Monroe County: Key West and Lower Keys

Similar documents
The Sunland Park flyover ramp is set to close the week of March 19 until early summer

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

West Tennessee Construction June 14-21, 2017

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

Septem ber 28, 2016 EL PASO, Texas

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS

Focused Traffic Analysis for the One Lincoln Park Project

CITY OF MINOT SNOW REMOVAL PLAN November 2017

The Urbana Free Library Parking and Transportation Study

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions.

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director

Annual Collision Report

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

City of Brainerd, Minnesota Snowplowing Policy

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

TOWN OF GRAND FALLS WINDSOR

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM

Hurricane Florence Recovery Report 4:00 PM November 15, 2018

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

CHAPTER 3 TRANSPORTATION

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors]

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

CITY OF MINOT SNOW REMOVAL PLAN October 2018

Effectiveness of Experimental Transverse- Bar Pavement Marking as Speed-Reduction Treatment on Freeway Curves

March Grade Crossing Analysis

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

collision analyses...

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

John A. Carlson Snow and Ice Removal

The following emergency snow routes are generally cleared first:

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081

City of Camrose Winter Road Maintenance Policy

Winter Maintenance on Provincial Highways

CVS Derwood. Local Area Transportation Review

August 10, 2007 File:

1600 Prairie Drive , FAX

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

City of Rhinelander Snow and Ice Policy

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/1/ :20:07 PM

First Coast TIM Meeting

September 13, 2018 MEDIA RELEASE. Waynesboro Department of Emergency Management Waynesboro Police Department Waynesboro Fire Department

REQUEST FOR PROPOSALS

Tahlequah Public Schools Inclement Weather Transportation Plan

Hurricane Florence Recovery Report 4:00 PM October 31, 2018

Mountain View Community Shuttle Monthly Operations Report

Winter Maintenance on Ontario s Highways

6711 LEE HIGHWAY TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015

COUNCIL POLICY MANUAL

Town of Windsor. Department of Public Works

US 169/I-70 North Loop Planning & Environmental Linkages Study

Storm Surge Forecast with Shifting Forecast Tracks

Coconino County Common Snow Plow Questions/Concerns

Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability

Smoke Fog Superfog - Smoke and Fog mixture Heavy rain and wind

Alachua/Bradford TIM Team Meeting Wednesday, April 10, 2013

Policy Title: Snow Removal & Ice Control Policy #: PW

Municipal Act, 2001 Loi de 2001 sur les municipalités

Appendix C Traffic Study

DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

Portable Changeable Message Sign (PCMS) Speed Study

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

Daily Field Observation Report

1.0 INTRODUCTION AND SUMMARY...

Town of Georgetown Founded Incorporated 1912

AWBREY VILLAGE NEWS Neighbors working together to promote quality of life and enhancement of property values

Exploring Nature With Children A Guided Journal Cursive Edition by Lynn Seddon

Snow and Ice Removal

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

THUNDERBIRD TIMES. November Dear Arrowhead Families,

TOWN OF WINDSOR SNOW CONTROL PLAN

South Western Region Travel Time Monitoring Program Congestion Management Process Spring 2008 Report

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842

DISPOSITION OF FATAL CRASH

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

Winter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM

Trip and Parking Generation Study of Orem Fitness Center-Abstract

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM

Hurricane Florence Operations Report 5:00 PM September 15, 2018

Weather Responsive Traffic Management. WYDOT VSL Project. October 2011

ATTACHMENT F Transportation Management Plan

Transcription:

FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please respond to this email with remove from list in the subject line. Thank you. Note: The Key West Police Department has asked that we remind drivers that the right turn on red law IS IN EFFECT at the entrance to Key West, travelling inbound from US1 onto North Roosevelt Boulevard, and outbound from South Roosevelt Boulevard onto US1. If the red arrow appears allowing bicycles and pedestrians to cross the intersection, vehicular traffic IS PERMITTED to turn right on the red arrow after coming to a complete stop, and as long as any bicycle or pedestrian traffic has cleared. UPCOMING Monroe County: Key West and Lower Keys SR 5/Truman Avenue from Whitehead St. to Eisenhower Dr. Project Start: June 2015 Projected Completion: December 2015 PROJECT DESCRIPTION: The project runs along SR5/Truman Avenue in Key West, from Whitehead Street to Truman Avenue and is scheduled to last approximately 140 days, 20 of which will be for milling and repaving. The improvements under this Contract consist of: Signalization at various intersections Sidewalk improvements including ADA compliance Milling and repaving along SR 5/Truman Avenue from Whitehead Street to Eisenhower Drive.

FOR INFORMATION OR QUESTIONS: Contact Public Information Specialist Dean Walters at dean@swcinc.net or 305-849-1474. SR 5/US 1/Overseas Highway from Key West to Big Coppitt Key (mm 3.9 to 9.8) Project Start: April 2015 Projected Completion: June 2016 WORK SCHEDULED FOR NEXT TWO WEEKS: Major anticipated activities will be drainage work on Stock Island, bridge rehabilitation work on the Boca Chica Bridge, southbound, and shoulder widening on the 4-lane. NIGHT TIME WORK/LANE CLOSURES: The merge lane from South Roosevelt Boulevard onto US1 has been shortened to allow for draining work to begin on the northbound side of US1. Therefore, traffic leaving the island from South Roosevelt onto US1 will be controlled by a traffic signal. Right-on-red will be permitted by law only after a complete stop and vehicular and pedestrian traffic has cleared. Lane shifts will be in effect on the northbound lanes of US1 on Stock Island, and on the southbound lanes of the Boca Chica bridge. No closures are anticipated for this week. For your safety and the safety of others, please be careful when driving, walking or biking in the construction zone. Speed limit will be strictly enforced. We apologize for any problems or issues that may arise, and appreciate your patience and cooperation during this important project. FOR INFORMATION OR QUESTION: Visit the project website on www.fdotmonroe.com, or contact Public Information Specialist Dean Walters at dean@swcinc.net or 305-849- 1474. SR 5/US 1/Overseas Highway, BAHIA HONDA BRIDGE REPAIR (mm 35.5 to 36.6) Project Start: June 2013 Projected Completion: July 2015 WORK SCHEDULED FOR NEXT WEEK: The Contractor will continue pile repair and beam repair. Most of the work will be from the underside of the bridge, except for the concrete pours. NIGHT TIME WORK/LANE CLOSURES: There will be daytime and nighttime single lane closures southbound and northbound for concrete pours and bridge repairs Monday, June 22, through Sunday, June 28. contact Public Information Specialist, Dean Walters at dean@swcinc.net or 305-849-1474.

Monroe County: Marathon and Middle Keys SR 5/US 1/Overseas Highway, LONG KEY BRIDGE REPAIR (mm 63 to 65) Project Start: January 2014 Projected Completion: January 2016 WORK SCHEDULED FOR NEXT WEEK: Concrete and drill shaft operations will continue. A 40MPH speed limit is specified in the contract plans for workers safety during the duration of the project. However, these signs may be covered if there is no work being performed which would allow the regular posted speed limit to stay in effect. Intermittent lane shifts in the early morning hours will continue during concrete pouring and drilled shaft operations. NIGHT TIME WORK/LANE CLOSURES: WEDNESDAY, JUNE 24, 2015 30-minute closure between 8:00 p.m. and 9:30 p.m. THURSDAY, JUNE 25, 2015 (early morning) 15-minute closure between 2:00 a.m. and 3:30 a.m. TUESDAY, JUNE 30, 2015 (early morning) 1-hour closure between midnight and 2:00 a.m. contact Public Information Specialist, Dean Walters at dean@swcinc.net or 305-849-1474. Monroe County: Upper Keys SR 5/US 1/Overseas Highway in Islamorada (mm 81.42 to 85.06) Project Start: April 2014 Projected Completion: July 2015 UPCOMING WORK SCHEDULED: Project is in final acceptance stage.

NIGHT TIME WORK/LANE CLOSURES: Traffic shifts may continue along SR 5/US 1/Overseas Highway in Islamorada between Jerome Ave (81.4) and Smuggler's Cove (MM 85.6), but no lane closures are anticipated. Please note that these schedules may change due to bad weather or other unexpected conditions. please contact Public Information Specialist, Paulette Summers, at 786-510-3921 or psummers@mrgmiami.com. SR 5/US 1/Overseas Highway in Tavernier (mm 90.8 to 99.6) (landscaping project to Poisonwood Rd.) Project Start: February 2015 Projected Completion: August 2017 UPCOMING WORK SCHEDULED: Installation of landscaping materials. NIGHT TIME WORK/LANE CLOSURES: No lane closures anticipated this week. Please use extra caution when driving within the construction zone as there may be an excessive amount of trucks entering and exiting the highway, as we continue to facilitate the removal of stock pile materials. This schedule may change due to bad weather or other unexpected conditions. For your safety and the safety of others, please use caution when driving, walking or biking in For more information on this project, contact Public Information Specialist Jackie Harder, at 305-731-6669, or jackie@swcinc.net. SR 5/US 1/Overseas Highway in Key Largo (mm 99.6 to 106.3) (landscaping project to Abaco Rd.) Project Start: April 2015 Projected Completion: November 2015 UPCOMING WORK SCHEDULED: Installation of landscaping materials. NIGHT TIME WORK/LANE CLOSURES: No lane closures anticipated this week.

For your safety and the safety of others, please use extra caution when driving, walking or biking in the area at that time. Please use extra caution when driving within the construction zone as there may be an excessive amount of trucks entering and exiting the highway, as we continue to facilitate the removal of stock pile materials. This schedule may change due to bad weather or other unexpected conditions. For your safety and the safety of others, please use caution when driving, walking or biking in For more information on this project, contact Public Information Specialist Jackie Harder, at 305-731-6669, or jackie@swcinc.net.