Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018

Similar documents
The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325)

Punjab Cities Program (P156972)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank Zambia Water Resources Development Project (P114949)

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

Public Disclosure Copy

The World Bank Zambia Water Resources Development Project (P114949)

PAMSIMAS Support Trust Fund (P116236)

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

Cities and Climate Change (P123201)

Public Disclosure Copy

Urban Water Supply Project (P156739)

The World Bank Indonesia National Slum Upgrading Project (P154782)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

Public Disclosure Copy

The World Bank Guilin Integrated Environment Management (P133017)

Public Disclosure Copy. Implementation Status & Results Report India: ICDS Systems Strengthening & Nutrition Improvement Program (ISSNIP) (P121731)

Public Disclosure Copy

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Community Development Program Support Project-Phase III (P144637)

Public Disclosure Copy

The World Bank Regional Infrastructure Development Fund (P154947)

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

Public Disclosure Copy

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

Name Previous Rating Current Rating

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

The World Bank Telangana Rural Inclusive Growth Project (P143608)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Public Disclosure Copy

Public Disclosure Copy

The World Bank Indonesia National Slum Upgrading Project (P154782)

Sri Lanka Strategic Cities Development Project (P130548)

Second Tamil Nadu Road Sector Project (P143751)

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Public Disclosure Copy

Zambia - Mining and Environmental Remediation and Improvement Project (P154683)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

Key Dates. Project Development Objectives. Components. Overall Ratings

The World Bank Cities and Climate Change (P123201)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Pakistan: Third Punjab Education Sector Project (P154524)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

Implementation Status & Results Report Croatia & Bosnia & Herzegovina GEF Adriatic Sea Environmental Pollution Control Project (I) (P143921)

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank Uganda Energy for Rural Transformation III (P133312)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Public Disclosure Copy. Implementation Status & Results Report Pacific Islands Regional Oceanscape Program - Solomon Islands (P151777)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

Public Disclosure Copy

The World Bank Biodiversity Conservation and Rural Livelihoods Improvement (P088520)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Sindh Enhancing Response to Reduce Stunting (P161624)

The World Bank OECS Regional Tourism Competitiveness (P152117)

Public Disclosure Copy

EC Ibarra Transport Infrastructure Improvement Project (P147280)

The World Bank BiH Floods Emergency Recovery Project (P151157)

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591)

Public Disclosure Copy. Implementation Status & Results Report AGRICULTURAL COMPETITIVENESS IMPROVEMENT PROJECT (P122812)

Malawi Education Sector Improvement Project (MESIP) (P154185)

Public Disclosure Copy

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441)

Seq No: 4 ARCHIVED on 12-Jun-2018 ISR32726 Created by: Pierre Joseph Kamano on 23-May-2018 Modified by: Mohamed Yassine on 07-Jun-2018

The World Bank Cusco Regional Development (P117318)

Public Disclosure Copy

SOUTH KARAKALPAKSTAN WATER RESOURCES MGMT IMPROVEMENT (P127764)

The World Bank Dam Operational Improvement and Safety (P096532)

Public Disclosure Copy. Implementation Status & Results Report Strengthening Institutional Capacity for Government Effectiveness Project (P149176)

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project (P127245)

Transcription:

Public Disclosure Authorized SOUTH ASIA India Water Global Practice Requesting Unit: SACIN Responsible Unit: GWA06 IBRD/IDA Program-for-Results FY 2014 Team Leader(s): Raghava Neti Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018 Program Development Objectives Program Development Objective (from Program Appraisal Document) To improve the performance of Maharashtra's sector institutions in planning, implementation and monitoring of its Rural Water Supply and Sanitation program and to improve access to quality and sustainable services in peri-urban villages, and in water-stressed and water-quality affected areas. Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Unsatisfactory Implementation Status and Key Decisions The Program has completed four years of implementation and has to catch up with the delays in investment related Disbursement Linked Indicators (DLI-3, 4), which led to disbursement delays. A request for restructuring of the Program was received from Department of Economic Affairs in December 2017. This restructuring will result in revision of result targets and Credit re-allocations between the Disbursement Linked Indicators, to reflect Government of Maharashtra's demand to emphasize peri-urban water supply scheme investments. Implementation of the M&E system is progressing with successful testing completed and roll-out to districts in progress. Close monitoring of the Program implementation is required by Government of Maharashtra, to ensure that disbursement delays are made up in the remainder of the Program period. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 5/21/2018 Page 1 of 10

Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P126325 IDA-53750 Effective USD 165.00 165.00 0.00 31.32 123.25 20% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date Program Action Plan 1. Strengthen complaint and grievance redress and vigilance mechanisms in WSSD (by Year-2) on complaints on procurement, financial management, service delivery, environmental and social, fraud and corruption issues; aggregated and publicly disclosed Client Yes Yearly Delayed Though a system of web-based and drop box based system is existing, alternate system of toll-number based system is being explored. 2. Prepare and implement an Annual Capacity Development Plan for key sector institutions (WSSO, DWSM and BRCs) focused on developing both individual competencies and collective capabilities (resources, tools and assets). Client Yes Yearly DLI#2:Strengthened capacity of key sector institutions (percentage of sanctioned staff maintained, trained and equipped every year in key sector In Progress 5/21/2018 Page 2 of 10

institutions as per the Annual Capacity Dev Plan) It is being implemented regularly. 3. Strengthen RWSS planning processes in Year 1 and review their effectiveness in Year 3 and Year 5. Client Yes Yearly Delayed Massachusetts Institute of Technology is providing support to develop the planning processes. Pilots in two districts were undertaken. Scale up in 12 program districts is planned based on lessons learned. 4. Establish and institutionalize technical and administrative back-up support mechanism by Year-2 for GPs/VWSCs. Client No 31-Mar-2016 Delayed The study on O&M is completed, and policy decision needs to be taken. 5. As part of the state s M&E system, establish a system to monitor the schedule performance (extent of completion within time sch edules) of completed rural water supply schemes, by Year-2, and then monitor annually Client Yes Yearly Delayed System to track is getting ready. 6. Strengthen institutions to better manage the sanitation program of the state, assess areas of weakness (particularly in relation to ODF slip back), and take mitigation actions as needed, by Year-2 Client No 31-Mar-2016 Completed Institutional strengthening was supported under the Program. 7. Prepare and adopt a comprehensive HR policy for the sector to attract and retain talent/skills, and review and revise O&M policy based on comprehensive diagnostics of affordability and complexities of schemes. Client No 31-Mar-2016 Completed 5/21/2018 Page 3 of 10

Completed HR Policy. O&M study is also completed. 8. Compile rules and procedures on procurement, including for selection of consultant services, into a comprehensive procurement manual for the RWSS sector, by Year-1, and adopt it. Client No 31-Mar-2015 In Progress Draft was ready, to be approved. 9. Conduct procurement post-review on a regular basis, covering at least 15% of contracts issued every year in the RWSS sector. Client Yes Yearly Delayed Post review needs to be initiated, now that part procurement of works has completed. 11. Establish a system to report information on expenditure at GPs/ VWSCs; carry out district-level and GP-level audits as per a specific ToR, by Year-2. Client Yes Yearly Delayed Though action was initiated, information from GSDA is still awaited. 12. Implement strengthened environmental and social management rules and procedures for the Program, supported by necessary capacity building measures for sector institutions. Client Yes CONTINUOUS In Progress Social actions have progressed. On environmental, training needs to be undertaken. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Low Low Macroeconomic -- Moderate Moderate 5/21/2018 Page 4 of 10

Risk Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Substantial Substantial Environment and Social -- Moderate Substantial Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Moderate Moderate Environmental Rating change: Action towards compliance of key environmental management actions, including (i) monitoring of water quality, source and treated, and its record keeping, (ii) management of reject water from RO and other proposed filtration technologies, (iii) ensuring safe onsite OHS practices, (iv) onboarding WSSO to provide last mile support to communities to ensure safe and secure water supply, and (iv)initiating environmental audit, still need to be addressed. The position of Environmental Specialist at RSPMU has fallen vacant which is affecting project monitoring. Results PDO Indicators by Objectives / Outcomes Improved Institutional Performance PDO Indicator 1:Number of districts using improved planning processes and strengthened M&E systems Custom) (Number, Value 0.00 0.00 2.00 33.00 PDO Indicator2: Percentage of completed rural water supply schemes that follow GoM s demand responsive approach & exited implementation with a schedule performance index of between 0.75 & 1.25. (Percentage, Custom) Value 0.00 0.00 56.00 30.00 Improved Access to quality and sustainable services PDO Indicator 3:Number of people in peri-urban villages who are connected to a sustainable water supply system and receive a regular water service (Number, Custom) 5/21/2018 Page 5 of 10

Value 0.00 0.00 0.00 340,000.00 Date 31-Mar-2014 10-Mar-2017 07-May-2018 31-Mar-2020 PDO Indicator 4:Number of people in water-stressed and water quality-affected areas who have access to a safe drinking water source (Number, Custom) Value 0.00 0.00 0.00 471,000.00 Date 31-Mar-2014 10-Mar-2017 07-May-2018 31-Mar-2020 Intermediate Results Indicators by Results Areas 1.Strengthened Sector Planning and Monitoring Intermediate Results Indicator 1: Strengthened M&E system for the sector (Text, Custom) Value Piloting testing of the WSSD carries out a M&E system has review of Existing M&E system is Piloting testing of the completed and verified. implementation of the limited in scope and is not strengthened M&E GoM plans to adopt the strengthened M&E fully used consistently system is taking place in M&E system at once system and identifies across the state 4 districts across all the districts, required changes and which is expected from future needs June onwards. Date 31-Mar-2014 10-Mar-2017 07-May-2018 31-Mar-2020 Intermediate Results Indicator 2: Improved sector planning process for the sector (Text, Custom) Value Improved planning All 33 districts are framework is now tested using improved in two districts. It is Existing planning Improved planning planning framework proposed to adopt this processes lack strategic framework is now tested and are producing in at least the 12 orientation. in two districts. annual action plans program districts. MIT that are consistent with support is being sector strategic plan. extended for the same. 2. Improved Capacity for Program Implementation Intermediate Results Indicator 3:Strengthened capacity of key sector institutions (Percentage, Custom) 5/21/2018 Page 6 of 10

Value 0.00 80.00 76.80 75.00 Intermediate Results Indicator 4:Percentage of rural water supply schemes that follow GoM s demand responsive approach (Percentage, Custom) Value 0.00 100.00 100.00 40.00 Date 12-Mar-2014 10-Mar-2017 08-May-2018 31-Mar-2020 Intermediate Results Indicator 5:Percentage of GPs that are using sustainable O&M mechanisms (Percentage, Custom) Value 10.00 70.00 0.00 40.00 Intermediate Results Indicator 6: No. of Aquifer Water Management Initiatives successfully implemented (Number, Custom) Value 6.00 6.00 0.00 24.00 Intermediate Results Indicator 7: Percentage of Gram Panchayats that maintain Open Defecation Free status (Percentage, Custom) Value 10.00 54.00 67.00 40.00 3. Improved access to quality and sustainable access to Water and Sanitation services in peri-urban villages Intermediate Results Indicator 8:No. of house connections to a commissioned water supply system (Number, Custom) Value 0.00 0.00 0.00 68,095.00 Intermediate Results Indicator 9: No.of houses connections to a sustainable water supply system receiving a regular water service (Number, Custom) 5/21/2018 Page 7 of 10

Value 0.00 0.00 0.00 51,071.00 Intermediate Results Indicator 10:No. of houses connections to sustainable sullage collection and safe disposal system (Number, Custom) Value 0.00 0.00 0.00 51,071.00 4. Improved access to safe drinking water in water-stressed and water quality affected areas Intermediate Results Indicator 11:No. of Community Safe and Secure Water Supply Schemes completed and operational (Number, Custom) Value 0.00 0.00 0.00 580.00 Disbursement Linked Indicators DLI_IND_TABLE DLI DLI#1: Strengthened M&E system for the sector (Intermediate Outcome, 34,000,000.00, 44%) Value Baseline Actual (Previous) Actual (Current) March 31, 2020 Existing M&E system is limited in scope and is not fully used consistently across the state An attempt was made by the government to hire a consultant as System Integrator, for delivering outputs related to second year result -- developing the M&E system and pilot testing it. But the attempt could not attract good competition. Hence a second call was given with improvements in proposals, made in discussion with Bank team. Consultant is now expected to be on board by mid January 2016 M&E system including the three core modules as per the DLI (sector performance, contract management and financial management) has been developed and has been tested in 4 districts. Its adoption in 10 districts in Phase-1 is going on. WSSD carries out a review of implementation of the strengthened M&E system and identifies required changes and future needs The result delivery will be delayed by six months - up to Sept 2016 5/21/2018 Page 8 of 10

Date 12-Mar-2014 21-Dec-2015 07-May-2018 -- DLI DLI#2:Strengthened capacity of key sector institutions (percentage of sanctioned staff maintained, trained and equipped every year in key sector institutions as per the Annual Capacity Dev Plan) (Outcome, 36,000,000.00, 45%) Baseline Actual (Previous) Actual (Current) March 31, 2020 Value 0.00 82.00 76.80 75.00 Date 12-Mar-2014 21-Dec-2015 22-Dec-2017 -- Result based on the IVA report DLI DLI#3: No. of house connections to a commissioned water supply system (Output, 40,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) March 31, 2020 Value 0.00 -- 0.00 68095.00 Date 12-Mar-2014 21-Dec-2015 07-May-2018 -- In this DLI, house connections given through a peri-urban water supply schemes after its completion will be measured DLI DLI#4: No. of house connections to a sustainable water supply system receiving a regular water service (Outcome, 25,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) March 31, 2020 Value 0.00 -- 0.00 51071.00 Date 12-Mar-2014 21-Dec-2015 07-May-2018 -- The results of this DLI will be achieved once DLI-3 is achieved DLI DLI#5: No. of Community Safe and Secure Water Supply Systems (CSSWS) (Outcome, 30,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) March 31, 2020 Value 0.00 -- 0.00 0.00 Date 12-Mar-2014 21-Dec-2015 07-May-2018 -- 5/21/2018 Page 9 of 10

5/21/2018 Page 10 of 10