CASE STUDY BINGA, PHILIPPINES

Similar documents
CASE STUDY BINGA, PHILIPPINES

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY SOLIS, SWITZERLAND

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Session: For more information:

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION. By Renee Vandermause & Chun-Yao Yang

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of Wonogiri Reservoir (1/3)

How to predict the sedimentological impacts of reservoir operations?

GTU. Shantilal Shah Engineering College, Bhavnagar

SEDICON SLUICERS AS EFFECTIVE MEHOD OF SEDIMENT REMOVAL FROM DESILTING TANKS AND CHAMBERS

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

SUSTAINABLE SEDIMENT MANAGEMENT

Upgrading Feasibility Study on the Upper Seti Storage Hydroelectric Project in Nepal

State Water Survey Division SURFACE WATER SECTION

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

Reservoir Sedimentation and Its Control

9. Flood Routing. chapter Two

STRUCTURAL STABILITY ASSESSMENT

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

Sedimentation in the Nile River

Evaluation of Deposition Pattern of Wonogiri Reservoir Sedimentation

Calculating the suspended sediment load of the Dez River

Final Report. Prepared for. American Rivers, California Trout, Friends of the River and Trout Unlimited

WMO Statement on the State of the Global Climate Preliminary conclusions for 2018 and WMO Greenhouse Bulletin

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

From micro to macro scale the impact on the sediment discharge after construction of the Three Gorges Dam on Yangtze River (Changjiang)

Complex Cascade Dams Operation The Glommen and Laagen Case

Sediment Management for Dam Removals

Assessment of Lake Forest Lake Sediment Trapping Efficiency and Capacity. Marlon R. Cook Groundwater Assessment Program Geological Survey of Alabama

Dam Safety Aspects of Reservoir-Triggered Seismicity

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap

Rock Sizing for Waterway & Gully Chutes

Contents. Diaphragm in pressure pipe: Steady state head loss evolution and transient phenomena. Nicolas J. Adam Giovanni De Cesare

Mekong Sediment from the Mekong River Commission Study

CCR Rule Annual Inspection Report (cont.) 2

Influence of the Major Drainages to the Mississippi River and Implications for System Level Management

June 2018 Sediments and Dredging at GBR Ports

ENGINEERING HYDROLOGY

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN. Keywords: Reservoir sedimentation, Sediment bypass, Diversion tunnel, Abrasion damage

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer

EFFICIENCY OF THE INTEGRATED RESERVOIR OPERATION FOR FLOOD CONTROL IN THE UPPER TONE RIVER OF JAPAN CONSIDERING SPATIAL DISTRIBUTION OF RAINFALL

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

Numerical modeling of sediment flushing from Lewis and Clark Lake

Instream Sediment Control Systems

An investigation on the impacts of density currents on the sedimentation in dam reservoirs using TCM model; case study: Maroon dam

Appendix O. Sediment Transport Modelling Technical Memorandum

River Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation.

Sedimentation Impacts on California Water Infrastructure

Why Geomorphology for Fish Passage

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING

Use of Climate information in Disaster Risk Management in Zimbabwe

Application of Satellite Data for Flood Forecasting and Early Warning in the Mekong River Basin in South-east Asia

Comparative analysis of different reservoir surveying methodologies for the optimum volumetric computation of fluvial sediment deposits

Lower Susquehanna River Integrated Sediment & Nutrient Monitoring Program

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA

Degradation Concerns related to Bridge Structures in Alberta

Technical Memorandum

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal

Rapid Hazard Assessment of Heavy Rainfall Triggered Landslide Dams A Review

Technical Memorandum No

National Hydrology committee of Afghanistan (NHCA) Sedimentation in Reservoire

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Summary of the 2017 Spring Flood

Study of Suspended Sediment and Its Mineral Content Analysis with Impact on Hydropower Design: A Case Study of Rahughat Hydroelectric Project

GEOL 1121 Earth Processes and Environments

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Cerro del Águila Gravity Dam in Perú: Between Feasibility and Challenges

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Morphological Changes of Reach Two of the Nile River

Rock & Aggregate Drop Inlet Protection

Do you think sediment transport is a concern?

Better estimation of Flood Wave Propagation Time in Meandering Reaches by using 2D-modelling

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

A hydro-sedimentological view of the Samarco disaster, focusing in the Rio Doce estuary and adjacent coastal zone

UGRC 144 Science and Technology in Our Lives/Geohazards

STREAM SYSTEMS and FLOODS

Precipitation Evaporation Infiltration Earth s Water and the Hydrologic Cycle. Runoff Transpiration

Analysis of Sedimentation in Wonogiri Reservoir

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

Sediment Weirs (Instream)

STUDIES ON THE MANAGEMENT OF SEDIMENT CHARACTERISTICS OF VAIGAI RESERVOIR

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner

VOLUME IV. Feasibility Study for the Madian Hydropower Project HYDRO - METEOROLOGICAL DATA BASE. Headrace Tunnel. Bahrain. Part 1 of 3.

FLOOD REPORT FOR MANITOBA. June 28, A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg

Transcription:

SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower plant, owned and operated by SN Aboitiz (SNAP) since 2008, is located in the upper reach of the Agno river, on the island of Luzon in the northern Philippines. The plant was commissioned in 1960 with the purpose of generating electricity and providing flood control services. Reservoir volume (original): 95 Mm3 Installed capacity: 140 MW Date of commissioning: 1960 Three dams in a cascade complex on the Agno river supply water to the 105 MW Ambuklao, the 140 MW Binga and the 345 MW San Roque hydroelectric power plants. Hydrology and sediment Binga dam, located 19 km downstream of Ambuklao, is a rockfill dam with an inclined clay core. With a height of 107.4 m, the dam's crest elevation is 586 masl, and it originally impounded 95 Mm3. The maximum and minimum operating levels of the reservoir are 575 and 566 masl respectively. Although the Ambuklao reservoir traps most of the sediment, the Binga tributaries, the Leboy, Adonot and Bisal rivers, carry very high sediment loads. This is deposited in the upper section of the Binga delta, as shown by the white sediment deposits in figure 1. The spillway is located at the left abutment, while the intake is on the right side leading to the underground powerhouse through an 800 m headrace tunnel. The design spillway discharge for a return period of 10,000 years is 10,521 m3/s. A location map is shown in figure 1. International Hydropower Association Chancery House, St Nicholas Way, Sutton, London SM1 IJB, United Kingdom T: +44 20 8652 5290 F: +44 20 8643 5600 E: iha@ Since it was refurbished in 2013, the 140 MW Binga plant hosts four Francis vertical shaft turbines of 35 MW each. The net head is 156 m and the design discharge is 25 m3/s. The average annual generation is 238.43 GWh. August 2017 The catchment tributary of the Binga dam comprises 936 km2, of which 72 per cent is regulated by the Ambuklao dam upstream. The Philippines is one of the countries most exposed to tropical storms. Approximately 20 cyclones and typhoons hit the country each year. They are concentrated in the months of June to September, but can occur throughout the year. Due to its geographical location, the Philippines also suffers from high magnitude earthquakes. Since the middle of the 20th century, there have been eight earthquakes higher than 7 points in magnitude. In 1990, the island of Luzon experienced a 7.8 point magnitude earthquake.

Aerial view of Binga hydropower plant As shown in figure 2, water inflow to the Binga reservoir has increased over the years, with the peak flow reaching up to 2,000 m 3 /s in 2017. Sediment problems Cyclones and typhoons cause major floods and landslides that increase water inflow and sediment load in the rivers. In combination with earthquakes, the sediment load in rivers can be very high, and contain heavy boulders that could seriously damage power plant s units. The annual observed sediment load through the turbines at Binga is 2.2 million tonnes, while at Ambuklao it is 4.5 million tonnes. Hard mineral concentration is not an issue because it only represents 10 per cent of sediment. Based on a traditional approach, the Binga reservoir was designed without any sediment management strategy. In addition, the sedimentation rate was underestimated due to the limited sediment data available at the time. Since commissioning in 1960, the Binga reservoir has filled up quickly with sediment, as shown in the storage capacity-elevation curve displayed in figure 3. By 1986, the reservoir had lost 35 per cent of its original capacity. In 2015, the storage volume was just 21 Mm 3, equivalent to 22 per cent of the original storage capacity. In 2008, SNAP acquired both Ambuklao and Binga power plants for USD 325 million. Both plants required major refurbishment due to their damaged hydro-mechanical equipment. The Binga power plant was not operational and the sediment deposits almost reached up to the intake level. Due to the bathymetry of the Binga reservoir, the sediment has filled up the dam and developed into a delta with a growing backwater effect, which could affect and bury the Ambuklao outlet. Figure 4 shows boulders and gravel in the backwater of Binga reservoir. In October 2009, following SNAP s acquisition of the Ambuklao and Binga power plants in 2008, an extreme precipitation event occurred. The peak inflow to the Binga reservoir reached 4,000 m 3 /s. Figure 5 shows the water inflow to the Ambuklao and Binga reservoirs due to the extreme flood. This extreme flooding clogged up the waterways, and sediment deposits trapped in the Binga dam increased. The loss of storage limited Binga s operational flexibility and therefore reduced the plant s revenue. In the case of Ambuklao, the power plant had to shut down. A total of USD 280 million was required to rehabilitate both the Ambuklao and Binga plants between 2010 and 2013.

Sediment management strategies Since the acquisition and refurbishment of Binga, the implementation of sediment management strategies is key to keeping the plant operational in the long term. Due to the high rate of storage loss, the stabilisation of sediment inflow and outflow is crucial for operating Binga as a run-of-river project. Any alternative approach to managing sediment requires changes in the operation rule of the flood gates. The operation rule, shown in figure 6, is based on the water level and does not include sediment routing during flood events greater than 500 m 3 /s. Ongoing studies are looking at technically-feasible solutions to convert Binga into a run-of-river power plant. The proposed sediment management strategies will have to meet the following objectives: protect the intake from deposition and slide trap the suspended load during normal flood season operation flush deposited suspended load during floods provide passage of incoming bed load during floods maintain small reservoir for peaking/ancillary services maintain ability to delay and dampen flood peak maintain dam safety and the integrity of the spillway A significant sediment management challenge is the high risk of clogging the current Binga intake, with an invert elevation of 555 masl. The longitudinal profile in figure 7 shows that sediment deposits are reaching that level. Other challenges include maintaining the existing storage volume, avoiding backwater effect, burying of the Ambuklao outlet, and maintaining dam safety when the bed load passes over the spillway to the downstream river reach. Physical model studies include several sediment routing options and intakelevel modifications to find a technicallyfeasible solution and acceptable and implementable operational regime, which would provide for a reliable run-of-river operation in the long term. Conclusions Sediment management considerations are fundamental during the initial concept/design phase when building dams and hydropower plants. Without them, sediment is deposited in reservoirs, minimising a plant s benefits, shortening its operational life, damaging the hydromechanical equipment and eventually losing sites for power generation and other benefits. Monitoring and gathering sediment data taking account of the impact of natural disasters such as earthquakes and typhoons into the design is key to planning adequate sediment management strategies. The annual cost of the research on sediment and sediment management at Binga is estimated to be around 2.5 per cent of the annual operation and maintenance costs, which are estimated at USD 2 million. Raising awareness of the benefits of regular monitoring and sediment management strategies in the operation and maintenance of a power plant could lead to an increase in the resources dedicated to sediment management. Graphs and figures >

Graphs and figures Figure 1: Binga hydropower plant location downstream of Ambuklao dam (source: Google Earth) Figure 2: annual water inflow to Binga reservoir Graphs and figures cont. >

Figure 3: storage capacity (Mm 3 ) and elevation (masl) curve of Binga reservoir from 1960 to 2015 Figure 4: sediment deposits in the backwater of Binga reservoir Graphs and figures cont. >

Figure 5: water inflow to Ambuklao and Binga reservoir during the extreme flood of 2009 Figure 6: flood rule curve for Binga dam - reservoir water level based operation Graphs and figures cont. >

Figure 7: longitudinal profile of Binga reservoir; the intake invert elevation is 555 This is part of a series of sediment management case studies collated by International Hydropower Association with support from the South Asia Water Initiative (SAWI), trust funds to the World Bank. www./sediment-management