D. B. G R A Y E N G I N E E R I N G I N C.

Similar documents
SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

Jp2g Consultants Inc.

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Materials. Use materials meeting the following.

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Woodford County Erosion Prevention Plan and Permit. Application #

Rock & Aggregate Drop Inlet Protection

Table 1 - Infiltration Rates

STORMWATER DESIGN CALCULATIONS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

WATER MANAGEMENT REPORT FOR PAGE ESTATES

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

Stormwater Inlet Sediment Traps

STORMWATER MANAGEMENT REPORT

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

FUNCTIONAL SERVICING REPORT AND SWM REPORT

Caledon Villas Corporation

Wellsgate Terrace SPECIFICATIONS.

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Guide to the use of the Erosion and Sediment Control Evaluation Tool

EROSION CONTROL NARRATIVE

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

WELCOME Lake Wabukayne OPEN HOUSE

Stone Outlet Sediment Trap

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

FHWA - HIGHWAY HYDROLOGY

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

Stormwater Outlet Sediment Traps

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

Coarse Sediment Traps

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011

Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015

Specifications Whitcomb Elementary School Demolition January 15, 2016

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

TPDES: Soil, Erosion and Sedimentation Methods

Hydrology Study Report

Suitable Applications Sediment traps should be considered for use:

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

3301 East 120 th Avenue Assited Living & Memory Care

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Continuing Education Course #101 Drainage Design with WinTR-55

APPENDIX B WORKSHEETS & EXHIBITS

Section 4: Model Development and Application

Sediment Trap. At multiple locations within the project site where sediment control is needed.

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

Climate Adaptation Challenges for Boston s Water and Sewer Systems

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

D.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough

Eastlake Assited Living & Memory Care

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Drainage Study for Civic Center Way

Stage Discharge Tabulation for Only Orifice Flow

APPENDIX B DRAINAGE REPORT

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

Template for Sediment and Erosion Control Plan General Instructions

: WATER SUPPLY SERVICING

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

Stormwater Work Projects 2013

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

Stormwater Management Report

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

Chapter 10 - Sacramento Method Examples

Chutes Part 5: Rock linings

Construction Exits Rock pads

CCR Rule Annual Inspection Report (cont.) 2

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Stormwater Capacity Analysis for Westover Branch Watershed

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

Chapter 5 CALIBRATION AND VERIFICATION

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Villages at Riverdale Thornton, CO

HYDROLOGY REPORT Tentative Tract No. 5978

Rucker Pond. Background

Stormwater Management Report

MS4: MAPPING CHALLENGES. Mike Towle Associate Planner, WestCOG

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015

UNIVERSITY OF BOLTON WESTERN INTERNATIONAL COLLEGE FZE BENG (HONS) CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2016/2017 GROUND AND WATER STUDIES 2

Map Reading 101: Using and Reading Maps and Plans

Web (Java, ArcGIS Server [WebADF, flex, silverlight]) Mobile (ArcGIS Mobile, ArcPad, Windows Mobile) Deskt

ONTARIO REGULATION 156/06. made under the CONSERVATION AUTHORITIES ACT

Transcription:

STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains 700 Long Point ircle 613-425-8044 Ottawa, Ontario K1T 4E9 dbgray@rogers.com 1

STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario This report addresses the stormwater management requirements of a proposed 35 unit three-storey apartment building development located on 2199 sq.m. of land at 948 Hunt lub Road in Ottawa. The proposed development is the second phase of a two phase development and is considered a revision to an existing approved site plan for 934 Hunt lub Road. This report forms part of the stormwater management design for the proposed development. Also refer to drawing SG-1 & SG-2, prepared by D. B. Gray Engineering Inc. WATER QUALITY: The Rideau Valley onservation Authority (RVA) commented that the municipal storm sewers fronting the subject property on Hunt lub Road run to the east, outletting either at the upstream end of the municipal Sawmill reek onstructed Wetland Facility or into a low area of publicly owned land adjacent the Airport Parkway in either case, no additional quality controls are required for the purpose of surface water quality protection. No permanent on-site quality control measures are proposed. During construction, an erosion and sediment control plan has been developed (see notes 2.1 to 2.5 on drawing SG-2). In summary, to filter out construction sediment, geotextile fabric will be placed between the grate and frame of all existing catch basins adjacent to the site and all new catch basins as they are installed. WATER QUANTITY: The stormwater management criteria for quantity control are to control the post development peak flows for the 5-year and 100-year storm events to peak flows during the 5-year storm event using a pre-development runoff coefficient or runoff coefficient of 0.5, whichever is less. It is calculated that the pre-development conditions reflect a 5-year runoff coefficient of 0.42. Using the Airport Formula for sheet flow it is calculated that the existing time of concentration is 13.0 minutes. Based on the Rational Method the pre-development (existing) peak flow is 23.33 l/s. 2

alculations are based on the Rational Method. The runoff coefficients for the 100 year event were increased by 25% to maximum 1.00. Stormwater will be stored within the development; on the roof of the proposed building; on the surface in a car park area; and underground in catch basins, manholes and sewer pipes. The runoff from the perimeter of the property (Drainage Area I 511 sq.m.) will be allowed to flow uncontrolled off the site. The flow from these areas is calculated at 10 minutes concentration. Each of three roof drains will be flow control type installed with a parabolic shaped slotted weir (1 slot per weir drain at 0.0124 l/s per mm per slot - 5 USgpm per inch per slot) causing the storm water to pond on the roof (Drainage Areas II & III 283 sq.m. & 604 sq.m.). An inlet control device (ID) located at the outlet pipe of B/MH-2 will control the release of stormwater from Drainage Area IV (801 sq.m.). The ID will restrict the flow and force the stormwater back up into the upstream sewer pipes, catch basin and manholes and onto the surface above catch basins B-1 and B/MH-2. Stormwater released through the roof drains and ID will be conveyed off the site via a an existing 300mm storm sewer connection that also serves 934 Hunt lub Road. The existing 300mm storm sewer connects to an existing 1800mm municipal storm sewer in Hunt lub Road. The ID shall be a Hydrovex "VHV Vertical Vortex Flow Regulator" and shall be sized by the manufacturer for a discharge rate of 9.95 l/s at 3.05 m head. It is calculated that an orifice area of 7854 sq.mm. (100 mm in diameter) and a discharge coefficient of 0.164 will restrict the outflow rate to 9.95 l/s at a head of 3.05 m. Based on this orifice the maximum outflow rate for the 1:5 year storm event is calculated to be 9.84 l/s at 2.98 m. EXISTING ATH BASIN B#4: The stormwater management design developed by Stantec Engineering for 934 Hunt lub Road (now built) included an IBEX Type A ID to be installed in the outlet pipe of the catch basin B#4 located in the southeast corner of 934 Hunt lub Road. Based on Stantec s calculations the drainage area for this catch basin is 140 sq.m. with a runoff coefficient of 0.20 (i.e. grass). During the 100-year storm event we calculate that at 15 minutes time of concentration the runoff from this area is 1.39 l/s. The IBEX Type A ID will release 23.26 l/s without any water ponding above the catch basin, so in this scenario there would be no surface ponding. 3

However the actual drainage area for this catch basin includes the south side of the roof and the rear yard of 948 Hunt lub Road. It is approximately 1500 sq.m. in area with a runoff coefficient of 0.28. During the 100-year storm event we calculate that at 15 minutes time of concentration the runoff from this area draining into B#4 is actually 19.96 l/s. However since the IBEX Type A ID will release 23.26 l/s there would still be no surface ponding. The proposed drainage area for this catch basin includes the southern perimeter of 948 Hunt lub Road. It is approximately 270 sq.m. in area with a runoff coefficient of 0.28. During the 100-year storm event we calculate that at 15 minutes time of concentration runoff from this area is actually 2.68 l/s. Again, since the IBEX Type A ID will release 23.26 l/s there would still be no surface ponding. ONLUSIONS: WATER QUALITY: The Rideau Valley onservation Authority (RVA) has commented that no on-site quality control measures are required. No permanent control measures are proposed. An erosion and sediment control plan as been developed to be implemented during construction WATER QUANTITY: One Hundred Year Storm Event: The maximum allowable release rate for the one hundred year storm event for the site is 23.33 l/s. The post-development release rate for the 100-year storm event is calculated to be 23.33 l/s. Therefore the maximum post development release rate for the 100-year storm event is equal to the maximum permitted release rate. A maximum stored volume of 51.65 cu.m. is required to achieve the post development release rate. Five Year Storm Event: The maximum allowable release rate for the five year storm event for the site is 23.33 l/s. The post-development release rate for the 5-year storm event is calculated to be 17.77 l/s. Therefore the maximum post development release rate for the 5-year storm event is less than the maximum permitted release rate. A maximum stored volume of 20.85 cu.m. is required to achieve the post development release rate. 4

Summary Tables ONE HUNDRED YEAR EVENT Drainage Area AREA I (Uncontrolled flow off site) AREA II (East Roof) AREA III (West Roof) Maximum Maximum Maximum Allowable Release Volume Release Rate Stored Rate l/s l/s cu.m. 8.29 - - 1.70-10.12 3.40-22.13 AREA IV 9.95-19.40 TOTAL 23.33 23.33 51.65 FIVE YEAR EVENT Drainage Area AREA I (Uncontrolled flow off site) AREA II (East Roof) AREA III (West Roof) Maximum Maximum Maximum Allowable Release Volume Release Rate Stored Rate l/s l/s cu.m. 4.02 - - 1.30-4.54 2.61-9.98 AREA IV 9.84-6.33 TOTAL 17.77 23.33 20.85 5

STORMWATER MANAGEMENT ALULATIONS The orifice calculations are based on the following formula: Q = d x A o 2gh x 1000 where: Q = flowrate in ltires per second d = coefficient of discharge A o = orifice area in sq.m. g = 9.81 m/s2 h = head above orifice in meters Flow control roof drain calculations are based on the following formula: Q = N x S x d x F where: Q = flowrate in ltires per second N = number of roof drains S = slots per weir d = pond depth at roof drain in mm F = flowrate through each slot 0.0124 litres per second per mm pond depth (5 USgpm per inch) Storage calculations on the roof and in the parking area are based on the following formula for volume of a cone: V = (A x d)/3 where: V = volume in cu.m. A = ponding area in sq.m. d = ponding depth in meters alculations for sub-surface storage (manholes and sewer pipes) are based on the following formula for volume of a cylinder: V = L x Pi x (d/2) 2 where: V = volume in cu.m. L = depth of water in manhole or length of pipe in meters d = diameter of manhole (1.22 m) or pipe in meters 6

948 Hunt lub Road Ottawa, Ontario REVISED REVISED 27-Aug-12 21-Apr-14 27-Nov-14 STORM WATER MANAGEMENT ALULATIONS Rational Method ONE HUNDRED YEAR EVENT Maximum Allowable Release Rate Five Year Event Pre-development (Existing) Development onditions Roof Area: 313 sq.m. 0.90 Asphalt/oncrete Area: 379 sq.m. 0.90 Landscaped: 1507 sq.m. 0.20 Total atchment Area 2199 sq.m. 0.42 Time of oncentration: Tc = Sheet Flow Airport Formula 3.26 (1.1 - ) (L) 1/2 min Sw 0.33 Runoff oefficient (): 0.42 Existing (see above) Sheet Flow Distance (L): 54 m Slope of Land (Sw): 2 % Time of oncentration (Sheet Flow): 13.0 min Area (A): 2199 sq.m. Time of oncentration: 13.0 min. Rainfall Intensity (i): 91 mm/hr (5 year event) Runoff oeficient (): 0.42 Existing (see above) or 0.5 which ever is less Flow Rate (2.78Ai): 23.33 l/s DRAINAGE AREA I (Uncontrolled Flow Off Site): Roof Area: 20 sq.m. 1.00 Asphalt/oncrete Area: 33 sq.m. 1.00 Landscaped: 458 sq.m. 0.25 Total atchment Area 511 sq.m. 0.33 Area (A): 511 sq.m. Time of oncentration: 10 min. Rainfall Intensity (i): 179 mm/hr (100 year event) Runoff oeficient (): 0.33 Flow Rate (2.78Ai): 8.29 l/s 7

DRAINAGE AREA II (East Roof): (ONE HUNDRED YEAR EVENT) Roof Area: 283 sq.m. 1.00 Paved Area: 0 sq.m. 1.00 Landscaped Areas: 0 sq.m. 0.25 Total atchment Area 283 Ave. 1.00 No. of Roof Drains: 1 Slots per Wier: 1 0.0124 l/s/mm/slot (5 USgpm/in/slot) Depth at Roof Drain: 137 mm Maximum Release Rate 1.70 l/s Pond Area: 222 sq.m. Achieved Vol: 10.12 cu.m. Max. Vol. Required: 10.12 cu.m. Release Stored Stored Time i 2.78Ai Rate Rate Volume min. mm/hr l/s l/s l/s cu.m. 5 243 19.09 1.70 17.40 5.22 10 179 14.05 1.70 12.35 7.41 15 143 11.24 1.70 9.55 8.59 20 120 9.44 1.70 7.74 9.29 25 104 8.17 1.70 6.47 9.71 30 92 7.23 1.70 5.53 9.96 35 83 6.50 1.70 4.80 10.08 40 75 5.91 1.70 4.22 10.12 45 69 5.43 1.70 3.74 10.09 50 64 5.03 1.70 3.34 10.01 55 60 4.69 1.70 3.00 9.89 60 56 4.40 1.70 2.70 9.73 65 53 4.14 1.70 2.45 9.54 70 50 3.92 1.70 2.22 9.33 75 47 3.72 1.70 2.02 9.10 80 45 3.54 1.70 1.84 8.85 85 43 3.38 1.70 1.68 8.59 90 41 3.23 1.70 1.54 8.31 95 39 3.10 1.70 1.41 8.02 100 38 2.98 1.70 1.29 7.72 105 36 2.87 1.70 1.18 7.41 110 35 2.77 1.70 1.07 7.09 115 34 2.68 1.70 0.98 6.76 120 33 2.59 1.70 0.89 6.43 125 32 2.51 1.70 0.81 6.09 130 31 2.43 1.70 0.74 5.74 135 30 2.36 1.70 0.66 5.38 140 29 2.29 1.70 0.60 5.02 145 28 2.23 1.70 0.54 4.66 150 28 2.17 1.70 0.48 4.29 180 24 1.88 1.70 0.19 2.00 210 21 1.66 1.66 0.00 0.00 240 19 1.50 1.50 0.00 0.00 270 17 1.36 1.36 0.00 0.00 300 16 1.25 1.25 0.00 0.00 8

DRAINAGE AREA III (West Roof): (ONE HUNDRED YEAR EVENT) Roof Area: 604 sq.m. 1.00 Paved Area: 0 sq.m. 1.00 Landscaped Areas: 0 sq.m. 0.25 Total atchment Area 604 Ave. 1.00 No. of Roof Drains: 2 Slots per Wier: 1 0.0124 l/s/mm/slot (5 USgpm/in/slot) Depth at Roof Drain: 137 mm Maximum Release Rate 3.40 l/s Pond Area: 484 sq.m. Achieved Vol: 22.13 cu.m. Max. Vol. Required: 22.13 cu.m. Release Stored Stored Time i 2.78Ai Rate Rate Volume min. mm/hr l/s l/s l/s cu.m. 5 243 40.75 3.40 37.35 11.21 10 179 29.98 3.40 26.58 15.95 15 143 23.99 3.40 20.60 18.54 20 120 20.14 3.40 16.74 20.09 25 104 17.44 3.40 14.04 21.06 30 92 15.43 3.40 12.03 21.65 35 83 13.87 3.40 10.47 21.98 40 75 12.62 3.40 9.22 22.13 45 69 11.59 3.40 8.20 22.13 50 64 10.74 3.40 7.34 22.02 55 60 10.01 3.40 6.61 21.82 60 56 9.39 3.40 5.99 21.55 65 53 8.84 3.40 5.44 21.22 70 50 8.36 3.40 4.96 20.84 75 47 7.93 3.40 4.54 20.41 80 45 7.55 3.40 4.16 19.95 85 43 7.21 3.40 3.81 19.45 90 41 6.90 3.40 3.50 18.92 95 39 6.62 3.40 3.22 18.37 100 38 6.36 3.40 2.97 17.80 105 36 6.13 3.40 2.73 17.20 110 35 5.91 3.40 2.51 16.58 115 34 5.71 3.40 2.31 15.95 120 33 5.52 3.40 2.12 15.30 125 32 5.35 3.40 1.95 14.64 130 31 5.19 3.40 1.79 13.96 135 30 5.04 3.40 1.64 13.27 140 29 4.89 3.40 1.50 12.57 145 28 4.76 3.40 1.36 11.86 150 28 4.64 3.40 1.24 11.14 180 24 4.01 3.40 0.62 6.64 210 21 3.55 3.40 0.15 1.91 240 19 3.19 3.19 0.00 0.00 270 17 2.90 2.90 0.00 0.00 300 16 2.67 2.67 0.00 0.00 9

DRAINAGE AREA IV (ONE HUNDRED YEAR EVENT) Roof Area: 0 sq.m. 1.00 Asphalt/oncrete Area: 777 sq.m. 1.00 Landscaped: 24 sq.m. 0.25 Total atchment Area 801 sq.m. 0.98 Storage in MH's & B's Water Elevation: 99.42 m Invert Depth m m B/MH-2 96.37 2.93 3.31 cu.m. ID Invert: 96.37 m B-1 97.05 2.25 0.81 cu.m. (Outlet Pipe OF B/MH-2): Head: 3.05 m Storage in Sewer Pipes Diam. Length mm m Orifice Diameter 100 mm 250 19.4 0.92 cu.m. Orifice Area: 7854 sq.mm. Surface Storage Above atch Basin Area Depth B/MH-2 170 0.12 6.61 cu.m. oefficient of Discharge: 0.164 B-1 200 0.12 7.75 cu.m. Max. Release Rate: 9.95 l/s Achieved Vol: 19.40 cu.m. Max. Vol. Required: 19.40 cu.m. Release Stored Stored Time i 2.78Ai Rate Rate Volume min. mm/hr l/s l/s l/s cu.m. 5 243 52.83 9.95 42.88 12.87 10 179 38.87 9.95 28.92 17.35 15 143 31.10 9.95 21.16 19.04 20 120 26.11 9.95 16.16 19.40 25 104 22.60 9.95 12.66 18.99 30 92 20.00 9.95 10.05 18.09 35 83 17.98 9.95 8.03 16.86 40 75 16.36 9.95 6.41 15.39 45 69 15.03 9.95 5.08 13.73 50 64 13.92 9.95 3.98 11.93 55 60 12.98 9.95 3.03 10.01 60 56 12.17 9.95 2.22 7.99 65 53 11.46 9.95 1.51 5.90 70 50 10.84 9.95 0.89 3.75 75 47 10.29 9.95 0.34 1.53 80 45 9.79 9.79 0.00 0.00 85 43 9.35 9.35 0.00 0.00 90 41 8.95 8.95 0.00 0.00 95 39 8.58 8.58 0.00 0.00 100 38 8.25 8.25 0.00 0.00 105 36 7.94 7.94 0.00 0.00 110 35 7.66 7.66 0.00 0.00 115 34 7.40 7.40 0.00 0.00 120 33 7.16 7.16 0.00 0.00 125 32 6.94 6.94 0.00 0.00 130 31 6.73 6.73 0.00 0.00 135 30 6.53 6.53 0.00 0.00 140 29 6.35 6.35 0.00 0.00 145 28 6.17 6.17 0.00 0.00 150 28 6.01 6.01 0.00 0.00 180 24 5.20 5.20 0.00 0.00 210 21 4.60 4.60 0.00 0.00 240 19 4.14 4.14 0.00 0.00 270 17 3.76 3.76 0.00 0.00 300 16 10 3.46 3.46 0.00 0.00

FIVE YEAR EVENT Maximum Allowable Release Rate Five Year Event Pre-development (Existing) Development onditions Roof Area: 313 sq.m. 0.90 Asphalt/oncrete Area: 379 sq.m. 0.90 Landscaped: 1507 sq.m. 0.20 Total atchment Area 2199 sq.m. 0.42 Time of oncentration: Tc = Sheet Flow Airport Formula 3.26 (1.1 - ) (L) 1/2 min Sw 0.33 Runoff oefficient (): 0.42 Existing (see above) Sheet Flow Distance (L): 54 m Slope of Land (Sw): 2 % Time of oncentration (Sheet Flow): 13.0 min Area (A): 2199 sq.m. Time of oncentration: 13.0 min. Rainfall Intensity (i): 91 mm/hr (5 year event) Runoff oeficient (): 0.42 Existing (see above) or 0.5 which ever is less Flow Rate (2.78Ai): 23.33 l/s DRAINAGE AREA I (Uncontrolled Flow Off Site): Roof Area: 20 sq.m. 0.90 Asphalt/oncrete Area: 33 sq.m. 0.90 Landscaped: 458 sq.m. 0.20 Total atchment Area 511 sq.m. 0.27 Area (A): 511 sq.m. Time of oncentration: 10 min. Rainfall Intensity (i): 104 mm/hr (5 year event) Runoff oeficient (): 0.27 Flow Rate (2.78Ai): 4.02 l/s 11

DRAINAGE AREA II (East Roof): (FIVE YEAR EVENT) Roof Area: 283 sq.m. 0.90 Paved Area: 0 sq.m. 0.90 Landscaped Areas: 0 sq.m. 0.20 Total atchment Area 283 Ave. 0.90 No. of Roof Drains: 1 Slots per Wier: 1 0.0124 l/s/mm/slot (5 USgpm/in/slot) Depth at Roof Drain: 105 mm Maximum Release Rate 1.30 l/s Pond Area: 130 sq.m. Achieved Vol: 4.54 cu.m. Max. Vol. Required: 4.54 cu.m. Release Stored Stored Time i 2.78Ai Rate Rate Volume min. mm/hr l/s l/s l/s cu.m. 5 141 10.00 1.30 8.70 2.61 10 104 7.38 1.30 6.08 3.65 15 84 5.92 1.30 4.62 4.16 20 70 4.97 1.30 3.68 4.41 25 61 4.31 1.30 3.01 4.52 30 54 3.82 1.30 2.52 4.54 35 49 3.44 1.30 2.14 4.49 40 44 3.13 1.30 1.83 4.39 45 41 2.88 1.30 1.58 4.26 50 38 2.67 1.30 1.37 4.11 55 35 2.49 1.30 1.19 3.92 60 33 2.33 1.30 1.04 3.73 65 31 2.20 1.30 0.90 3.51 70 29 2.08 1.30 0.78 3.28 75 28 1.97 1.30 0.68 3.05 80 27 1.88 1.30 0.58 2.80 85 25 1.80 1.30 0.50 2.54 90 24 1.72 1.30 0.42 2.28 95 23 1.65 1.30 0.35 2.01 100 22 1.59 1.30 0.29 1.73 105 22 1.53 1.30 0.23 1.45 110 21 1.47 1.30 0.18 1.17 115 20 1.42 1.30 0.13 0.88 120 19 1.38 1.30 0.08 0.58 125 19 1.34 1.30 0.04 0.28 130 18 1.30 1.30 0.00 0.00 135 18 1.26 1.26 0.00 0.00 140 17 1.22 1.22 0.00 0.00 145 17 1.19 1.19 0.00 0.00 150 16 1.16 1.16 0.00 0.00 180 14 1.00 1.00 0.00 0.00 210 13 0.89 0.89 0.00 0.00 240 11 0.80 0.80 0.00 0.00 270 10 0.73 0.73 0.00 0.00 300 9 0.67 0.67 0.00 0.00 12

DRAINAGE AREA III (West Roof): (FIVE YEAR EVENT) Roof Area: 604 sq.m. 0.90 Paved Area: 0 sq.m. 0.90 Landscaped Areas: 0 sq.m. 0.20 Total atchment Area 604 Ave. 0.90 No. of Roof Drains: 2 Slots per Wier: 1 0.0124 l/s/mm/slot (5 USgpm/in/slot) Depth at Roof Drain: 105 mm Maximum Release Rate 2.61 l/s Pond Area: 285 sq.m. Achieved Vol: 9.98 cu.m. Max. Vol. Required: 9.98 cu.m. Release Stored Stored Time i 2.78Ai Rate Rate Volume min. mm/hr l/s l/s l/s cu.m. 5 141 21.34 2.61 18.73 5.62 10 104 15.75 2.61 13.14 7.88 15 84 12.63 2.61 10.02 9.02 20 70 10.62 2.61 8.01 9.61 25 61 9.20 2.61 6.60 9.89 30 54 8.15 2.61 5.54 9.98 35 49 7.33 2.61 4.73 9.92 40 44 6.68 2.61 4.07 9.77 45 41 6.14 2.61 3.53 9.54 50 38 5.69 2.61 3.08 9.25 55 35 5.31 2.61 2.70 8.92 60 33 4.98 2.61 2.37 8.54 65 31 4.69 2.61 2.09 8.13 70 29 4.44 2.61 1.83 7.70 75 28 4.21 2.61 1.61 7.24 80 27 4.01 2.61 1.41 6.76 85 25 3.83 2.61 1.23 6.26 90 24 3.67 2.61 1.06 5.75 95 23 3.52 2.61 0.92 5.22 100 22 3.39 2.61 0.78 4.68 105 22 3.26 2.61 0.66 4.13 110 21 3.15 2.61 0.54 3.57 115 20 3.04 2.61 0.43 3.00 120 19 2.94 2.61 0.34 2.42 125 19 2.85 2.61 0.24 1.83 130 18 2.76 2.61 0.16 1.24 135 18 2.68 2.61 0.08 0.64 140 17 2.61 2.61 0.00 0.03 145 17 2.54 2.54 0.00 0.00 150 16 2.47 2.47 0.00 0.00 180 14 2.14 2.14 0.00 0.00 210 13 1.90 1.90 0.00 0.00 240 11 1.71 1.71 0.00 0.00 270 10 1.55 1.55 0.00 0.00 300 9 1.43 1.43 0.00 0.00 13

DRAINAGE AREA IV (FIVE YEAR EVENT) Roof Area: 0 sq.m. 0.90 Asphalt/oncrete Area: 777 sq.m. 0.90 Landscaped: 24 sq.m. 0.20 Total atchment Area 801 sq.m. 0.88 Storage in MH's & B's Water Elevation: 99.35 m Invert Depth m m B/MH-2 96.37 2.93 3.31 cu.m. ID Invert: 96.37 m B-1 97.05 2.25 0.81 cu.m. (Outlet Pipe OF B/MH-2): Head: 2.98 m Storage in Sewer Pipes Diam. Length mm m Orifice Diameter 100 mm 250 19.4 0.92 cu.m. Orifice Area: 7854 sq.mm. Surface Storage Above atch Basin Area Depth B/MH-2 47 0.05 0.81 cu.m. oefficient of Discharge: 0.164 B-1 27 0.05 0.48 cu.m. Max. Release Rate: 9.84 l/s Achieved Vol: 6.33 cu.m. Max. Vol. Required: 6.33 cu.m. Release Stored Stored Time i 2.78Ai Rate Rate Volume min. mm/hr l/s l/s l/s cu.m. 5 141 27.63 9.84 17.79 5.34 10 104 20.39 9.84 10.55 6.33 15 84 16.36 9.84 6.52 5.86 20 70 13.75 9.84 3.91 4.69 25 61 11.92 9.84 2.08 3.12 30 54 10.56 9.84 0.72 1.29 35 49 9.50 9.50 0.00 0.00 40 44 8.65 8.65 0.00 0.00 45 41 7.95 7.95 0.00 0.00 50 38 7.37 7.37 0.00 0.00 55 35 6.88 6.88 0.00 0.00 60 33 6.45 6.45 0.00 0.00 65 31 6.08 6.08 0.00 0.00 70 29 5.75 5.75 0.00 0.00 75 28 5.46 5.46 0.00 0.00 80 27 5.20 5.20 0.00 0.00 85 25 4.97 4.97 0.00 0.00 90 24 4.75 4.75 0.00 0.00 95 23 4.56 4.56 0.00 0.00 100 22 4.39 4.39 0.00 0.00 105 22 4.22 4.22 0.00 0.00 110 21 4.08 4.08 0.00 0.00 115 20 3.94 3.94 0.00 0.00 120 19 3.81 3.81 0.00 0.00 125 19 3.69 3.69 0.00 0.00 130 18 3.58 3.58 0.00 0.00 135 18 3.48 3.48 0.00 0.00 140 17 3.38 3.38 0.00 0.00 145 17 3.29 3.29 0.00 0.00 150 16 3.20 3.20 0.00 0.00 180 14 2.78 2.78 0.00 0.00 210 13 2.46 2.46 0.00 0.00 240 11 2.21 2.21 0.00 0.00 270 10 2.01 2.01 0.00 0.00 300 9 14 1.85 1.85 0.00 0.00

From: Jocelyn handler <jocelyn.chandler@rvca.ca> To: DOUGLAS GRAY <dbgray@rogers.com> Sent: Tuesday, April 22, 2014 12:15 PM Subject: RE: 948 Hunt lub Rd Hello Doug, the municipal storm sewers fronting the subject property on Hunt lub Road run to the east, outletting either at the upstream end of the municipal Sawmill reek onstructed Wetland Facility or into a low area of publicly owned land adjacent the Airport Parkway. Although our mapping data lacks a definite outlet for this stormsewer, in either case, no additional quality controls are required for the purpose of surface water quality protection. Jocelyn Jocelyn handler M.Pl. MIP, RPP Planner, RVA t) 613-692-3571 x1137 f) 613-692-0831 jocelyn.chandler@rvca.ca www.rvca.ca mail: Box 599 3889 Rideau Valley Dr., Manotick, ON K4M 1A5 courier: 3889 Rideau Valley Dr., Nepean, ON K2 3H1 This message may contain information that is privileged or confidential and is intended for the use of the individual(s) or entity named above. This material may contain confidential or personal information which may be subject to the provisions of the Municipal Freedom of Information & Protection of Privacy Act. If you are not the intended recipient of this email, any use, review, revision, retransmission, distribution, dissemination, copying, printing or otherwise use of, or taking any action in reliance upon this email, is strictly prohibited. If you have received this email in error, please contact the sender and delete the original and any copy of the email and any print out thereof, immediately. Your cooperation is appreciated. From: DOUGLAS GRAY [mailto:dbgray@rogers.com] Sent: Tuesday, April 22, 2014 11:02 AM To: Jocelyn handler Subject: 948 Hunt lub Rd Hi Jocelyn I am working on a proposed three-storey 35 unit apartment building development located on 2199 sq.m. of land at 948 Hunt lub Rd in Ottawa. Attached is a location map. Please comment and provide recommendations concerning the stormwater quality criteria for this site. Regards, Doug D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains 700 Long Point ircle Tel: 613-425-8044 Ottawa, Ontario K1T 4E9 dbgray@rogers.com 15

16

17