HYDRAULIC RESEARCH OF SEDIMENT TRANSPORT IN THE VERTICAL SLOT FISH PASSES

Similar documents
VELOCITY AND WATER DEPTH ANALYSIS ON DIFFERENT TYPES OF BLOCK RAMPS

APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE

NUMERICAL SIMULATION OF OPEN CHANNEL FLOW BETWEEN BRIDGE PIERS

Sediment trapping efficiency of modular steel check dam in laboratory experiment and field observation

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

NUMERICAL SIMULATION OF EROSION PROCESSES ON CROSSBAR BLOCK RAMPS

Local Scouring due to Flow Jet at Downstream of Rectangular Sharp-Crested Weirs

Tom Ballestero University of New Hampshire. 1 May 2013

MEASUREMENT OF 3D FLOW FIELD IN A 90 BEND WITH ULTRASONIC DOPPLER VELOCITY PROFILER

Technical Memorandum No

Sediment Extraction and Flow Structure of Vortex Settling Basin

ON SOME MOUNTAIN STREAMS AND RIVERS MORPHODYNAMICAL PARAMETER CHARACTERISTICS USING FIELD AND NUMERICAL MODELING

Do you think sediment transport is a concern?

Lecture Note for Open Channel Hydraulics

Fish Passage at Road Crossings

Experimental Study of the Sediment Trap Effect of Steel Grid-Type Sabo Dams

VARIATION OF MANNING S ROUGHNESS COEFFICIENT WITH SEEPAGE IN SAND-BED CHANNEL *Satish Patel 1 and Bimlesh Kumar 2

A Preliminary Study of Field Scour Morphology Downstream of Block Ramps Located at River Bends

Study of the rate of sediment trapping and water loss in the vortex tube structure at different placement angles

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

Swift Creek Sediment Management Action Plan (SCSMAP)

EXAMPLES (SEDIMENT TRANSPORT) AUTUMN 2018

U-Shaped Sediment Traps

Lateral Inflow into High-Velocity Channels

Deposition and Resuspension of Sediments in Near Bank Water Zones of the River Elbe

An investigation on the impacts of density currents on the sedimentation in dam reservoirs using TCM model; case study: Maroon dam

COMPARISON OF LABORATORY AND FIELD MEASUREMENTS OF BRIDGE PIER SCOUR

Coarse Sediment Traps

Factors affecting confluence scour

NUMERICAL MODEL FOR MOVABLE BED AS A TOOL FOR THE SIMULATION OF THE RIVER EROSION A CASE STUDY

Engineering Hydrology (ECIV 4323) CHAPTER FOUR. Stream flow measurement. Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib

Possibility of Reducing Sedimentation at Lateral Diversion

Laboratory experiences on open channel flow (in collaboration with Dr. Ing. Luca Milanesi)

Physical modelling of sediment transport in mountain torrents upstream of open check dams

LOGO Self-Cleansing of Storm Drain through Incipient Motion Design Concept and Flushing Gate

How to predict the sedimentological impacts of reservoir operations?

In-channel coarse sediment trap Best Management Practice

Watershed concepts for community environmental planning

Measurement of bed load with the use of hydrophones in mountain torrents

Degradation Concerns related to Bridge Structures in Alberta

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26

Laboratory Investigation of Submerged Vane Shapes Effect on River Banks Protection

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

Lab 7: Nonuniform Flow and Open Channel Transitions

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan

Appendix O. Sediment Transport Modelling Technical Memorandum

!"#$%&&'()*+#$%(,-./0*)%(!

Lecture 10: River Channels

Application of an ultrasonic velocity profile monitor in a hydraulic laboratory

COMPREHENSIVE ASSESSMENT OF CONTAMINATED FLUVIAL SEDIMENTS EROSION RISK AND ECOLOGICAL HAZARD

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

Stream Simulation: A Simple Example

Why Geomorphology for Fish Passage

Research Topic Updated on Oct. 9, 2014

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Case Study 2: Twenty-mile Creek Rock Fords

Appendix F Channel Grade Control Structures

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

Evaluation of Geomorphic Effects of Removal of Marmot and Little Sandy Dams and Potential Impacts on Anadromous Salmonids

APPENDIX B Hydraulic Considerations for Pipeline Crossings of Stream Channels

L.O: SLOWING STREAMS DEPOSIT (SORT) SEDIMENT HORIZONTALLY BY SIZE.

DETERMINATION OF SEDIMENT TRAP EFFICIENCY OF SMALL WATER RESERVOIR AT KREMPNA

Sediment Weirs (Instream)

Module 15 : Grit Chamber. Lecture 19 : Grit Chamber

Technical Memorandum No Sediment Model

Use of benthic invertebrate biological indicators in evaluating sediment deposition impairment on the Middle Truckee River, California

Summary. Streams and Drainage Systems

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Laboratory Exercise #3 The Hydrologic Cycle and Running Water Processes

A STUDY ON DEBRIS FLOW DEPOSITION BY THE ARRANGEMENT OF SABO DAM


Diego Burgos. Geology 394. Advisors: Dr. Prestegaard. Phillip Goodling

15. GRIT CHAMBER 15.1 Horizontal Velocity in Flow Though Grit Chamber

What is weathering and how does it change Earth s surface? Answer the question using

Longitudinal dams as an alternative to wing dikes in river engineering. Fredrik Huthoff

Countermeasure Calculations and Design

EFFECT OF TWO SUCCESIVE CHECK DAMS ON DEBRIS FLOW DEPOSITION

The last three sections of the main body of this report consist of:

The Effects of Geomorphology and Watershed Land Use on Spawning Habitat

LAB-SCALE INVESTIGATION ONBAR FORMATION COORDINATES IN RIVER BASED ON FLOW AND SEDIMENT

Upper Drac River restoration project

PRESSURE AND SCOURING AROUND A SPUR DIKE DURING THE SURGE PASS

Storm Water Best Management Practice: Development of Debris Filtering Structure for Supercritical Flow

(3) Sediment Movement Classes of sediment transported

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

1.060 Engineering Mechanics II Spring Problem Set 4

Erosion Rate is a Function of Erodibility and Excess Shear Stress = k ( o - c ) From Relation between Shear Stress and Erosion We Calculate c and

EFFECT OF GRAIN DENSITY ON PLANE BED FRICTION. Václav Matoušek, Vojtěch Bareš, Jan Krupička, Tomáš Picek, Štěpán Zrostlík

Calculation of Stream Discharge Required to Move Bed Material

Zainab Mohamed Yusof*, Syura Fazreen Hamzah 1 & Shahabuddin Amerudin 2

A STUDY ON DEBRIS FLOW OUTFLOW DISCHARGE AT A SERIES OF SABO DAMS

Advanced Hydraulics Prof. Dr. Suresh A Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River

Annual transport rates at two locations on the fore-slope.

Dolores River Watershed Study

WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION

Transcription:

Journal of Ecological Engineering Volume 17, Issue 1, Jan. 2016, pages 143 148 DOI: 10.12911/22998993/61203 Research Article HYDRAULIC RESEARCH OF SEDIMENT TRANSPORT IN THE VERTICAL SLOT FISH PASSES Justyna Mumot 1, Tomasz Tymiński 1 1 Instutute Environmental Engineering, Wrocław University of Environmental and Life Sciences, Plac Grunwaldzki 24, 50-365 Wrocław, Poland, e-mail: justyna.mumot@up.wroc.pl Received: 2015.11.20 Accepted: 2015.12.09 Published: 2016.01.06 ABSTRACT The physical model of vertical slot fishway was conducted. On the fishway a device used for sediment dispense was installed. The sediment was dispensed to each chamber. Measurements of approx. height of the water table, measurements of flow rate, observation of line streams in chambers were carried out during the studies. The flows of sediment and hydraulic parameters inside designed fishway, single compartments and their connection with sedimentation process in individual chambers were also studied. the obtained research results constitute starting point for experimental analyses and research analyses. Based on the observation and measurements it is possible to state that the constructed physical model reflects the activity conditions of the vertical slot fishway. During the studies a place of deposition in sediments of individual fishway chambers were determined. Keywords: vertical slot fishway, physical model, flow conditions, sediment. INTRODUCTION All fish migrate, which results from different needs of individual species. Migration results from a need to change the place for preying, in search for food, as well as to spawn. Very often migrating fish have obstacles ahead, particularly when it is an upriver migration. They face a different kind of stackings, steps, thresholds, etc. Structures, which maintain biological continuity in rivers, are fishways. Built on stacking they enable fish migration up and down watercourse. Fishway must be designed and constructed so that combination of upper and lower level was concatenation (that gives possibility to rest for fish after defeating each stage) or mild connection (ramp). A fishway is a building, which eliminates large local slope of water table on a longer stretch of river. In fishway the flow rate of water should enable aquatic organism upstream migration. Frequent problem, which appears in fishways operation, is sediment deposition, which accumulates due to insufficient flow rate of water in the fishway. What is even more important, sediment de- position in the fishway prevents aquatic organism migration through fishway. AREA OF RESEARCH Figure 1 shows a general schematic of the measurement set-up together with the supply installation. Studies were carried out in the opened rectangular flume of concrete bottom L = 13.50 m in length and B = 0.96 m in width. The vertical slot fishway model built from PCV panels of thickness of 10 mm was mounted in this rectangular flume. Main fishway, modeling plate of riverbed bottom, upper control section, outlet section and stacking valve consisted the model. The fishway was a channel with length Lp = 2.10 m, internal width bp = 0.25 m, heights of side partition walls h = 0.18 m and constant bed slope 1:10. The flume of the fishway was divided into 7 chambers (Figure 2) of fixed compartments with a slot width s = 40 mm. Maximum discharge of the closed circulation system was Q = 40.70 l s 1. 143

Figure 1. Outline of the measuring system Figure 2. On the right view on the chamber in fishway while measurement with probe (probe is on the right) on the left view the dimensions of the chamber of fishway METHODOLOGY In the course of research measurements of elevation height of the water level, flow velocity measurements in different chambers in fishway were carried out and sediment deposition in each chamber in fishway were analyzed. Sediment deposition in each chamber was analyzed in the fishway. Measurements of the water table height were carried out using a needle streamgauge and a cathetometer. Measurements were carried out in the middle of chamber length near partition wall on opposite slot side. During the studies, 10 measuring series were carried out. The number of measuring points in series from 3 to 14 (points depend on the places we have laid down over debris). Multidirectional measurements of local velocity in chambers were carried out using electromagnetic probe of PEMS type. Accuracy of measurement was ±0.001 m s 1. The measurements were conducted in the middle of depth in fishway chambers at characteristic points of flow disturbance and at points located in a grid of squares, as well as on inlet and outlet from the chamber. Sediment was dispensed to the first chamber with a sediment dispenser (Figure 3). The sediment of sand faction (fine sand and medium sand) was dispensed with grains diameter of 0.125 mm, 0.5 mm and 1 mm. Next, the sediment was dispensed right behind the intake in GK1 chamber, all the way to K5 chamber. In a container an agitator was installed with electric motor and adjusted speed of turnovers. Agitator s work disqualified sedimentation process of particles inside the container during dispense of research material. A hole is in the bottom of the container through which flows dispensed the material. Next, the sediment flows through wire (PCV tube) with a diameter of 0.010 m, at the end of which the tube dispensing samples, horizontally located, with a width corresponding to the width of the 144

Figure 3. Sediment dispenser riverbed i.e. 0.96 m. In the tube there are 7 holes with diameter of 0.02 m about permanent gauge, through which the sediment flows freely into the riverbed. RESULTS AND DISCUSSION Sediment dispense was held in a constant way right above water table from upper position in the first chamber on its entire widths. Studies were always carried out at the constant flow of water (Q = 20 l s 1 ). It was a flow, by which particles were transported in the entire profile of fishway. In addition, there was also deposition of about 70% sediment particles at the bottom, which was important for research. On the bottom grains of size 1 mm settled quite fast. Grains with a diameter of 0.125 mm and 0.5 mm were transported to a further chambers of fishway 30%. In Figure 4 up to Figure 7 a horizontal distribution of flow velocity and sediment deposition in chambers of fishway are presented. Due to specific local velocity distribution in the chambers GK1 (Figure 4) and GK3 (Figure 5) the sediment have been deposited almost over the entire surface of the chamber. However, in the chambers K1 (Figure 6) and K3 (Figure 7) the sedimentation was observed only in a small Figure 4. Horizontal distribution of flow velocity in GK1 chamber 145

Figure 5. Horizontal distribution of flow velocity in GK3 chamber Figure 6. Horizontal distribution of flow velocity in K1 chamber 146 Figure 7. Horizontal distribution of flow velocity in K3 chamber

area. The greatest local momentary velocities of water flow occur in the first chamber GK1. Higher velocities can also be observed in the chamber GK3 (at the inlet of proper fishway). In all cases, the highest local velocities occur at the outlet and inlet of the fishway chamber. However the smallest local velocities appear at partition wall and in the corners of chamber. In Figures 8 and 9 dispense and deposition of sediment was observed. Figure 8 presents how sediment distributes, which was dispensed before inlet to fishway by the first GK1 chamber. Whereas, Figure 9 presents what sediment deposition looks like in the third GK3 chamber. In this case, the sediment was dispensed right behind inflow in the first chamber. In Figures 10 and 11 sediment deposition was presented after 10 minutes of studies at constant flow rate and single dispense of sediment from the GK1 chamber downstream to the K5 chamber. CONCLUSIONS Based on conducted observation and measurements it is possible to state that physical model reflects activity conditions of vertical slot fishway. With established parameters (fixed Q and appropriate grain size) it is possible to notice places in which sediment deposition is held. With grains about diameter 0.125 mm, 0.5 mm and 1.0 mm in quite a short time it is possible to observe phenomenon of sedimentation and sediment deposition (70% of all grains). Particularly the bigger grains with diameter d = 1.0 mm sedimented relative fast. About 60% of smaller grains (these with d = 0.125 mm and 0.5 mm) were transported downstream to the next chambers. After conducted laboratory investigation it can be notice that: there is a clear relationship between the hydraulic flow conditions and sediment transport in the fishway, Figure 8. Sediment deposition in GK1 chamber Figure 9. Sediment deposition in GK3 chamber Figure 10. Sediment deposition in GK1 chamber after 10 minutes research Figure 11. Sediment deposition in GK3 chamber after 10 minutes research 147

sediment transport and sedimentation significantly depend mainly on the sediment properties and spatial distribution of flow velocity, much lower mean velocity in GK1, GK2 and GK3 chambers, which result for a lack of stream slope in the bottom, the only zones of increased rate are places in vicinity of intake and outlet slot, sediment deposition appears in the middle of chamber and by side partition walls, the course of sediment transport in time in the fishway is not homogeneous, presented results should be considered as preliminary studies of reconnaissance nature, which will be continued (also in a wider range). REFERENCES 1. Bartnik W., 1991. Determination of the critical conditions of incipient motion of bed load in mountain rivers. In: Armanini A., Di Silvio G. (Eds.) Lecture Note in Earth Sciences. Fluvial Hydraulics of Mountain Region, Berlin, 37. 2. Bialik R., 2009. Numeryczne modelowanie transportu rumowiska wleczonego. ACTA Scient. Pol., Formatio Circumiectus 9 (2) [in Polish]. 3. DVWK, 1996. Fischaufstieganlagen: Bemessung, Gestaltung, Funktionskontrolle. Merkblätter zur Wasserwirtschaft, Bonn, Nr. 232 [in German]. 4. FAO-UN, 2002. Fish passes design, dimensions and monitoring. FAO-UN, DVWK-Germany, Rome. 5. Gessler J. 1971. Beginning and ceasing sediment motion. In: Shen H.W. (Ed.) River Mechanics, Chapt. 7. 6. Głowski R., Kasperek R., Parzonka W., 2010. Wstępna analiza transportu rumowiska unoszonego w przekroju wodowskazowym Chałupki na granicznym odcinku górnej Odry. ACTA Scient. Pol., Formatio Circumiectus 9 (2) [in Polish]. 7. Graf W.H., 1978. The modes of sediment transport and their related bed forms in conveyance systems. In: Proceedings of the Conference Advances in sediment transport, Jabłonna. Ossolineum, Wrocław. 8. Krüger F., 2008. Anforderungen an Fischaufstiegsanlagen, Beispiele aus der Praxis. Konferenzmaterialien: Vortrag zum Wasserbaulichen Kolloquium Oekologische Durchgängigkeit von Fließgewässern, Universität Hannover [in German]. 9. Larinier M., 2002. Buffle Fishways, Bull. Fr. Peche Piscic. 364 suppl. 2002: Lowe M., Associates Hydrologic Solution Preliminary fish ladder concept design for Corte Madera Creek flood Control channel, for transition between units three and four. 10. Radecki-Pawlik A., 2014. Hydromorfologia rzek i potoków górskich. UR, Kraków [in Polish]. 11. Rajaratmam N., Eed S.A., Katapodis C., 2002. Generalized study of hydraulic of culvert fishways. Journal of Hydraulic Engineering. 148