Transcription:

THE GSI FUTURE PROJECT: AN INTERNATIONAL ACCELERATOR FACILITY FOR BEAMS OF IONS AND ANTIPROTONS Ina Pschorn Gesellschaft für Schwerionenforschung mbh, D-64291 Darmstadt, Germany 1. INTRODUCTION The GSI Laboratory (Gesellschaft für Schwerionenforschung) at Darmstadt / Germany already has an excellent, and in many aspects unique, accelerator facility for heavy ion beams. Based on the experiences and technological developments attained here, a new facility that will boost the intensity of the beam by a factor of 100 to 10000 and increase the beam energy 15-fold is proposed. The planned future facility is based on two superconducting synchrotrons and a system of associated storage rings. It will use the present accelerators, the universal linear accelerator (UNILAC) and the synchrotron ring accelerator (SIS18) as injector. The new large dual ring accelerator SIS 100/200 with about 1100 meters five times the circumference of the current SIS - will be installed in a tunnel system 24 meters below ground, while the other buildings and facilities will be arranged above ground. Approximately eight years have been planned for the realization of the project that is a challenge not only for the physicists but also for the survey and alignment group. Figure 1: Location of the projected new international facility

2. EXISTING ACCELERATOR FACILITY The existing accelerator facility of GSI consists of the universal linear accelerator UNILAC (energy of 2-20 MeV/u), commissioned in 1975 and upgraded several times, the heavy ion synchrotron SIS18 (1-2 GeV/u) and the experimental cooler/storage ring ESR (0.5-1 GeV/u), both constructed between 1985 and 1990. The facility is a user facility, open to national and international research groups. More than 1000 scientists from over 25 countries are involved in the ongoing research activities pursued at GSI. The program includes fundamental research in nuclear, atomic and biophysics as well as research in applied fields such as material sciences, plasma physics, cancer therapy, and accelerator development. Transfer building Figure 2: Layout of the existing GSI facility (blue) together with the proposed upgrade (red). The UNILAC / SIS18 complex serves as the injector for the new double ring synchrotron. 3. PLANNED NEW ACCELERATOR FACILITY The principal part of the planned new accelerator facility is a synchrotron complex, consisting of two separate synchrotron accelerator rings with 100 and 200 Tm maximum magnetic rigidity. They will be installed in the same tunnel and equipped with new, rapidly cycling superconducting magnets.

The facility will be complemented by three additional cooler/storage rings the collector ring (CR), the new experimental storage ring (NESR) and the high energy storage ring (HESR), and will also contain the new fragment separator Super-FRS as well as several experimental areas. Table 1 Key parameters of the proposed synchrotrons and cooler/storage rings Ring Circumference Bending Power Beam Energy [m] [Tm] SIS100 1080 100 2.7 GeV/u U28 + 29 GeV protons SIS200 1080 200 22.3 GeV/u U92 + CR 187 13 740 MeV/u, A/q=2.7 3 GeV antiprotons NESR 208 13 740 MeV/u, A/q=2.7 3 GeV antiprotons HESR 430 50 14 GeV antiprotons 4. CIVIL CONSTRUCTION Due to the fact that the existing accelerator will be used as an injector, the new complex will be constructed east of the existing GSI facility. Environmental and safety aspects as well as anticipated costs led to the decision to install the large double ring SIS100/200 in one tunnel at a depth of -24 meters. For economic reasons all other buildings will be arranged above ground, south of the large new tunnel. The tunnel should be built in shield driving technique while the injection / extraction ramps should be constructed by cut-and-cover technique. Radiation protection requirements will result in an effective inner tunnel diameter of 5m, compared to the exterior diameter of 8m. Figure 3: Tunnel cross-section for the two-ring synchrotron facility

Halls above ground will be constructed as framed structures and made of reinforced concrete. High activation, that is expected at some experimental areas and other parts of the accelerator, will result in extensive shielding measures implemented by concrete walls with a thickness up to 9m (Super-FRS). 5. SURVEY AND ALIGNMENT Exact positioning of all elements with respect to neighboring components within the new facility, is essential for high beam quality, low losses and easy commissioning of the machine. At this early stage of planning it is not possible to present a detailed concept for survey and alignment of the new facility, particularly because the final lattice is not yet known and alignment tolerances (global, relative) have not been definitively defined yet. At this stage tolerances are assumed to be in the range of a few tenths of millimeter (relative), depending on the machine. 5.1 Basic Alignment Concept The basic principles of survey and alignment in order to achieve a successful start up of the new machines can be summarized as: Figure 4: One of the existing monument pillars used for SIS18 surfaceto-tunnel transfer of coordinates 5.2 Particular geometrical characteristics of the GSI facility Installation of a 3D reference network at the surface to ensure the correct location and orientation of the existing and the new accelerator facility with respect to each other Installation of 3D reference network(s) in the tunnel, in the rings above ground, transfer lines, Network densification to allow the connection of networks between the surface and tunnel network as well as between all sections of the accelerator facility (e.g. horizontal and vertical sight pipes) Component fiducialisation Pre-alignment of supports and components Relative alignment of components and a quality control measurement A matter of special importance is the design and layout of the reference network for the machine because of the multiple bifurcations of the beamlines (see transfer building). Furthermore, the variation of beam level not only the difference between the synchrotron at a

depth of -24m and the rings above ground, but also within the transfer area should be considered. The ability to operate the accelerator subsystems in parallel up to four different scientific programs, involving different kinds of ions, is to guarantee. Therefore it is probably necessary to arrange the different beamlines one above and below the other within the transfer section. Shielding for radiation protection can lead to concrete walls with a thickness of up to 9m. Hence, direct linkage of the machine reference systems using sight pipes will not be possible. 5.3 Fiducialisation of superconducting magnets Both synchrotrons SIS100 / SIS200 will use superconducting magnets operating at temperatures of 4K to guide the circulating particles. Appropriate procedures for relating the effective magnetic axis of a non-accessible component to reference marks outside the cryostat have to be developed in close collaboration with the magnetic measurements group. The classical magnets can be fiducialised with laser trackers as it is accomplished at GSI already for several years. Figure 5: A Nuclotron-type short model dipole of 1.4 m length that is used for SIS100 the 4K version in its cryostat. 5.4 Remote Systems After initial installation, including all adjustment procedures, and beginning of operation, some areas of the new facility will not (or only with great effort) be accessible due to an expected high level of neutron production and activation. This will be true even in later shutdown periods. The basic necessity for using automated, remote systems for position control and realignment within this zone is therefore obvious.

5.5 Special tasks Besides questions regarding the predefinition of reference frames (taking into consideration the earth s curvature and deflection of the vertical), the design of networks, the specification of measurement procedures and much more, it is rather essential at this early stage of planning to exert influence on decisions which have great impact on alignment for example: Civil engineering: Stability of the floor Climatic requirements Sight pipes and other stay-clears in space for alignment tasks Easy access to the machines Mechanical engineering / magnet design: Component supports Adjustment systems Alignment fiducials on the magnets / cryostats 6. CONCLUSION The survey and alignment of the new facility presents many challenges to a survey and alignment group, which still has to be set up, to work on these tasks. 7. REFERENCES [1] Conceptual Design Report An International Accelerator Facility for Beams of Ions and Antiprotons, GSI, 2001