CASE STUDY BINGA, PHILIPPINES

Similar documents
CASE STUDY BINGA, PHILIPPINES

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY SOLIS, SWITZERLAND

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

Session: For more information:

SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION. By Renee Vandermause & Chun-Yao Yang

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

GTU. Shantilal Shah Engineering College, Bhavnagar

2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of Wonogiri Reservoir (1/3)

SEDICON SLUICERS AS EFFECTIVE MEHOD OF SEDIMENT REMOVAL FROM DESILTING TANKS AND CHAMBERS

Sedimentation in the Nile River

How to predict the sedimentological impacts of reservoir operations?

SUSTAINABLE SEDIMENT MANAGEMENT

Assessment of Lake Forest Lake Sediment Trapping Efficiency and Capacity. Marlon R. Cook Groundwater Assessment Program Geological Survey of Alabama

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

State Water Survey Division SURFACE WATER SECTION

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Mekong Sediment from the Mekong River Commission Study

9. Flood Routing. chapter Two

STRUCTURAL STABILITY ASSESSMENT

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

Evaluation of Deposition Pattern of Wonogiri Reservoir Sedimentation

WMO Statement on the State of the Global Climate Preliminary conclusions for 2018 and WMO Greenhouse Bulletin

Upgrading Feasibility Study on the Upper Seti Storage Hydroelectric Project in Nepal

River Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation.

Rock Sizing for Waterway & Gully Chutes

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

Final Report. Prepared for. American Rivers, California Trout, Friends of the River and Trout Unlimited

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap

Instream Sediment Control Systems

Numerical modeling of sediment flushing from Lewis and Clark Lake

Reservoir Sedimentation and Its Control

CCR Rule Annual Inspection Report (cont.) 2

Dam Safety Aspects of Reservoir-Triggered Seismicity

Influence of the Major Drainages to the Mississippi River and Implications for System Level Management

ENGINEERING HYDROLOGY

Sediment Management for Dam Removals

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

National Hydrology committee of Afghanistan (NHCA) Sedimentation in Reservoire

Calculating the suspended sediment load of the Dez River

Complex Cascade Dams Operation The Glommen and Laagen Case

June 2018 Sediments and Dredging at GBR Ports

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

Sedimentation Impacts on California Water Infrastructure

Rapid Hazard Assessment of Heavy Rainfall Triggered Landslide Dams A Review

Why Geomorphology for Fish Passage

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Contents. Diaphragm in pressure pipe: Steady state head loss evolution and transient phenomena. Nicolas J. Adam Giovanni De Cesare

RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN. Keywords: Reservoir sedimentation, Sediment bypass, Diversion tunnel, Abrasion damage

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

EFFICIENCY OF THE INTEGRATED RESERVOIR OPERATION FOR FLOOD CONTROL IN THE UPPER TONE RIVER OF JAPAN CONSIDERING SPATIAL DISTRIBUTION OF RAINFALL

GEOL 1121 Earth Processes and Environments

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Do you think sediment transport is a concern?

Application of Satellite Data for Flood Forecasting and Early Warning in the Mekong River Basin in South-east Asia

Better estimation of Flood Wave Propagation Time in Meandering Reaches by using 2D-modelling

Application of SWAT Model to Estimate the Runoff and Sediment Load from the Right Bank Valleys of Mosul Dam Reservoir

Lower Susquehanna River Integrated Sediment & Nutrient Monitoring Program

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA

The first steps in the hydropower project cycle:

UGRC 144 Science and Technology in Our Lives/Geohazards

From micro to macro scale the impact on the sediment discharge after construction of the Three Gorges Dam on Yangtze River (Changjiang)

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal

Degradation Concerns related to Bridge Structures in Alberta

An investigation on the impacts of density currents on the sedimentation in dam reservoirs using TCM model; case study: Maroon dam

Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum

Sediment Weirs (Instream)

Earth Science Chapter 6 Section 2 Review

Rock Sizing for Small Dam Spillways

Technical Memorandum No

STUDY GUIDE FOR CONTENT MASTERY. Surface Water Movement

HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin. Mike Langland and Ed Koerkle

TABLE OF CONTENTS LIST OF TABLES. Page

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

Stone Outlet Sediment Trap

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Rock & Aggregate Drop Inlet Protection

Morphological Changes of Reach Two of the Nile River

U.S. ARMY CORPS OF ENGINEERS

Use of Climate information in Disaster Risk Management in Zimbabwe

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Assessment of the catastrophic events originated in the river Vere basin

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

STREAM SYSTEMS and FLOODS

Precipitation Evaporation Infiltration Earth s Water and the Hydrologic Cycle. Runoff Transpiration

Transcription:

SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume (original): 95 Mm 3 Installed capacity: 140 MW Date of commissioning: 1960 International Hydropower Association Chancery House, St Nicholas Way, Sutton, London SM1 IJB, United Kingdom T: +44 20 8652 5290 F: +44 20 8643 5600 E: iha@ Following commissioning in 1960, the Binga reservoir filled rapidly with sediment due to an underestimation of the sediment load and the absence of any sediment management strategy. When Binga hydropower plant was acquired by SN Aboitiz (SNAP) in 2008, it was not operational. Sediment management is crucial to maintaining the plant as a run-of-river project. Binga hydropower plant, owned and operated by SN Aboitiz (SNAP) since 2008, is located in the upper reaches of the Agno river, on the island of Luzon in the northern Philippines. The plant was commissioned in 1960 with the purpose of generating electricity and providing flood control services. Three dams in a cascade complex on the Agno river supply water to the 105 MW Ambuklao, the 140 MW Binga and the 345 MW San Roque hydropower plants. Binga dam, located 19 km downstream from Ambuklao, is a rock-fill dam with an inclined clay core. At a height of 107.4 m, the dam crest elevation is 586 masl, and the dam originally impounded a volume of 95 Mm 3. The maximum and minimum operating levels of the reservoir are 575 and 566 masl respectively. The spillway is located at the left abutment, while the intake is on the right side leading August 2017 to the underground powerhouse through an 800 m headrace tunnel. The design spillway discharge for a return period of 10,000 years is 10,521 m 3 /s. A location map is shown in figure 1. Following its refurbishment in 2013, the 140 MW Binga plant now hosts four Francis vertical shaft turbines of 35 MW each. The net head is 156 m and the design discharge is 25 m 3 /s. The average annual generation is 238.43 GWh. Hydrology and sediment The catchment tributary of the Binga dam comprises 936 km 2, of which 72 per cent is regulated by the Ambuklao dam upstream. Although the Ambuklao reservoir traps most of the sediment, the Binga tributaries, the Leboy, Adonot and Bisal Rivers, carry very high sediment loads. This is deposited in the upper section of the Binga delta, as shown by the white sediment deposits in figure 1.

Aerial view of Binga hydropower plant The Philippines is one of the countries most exposed to tropical storms. Approximately 20 cyclones and typhoons hit the country each year. They are concentrated in the months of June to September, but can occur throughout the year. Due to its geographical location, the Philippines also suffers from high magnitude earthquakes. Since the middle of the 20th century, there have been eight earthquakes above 7 points in magnitude. In 1990, the island of Luzon experienced a 7.8 magnitude earthquake. As shown in figure 2, the water inflow to the Binga reservoir has increased over the years, with the peak flow reaching up to 2,000 m 3 /s in 2017. Sediment problems Cyclones and typhoons cause major floods and landslides that increase water inflow and sediment load in the rivers. In combination with earthquakes, the sediment load in the rivers can be very high, and can contain heavy boulders that have the potential to seriously damage a power plant s units. The annual observed sediment load through the turbines at Binga is 2.2 million tons, while at Ambuklao it is 4.5 million tons. Hard mineral concentration is not an issue because this represents just 10 per cent of the sediment load. Based on a traditional approach, the Binga reservoir was designed without any sediment management strategy. In addition, the sedimentation rate was underestimated due to the limited sediment data available at the time. After commissioning in 1960, the Binga reservoir rapidly filled up with sediment as shown in the storage capacityelevation curve displayed in figure 3. By 1986, the reservoir had lost 35 per cent of its original capacity. In 2015, the storage volume was just 21 Mm 3, equivalent to 22 per cent of the original storage capacity. In 2008, SNAP acquired both the Ambuklao and Binga power plants for USD 325 million. Both plants required major refurbishment due to the damaged hydro-mechanical equipment. The Binga power plant was not operational and the sediment deposits almost reached the intake level. Due to the bathymetry of the Binga reservoir, the sediment has filled the dam and developed into a delta with a growing backwater effect, which could affect and bury the Ambuklao outlet. Figure 4 shows boulders and gravel in the backwater of the Binga reservoir. An extreme precipitation event occurred in October 2009, following SNAP s acquisition of the Ambuklao and Binga power plants. The peak inflow to the Binga reservoir reached 4,000 m 3 /s. Figure 5 shows the water inflow to the

Ambuklao and Binga reservoirs due to the extreme flood. This extreme flooding clogged up the waterways, and sediment deposits trapped in the Binga dam increased. The loss of storage limited Binga s operational flexibility and therefore reduced the plant s revenue. In the case of Ambuklao, the power plant had to shut down. A total of USD 280 million was required to rehabilitate both the Ambuklao and Binga plants, between 2010 and 2013. Sediment management strategies Since the acquisition and refurbishment of Binga, the implementation of sediment management strategies is key to keeping the plant operational in the long term. Due to the high rate of storage loss, the stabilisation of sediment inflow and outflow is crucial for operating Binga as a run-of-river project. Any alternative approach to managing sediment requires changes in the operating rule of the flood gates. The operating rule, shown in figure 6, is based on the water level and does not include sediment routing during flood events greater than 500 m 3 /s. Ongoing studies are looking at technically-feasible solutions to convert Binga into a run-of-river power plant. The proposed sediment management strategies will have to meet the following objectives: protect the intake from deposition and slide; trap the suspended load during normal flood season operation; flush deposited suspended load during floods; provide passage of incoming bed load during floods; maintain small reservoir for peaking/ancillary services; maintain ability to delay and dampen flood peak; and maintain dam safety and the integrity of the spillway. A significant sediment management challenge is the high risk of clogging the current Binga intake, with an invert elevation of 555 masl. The longitudinal profile in figure 7 shows that sediment deposits are reaching that level. Other challenges include maintaining the existing storage volume, avoiding backwater effect, the burying of the Ambuklao outlet, and maintaining dam safety when the bed load passes over the spillway to the downstream river reach. Physical model studies include several sediment routing options and intakelevel modifications to find a technically feasible solution and acceptable and implementable operational regime, which would provide for a reliable run-of-river operation in the long term. Conclusions Sediment management considerations are fundamental during the initial concept/design phase when building dams and hydropower plants. Without them, sediment is deposited in reservoirs, minimising a plant s benefits, shortening its operational life, damaging the hydro-mechanical equipment and eventually losing sites for power generation and other benefits. Monitoring and gathering sediment data taking account of the impact of natural disasters such as earthquakes and typhoons into the design is key to planning adequate sediment management strategies. The annual cost of the research on sediment and sediment management at Binga is estimated to be around 2.5 per cent of the annual operation and maintenance costs, which are estimated at USD 2 million. Raising awareness of the benefits of regular monitoring and sediment management strategies in the operation and maintenance of a power plant could lead to an increase in the resources dedicated to sediment management. Graphs and figures >

Graphs and figures Figure 1 - Binga hydropower plant location downstream of Ambuklao dam (Google Earth) Figure 2 - annual water inflow to Binga reservoir Graphs and figures cont. >

Figure 3 - storage capacity (Mm 3 ) and elevation (masl) curve of Binga reservoir from 1960 to 2015 Figure 4 - sediment deposits in the backwater of Binga reservoir Graphs and figures cont. >

Figure 5 - water inflow to Ambuklao and Binga reservoir during the extreme flood of 2009 Figure 6 - flood rule curve for Binga dam - reservoir water level based operation Graphs and figures cont. >

Figure 7 - longitudinal profile of Binga reservoir; the intake invert elevation is 555 This is part of a series of sediment management case studies collated by International Hydropower Association with support from the South Asia Water Initiative (SAWI), trust funds to the World Bank. www./sediment-management