POOR FACE AND HOLLOW SLUG

Similar documents
A L A BA M A L A W R E V IE W

H STO RY OF TH E SA NT

OH BOY! Story. N a r r a t iv e a n d o bj e c t s th ea t e r Fo r a l l a g e s, fr o m th e a ge of 9

What are S M U s? SMU = Software Maintenance Upgrade Software patch del iv ery u nit wh ich once ins tal l ed and activ ated prov ides a point-fix for

c. What is the average rate of change of f on the interval [, ]? Answer: d. What is a local minimum value of f? Answer: 5 e. On what interval(s) is f

S ca le M o d e l o f th e S o la r Sy ste m

P a g e 5 1 of R e p o r t P B 4 / 0 9

Instruction Sheet COOL SERIES DUCT COOL LISTED H NK O. PR D C FE - Re ove r fro e c sed rea. I Page 1 Rev A

T h e C S E T I P r o j e c t

C o r p o r a t e l i f e i n A n c i e n t I n d i a e x p r e s s e d i t s e l f

E Service E-Series Padlock seires PadlockManual No. Part No. Part No. Part

THIS PAGE DECLASSIFIED IAW E

DU67 Tube Microphone

LU N C H IN C LU D E D

Operation Manual for Automatic Leveling Systems

PLAY OFF 48" FOOSBALL TABLE ASSEM BLY I NSTRU CTI ONS

Software Process Models there are many process model s in th e li t e ra t u re, s om e a r e prescriptions and some are descriptions you need to mode

HUSTLER 7' & 8' POOL TABLE ASSEM BLY I NSTRUCTI ONS

Form and content. Iowa Research Online. University of Iowa. Ann A Rahim Khan University of Iowa. Theses and Dissertations

7.2 P rodu c t L oad/u nload Sy stem s

Executive Committee and Officers ( )

176 5 t h Fl oo r. 337 P o ly me r Ma te ri al s

DETAIL MEASURE EVALUATE

Edition 3 September Air Angle Wrench and Nut Runner. QA6 and QA8 Series. Parts Information. Save These Instructions

Beechwood Music Department Staff

Grain Reserves, Volatility and the WTO

Certificate Sound reduction of building elements

WHEEL BEARINGS OIL LUBRICATED WHEEL ENDS*: GREASE LUBRICATED WHEEL ENDS: SU G G E ST E D OI L PRO P E RT I E S

Snow Blade Operator s/assembly Instructions

Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: December 15, 2016

Alles Taylor & Duke, LLC Bob Wright, PE RECORD DRAWINGS. CPOW Mini-Ed Conf er ence Mar ch 27, 2015

High Capacity Double Pillar Fully Automatic Bandsaw. p h a r o s 2 8 0

HEAVY DUTY SWING-OUT VALVE

Important Instructions

Class Diagrams. CSC 440/540: Software Engineering Slide #1

HEAVY DUTY SWING-OUT VALVE

Conversion Kit for: 7620 and 7820 Swing-Out Valves ft-lbs ft-lbs 8835/ ft-lbs

AD I T YA PR I N T ER S. Printing Events Branding

R C o n t r o l l e d D o o r C l o s e r

CHEM 130 Exp. 8: Molecular Models

Winterization Checklist for Entrances and Loading Docks

Capacitor Discharge called CD welding

Table of C on t en t s Global Campus 21 in N umbe r s R e g ional Capac it y D e v e lopme nt in E-L e ar ning Structure a n d C o m p o n en ts R ea

THIS PAGE DECLASSIFIED IAW EO IRIS u blic Record. Key I fo mation. Ma n: AIR MATERIEL COMM ND. Adm ni trative Mar ings.

/2" Heavy Duty Swing-Out

THIS PAGE DECLASSIFIED IAW EO 12958

Functional pottery [slide]

Yamaha Virago V-twin. Instruction manual with visual guide for Yamaha XV

I N A C O M P L E X W O R L D

The Ability C ongress held at the Shoreham Hotel Decem ber 29 to 31, was a reco rd breaker for winter C ongresses.

CATAVASII LA NAȘTEREA DOMNULUI DUMNEZEU ȘI MÂNTUITORULUI NOSTRU, IISUS HRISTOS. CÂNTAREA I-A. Ήχος Πα. to os se e e na aș te e e slă ă ă vi i i i i

F48T10VHO, F60T10VHO, F72T10VHO, F96T12HO (1 LAMP ONLY) ELECTRICAL DATA (120V APPLICATION)

210H-3 HA 289 HA H-3. f80 f160. f140. f125. f50. Type. Standard type. Adaptable fluid. Seal material. Phosphate ester fluid. Water in oil fluid

Product Data Sheet KyoRack 2

o Alphabet Recitation

P a g e 3 6 of R e p o r t P B 4 / 0 9

5. DRIVE 1. SAFETY 2. PREPARATION 3. FRAME 4. TRANSMISSION 6. ROW UNIT 7. OPTIONAL EQUIPMENT

EKOLOGIE EN SYSTEMATIEK. T h is p a p e r n o t to be c i t e d w ith o u t p r i o r r e f e r e n c e to th e a u th o r. PRIMARY PRODUCTIVITY.

PARTS LIST / TECHNICAL GUIDE

X2 DESIGNER W E D D I N G S

Title: A LI GN M E N T / H A N DLI N G DI A GN O SI S: FRO N T WH E E L A LI GN M E N T : A DJU ST M E N T ( V enza)

Lesson Ten. What role does energy play in chemical reactions? Grade 8. Science. 90 minutes ENGLISH LANGUAGE ARTS

Dangote Flour Mills Plc

The Periodic Table. Periodic Properties. Can you explain this graph? Valence Electrons. Valence Electrons. Paramagnetism

INSTALLATION INSTRUCTIONS ATV Plow Blade Part Number: (50 ), (54 ), or (60 ) Application: All Terrain Vehicles

A new ThermicSol product

Service Information Letter SIL # 017

Owners manual. Sears PLOW MODEL NO CAUTION: Read Rules for Safe Operation and Instructions Carefully

st y lisa a n a con ven ient a e s és o f t lze S t a n di n g, O f fi c e, D w a r f, o r e t lzi s o o o le c onta ins onl y

1073 Series One Way Snowplow owner s manual. Read before operating. Important safety and operation instructions inside.

CPU. 60%/yr. Moore s Law. Processor-Memory Performance Gap: (grows 50% / year) DRAM. 7%/yr. DRAM

MOLINA HEALTHCARE, INC. (Exact name of registrant as specified in its charter)

I M P O R T A N T S A F E T Y I N S T R U C T I O N S W h e n u s i n g t h i s e l e c t r o n i c d e v i c e, b a s i c p r e c a u t i o n s s h o

Chemistry 1 First Lecture Exam Fall Abbasi Khajo Levine Mathias Mathias/Ortiz Metlitsky Rahi Sanchez-Delgado Vasserman

Instruction Manual. Kite-22 Camera Crane Starter Package (KITE-22-STARTER) Exclusive of Weights

A o odatio List Asoke campus

Product Data Sheet KyoRack 4

Liste de pièces Lista de Piezas Parts List

Use precise language and domain-specific vocabulary to inform about or explain the topic. CCSS.ELA-LITERACY.WHST D

F l a s h-b a s e d S S D s i n E n t e r p r i s e F l a s h-b a s e d S S D s ( S o-s ltiad t e D r i v e s ) a r e b e c o m i n g a n a t t r a c

LSU Historical Dissertations and Theses

Pushbutton Units and Indicator Lights

Bellman-F o r d s A lg o r i t h m The id ea: There is a shortest p ath f rom s to any other verte that d oes not contain a non-negative cy cle ( can

Use precise language and domain-specific vocabulary to inform about or explain the topic. CCSS.ELA-LITERACY.WHST D

Atoms and the Periodic Table

Automatic Level Maintenance Manual SAL-XX W/ AIR DAMPENED COMPENSATOR

Instructions. 1. Do not open the exam until you are told to start.

Tie Bar Extension Measuring Chain

Last 4 Digits of USC ID:

x Builders Level Service Manual

Chapter 1 Introduction to Data Communications

B ooks Expans ion on S ciencedirect: 2007:

100Z-1 100Z-1 51 HA 50. Cushion ring Cushion ring. Type. Standard type. Switch Set

CRAIG MANUFACTURING LTD. 96 McLean Ave. Hartland, New Brunswick CANADA E7P 2K5

LAW WOODEN CLOCK 5 SHT 1 OF 9 SHTS. General Assembly 1 NTS FEB Designed by: BRLAW

Agenda Rationale for ETG S eek ing I d eas ETG fram ew ork and res u lts 2

Provider Satisfaction

Lab Day and Time: Instructions. 1. Do not open the exam until you are told to start.

F AX:

02/05/09 Last 4 Digits of USC ID: Dr. Jessica Parr

Transcription:

POOR FACE AND HOLLOW SLUG Th e followin g (15) Fifteen Steps In s tru ction s a re for ch eckin g Lu dlow wh en Poor Face and Hollow Slugs are being cast: 1 Clean Plunger and Well. After three to five years of use, Well Reamer may need replacing. Due to the heatin g a n d coolin g of Rea m er, th e fou r s egm en ts will becom e s et to s ize of Well. Sprea din g th es e a pa rt with a Screw Driver m a y h elp, bu t, s qu a re or cu ttin g edges m a y becom e worn. Th erefore it is bes t to repla ce Well Rea m er. Th is ca n be decided by th e a m ou n t of pres s u re n eeded to tu rn Rea m er wh en im m ers ed in Well. If a ligh t pres s u re is n eeded to tu rn Reamer, then replacement is necessary. Wh en clea n in g Plu n ger, be s u re to ch eck Side Wa lls for n icks a n d bu rrs. Ch eck for Rin g left by Meta l Heigh t in Cru cible, a s th is m a y s low Stroke of Plu n ger. Us e a Fin e Grit of Em ery Cloth for clea n in g, or, a piece of Bra s s can also be used. 2 Remove Mouthpiece and Clean Throat. Obta in a Ha n d File on e in ch wide a n d ten to twelve in ch es lon g, Grin d a wood Ch is el edge a t on e en d. Us e th is file for s cra pin g a n d ch oppin g Dros s off Side Wa lls in s ide of Th roa t a rea. To clea n fa rth er down in to Th roa t Opening, use a 3/16 x 3/8 x 15 inch long piece of Bar Stock. Bend one end s o th a t it ca n rea ch down u n dern ea th th e Side Wa ll on Left Side of Th roa t opening. After clea n in g Th roa t a s m en tion ed a bove, in s ta ll Mou th piece. Set a lin e of Type, u s in g th e la rges t s ize a va ila ble, ca s t a b ou t (12) twelve s lu gs, th en remove Mouthpiece again to clean out Dross that has been pushed up to top of Metal in Throat. Clea n Mou th piece Slot with ( 2 pt. ) two poin t bla de, s cra pe ou ter wa lls of Funnel, scrape and clean inner walls of Funnel. Do n ot pu t Fu n n el in Vis e, cla m p Mou th piece in th e Vis e, u s in g a ra g a n d th en s cra pe th e Mou th piece. Firs t on e s ide, th en th e oth er to clea n th e s ides of th e Fu n n el. To clea n th e s lot, u s e th e Slot Scra per or if you ca n get on e, a broken Rou s e Ba n d Sa w Bla de. Brea k it in pieces a bou t 7 or 8 in ch es lon g, th es e Bla des a re th in a n d flexible a n d ca n be twis ted with ou t brea kin g a n d th ey a re idea l for clea n in g ou t th e Slot. Th ere is ju s t en ou gh set to the Teeth to do a good job of cleaning out the Slot. If Slot is wider th a n two poin ts, repla ce Mou th piece. If Air Ven ts a ppea r shallow, send Mouthpiece in to Factory for Cleaning and Re-Venting.

Be s u re to u s e Wire Bru s h on Mou th piece to keep Air Ven ts clea n a n d open for proper es ca pe of Air a t tim e of ca s tin g. If Air Ven ts becom e filled with Dros s, Air will n ot be a ble to be pu s h ed ou t of ca s tin g a rea a n d th e res u lt will be Hollow Slugs. 3 Check Plunger Connecting Lever #274A. Holes in Con n ectin g Lever in tim e will becom e Ova l s h a ped, Pin s #280 becom e worn, h ole in Con n ectin g Lever Bra cket #276 a ls o becom e Ova l Sh a ped. Con n ectin g Rod #271 will a ls o n eed repla cin g. Th es e con dition s give a dela yed a ction a n d bou n ce to Plu n ger Stroke, a n d s h ou ld be repla ced before trying to set or check Plunger Height. At th is poin t, ch eck h ole in Plu n ger Lin k Sh a ft #253. Th is a ls o m a y h a ve to be repla ced. In s om e ca s es, it is bes t to repla ce Plu n ger, for rem ova l of Plunger Link Shaft is more trouble than it appears to be. 4 - Check Height of Plunger. Set with 1/ 16 drill Rod, a s in s tru cted in Lu dlow Ma n u a l, Plu n ger Heigh t Adjustment. Turn Plunger Connecting Lever one full turn down. Then cast a bou t (12) twelve to (15) fifteen s lu gs with la rges t Type a va ila ble to ch eck Plu n ger Heigh t for Meta l flow in to Well. If Meta l does n ot flow properly in to Well after casting some slugs. Plunger will hit bottom of Well. Raise Plunger Level one full turn to allow proper flow of Metal into Well. 5 Check Plunger Spring Pressure. Set dis ta n ce between Plu n ger Con n ectin g Yoke #278 a n d Plu n ger Sprin g Plu g #264, a t (11) eleven Pica s. Th e dis ta n ce or s pa ce of (11) eleven Pica s shou ld be figu red from th e top of Plu n ger Sprin g Plu g to th e u n ders ide of Plu n ger Con n ectin g Yoke. Set Plu n ger Sprin g Adju s tin g Lever in fron t of Machine at Medium, or one Notch above Medium.

6 Make New Table Top Lock-up. 1 Rear Table Latch Adjustment. 2 Main Slide Height Adjustment. 3 Stick Locking Mechanism Adjustment. 4 Crucible Compression Adjustment. The above adjustments are described in the Ludlow Manual. If a s wellin g occu rs a fter m a kin g a n ew Lock-u p, ch eck Ma in Slide Heigh t Adju s tm en t. Wh en Mou th piece a n d Mold a re in ca s tin g p os ition, in oth er words, locked u p, th en top of Mold s h ou ld be a b ou t 4 pts. below th e Ta ble Top. Als o, try redu cin g Plu n ger Sprin g Pres s u re on e n otch by lowerin g Adju s tin g Lever in fron t of Ma ch in e. Som etim es Ma in Slide Ca m is worn a n d too m u ch pla y will s well T Hea d pa rt of Slu g. Th is is ca u s ed b y s epa ra tion of m old to Ma ts Lock-u p wh en ca s t is m a de. To com pen s a te for th is, ra is in g of Ma in Slide a bou t on e or two poin ts will give a tigh ter Lockup. If Ma in Slide Ca m Roller h a s a fla t s ide, th e s a m e con dition will exis t. Removal of Main Slide is necessary to check and replace Roller. 7 Check Plunger Cam Level Stroke. Ca m #A254A, con trols th e Stroke of th e Plu n ger. Th a t is, wh en th e Plu n ger strikes for a cast and when it is raised back up to Normal Position. The Cap open in g s h ou ld be s et to Fou r a n d on e-h a lf (4½ ) Pica s, a n d n o wider th a n Seven (7) Picas. If th e Lock Bolts becom e loos e, Ca m m a y open or clos e. Plu n ger will th en s trike before Lock-u p of Mou th piece to Mold, or, m a y s till be ca s tin g a fter breakaway of Mouthpiece from Mold.

8 Check Crucible Temperature. Gas or Electric, set at 560 to 580 Degrees. Electric Cru cible Before s ettin g Cru cible Tem pera tu re, be s u re to s et Rheostat #A310EB, to #6. Th is will a llow for extra h ea t in Th roa t a n d Mouthpiece if moved to #5 or above. Ga s Cru cible Lower Th roa t Fla m e to n orm a l h eigh t. If, a fter s ettin g Crucible Temperature and more heat is needed in Throat Burner, removal of Th roa t Ga s a n d Air Mixer Spu d Ada pter #392, will be n eces s a ry. A la rger Spu d #300, m a y be n eeded. Ga s Spu d #300 Holes a re figu red to Wire Size Regulations. 9 Check Throat Heat. On Electric Cru cible, s et Rh eos ta t a t #5 or #6 for 12 pt. Molds. Wh en u s in g a 6 pt. Mold, set Rheostat at #2 or #3. For Gas Crucible, a larger spud #300 may be needed. Gas Spud #300 Holes are figured to Wire Size Regulations. 10 Check Water Pump. En ou gh Wa ter m u s t be pu m ped th rou gh Mold to s olidify ea ch ca s t property for a s olid s lu g. A drop in Wa ter s u pply m a y ch a n ge th e Fa ce a n d ca s t a hollow slug. After a few yea rs of u s e, th e Ru bber Hos es s h ou ld be ch a n ged, a s a s wellin g of he Rubber is caused by the Oil and Water. Th e Wa ter Coolin g Holes in th e Lu dlow Mold ca n becom e clogged with Ru s t or Slu dge depos its. Retu rn in g Mold to Fa ctory for clea n in g is th e bes t solution. Contact Ludlow for a Loaner Mold. As for th e Wa ter Pu m p, a repa ir job a n d clea n in g by th e Fa ctory is recommended, or, a new re-packing job with Water Pump Packing #M293C. Ch eck V-Belt, it m a y be loos e a n d n eed a dju s tin g. Loos en Wa ter Pu m p Adju s tin g Pla te Screw #M215A, th is will a llow Wa ter Pu m p to be ra is ed or lowered. After adjusting, tighten Screw.

11 Raise Front Legs of Machine about 24 to 36 pts. Mos t floors, Con crete or Wood, a re u n even. Th e fron t of th e Lu dlow m a y pitch too low, ca u s in g Meta l to flow ou t of Mou th piece Slot a n d ca u s e s qu irts before ca s tin g. Ra is in g fron t Legs of Ma ch in e 24 to 36 pts. ca n correct this trouble. A low pitch in Meta l Cru cible will ca u s e a n u n even tou ch of h ea t by h ot Meta l to Mou th piece Fu n n el. Ra is in g of fron t Legs will give a m ore even touch to Mouthpiece Funnel. 12 Check Height of Metal in Crucible. A drop of m ore th a n (3/ 4 ) th ree-qu a rters of a n in ch of Meta l in Cru cible will leave more Air Space below Mouthpiece in Throat area or Well. This will m ea n m ore Air h a s to be pu s h ed ou t th rou gh Air Ven ts a t tim e of ca s tin g. Ra is in g Meta l Level in Cru cible will res u lt in a m ore s olid a n d better s lu g face. (See Check-up #11) 13 Check Three Crucible Adjustments. 1 Mouthpiece to Mold Adjustment. 2 Cen tering Mou th piece Open ing w ith Mold. 3 Crucible Adjustment. To level off Cru cible, in s ert equ a l a m ou n t of s pa ce a t b ottom of Cru cible Swivel Bra cket wh ere Cru cible Swivel Bra cket Adju s tin g Screw #237 tou ch es Cru cible Swivel Bra cket. After levelin g off Cru cible, m a ke a Pa per im pres s ion to s ee h ow fa r a wa y or clos e to Mold a t tim e of lock-up Mou th piece will be. Determ in e a t th is poin t wh eth er to ra is e or lower Crucible. (See Plate 15 Place equal amount of spaces in area E)

14 Check for water Leak in Mold. Ma ke s u re Motor is n ot ru n n in g, ra is e Ta ble Top, rem ove Felt Mou th piece Wiper and clean away dirt from underside of Mold where contact is made by Mold a n d Mou th piece. Be s u re Sa fety Fin ger #753A is in pos ition. Sta rt motor and push Clutch Release. When Crucible starts to swing to the Right to m a ke con ta ct with u n ders ide of Mold, ben d d own a n d lis ten for a s izzlin g sound of Water touching a hot surface. If this is heard, contact Ludlow for a Loaner Mold and send your Mold in for a repair of Water Leak. Als o, with Motor ru n n in g, rem ove Mold, b u t do n ot rem ove Wa ter Con n ection. Tu rn Mold u pside down a n d s ee if th ere is a lea k th a t ca n be seen, the Water must be circulating at the time. 15 Check Plunger Connecting Rod #272. Th is pa rt h a s a h ole drilled th rou gh it, a n d h ole s h ou ld poin t from Fron t to Rea r of Ma ch in e for proper s ettin g. Rou n ded a n d Elon ga ted Hea d s h ou ld point from Left to Right. Ch eck Plu n ger Ca m Lever, pa rt #A258 to s ee if a deep groove h a s been s cored by Hea d of Plu n ger Con n ectin g Rod #272. Th es e two pa rts com e together under Crucible. See Plate 15. If Plu n ger Ca m Lever h a s a deep groove worn in it, th is will ch a n ge th e Plu n ger Heigh t. Ch a n gin g Plu n ger Ca m Lever is recom m en ded. To repla ce Lever, remove Water Tank.

THIS IS A SYNOPSIS OF ATTACHED INSTRUCTIONS 1 Clean Plunger and Well. 2 Remove Mouthpiece and Clean Throat. 3 Check Plunger Connecting Lever @274A 4 Check Height of Plunger. 5 Check Plunger Spring Pressure. 6 Make New Table Top Lock-up. 7 Check Plunger Cam Lever Stroke. 8 Check Crucible Temperature. 9 Check Throat Heat. 10 Check Water Pump. 11 Raise Front Legs of Machine. 12 Check Height of Metal in Crucible. 13 Check Three Crucible Adjustments. 14 Check for Water Leak in Mold. 15 Check Plunger Connecting Rod #272. Wh ere th is docu m en t refers to (FACTORY) you ca n repla ce with HOT METAL SERVICES or whomever your local service person is. Hot Metal Services Dave or Beth Seat P.O. Box 1160 Mount Juliet, TN 37121 (615) 754-5500 info@hotmetalservices.com All of th es e pa ges h a d th e in itia ls (EPF) a t th e bottom. I h a ve been told th es e a re th e in itia ls of Ed wa rd P. Form a n a form er em ployee of Lu dlow Typograph.